environmentally conscious design & manufacturing (me592) date: april 5, 2000 slide:1...

19
Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors in Machining Operations Prof. S. M. Pandit

Post on 22-Dec-2015

226 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:1

Environmentally Conscious Design & Manufacturing

Class 14: Cost Factors in Machining Operations

Prof. S. M. Pandit

Page 2: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:2

Manufacturing Economics & the Environment

Life cycle view Raw material Manufacturing

Design Production (Scheduling, Planning, Machining)

Use Post-use Materials handling Energy production

Page 3: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:3

Manufacturing Economics & the Environment

Product Life Cycle Use

Power Generation

•“Waste”

•Energy

•Materials

•Fluids

Post Use

Raw Material ExtractionMaterial Handling and Logistics

Manufacturing

Page 4: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:4

Raw Material

• Design requirements– With/ without environmental considerations– Quality factor

• Quality deterioration/ improvement• Inspection

• Cost of raw material– Natural (extraction cost)– Man-made (development costs - temporal)

Page 5: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:5

Post Use

Environmental Impact

• Reuse / Remanufacture / Recycle / Disposal

“Cost”

Material cost

Design costs

Option chosen

Page 6: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:6

Material Handling Cost

Equipment A B C

Tractor truck 34 583 239Forklift truck 21 1779 338Hand truck 19 * 203

Item Choice (Design)

Manufacturing Facilities Location, Planning and DesignD.R. Sule (PWS Kent Publ. Co., 1988)

Data from Material & Design choice Add to total cost

Page 7: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:7

Manufacturing Cost Factors

• Machine Tool• Machining

– Process parameters wear rate– Tool / Workpiece interaction

• Work (job) chips• Tool wear / failure debris

– Fluid use mist, disposal• Process scheduling energy use• Production planning productivity factors

Page 8: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:8

Machining Costs

• Machine Tool

– Power requirements– Initial costs– Depreciation– Flexibility– Maintenance– Expected use

Page 9: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:9

Machining Costs

• Process parameters – Speed– Feed– Depth of cut

Power=Feed Rate(Feed Force+Friction Force)/ (Mech* Mech)

Engineering Formulas (7th Ed.,1998)K.Gieck & Reiner Gieck., Mc Graw Hill

Tool wear

Power consumed

Tool typeWork - pieceFluid applicationQuality requirementsProductivity needed

Page 10: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:10

Machining Costs

• Process Parameters– Tool type• Insert – Rake,

• Non - Insert

• Cutter Type (turning, milling, ..)• Single point / Multi point / Form tool

Material

Cost

Material, Dry/wet

Page 11: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:11

Machining Costs

– Volume of material removed (m3)– Tool type needed (insert …)– Cutting fluid needed (Y/N, flow rate)

Work - piece

Cost

Page 12: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:12

Machining Costs

L

/12dddd3dπLV

)22(2

0 isis

Volume removed:

Page 13: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:13

Machining Costs

• Chips– Continuous (bad)

• Interferes in machining - Flush with cutting fluid ?

– Discontinuous (good) • Need to adjust

– Work material– Machining parameters– Tool geometry

– Dust

Page 14: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:14

Machining Costs

• Factors influencing fluid application costs– Type of fluid

• Synthetic / natural oils / semi-synthetic• Straight oils• Air / inert gas

– Flow rate– Heat transfer requirements– Lubrication & chip transport– Chip adhesion

Page 15: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:15

Machining Costs

• Tool

– Excessive wear rate v/s cost– Catastrophic failure

• inclusions in work• incorrect parameters• shock loading (temperature / load induced)

Page 16: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:16

Machining Costs

• Fluid Use– Mist collectors– Pumps and tanks (circulation)– Filtration– Maintenance system– Additives / Initial cost– Disposal (bioremediation / chemical treatment)

Page 17: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:17

Scheduling

Scheduling L.P. formulation

Cost EnvironmentQuality

Cost Difference

Page 18: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:18

Page 19: Environmentally Conscious Design & Manufacturing (ME592) Date: April 5, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 14: Cost Factors

Environmentally Conscious Design & Manufacturing (ME592)

Date: April 5, 2000 Slide:19

Case Study

• Machining– Tool– Work– Cutting Fluid– Power, labor, m/c tool– Environment ?

Cost items

Alternative 1 Alternative 2