MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 1 of 15
DATED
2015-12-16 REV
1
Table of Contents
1.0 PURPOSE....................................................................................................................................................................... 2
2.0 SCOPE ........................................................................................................................................................................... 2
2.1. EXCEPTIONS ................................................................................................................................................................ 2
3.0 REFERENCES .................................................................................................................................................................. 2
4.0 DEFINITIONS ................................................................................................................................................................. 2
5.0 PROCEDURES ................................................................................................................................................................ 2
5.1. PERSONNEL ..................................................................................................................................................................... 2 5.2. SAMPLE CUTTING.............................................................................................................................................................. 3 5.3. DOCUMENTATION ............................................................................................................................................................ 3 5.4. SAMPLE CHAIN OF CUSTODY................................................................................................................................................ 4 5.5. RECEIPT OF TEST RESULTS ................................................................................................................................................... 4 5.6. RECORDING AND STORAGE OF TEST RESULTS .......................................................................................................................... 5 5.7. PROCUREMENT AND PAYMENT OF TEST SERVICES .................................................................................................................... 5
6.0 APPENDICES .................................................................................................................................................................. 6
Appendix A: Recap Instructions ........................................................................................................................................................... 7 Appendix B: Shipping Labels .............................................................................................................................................................. 13 Appendix C: Warehouse Shipping Form ............................................................................................................................................ 14 Appendix D: Revision Notes and Approvals ....................................................................................................................................... 15
Training Code (If applicable): SSF0098.4
Document Owner: Name: Al Guse, P. Eng. Position: Principal Engineer – Mine Hoisting
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 2 of 15
DATED
2015-12-16 REV
1
1.0 PURPOSE
This procedure describes the mandatory methodology for cutting, preparing, packaging, delivery and documentation for destructive test samples of mine hoist ropes.
2.0 SCOPE
This procedure is applicable to all mines required by regulation to submit samples of mine hoist ropes for destructive tests. This applies to all drum type hoists.
2.1. EXCEPTIONS
In-service destructive tests of Koepe hoist ropes are not required by regulation and are therefore and exception from this procedure.
3.0 REFERENCES
The following references were used in the development of this document or are related to it. They shall be used in their most recent revision.
CSA G4-09 – Steel wire rope for general purpose and for mine hoisting and mine haulage
O. Reg 854 – Occupational Health and Safety Regulation for Mines and Mining Plants
4.0 DEFINITIONS
MOL-MTL: Ministry of Labour – Materials Testing Laboratory
5.0 PROCEDURES
5.1. PERSONNEL
A person shall be designated at each mine site responsible to ensure this procedure and
processes are followed for all mine hoist rope destructive test samples. In most cases this is the
fixed plant maintenance planner. The designated person also manages the Rope Record Book.
Training required is Rope Record Book Training SSF098.4.
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 3 of 15
DATED
2015-12-16 REV
1
5.2. SAMPLE CUTTING
Sample cutting, clamping and handling as per “Recap Instructions”, see Appendix A.
a. Keep sample as straight as possible.
b. Put all clamps on rope prior to cutting.
c. Electric punch-lock tool may be used.
d. Recommended to use a pre-marked 8’ long stick as a template for locating the clamps.
e. Abrasive disc cutting only.
f. Place the metal tag with rope reel # in the middle of the 8’ sample.
5.3. DOCUMENTATION
Shipping labels and warehouse shipping form shall be used, see Appendix B, C. Labels and
forms to be pre-printed and plastic laminated prior to the rope cutting job.
a. Two shipping labels:
1 copy on shipping tube,
1 copy on rope.
b. Three warehouse shipping forms:
1 copy goes to the lab, signed by delivery person and the lab attendant and is left
with the lab,
1 copy goes to the lab, signed by delivery person and the lab attendant and comes
back to the mine to be handed back to the Contact Person and is kept in the rope
file
1 copy is kept at the mine, overwritten “sample copy”. Brought back to Contact
Person after sample has been packaged and put on the delivery truck.
c. Provide a metal tag, stamped with the rope reel number, wired to the middle of the 8’
sample. This tag will remain on the sample from the time it is cut until it is destructively
tested at the MOL-MTL.
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 4 of 15
DATED
2015-12-16 REV
1
5.4. SAMPLE CHAIN OF CUSTODY
Procedures for chain-of-custody handling of the sample from the collar floor to MOL-MTL:
a. Shipping label and metal tag attached to sample as it is cut and banded and placed into
the labeled shipping tube. Make sure the labels match the metal reel # tag. This is to be
done at collar as the rope sample is cut.
b. Sample goes directly from collar to designated area, and then delivered to MOL-MTL as
soon as possible by the Contact Person or designate. Lab will receive samples weekdays
between 7:30am and 4:00pm weekdays. If sample cannot be delivered within the
available hours, wait for the next available day.
c. Delivery person and MOL-MTL technician both verify sample has been properly labeled
and received; both persons sign the two copies of the warehouse form. If for some
reason this process can’t be completed, the delivery person is to go back to the mine with
the sample and return with the sample on the next available day.
5.5. RECEIPT OF TEST RESULTS
a. Test report is emailed by MOL-MTL to Contact Person and to Hoisting Group
b. For any test results that are at “removal” stage, MOL-MTL will inform the Contact
Person by telephone.
c. Contact Person and Hoisting Group verify test report information:
Rope reel #
Initial test #
Shaft, compartment
Rope diameter, wire diameters
Proper initial test data used for comparison
Review results for any anomalies:
Removals
Cautionaries
Any significant change from previous test results
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 5 of 15
DATED
2015-12-16 REV
1
5.6. RECORDING AND STORAGE OF TEST RESULTS
a. Mine Contact Person records test data in the Rope Record Book.
b. Hoisting Group keeps all test reports on a network folder accessible on Mines
Hoisting webpage.
c. Contact Person keeps the documentation as:
Hard copy in binder of current rope documentation
Electronic copy in equipment folder on network
5.7. PROCUREMENT AND PAYMENT OF TEST SERVICES
a. A Purchase Order (PO) is created by each mine for several months’ worth of testing.
b. PO number is noted on the sample label and shipping form.
c. MOL-MTL will not test rope unless there is a PO number provided.
d. MOL-MTL emails their “ARIR” form with the test report, this is the “pro-forma invoice”
that verifies to the Releaser that the work has been completed.
e. Contact Person forwards email with ARIR form to Releaser.
f. Releaser creates and emails SES# to MOL-MTL (cc to contact person) so that MOL-
MTL can include this information on the invoice to expedite payment.
g. MOL-MTL sends invoice to government Payment Processing Centre (PPC). PPC
mails invoice to Vale Shared Services Organization (SSO). SSO processes the
invoice using the SES# provided.
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 6 of 15
DATED
2015-12-16 REV
1
6.0 APPENDICES
APPENDIX A: Recap Instructions APPENDIX B: Shipping Labels APPENDIX C: Warehouse Shipping Form APPENDIX D: Revision Notes and Approvals .
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 7 of 15
DATED
2015-12-16 REV
1
Appendix A: Recap Instructions
SAMPLE CUTTING AND CLAMPING INSTRUCTIONS
(refer to CSA Standard G4-09) 1. KEEP SAMPLE STRAIGHT AT ALL TIMES
2. INSTALL ALL CLAMPS BEFORE CUTTING ROPE
3. CUT ROPE WITH ABRASIVE CUT-OFF DISC ONLY
4. SECURELY TAPE LAIMINATED SHIPPING LABEL AND METAL ROPE REEL #TAG ON SAMPLE IMMEDIATELY AFTER CUTTIN GAN DCLAMPING
PACKING AND SHIPPING INSTRUCTIONS
1. PACKAGE SAMPLE IN AN ABS TUBE, SECURELY TAPE 2ND LAMINATED LABEL ON
TUBE
2. 3 COPIES OF WAREHOUSE SHIPPING REPORT (Form #145) MUST BE FILLED OUT. ALL HIGHLIGHTED INFORMATION MUST BE FILLED OUT.
3. PERSON RESPONSIBLE FOR PACKAGING THE SAMPLE RETURNS ONE COPY OF SHIPPING REPORT TO MINE CONTACT PERSON AFTER SAMPLE HAS BEEN LOADED ONTO TRUCK.
4. DELIVERY PERSON TO ACCOMPANY THE SAMPLE TO THE LAB.
5. TRANSPORT SAMPLE TO MINISTRY OF LABOUR MATERIALS TESTING LAB AS SOON AS POSSIBLE (DURING NORMAL LAB HOURS 7:30am – 4:00pm weekdays).
6. DELIVERY PERSON AND LAB TECHNICIAN SIGN BOTH COPIES OF WAREHOUSE SHIPPING FORM
a. ONE COPY KEPT BY LAB TECHNICIAN.
b. ONE COPY RETURNED BY DELIVERY PERSON TO MINE CONTACT PERSON.
7. IF SAMPLE CANNOT BE RECEIVED PROPERLY BY LAB TECHNICIAN, DELIVERY PERSON TO RETURN SAMPLE TO MINE AND NOTIFY CONTACT PERSON.
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 8 of 15
DATED
2015-12-16 REV
1
SAMPLE CLAMPING
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 9 of 15
DATED
2015-12-16 REV
1
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 10 of 15
DATED
2015-12-16 REV
1
HOIST ROPE RECAP SAMPLE IDENTIFICATION
IF 8’ IS CUT OFF
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 11 of 15
DATED
2015-12-16 REV
1
HOIST ROPE RECAP SAMPLE IDENTIFICATION IF MORE THAN 8’ IS CUT OFF
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 12 of 15
DATED
2015-12-16 REV
1
ROPE SAMPLE INFORMATION
1. The eight foot sample should be properly seized, tagged and transported preferably in a plastic tub of appropriate size. (Refer CSA G4-09 Section 15.3.1 for sampling procedures for new ropes at manufacturer’s plant and 15.3.2 for sampling procedure at mine site.)
2. The sample should be submitted to:
ONTARIO MINISTRY OF LABOUR MATERIAL TESTING LABORATORY BUILDING “C” 933 RAMSEY LAKE ROAD SUDBURY, ONTARIO P3E 6B5
3. The following information should be provided on the package slip (PLEASE PRINT). It may also be very useful to provide the information both on the rope inside the tube and on the outside of the tube, since information can be lost or damaged during shipping.
• COMPANY NAME: • MINE: • SHAFT NUMBER: • ROPE NUMBER: • COMPT.NUMBER: • CONTACT PERSON AND PHONE #: • CONTACT PERSON EMAIL: • COMPLETE MAILING ADDRESS: • FAX #: • PURCHASE ORDER #:
• ORIGINAL TEST:
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 13 of 15
DATED
2015-12-16 REV
1
Appendix B: Shipping Labels
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 14 of 15
DATED
2015-12-16 REV
1
Appendix C: Warehouse Shipping Form
MAINTENANCE STANDARD PROCECURE ONTARIO OPERATIONS
TITLES:
EQUIPMENT HOISTING HOIST ROPE DESTRUCTIVE TEST SAMPLE PROCEDURE
VALE
MPROC-80003
PAGE
Page 15 of 15
DATED
2015-12-16 REV
1
Appendix D: Revision Notes and Approvals
The Revision Notes and Approvals table only displays the latest revision number and a list of the last revisions made to the document. For details on previous revisions contact the document owner.
Rev Revision Notes
Last Revised by: Al Guse, P. Eng., Principal Engineer – Mine Hoisting, Ontario Operations