    Meeting PurposePresent Project Design

  • 8/14/2019 Erie Boulevard

    3/37

    33

    Project Description

    Federally Funded TransportationProject

    Project Funding - $14 million Total 80% Federal 15% State

    5% City

  • 8/14/2019 Erie Boulevard

    4/37

    44

    Project LocationProject Location

    Reconstruction of Erie Boulevard from I-890 to Union Street

    Project Begins I 890

    Project EndsUnion Street

  • 8/14/2019 Erie Boulevard

    5/37

    55

    Why are we doing this

    and what needs to beimproved?

  • 8/14/2019 Erie Boulevard

    6/37

    66

    x s ng oa wayConditions

    NarrowPaintedMedianFour Travel Lanes

    Approximately 110 Feet

    DiagonalParking and

    Back-outSpace

    High Speeds

    Difficult Left Turns

    Difficult Pedestrian Crossings

    Random U-Turns

    Accidents

  • 8/14/2019 Erie Boulevard

    7/3777

    The existing condition is

    not an acceptabledesign solution.

  • 8/14/2019 Erie Boulevard

    8/3788

    The Image of Erie

    Boulevard

    Th i f

  • 8/14/2019 Erie Boulevard

    9/3799

    The image of aprogressive successful

    city?

  • 8/14/2019 Erie Boulevard

    10/371010

    Albany, NY

    Add photo

  • 8/14/2019 Erie Boulevard

    11/37

  • 8/14/2019 Erie Boulevard

    12/371212

    Oneonta, NY

  • 8/14/2019 Erie Boulevard

    13/371313

    Hudson, NY

  • 8/14/2019 Erie Boulevard

    14/371414

    State Street,

    Schenectady

  • 8/14/2019 Erie Boulevard

    15/371515

    State Street,

    Schenectady

  • 8/14/2019 Erie Boulevard

    16/371616

    State Street,

    Schenectady

  • 8/14/2019 Erie Boulevard

    17/371717

    State Street,

    Schenectady

  • 8/14/2019 Erie Boulevard

    18/371818

    Revitalization of

    Downtown Schenectady

    I-890

    State Street

    Lower State Street

    Erie Boulevard

  • 8/14/2019 Erie Boulevard

    19/371919

    Erie Boulevard Looking

    South

  • 8/14/2019 Erie Boulevard

    20/372020

    Lower State Street

    Looking West

  • 8/14/2019 Erie Boulevard

    21/372121

    Where are we in the

    design process?

  • 8/14/2019 Erie Boulevard

    22/372222

    Design Process

    Preliminary Design Phase 2006 to2009

    Public Information Meeting Nov. 29,2007

    Meet with individuals and

    organizationsEvaluation of alternatives 2008 to

    Present

    Final Design

  • 8/14/2019 Erie Boulevard

    23/37

  • 8/14/2019 Erie Boulevard

    24/37

    2424

    Key Issues from the

    Public InvolvementOn-street parking and strategicparking locations

    Service access to businessesTurnarounds and access to businessService road on east side

    Left turns at State StreetBike LanesRoundabouts are undesirable

  • 8/14/2019 Erie Boulevard

    25/37

    2525

    What is the basis of the

    design?

  • 8/14/2019 Erie Boulevard

    26/37

    2626

    Project Objectives1. Improve traffic operations2. Provide for safe and efficient vehicular

    travel3. Improve access and linkages

    4. Reduce vehicular speeds5. Improve pedestrian and bicycle access6. Maximize on-street parking

    7. Make consistent with downtownredevelopment plans

    Design Alternatives that

  • 8/14/2019 Erie Boulevard

    27/37

    2727

    Design Alternatives thatMeet the Project

    ObjectivesAlternative A Conventional

    Intersection at South Ferry Street

    and Service RoadAlternative B Roundabout

    Intersection at South Ferry Street

    and Service Road

  • 8/14/2019 Erie Boulevard

    28/37

    2828

    Preferred Design

    AlternativeAlternative A ConventionalIntersection at South Ferry Street

    and Service Road

  • 8/14/2019 Erie Boulevard

    29/37

    2929

    Key Elements of the

    Project DesignComparable on-street parking with

    buffer

    Wide conventional intersection with turnlanes

    Service Road for access to the rear ofbuildings

    Bike lanes

    Pedestrian improvements at LibertyStreet

    Off-Peak left turns onto State Street

  • 8/14/2019 Erie Boulevard

    30/37

    3030

    Proposed Project DesignI-890 to State Street

    Realigned conventional

    Intersection with signal

    Curbed Median with StreetTrees

    Service Road with Access to

    Intersection

    Turnaround at I890

    Parallel Parking - West Side

    Diagonal Parking East side

    Turnaround at Erie Street

    I-890

    State St.

  • 8/14/2019 Erie Boulevard

    31/37

    3131

    Proposed Project DesignI-890 to State Street

    Requires acquisition of

    book store

    One-way streetnorthbound

    Requires acquisition of old

    body shop

    Parallel Parking in front of

    Computer store Allows U-turns except for

    trucks

    Service access to Olenders

  • 8/14/2019 Erie Boulevard

    32/37

    3232

    Proposed Project DesignState Street to Union Street

    Realigned intersection for better

    traffic flow and shorter

    pedestrian crossings

    Entrances from sidewalk to new

    Train Station

    Extend sidewalk beneath RR

    bridge

    Preserve Union Street entrance

    to Stockade

    Left Turns during Non-

    Peak Hours

  • 8/14/2019 Erie Boulevard

    33/37

    3333

    Enhanced ConventionalIntersection

    Public SpaceTextured Pavement within

    Intersection

    CrosswalksPedestrian Refuge

  • 8/14/2019 Erie Boulevard

    34/37

    3434

    Typical On-Street Parking

    Bike Lanes on both sides

    Textured pavement buffer

    strip

    Parallel parking on west side

    Diagonal parking on east

    side

    Preserves all but 5 parking spaces

    Next Steps

  • 8/14/2019 Erie Boulevard

    35/37

    3535

    Next Steps

    Written comments may besubmitted until May 5, 2009

    to:

    Erie Boulevard Project

    Clough Harbour & AssociatesIII Winners Circle, P.O. Box 5269

    Albany, NY 12077-0269

  • 8/14/2019 Erie Boulevard

    36/37

  • 8/14/2019 Erie Boulevard

    37/37

    Proposed Project DesignState Street to Union Street