Measurements in Estimating
PROFORMAS USED IN ESTIMATE
1. Measurement form
The details of measurements of each item of work are taken out and quantities of each and every item is computed in a prescribed form known as measurement form as under :-
Cont.
Item No. Description No. Length Breadth Height Quantity
Measurement Form:
2. Abstract of cost form
The cost under each item of the work is determined from the quantities and total cost is worked out in a prescribed form called abstract of cost form as shown on next slide
Cont.
Cont.
item no Description quantity unit of payment Rate Amount
Cost Form:
3. Material Statement form
When materials are issued direct to the work or purchased directly from the market, there cost are either charged direct to the work or debited to be suspense head “materials”
Cont.
in the account of work and when the cost is debited to the suspense head “Materials”, the account is called “Material at site account “ M.A.S. accountis maintained monthwise in form 35 as under
Name of Work …….
Cont.
total issues to the work principal items
unit
quantity
pettyitem
total
Dated initials ofsub-divisionalofficer
Dated initials divisional accountantas token of check
Units of measurement & Units of payment
The unit of different works depend
on their nature, size & shape.
In general,the units of different
item of work are based on
the principals mentioned further :-
Cont.
1. Mass,voluminous and thick works shall be taken in cubic unit or volume. the measurements of length, width and height or depth shall be taken to compute the volume or cubic contents
Cont.
2. Shallow,thin and surface works shall be taken in square unit or in area. the measurement of length and width or height shall be taken to compute the area.
3. Long and thin work is taken in running unit.
4. piece work, job work is taken in number.
UNITS OF MEASUREMENT & PAYMENTUNITS OF MEASUREMENT & PAYMENT
Earth Work
PARTICULARS OF ITEMS Measure Payment
•Earth filling under floors cu.m % cu.m
•Rock excavation cu.m %cu.m
•Puddle clay core cu.m %cu.m
PARTICULARS OF ITEMS Measure Payment
•Surface dressing and leveling,etc. Sq. m per sq. m
•cutting of trees no per no.
•Sand filling cu m per cu m
CONCRETE
PARTICULARS OF ITEMS measure payments
•Cement concrete 1:4:8 in
foundation cu m per cu m
•Plain cement concrete 1:2:4 cu m per cu m
•R.C.C chajja and sun shade cu m per cu m
PARTICULAR OF ITEMS measure payments
•Precast cement concrete cu m per cu m
• Cement concrete jali work sq. m per sq. m
• Cement concrete bed plates cu m per cu m
PARTICULARS OF ITEMS measure payment
• First class burnt bricks in mud
mortar in foundation and plinth cu m per cu m
• First class burnt bricks in mud
mortar in super structure cu m per cu m
BRICK WORK
PARTICULARS OF ITEMS measure payment
• First class B.B in cement mortar 1:5
in foundation and plinth cu m per cu m
• First class B.Bin cement mortar 1:5 in
superstructure cu m per cu m
First class B.B in cement mortar 1:6 in
foundation and plinth cu m per cu m
STONE WORK
PARTICULARS OF ITEMS measure payment
• Coursed rubble masonry in mud
mortar in foundation and plinth cu m per cu m
• Coursed rubble masonry in mud
mortar in super structure cu m per cu m
PARTICULARS OF ITEMS measure payment
•Coursed rubble masonry in lime
mortar 1:3 in foundation and plinth cu m per cu m
•Coursed rubble masonry in cement
mortar 1:7 in foundation and plinth cu m per cu m
•Coursed rubble masonry in cement
mortar 1:7 in super structure cu m per cu m
ROOFING
PARTICULARS OF ITEMS measure payment
• R.C.C slab roofing cu m per cu m
• R.B slab roofing cu m per cu m
• First class mud roofing sq m per sq m
•Second class mud roofing sq m per sq m
PARTICULARS OF ITEMS measure payment
•Third class mud roofing sq m per sq m
•Expension joint metre per m
• Allahabad tile roofing sq m per sq m
• Eave board sq m per sq m
FLOORING
PARTICULARS OF ITEMS measure payment
• Conglomerate floor 2.5 cm thick of
cement concrete 1:2:4 over 7.5 cm lime
concrete sq m per sq m
PARTICULARS OF ITEMS measure payment
•Flate brick flooring in cement over
10cm thick cement concrete 1:6 :18
over 10 cm thick sand filling sq m per sq m
•Brick on edge flooring over 10 cm
thick line concrete over 10 cm sand
filling sq m per sq m
PARTICULARS OF ITEMS measure payment
• Dry brick on edge flooring with
sand grouting over consolidating
earth sq m per sq m
• Toping of cement concrete 1:2:4 sq m per sq m
• Terrazo flooring over 10 cm thick cement concrete 1:2:4 over sand sq m per sq m
PARTICULARS OF ITEM measure payment
•Mud plaster 12.5 mm thick sq m per sq m
• Cement plaster 12.5 mm thick 1:4 sq m per sq m
• Cement plaster 12 mm thick 1:5 sq m per sq m
• Lime plaster 12.5 mm thick sq m per sq m
FINISHING
PARTICULARS OF ITEMS measure payment
• Gobri leeping sq m per sq m
• Cement pointing 1:2 (deep) sq m per sq m
• Cement pointing 1:2 (flush) sq m per sq m
• Cement pointing 1:3 (flush) sq m per sq m
PAINTING
PARTICULARS OF ITEMS measure payment
• Painting doors and windows (3 coat) sq m per sq m
• Painting doors and windows (2 coat) sq m per sq m
• Varnishing 2 coats sq m per sq m
• Solignum painting 2 coats sq m per sq m
PARTICULARS OF ITEMS measure payment
• Coal tarring (no. of coats specified sq. m per sq. m
• Removing of paint or varnish sq. m per sq. m
WOOD WORK
PARTICULARS OF ITEMS measure payment
•Deodar wood wrought framed in
beams and battened and fixed in
position sq m per sq m
•Doors, windows and almirah of
any type sq m per sq m
PARTICULARS OF ITEMS measure payment
• Sawing of timber sq m per sq m
• Ballies(dia. Specified) metre per m
• Deodar wood panelled and glazed
doors or windows complete and
fixed in position sq m per sq m
STEEL WORK
PARTICULARS OF ITEMS measure payment
•Expended metal (size specified) sq m per sq m
• Iron work in trusses quintal per quintal
•Threading in iron cm per cm
PARTICULARS OF ITEMS measure payment
Welding cm per cm
Rivets, bolts and nuts quintal per quintal
Boring holes in iron no. per no.
Barbed wire fencing metre per m
PARTICULARS OF ITEMS measure payment
•Ornamental cornice metre per m
•Jungle clearance sq m per sq m
•Silt clearance cu m per cu m
•Glazing sq m per sq m
MISCELLANEOUS
PARTICULAR OF ITEMS measure payment
•Glazed panes (supply) sq m per sq m
•Renewing glass panes no. Per no.
•Fixing of glass panes no. Per no.
MATERIALS
PARTICULARS OF ITEMS measure payment
• Supply of bricks 1000 no. Per 1000 no.
• Supply of cement bag per bag
• Supply of sand cu m per cu m
PARTICULARS OF ITEMS measure payment
• Supply of surkhi cu m per cu m
• Supply of brick ballast cu m per cu m
• Supply of steel quintal per quintal
• Supply of bitumen tonne per tonne
ELECTRICAL INSTALLATION
PARTICULARS OF ITEMS measure payment
• Wiring in the building for all types
of electric filling such as bulb, plug,
fan, point, power plug , etc. each each
PARTICULARS OF ITEMS measure payment
• Supply of installated electric wire metre per m
• Supply of bare electric wire quintal quintal
PUBLIC HEALTH ENGG.
PARTICULAR OF ITEMS measure payment
•Supply of water closet no. per no.
•Supply of intercepting trap no. per no.
•Supply of wash hand basin no. per no.
PARTICULARS OF ITEMS measure payment
• Supply of bib cock no. Per no.
• Supply of stop cock no. Per no.
• Supply of water metre no. Per no.
• Supply of C.I pipes metre per m
ROADS
PARTICULARS OF ITEMS measure payment
•Preparation of sub grade for soling
coat sq m % sq m
• Collection of bricks of soling coat
including stacking and consolidating
2.5 cm thick layers of clay cu m per cu m
PARTICULARS OF ITEMS measure payment
•Brick on end edging on both sides
with bricks and labour complete rm rm
•Collection of bajri screened and
stacked cu m cu m