erosion theather site analysis
DESCRIPTION
theater design. clemson universityTRANSCRIPT
[CONNNECT]ivityKathryn HarrisRachel RandallVeronica Acosta
Site Views
CONFERENCE CENTER AND INN
line of importance
clemson house
tillman
stadium
little john
water tower
site
smoke stack
highest elevationsfeet above sea level
georgia
SOUTH CAROLINA
TO ATLANTA
TO CHARLOTTE
TO COLUMBIA
SAVANNAH RIVER
SENECA RIVER
_______ RIVER
CLEMSON,SC
LAKE
JOC
ASSE
ELA
KE K
EOWE
E//
LAKE
HAR
TWEL
L//
connectivityby water
georgia
SOUTH CAROLINA
TO ATLANTA
TO CHARLOTTE
TO COLUMBIA
SAVANNAH RIVER
SENECA RIVER
_______ RIVER
CLEMSON,SC
LAKE
JOC
ASSE
ELA
KE K
EOWE
E//
LAKE
HAR
TWEL
L//
connectivityby water
vehicular access
pedestrian path
service access
shuttle option
connectivityby land
1:350
SUN PATH
Spring and fall equinox
Winter
solst
ice
summer
solst
icesummer solstice
Winter solstice
summer wind
winter wind
high noon
Sunset
Sunrise
y
x
x
x
x
y
y
y
solar orientation
zoning research
-CANNOT build below 660 feet above sea level-Maintain schoreline vegetation -quality resource -sound management -preserve wetlands and habitat -prevents erosion
-Did you KNOW? -An acre of trees can: remove up to 13 tons of pollutants from the air give off enough oxygen for 18 people daily conserve up to 100 lbs. of topsoil during a 2-inch rainfall reduce cooling costs 25 % in 90-degree weather. reduce noise pollution by 50% provide homes for 400 species of wildlife and thousands of beneficial microorganisms
Ntree study+zoning
100’ building restriction
existing rowing facility @ 100’ from shoreline
proposed remaining trees- most desirable for landscape
brooks center2.73 mi.
off site shuttle.76 mi.
bowman field1.4 mi.
02min
12min
08min
$0.08
04min
21min
16min
$0.14
07min
45min
25min
$0.28
PROXIMITY MAPPING
public
transition
private
buffer
buffer
buffer
transitionpublicbuffer bufferprivatelake hartwell
PRELIMINARY SITE USE
site sectionn o r t h/s o u t h
660 ft.Lake Hartwell
highest point on site 720 ft.
tallest tree canopy 795 ft.
hwy93 -------site boundaries------
Every 100’
Section 1
Section 2
Section 3
Section 4
Section 5
Section 6
Section 8
Section 7
100’
EASTWEST SITE
Section 1
Section 2
Section 3
Section 4
Section 5
Section 6
Section 8
Section 7
created by u s e r s and n a t u r e
STABILIZE SCULPT
Stabilizeto maintain balance between the natural and the built.
100’ building restriction
existing rowing facility @ 100’ from shoreline
buffer
theatre
public
private
bufferLobby
back ofhouse
site stabilizationa c c e s s
lakehartwell
rive
r
highway93
site stabilizationF O O T P R I N T
lakehartwell
rive
r
highway93
site stabilizationt e r r a c i n g
640680720760
800840
full flood @660
N
site stabilizationC H A R A C T E R
Sculptto allow and embrace natural transforma-tion.
preliminary site use
100’ building restriction
existing rowing facility @ 100’ from shoreline
lobbyauditorium
buffer
buffer
buffer
back of house
public
private
views study
site sculptureF O O T P R I N T
HIGHWAY 93lake hartwell
site sculptureF O O T P R I N T
HIGHWAY 93lake hartwell
640680720760
800840
full flood @660
entrance @720
flyhouse pro-file @790tree canopy
site sculpturecharacter
created by u s e r s and n a t u r e
STABILIZE SCULPT
Erosion