estonian engineer battalion capabilities overview 11.10.20141

14
Estonian Engineer Battalion capabilities overview 26.6.2022 1

Upload: pamela-sussex

Post on 01-Apr-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Estonian Engineer Battalion capabilities overview 11.10.20141

Estonian Engineer Battalion capabilities

overview

11.4.2023 1

Page 2: Estonian Engineer Battalion capabilities overview 11.10.20141

Organization

11.4.2023 2

2 31

HQ

Page 3: Estonian Engineer Battalion capabilities overview 11.10.20141

Battalion main capabilities

– Support INF BDE with mobility, countermobility, survivability and CBRN tasks in all operations.

11.4.2023 3

Page 4: Estonian Engineer Battalion capabilities overview 11.10.20141

HQ and CSS Coy

HQ PLT RECCE PLT CSS PLT MEDI PLT BRIDGE PLT

Page 5: Estonian Engineer Battalion capabilities overview 11.10.20141

HQ and CSS coy capabilities:

• Provide BN HQ operating conditions• Provide CSS for ENG Coy-s and CBRN Coy• Conduct ENG recce with two teams simultaneously

in BDE AOR.• Support BDE operations with two mobile bridge

systems.

Page 6: Estonian Engineer Battalion capabilities overview 11.10.20141

2 x Engineer Company

COM team 3 x ENG PLT HVY EQP PLT

Page 7: Estonian Engineer Battalion capabilities overview 11.10.20141

Engineer Coy capabilities:

11.4.2023 7

• Construct at least 3 obstacle groups in accordance with BDE battle plan in 24 hours. • Conduct demolition works including operative – tactical level objects, such as harbours, airfields, rail- and automobile road junctions.• Breach and clear minefields, UXO-s and objects prepared for demolitions.• Construct field bridges for small river crossings and gaps. (• Conduct road construction and repair assignments.• Support construction of Infantry, Field Artillery and Mortar positions.• Construct deception objects IAW BDE battle plan.

Page 8: Estonian Engineer Battalion capabilities overview 11.10.20141

Engineer Coy capabilities:

11.4.2023 8

Additional reserve tasks:• Counter mobility tasks in BDE AOR in readiness on O+30min with ENG PLT sized units.• Mobility tasks with 9 teams and 3 HWY EQP teams simultaneously in BDE AOR readiness on O+30min.• Counter landing operations in BDE AOR with ENG coy sized unit on O+30min.• INF defensive tasks to block up to BN sized OPFOR unit.

Page 9: Estonian Engineer Battalion capabilities overview 11.10.20141

CBRN Coy capabilities:

• Conduct CBRN tests and recce.• Decontamination tasks after exposure to CBN

attacks or ROTA incidents.• Water purification.

11.4.2023 9

Page 10: Estonian Engineer Battalion capabilities overview 11.10.20141
Page 11: Estonian Engineer Battalion capabilities overview 11.10.20141
Page 12: Estonian Engineer Battalion capabilities overview 11.10.20141

11.4.2023 12

Page 14: Estonian Engineer Battalion capabilities overview 11.10.20141