estimate_certificate.doc

Upload: karunamoorthip2209

Post on 14-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 Estimate_Certificate.doc

    1/5

    INDEX

    1 Checklist

    2 Specification report

    3 Abstract

    4 Average rate Analysis

    5 Detailed Estimate

    6 Abstract for data

    7 Quarry map

    8 Approved RMR

    9 Lead particulars for Bitumen and emulsion

    10 Bitumen and emulsion invoice

    11 Rate for graded metal

    12 Hire and Labour

    13 Data and rate analysis

    14Certificate for carted earth, lead, corporation,night work, second tack coat

    15 Certificate for work

    16 CBR test result17 BBD test result

    18 Traffic census

    19 Road chart

    20 Work history from RMS

    21 Typical Cross section & Longitudinal section

    22 Key map from GIS

    23 Neat sketch showing proposal

    24 Pavement design

    a) Design traffic calculation

    b) Design for widening

    c) Design for strengthening

    d) Design for rebuilding, curves, CC

    25 Copy of extract of GO

    CERTIFICATE FOR WORK

  • 7/27/2019 Estimate_Certificate.doc

    2/5

    1. This is to certify that the list of works proposed under CRIDP 2012-2013

    have not been taken up in the last five years under any Plan Schemes.

    2. The proposed stretches are not under defect liability period under any

    plan or non plan schemes.

    3. It is certified that the above works are not proposed to be taken up

    under any other scheme.

    4. No land acquisition is involved in this work.

    5. The proposals have been prepared adhering the appropriate circulars,

    government orders and guidelines issued.

    6. Certified that the field particulars furnished above are based on the site

    inspection and site has been inspected by the DE on

    7. Certified that the various provision made under all items are adequate

    and do not warrant any revision.

    8. Certified that the provisions made to cross drainage works, Protective

    works, Geometric improvements are sufficient and do no warrant any

    revision.

    Divisional Engineer (H) C&M Assistant Divisional Engineer (H)Assistant Engineer (H)Chennai City Roads Division C&M, Tambaram sub Division C&M,

    Tambaram SectionSaidapet, Chennai 15 Chennai 100

    Chennai -- 100

  • 7/27/2019 Estimate_Certificate.doc

    3/5

    CERTIFICATE FOR CBR SOIL

    1. Supply of carted earth having CBR value more than 10 including cost and

    conveyance of carted earth and all T&P charges and other labour charges,

    incidental charges etc., as directed by the department officers for filling

    sub grade portion, is available only at a lead of 4 Kms.

    2. Required quantity of 10 CBR soil is available at a lead of 4 Kms

    3. Certified that the cut earths available at this portion are not suitable

    4. Certified that the carted earth is not available at nearby location. So, it has

    to be conveyed from a distance of 4 Kms for sub grade filling and formation

    Divisional Engineer (H) C&M Assistant Divisional Engineer (H)Assistant Engineer (H)Chennai City Roads Division C&M, Tambaram sub Division C&M,

    Tambaram SectionSaidapet, Chennai 15 Chennai 100

    Chennai -- 100

  • 7/27/2019 Estimate_Certificate.doc

    4/5

    CERTIFICATE FOR QUARRY

    1. Certified that the leads adopted are shortest to the best of my knowledge

    and belief.

    2. Certified that the quarries adopted are having sufficient yield.

    3. Certified that the CMP is erected at Km 1 / 0 of Tambaram Thiruneermalai

    Road.

    4. Certified that the Rates adopted other than the Schedule of Rates are not

    exceeding to the Existing Local Market Rates.

    Divisional Engineer (H) C&M Assistant Divisional Engineer (H)Assistant Engineer (H)Chennai City Roads Division C&M, Tambaram sub Division C&M,

    Tambaram SectionSaidapet, Chennai 15 Chennai 100

    Chennai -- 100

  • 7/27/2019 Estimate_Certificate.doc

    5/5

    CERTIFICATE FOR SECOND TACK COAT

    This is to certify that

    1. The traffic is heavy and more than 13875 CVPD.

    2. There is no alternate road and diversion of traffic is not possible.

    3. Half way method of execution is not possible.

    4. Wearing course cannot be laid over binder before 48 hours.

    The condition laid in as per CE General (H), Chennai-5, Circular Memo No.

    13138 / Saalai-2 / 2002 / dated: 3.6.2002 are satisfied and hence second tack

    coat is absolutely necessary.

    Divisional Engineer (H) C&M Assistant Divisional Engineer (H)Assistant Engineer (H)Chennai City Roads Division C&M, Tambaram sub Division C&M,

    Tambaram SectionSaidapet, Chennai 15 Chennai 100

    Chennai -- 100