ercole cauti powered project manager smart … cauti – powered project manager smart energy expo...

14
Ercole Cauti Powered Project Manager SMART ENERGY EXPO Verona, 11/10/2013

Upload: hakhue

Post on 02-May-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

Ercole Cauti – Powered Project Manager

SMART ENERGY EXPO

Verona, 11/10/2013

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 2

Guide lines

• Method of construction and management of wind plants

Project Activities

• Joint approach

• Costruction of terrestiral and manrine anemometers

• Obtain data thriugh direct measurement

Initial idea

• Experimental project in the field of renewable energies

• Involve partners of different Countries

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 3

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 4

Definition of guide lines for the realization of wind park in the Adriatic Sea

Analysis and experimental evaluation of the topics

• Environmental

• Infrastructural

• Energetic

• Tecnological

Experimental and numerical evaluation of the wind Setting up of the first -rate weather station network

All project duration

General management

Monitoring and evluation

Financial Report

Simple and effective messages

Informarm and involve

State of the art

• Tecnological

• Normative

• Energetic policy

• Environmental policy

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 5

-

100.000,00

200.000,00

300.000,00

400.000,00

500.000,00

600.000,00

700.000,00

685.0

00

100.0

00

164.0

00

164.0

00

325.0

00

304.0

00

137.0

00

311.0

00

268.0

00

100.0

00

100.0

00

100.0

00

103.0

00

+ EQUIPMENT = € 1.592.000

1 2 3 4 5 6

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 6

WP 1

13,5%

WP 2

10,6%

WP 36,4%

WP 449,7%

WP 59,2%

WP 610,6%

WP 1 NATIONAL AND INTERNATIONAL PROJECT MANAGEMENT

WP 2 COMMUNICATION AND DISSEMINATION

WP 3 TECHNOLOGICAL, NORMATIVE, OF ENERGETIC AND ENVIRONMENTAL POLICY STATE OF THE ART

WP 4 NUMERICAL AND EXPERIMENTAL EVALUATION OF WIND ENERGY RESOURCES IN THE ADRIATIC BASIN

WP 5 ANALYSIS AND EXPERIMENTAL EVALUATION OF ENVIRONMENTAL, INFRASTRUCTURAL, ENERGETIC AND TECHNOLOGICAL ISSUES

WP 6 DEFINITION OF GUIDELINES OR THE REALIZATION OF OFF-SHORE WIND PARKS IN THE ADRIATIC SEA

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 7

2012

Analysis

2011

Starting activities

2013

Experimentation

2015

Utilization of resultats

2014

Ending activities

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 8

2014 2013

I sem. II sem.

2011 2010 2012

WP 6 – Guide lines

WP 4 – Numerical analysis and experimentation

WP 5 – Analysis and environmental evaluation

WP 2 – Communication and dissemination

WP 3 – State of the art

WP 1 – National and Transnational Project management

I sem. II sem. I sem. II sem. I sem. II sem.

CHECK CHECK

CHECK

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 9

• Zero emission 2010 - 2011

• Open days (Bruxelles 2011-2012-2013)

• Mister kilowatt (Radio 24)

• Microeolico Ravenna

• Mediterre Bari

• Pubblicazione

• Magazine Open Days

• Wind Energy

• Festival of the Energy (PG)

• RIO + 20 – world conference in Rio

De Janeiro (June 2012)

• Ancona “The offshore win energy development in the Adriatic Sea: the project POWERE as a planning policy”

• Ravenna “The potential of wind energy in the Adriatic Sea and the prospect of the green port” nest 28th June with Opening ceremony of the new small wind turbine on the North outer breakwater in Porto Corsini

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 10

• Cleaning the world 2013: Visit to small wind turbines of Powered Project, by bicycle from Ravenna to Porto Corsini - sett. 2013

• Open days 2013 – 100 Eurban Solutions at Committee of the Regions

• Smart Energy Expo – Oct. 2013

• Ecomondo Rimini – Nov. 2013

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 11

• Official tender

• Tender published in

• Abruzzo Region web site on 29th Sept.2011 (It version) and on 4th Oct 2011 (EN version)

• http://www.regione.abruzzo.it/portale/index.asp?modello=avvisoSing&servizio=le&stileDiv=sequence&template=default&tom=1899&b=avviso.

• http://www.powered-ipa.it/it/blog/2012/05/10/rinnovato-il-bando-per-cercare-sponsor-a-powered/ Always opened

• The sponsorship program for the activities of the project Powered provides for the establishment of four Short Lists (Lists) for the categories of services identified as follows:

• Construction of anemometer towers

• Provision of suitable site for placement of anemometers

• Provision of computing resources

• Equipment and services useful for experimentation

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 12

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 13

infrastrutture

tecnologie

Verona, 11/10/2013 - Smart Energy Expo Un approccio socio-ambientale alla pianificazione di parchi eolici off-shore 14

energia

ambiente

cond

ivisi

one

gover

nace

Thank you for

your attention

Ercole CAUTI

Project Manager

[email protected]

+39 335 8421600