© LANCO Group, All Rights Reserved POWER EPC INFRASTRUCTURE SOLAR NATURAL RESOURCES Investor Presentation Dec 2016

Upload: others

Post on 27-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

POWER EPC  INFRASTRUCTURE SOLAR  NATURAL RESOURCES 

Investor Presentation Dec 2016 

 

Page 2: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Agenda 

1  Company Overview 

2  Financials 

3  Industry Overview 

4  Business Ver=cals 

5  Corporate Social Responsibility & Rewards / Recogni=on 

P|2 

Page 3: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Mission, Vision and Values  

Mission: Development of Society through Leadership, Entrepreneurship, Ownership

 

Vision: Most Admired Integrated Infrastructure Enterprise

Values: Integrity

Humility & Respect

Achievement Drive Accountability

Continuous Learning

Teamwork Organization before Self

Positive Attitude P|3 

Page 4: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

India’s largest Integrated Power Developer 

Infrastructure Property Development 

Subsidiaries / Affiliates 

Lanco Power  Natural Resources Solar 

Lanco Infratech Limited (LITL) (EPC & Construc=on) 

•  All businesses of the group are under LITL, the listed Holdco of the group, with Promoters’ Holding ~ 71% •  Adj. Net Worth (including Minority)  ~ US $ 204 Mn as against a peak of US $ 1.25 Bn as on 31.03.2012 •  Power  projects  of  8,101  MW  in  12  states  of  India  (3,465  MW  under  opera[on  &  4,636  MW  under construc[on) 

Thermal  Hydro  Roads Lanco Hills EPC 

Genera=on 

Manufacturing 

All Coal and Gas based SPVs 

All Hydro based SPVs 

Assumed US$ / INR = 60 

•  Devihalli •  Hoskote 

•  Griffin •  Tasra 

Coal 

P|4 

Page 5: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Pan India Presence 

Chitradurga (3MW) 

Tanjore power (120 MW) 

Amarkantak – I  & II( 600 MW) Amarkantak – III & IV (1320 MW) 

Kondapalli (1476 MW) 

Teesta(500 MW) 

Mandakini(76 MW) 

Anpara(1200 MW) 

Babandh ( 1320 MW) 

Lanco Hills 

Plants under construc[on 

Plants under opera[on 

Plants under construc[on 

Plants under opera[on 

Plants under construc[on 

Plants under opera[on 

Property development 

Road development 

LHPL (10 MW) 

LTPL(10 MW) 

81 km Bangalore – Hoskote  – Mudbagal 82 km Neelamangla – Devihalli 

Coal Based 

Hydro 

Gas 

Wind 

Registered office 

Corporate Office 

Hyderabad 

Gurgaon 

Coal mine 

Vidarbha (1320 MW) 

Plants under opera[on 

Solar 

Solar Power Plants 

Manufacturing at Rajnandgaon‐ Chhacsgarh Gujarat Solar (35 MW) 

Rajasthan Solar(11 MW) 

Tasra mine 

P|5 

Page 6: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Experienced Management Team 

L Madhusudhan Rao Execu[ve Chairman 

 G Bhaskara Rao Execu&ve Vice Chairman 

L Sridhar Vice Chairman 

G Venkatesh Babu Managing Director 

Key Execu=ves 

Finance  Power 

Lanco Group Senior Management Team 

    T Adi Babu     T N Subramanian 

    Sumeet Kumar 

    Sanjay Varghese 

   P Panduranga Rao    K Raja Gopal 

Resources, EPC & Solar 

  Rajkumar Roy 

P|6 

Page 7: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Agenda 

1  Company Overview 

2  Financials 

3  Industry Overview 

4  Business Ver=cals 

5  Corporate Social Responsibility & Rewards / Recogni=on 

P|7 

Page 8: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

 60    58   89  

 157   114  

 ‐178  

 ‐381   ‐344  

 1  

 ‐232  

 77    72  

 154   203  

 230  

 39  

 ‐124   ‐84  

 73  

 ‐94  

‐500 

‐400 

‐300 

‐200 

‐100 

100 

200 

300 

FY08  FY09  FY10  FY11  FY12  FY13  FY14  FY15  FY16  9M Dec'16 

Adj PAT ‐ Reported PAT+ Profit Eliminated 

Cash Profit ‐ PAT + Deprecia[on + Forex Loss / (Gain) + Profit Eliminated 

Financials – P&L 

Note: 1.  Assumed US$ / INR =60 2.  Mn indicate million 

* Revenue : Before intersegment revenue elimina[on 

US$ Mn 

* *  FY 16 Revenue does not include UPCL 

Revenue & EBIDTA 

Adjusted PAT & Cash Profit 

P|8 

552 

1,021 

1,598 

1,884 

2,566  2,549 

1,813 1,614  1,667 

1,026 

25% 16% 

19% 

23% 

17%  18%  17% 20% 

30% 

21% 

 ‐    

 500  

 1,000  

 1,500  

 2,000  

 2,500  

 3,000  

FY08  FY09  FY10  FY11  FY12  FY13  FY14  FY15  FY16  9M Dec'16 15% 

18% 

21% 

24% 

27% 

30% 

33% 

Revenue  EBIDTA % 

Page 9: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

 145  

 190  

 366  

 277    268  

 109    101  

 144   125    123  

 ‐    

 50  

 100  

 150  

 200  

 250  

 300  

 350  

 400  

FY08  FY09  FY10  FY11  FY12  FY13  FY14  FY15  FY16  9M Dec'16 

 726    1,065    1,348  

 2,935  

 5,901   6,470    6,813  

 7,202   7,762  

 8,316  

 ‐    

 1,000  

 2,000  

 3,000  

 4,000  

 5,000  

 6,000  

 7,000  

 8,000  

 9,000  

FY08  FY09  FY10  FY11  FY12  FY13  FY14  FY15  FY16  9M Dec'16 

Financials – Balance Sheet 

* Fixed Assets : Gross Block + CWIP 

Note: 1.  Assumed US$ / INR = 60 

US$ Mn 

Fixed Assets 

Cash & Cash Equivalent 

P|9 

Page 10: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Agenda 

1  Company Overview 

2  Financials 

3  Industry Overview 

4  Business Ver=cals 

5  Corporate Social Responsibility & Rewards / Recogni=on 

P|10 

Page 11: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

1010 

4074 

1000 

2000 

3000 

4000 

5000 

India  China 

Strong Infrastructure Push to drive GDP Growth XII Plan (FY13‐FY17) spending on Infrastructure – US $ 939 Bn 

(of which Construc=on Opportunity ~ US $ 445 Bn) 

Source:  World Bank Data & CEA 

Per capita consump=on of electricity (2015) 

Installed Power Capacity Growth (GW) – Excluding Renewables 

Source: CEA (*Till Oct 2016) 

Among BRIC countries, India’s per capita consump=on of electricity is the lowest.  China’s per capita consump=on of power is 4.92x of India. 

In  order  to  achieve  8%  growth,  India  should anain at least 7% growth in power sector.  

USD / INR = Rs. 60 

303 

161  157 

87 

20 

84 42  33 

14  24  9 0 

50 

100 

150 

200 

250 

300 

350 

Spending in 12th Plan 

EPC Opportunity 

Source:  Planning Commission , EY – EPC  ‐ Making India Brick by Brick   

P|11 

121  124  132 143  148 

159 174 

200 

223 243 

268 

298  307 

100 

150 

200 

250 

300 

350 

FY 05  FY 06  FY 07  FY 08  FY 09  FY 10  FY 11  FY 12  FY 13  FY 14  FY 15  FY 16 FY 17* 

Page 12: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Coal Gas Diesel Total

State 64                 7                    0                  72                 ‐              29                   2                    103                   33%Private 72                 11                  0                  83                 ‐              3                     48                  135                   43%Central 52                 7                    ‐              59                 6                  12                   0                    77                     24%Total 188               25                  1                  215               6                  44                   50                  315                   100%% age 60% 8% 0% 68% 2% 14% 16% 100%

Ownership Grand Total % ageThermal

Nuclear Hydro  RES   (MNRE)

As on 31 Jan 2017 

Source: CEA & www.ibef.org 

Installed Capacity (GW) 

  Contribu[on of Private Coal based IPPs in last 5 years is more than 45% (56 GW / 124 GW) 

  2015‐16 Indian per‐capita Consump[on is 1075 kWh against World average of 3026 kWh  

  GDP growth projected to be in the range of 8% for next 5 years 

  Addi[onal Energy demand drivers: Make in India, 100% Village Electrifica[on (> 9000 to be electrified Villages), 24x7 Power Supply by 2019, 100 Smart Ci[es, etc.,  

Sector Over View: Power 

P|12 

79  87  42  38  24 

14 12 

6  7 5 

50 

100 

10 

15 

FY 12 FY 13 FY 14 FY 15 FY 16  Energy Defi

cit (BU

Peak Deffi

cit (GW

Peak and Energy Deficit 

Energy Deficit  Peak Deficit 

631 672 

717 734 

779 819 

884 914 

957 1010 

1075 

FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 

Per Capita Consump=on Growth (Units) 

Per capita consump=on of electricity ~ growing at brisk pace 

Page 13: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Natural Resources (Coal)  

  Coal will con[nue to have a dominant share in India’s energy mix 

  Per Capita electricity consump[on grew at CAGR of 10% between FY‐06 & FY‐16 

  Imports of coal are expected to almost triple between 2011‐12 and 2021‐22 

  Domes[c coal Produc[on Target of 1 bn Tonne by 2020 against 597 MT in 2015‐16 

  Demand from power sector is expected to form 75% of the total coal demand of 980 million tons projected in 2016‐17 

Percentage Share of each fuel in India’s commercial energy produc=on 

Securing coal: a need; an opportunity 

Source: Open Government Data (OGD) Plaqorm India P|13 

66% 71%  69%  68%  67% 

16% 13% 

12% 9% 

7% 

12%  11% 13% 

15% 16% 

3%  4% 3% 

3% 3% 

2%  2% 2% 

4% 5% 

0%  0%  2%  2%  3% 

60% 

65% 

70% 

75% 

80% 

85% 

90% 

95% 

100% 

2000‐01 (Actual)  2006‐07 (Actual)  2011‐12 (Actual)  2016‐17 (Provisional)  2021‐22 (Projected) 

Coal & Lignite  Crude Oil  Natural Gas  Hydro Power  Nuclear Power  Renewable Energy 

Page 14: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Solar Scenario Indian

 Perspec=v

Source: MNRE 

  JNNSM was launched in January 2010. The target is to add 100 GW solar capacity by 2022. It is split between  60  GW  of  u[lity  scale  projects  and  40 GW of roosop projects. 

  JNNSM target revised to 100GW by 2020 

  India’s  current  solar  power  installed  capacity  is 8875 MW (0.7% of the es[mated poten[al) 

 Solar radia[on is high 4.5‐5.5 kWh/m2  in   most of the regions (>300 days of Sunshine) 

Glob

al Scena

rio (G

W) 

Huge untapped Renewable Energy poten=al is available in India 

•  India has Solar Power Poten=al of : 750 GW 

•  State wise break up is : 

(i)  Rajasthan  –  142 (ii)  Jammu & Kashmir  –  110 (iii)  Madhya Pradesh  –  60 (iv)  Maharashtra  –  60 (v)  Gujarat  –  36 (vi)  Others  –  340 

P|14 

 40    75    104    138   179  

 229   306  

 389   480  

 584  

 704  

2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020 

Global Solar Market [ll 2020 

 5    17  

 32  

 48  

 65  

 83  

 100  

 ‐     10   20   30   40   50   60   70   80   90   100   110   120  

2016  2017  2018  2019  2020  2021  2022 

Solar India Prospects [ll 2022 

Source: MNRE 

Page 15: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Agenda 

1  Company Overview 

2  Financials 

3  Industry Overview 

4  Business Ver=cals 

5  Corporate Social Responsibility & Rewards / Recogni=on 

P|15 

Page 16: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Lanco Power Business ‐ Project Status Update 

Plant Fuel Capacity (MW) Ooake Anpara Coal 1,200 PPA Kondapalli I Gas 368 PPA Kondapalli II Gas 366 Short Term Kondapalli III  Gas  742  Short Term Amarkantak I Coal 300 PPA Amarkantak II Coal 300 PPA Tanjore Gas 120 PPA Other Renewable Wind, Solar, Hydro 69 PPA Total 3,465

Power Projects under Opera=on 

Plant Fuel Financial closure  Capacity (MW)

Es=mated comple=on

Lanco Mandakini  Hydro Y 76 FY 17

Teesta Hydro Y 500 FY 18

Amarkantak III & IV Coal Y 1,320 FY 17

Vidarbha Coal Y 1,320 FY 19

Babandh Coal  Y 1,320 FY 18

Solar Solar Y 100 FY 17 

Total 4,636

Power Projects under Construc=on 

46% 52% 

2% Fuel Diversification

Gas  Coal  Renewables including Hydro 

P|16 

Page 17: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Presence Across Value Chain De‐risking the Power Business 

Fuel (Coal mining)  In House EPC   Genera=on and O&M  Trading 

•  Griffin coal, Collie  region in  Western  Australia, currently  produces  3 MTPA  with  resources  of 1.04 bn 

•  Selected as MDO by SAIL for Tasra Open Cast mine with  geological  reserves of approximately 250 mn tons  i n  Jha rkhand . Includes development of a cap[ve power plant as well. 

•  Completed  projects  with capacity of 4,610 MW  

•  4,636  MW  projects  under construc[on 

•  S t r o n g  e n g i n e e r i n g capability  

•  O v e r   1 0   y e a r s   o f  experience  in  design  and development  of  Power Projects 

•  Handles  global  suppliers selec[on  and  sourcing  of diverse materials  like high‐p r e s s u r e  f a b r i c a t e d e q u i p m e n t ,   s k i d s , i n s t r u m e n t a [ o n   & electrical systems 

•  Opera[ng  capac i ty  o f  3,465MW 

•  4,636  MW  projects  under construc[on. 

•  One  of  largest  private sector  players  in  Indian power trading market 

Transmission and Distribu=on 

•  S t r a t e g y  i n c l u d e s possible  expansion    into t r a n s m i s s i o n  a n d distribu[on 

Integrated presence across value chain capturing value addi=on across the businesses 

Type   MW 

Thermal & Gas  3,396 

Renewable (Hydro, Solar, Wind) 

69 

TOTAL  3.465 

P|17 

Page 18: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

 2,170   1,719  

 4,286  

 5,021    5,117  

 4,383    4,363   4,677    4,513  

 4,298  

 ‐    

 1,000  

 2,000  

 3,000  

 4,000  

 5,000  

 6,000  

FY08  FY09  FY10  FY11  FY12  FY13  FY14  FY15  FY16  9M Dec'16 

EPC Business: Strong Exper=se in the Power Sector Order Book (USD Mn) 

 Major Power Plant EPC orders executed  External Power Plant EPC orders under execu=on  

Kondapalli    1,476 MW Udupi    1,200 MW Anpara     1,200 MW Amarkantak (I & II)     600 MW Budhil         70 MW Mahagenco (Solar)       75 MW 

EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercri[cal Ennore Thermal Power Project (1*660MW) EPC of 100 MW Solar PV Power Plant in Madhya Pradesh 

Also execu[ng a wide range of projects across other infrastructure sectors like Highways, Airports, Transmission and Distribu[on, Water Infrastructure and Heavy Civil Structures.  

P|18 

Page 19: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Integrated Manufacturing  EPC  Domes=c Project 

Development Opera=ons & Maintenance 

Product & Services Group 

(PSG) 

 Opera=onal module line with 175 MW capacity 

 Secng up 1,800 MT polysilicion facility and 100 MW wafer facility 

 600 MW Solar Cell line is under planning 

 Turnkey EPC: Capabili[es to execute PV and Solar Thermal projects 

 Executed total projects of 245 MW capacity, another 155 MW is under construc=on 

 One of the largest solar farm development porqolio in India  

 Opera=onal porpolio of 46 MW PV assets and 100 MW of solar thermal under construc=on 

 Provides own and third party O&M services  

 Currently providing services to projects totaling 245 MW 

 Offers services in the decentralized solar PV retail segment 

 59 projects completed with total capacity of ~10 MW 

Solar Business – Presence across the Value Chain 

P|19 

Page 20: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Natural Resources (Coal)  

Tasra Open Cast Project (SAIL) 

•  Selected as Mine Developer and Operator (MDO) by Steel Authority of India (SAIL) for Tasra Open Cast Project and development of associated cap[ve power project. 

•  Located  in  Jharia  coalfield  of  Dhanbad  (Jharkhand)  having  geological  reserves  of  approximately  250 million tons  

•  Secng  up  of  coal  washery  and  opera[on  of  power  plant  of    200‐300  MW  capacity  based  on  the secondary products arising from the proposed Tasra Washery.   

Griffin Coal 

Largest opera[onal thermal coal mines in Western Australia, with Resource base of 1.2 bn Tonne Strategic loca[on – Bunbury port <100 km from mine 

Good connec[vity of rail and port.  

Current produc=on :‐ capacity of 4 mtpa of coal.  

Expansion : Plans to ramp up produc[on  to a max of 15 MTPA by FY 18 

P|20 

Page 21: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Infrastructure Business – Leveraging Construc=on Exper=se to Build Infrastructure 

Lanco has moved into selec=ve infrastructure projects to leverage its EPC experience 

Awarded two Na=onal highway projects in Karnataka 

i. 81 km stretch connec[ng Bangalore – Hoskote – Mudbagal 

ii. 82 km stretch connec[ng Neelamangla – Devihalli  

Concession periods of 20 years and 25 years respec[vely during which toll will be collected 

Capex of USD $ 308 mn  

Grant from NHAI USD $ 60 mn 

COD of Devihalli anained on June 25th 2012 and toll collec[on started 

COD of Hoskote anained on December 20th 2013 and toll collec[on started  

P|21 

Page 22: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Property Development Business Lanco Hills is the group’s foray into property development, located in Hyderabad, spread over 100 acres and comprises residen=al space, office space and IT SEZ 

Lanco Hills 

Residen=al •  Consists of High Rise Apartments and Condominiums  •  In addi[on to high rise towers, 56 Villas are also under construc[on •  Total 7.7 Million Square Feet of built up area 

Office space 

Property Development is restricted to Hyderabad only 

•  The Lanco Offices zone offers  6.01 million square feet of built‐up area, which includes premium workspace with both SEZ and non‐SEZ zones 

•  Offices at Lanco Hills can accommodate over 75000 working professionals and has a spacious 12,000 car park facility 

P|22 

Page 23: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

We care for the world we live in 

Lanco Foundation

•  Member of the UN Global Compact

•  Operating in 10 Indian States at 12 locations

•  Covering 155 villages & 240,000 population beneficiaries

•  we have a number of initiatives in place that help us to make a difference…

•  Focused work in the areas of:

  Disability

  Education

  Safe Drinking water

  Mobile Health Services

  Support of traditional arts & crafts

P|23 

Page 24: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Recent Awards   Lanco Anpara Power received 5 Star Rating by British Council

  8th Construction World- Annual Award for “Fastest Growing Construction Company”

  Lanco Infratech Ltd received PRSI Golden Jubilee Award for the “Most Impressive Public Relations Initiatives”

  Lanco Tanjore Power received British Sword of Honour Award for “HSE and 5 Star Rating” by British Council

  Lanco Amarkantak wins “Greentech Safety Award 2013” in Gold category in Thermal Power sector

  Lanco Anpara wins “Power Line Award” for the Best Thermal Project

  Lanco Amarkantak wins “Golden Peacock Occupational Health & Safety Award” for the Year 2013

  Lanco Solar Wins “IESA Award For Most Innovative Product” for 2012

  Lanco Kondapalli Wins “Energy Conservation Award at both state and national level by NREDCAP ” in December 2013

  Lanco Tanjore Power received TERI Corporate Award for “Environmental Excellence and Corporate Social Responsibility”

  IKU II received IEEMA award for “Excellence in Fast Track Commissioning of Small Hydro Projects”

P|24 

Page 25: EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor ...lancogroup.com/pdf/ir/IR.pdf · EPC POWER SOLAR NATURAL INFRASTRUCTURE RESOURCES Investor Presentation

© LANCO Group, All Rights Reserved   

Disclaimer  

No representa[on or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy,  completeness  or  correctness  of  the  informa[on  or  opinions  contained  in  this  presenta[on.  Such informa[on and opinions are in all events not current aser the date of this presenta[on. Certain statements made in this presenta[on may not be based on historical  informa[on or facts and may be "forward looking statements" based on the currently held beliefs and assump[ons of the management of the Company, which are expressed  in good  faith and  in  their opinion  reasonable,  including  those  rela[ng  to  the Company's  general business plans and strategy,  its  future  financial  condi[on  and  growth  prospects  and  future  developments  in  its  industry  and  its compe[[ve and regulatory environment.   Forward‐looking  statements  involve  known and unknown  risks,  uncertain[es and other  factors, which may  cause the  actual  results,  financial  condi[on,  performance or  achievements  of  the Company or  industry  results  to  differ materially from the results, financial condi[on, performance or achievements expressed or implied by such forward‐looking  statements,  including  future  changes  or  developments  in  the  Company's  business,  its  compe[[ve environment  and  poli[cal,  economic,  legal  and  social  condi[ons.  Further,  past  performance  is  not  necessarily indica[ve  of  future  results.  Given  these  risks,  uncertain[es  and  other  factors,  viewers  of  this  presenta[on  are cau[oned not to place undue reliance on these forward‐looking statements. The Company disclaims any obliga[on to update these forward‐looking statements to reflect future events or developments.   This  presenta[on  is  for  general  informa[on  purposes  only,  without  regard  to  any  specific  objec[ves,  financial situa[ons  or  informa[onal  needs  of  any  par[cular  person.  This  presenta[on  does  not  cons[tute  an  offer  or invita[on  to purchase or  subscribe  for any  securi[es of  the Company by any person  in any  jurisdic[on,  including India  and  the  United  States.  No  part  of  it  should  form  the  basis  of  or  be  relied  upon  in  connec[on  with  any investment decision or any contract or commitment to purchase or subscribe for any securi[es. The Company may alter, modify or otherwise change in any manner the content of this presenta[on, without obliga[on to no[fy any person of such change or changes. This presenta[on may not be copied or disseminated in any manner. 

P|25 