Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project Jilin Province Research Academy of Environmental Sciences Jul.6, 2009 E2217 v9 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 23-Mar-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan of

Tonghua City Agricultural Products Quality and Safety

Inspection Center Construction Project

Jilin Province Research Academy of Environmental Sciences

Jul.6, 2009

E2217v9

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Content 1 Construction Background and Aim of EMP .............................................................................. 1 1.1 Project Background ................................................................................................ 1 1.2 Aim, Guideline and Requirements of EMP ............................................................ 2 1.3 Compilation Basis and Executive Standard ........................................................... 3

1.3.1 Compilation Basis ............................................................................................................ 3 1.3.2 Requirements of the World Bank ..................................................................................... 4 1.3.3 Technical Specifications, Guidelines ............................................................................... 4 1.3.4 Executive Standard ........................................................................................................... 5

1.4 Laboratory Grading Basis ...................................................................................... 9 2 Main Environmental Impact and Mitigation Measures ......................................................... 10 2.1 Existing Pollutant Emission and Pollutant Prevention and Control Measures Analysis ...................................................................................................................... 10 2.2 Environmental Impact Assessment Analysis ........................................................ 11

2.2.1 Environmental Impact Analysis during Construction Period ......................................... 11 2.2.2 Environmental Impact Analysis during Operation Period ............................................. 12

2.3 Environmental Impact Mitigation Measures ........................................................ 15 2.3.1 Environmental Protection Aim ....................................................................................... 15 2.3.2 Environmental Impact Mitigation Measures during Construction Period...................... 16 2.3.3 Environmental Impact Mitigation Measures during Operation Period .......................... 18

3 Enforcement Body ...................................................................................................................... 26 3.1 Environmental Management Organization .......................................................... 26

3.1.1 Structure of Environmental Management Institution ..................................................... 26 3.1.2 Duty of Environmental Management Organization ....................................................... 28

3.2 Environmental Monitoring Organization and Duty ............................................. 30 3.3 Duty of Contractor ............................................................................................... 31 3.4 Personnel Training ................................................................................................ 32

3.4.1 Training for Newly-added Full-time, Part-time Personnel in Environmental Protection during Construction Period ..................................................................................................... 32 3.4.2 Training for Newly-added Full-time, Part-time Personnel in Environmental Protection during Operation Period .......................................................................................................... 33

4 Environmental Monitoring Plan ............................................................................................... 35 4.1 Aim of Environmental Monitoring ....................................................................... 35 4.2 Monitoring Implementation ................................................................................. 35 4.3 Environmental Monitoring Program .................................................................... 35

5 Environmental Management Plan Monitoring Estimation .................................................... 42 6 Report.......................................................................................................................................... 42 7 Public Participation ................................................................................................................... 43 7.1 Information Disclosure ......................................................................................... 43 7.2 Public Participation Investigation ........................................................................ 44

8 Dispute Complaint Channel ...................................................................................................... 50 8.1 Establishment and Constitution of Complaint Organization ................................ 50 8.2 Complaint Procedure ............................................................................................ 50

Page 3: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-1-

1 Construction Background and Aim of EMP

1.1 Project Background

The aim of agricultural products quality and safety project construction funded by Jilin

Province World Bank is to adopt advanced safety control technology such as GAP, GMP

and HACCP and so on to produce and process agricultural products to increase

coverage area of standardized demonstration plot (base) to make the production and

process of most agricultural products in our province gradually go on the track of

standardized production.

The project is designed centering on agricultural products quality and safety guarantee

system, overall-process standardized demonstration and promotion, overall-process

quality supervision, products quality inspection, quality traceability, advocacy and

training and relevant research on agricultural products quality and safety and so on;

there are 5 subitems including GAP promotion item of agricultural products quality and

safety, public monitoring item of agricultural products quality and safety, practicability

research, training and advocacy item of agricultural products quality and safety,

demonstration mode of safety production chain of agricultural products (on-lending

project) , and project management item. This project indicates Tonghua City

Agricultural Products Quality and Safety Inspection Center Construction Project in

agricultural products quality and safety monitoring system construction project in the

second subitem of public monitoring item of agricultural products quality and safety.

Land for construction of the project is located at No. 11, Xinguang Road, Tonghua City,

which is the reconstruction of the existing Tonghua City Agricultural Products Quality

and Safety Supervision and Inspection Station. Laboratory is planned to be built on the

third and fourth floor, which will be equipped with inspection instruments and

equipments such as gas chromatograph, liquid phase chromatograph, GC-MS and

LC-MS and so on, supporting instruments and equipments such as microwave digestion

system, electronic balance and so on and supplementary instruments and equipments

such as sampling vehicle, computer, projector and so on. The inspection center mainly

takes charge of the determination of biological indicator and physical index and

Page 4: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-2-

chemical index of origin environment (soil, air and water quality) of agriculture (crop

farming, animal husbandry and aquaculture), quality and safety of agricultural

investment (fertilizer, pesticide, veterinary medicine, feedstuff, fishery medicine etc.)

and agricultural products (foodstuff, vegetable, fruit, pork, beef and mutton, poultry

meat, poultry egg, milk and fishes, shrimp and crab series etc.) in 5 counties (cities)

such as Tonghua County, Liuhe County, Huinan County, Meihekou City and Ji’an City.

The project plans a total investment of 12.1032 million Yuan (exclusive of contingency

cost), including an investment of 10.9963 million Yuan for laboratory instruments and

equipments of the inspection center, an investment of 756.2 thousand Yuan for

rebuilding and expansion, decoration and auxiliary facilities of the inspection center

laboratory, and an investment of 350.7 thousand Yuan for other charges of project

construction and so on.

1.2 Aim, Guideline and Requirements of EMP

Environmental impact assessment of this project indicates that this project will cause

impact on the environment mainly during construction and operation periods. The EMP

will elaborate on environmental mitigation measures, environmental management,

environmental supervision, and environmental monitoring and so on, which will be the

guidance document to carry out these activities; its functions are as follows:

(1) Provide guidance document on environment. The volume of EMP will be provided

to construction supervision unit, environmental monitoring unit and other related units

during construction and operation periods as environmental protection document after

examined by the World Bank.

(2) Clearly define responsibilities and functions of relevant units and relevant functional

departments and administrative organizations, and put forward communication channels

and modes among all departments.

(3) Put forward environmental mitigation measures and environmental monitoring plan

during construction and operation periods.

Page 5: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-3-

1.3 Compilation Basis and Executive Standard

1.3.1 Compilation Basis

1.3.1.1 Relevant Rules and Regulations on Chinese Environmental Protection

(1) The Environmental Protection Law of the People’s Republic of China, Dec. 26,

1989; (2) The Law of the People’s Republic of China on the Prevention and Control of Atmospheric Pollution, Apr. 29, 2000; (3) The Law of the People’s Republic of China on the Prevention and Control of Water Pollution, Feb. 28, 2008; (4) Rules for Implementation of Law of the People’s Republic of China on the

Prevention and Control of Water Pollution of order No. 284 of the State Council;

(5) The Law of the People’s Republic of China on the Prevention and Control of

Environmental Pollution by Solid Wastes, Apr. 2005;

(6) The Law of the People’s Republic of China on the Prevention and Control of

Environmental Noise Pollution, Mar. 1, 1997;

(7) The Law of the People’s Republic of China on the Promotion of Cleaner Production,

Jan. 1, 2003;

(8) The Law of the People’s Republic of China on Environmental Impact Assessment,

Oct. 28, 2002;

(9) Energy Conservation Law of the People’s Republic of China, Jan. 1, 1998;

(10) The Law of the People’s Republic of China on the Promotion of Cleaner

Production (2002);

(11) Regulations on the Administration of Construction Project Environmental

Protection of order No. 253 of the State Council [1998], Nov. 29, 1998;

(12) State Environmental Protection Administration of China issued Administration of

Environmental Protection in Construction Projects by Means of Classification

Catalogue in Jan. 1, 2003;

(13) Some Suggestions on Environmental Management of Construction Project of the

State Bureau of Environmental Protection, Mar. 21, 1988;

(14) No. 2000.36 document: Circular of the State Council Concerning Strengthening

Page 6: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-4-

Urban Water Supply and Prevention and Control of Water Pollution;

(15) Notice on Strengthening Administration of Construction Project Environmental

Impact Assessment Funded by IFC (HJ [1993] No. 324 document);

(16) Interim Measures on Public Participation in Environmental Impact Assessment of

the State Environmental Protection Administration (2006);

(17) GJMZY [2000] No. 1015: Suggestions on Strengthening Water-saving in Industry

(2000).

1.3.2 Requirements of the World Bank

The World Bank requirements include ten safeguards policies, namely business policy,

procedures of the World Bank, business guidelines etc. as follows:

(1) Environmental assessment (OP/BP/GP4.01)

(2) Forestry (OP /GP4.36)

(3) Natural habitat (OP/BP4.04)

(4) Dam safety (OP/BP4.37)

(5) Pesticide administration (OP4.09)

(6) Involuntary immigration (OP4.30)

(7) Minority (OP4.20)

(8) Cultural relic (OP4.11)

(9) Disputed area project (OP/BP/GP7.60)

(10) International waterway project (OP/BP/GP7.50)

1.3.3 Technical Specifications, Guidelines

(1) Technical Guidelines for Environmental Impact Assessment · General Principles

(HJ/T2.1-93);

(2) Technical Guidelines for Environmental Impact Assessment · Atmospheric

Environment (HJ/T2.2-93);

(3) Technical Guidelines for Environmental Impact Assessment · Surface Water

Environment (HJ/T2.3-93);

(4) Technical Guidelines for Environmental Impact Assessment · Acoustical

Environment (HJ/T2.4-1995);

Page 7: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-5-

(5) Technical Guidelines for Environmental Impact Assessment · Non-polluted

Ecological Impact (HJ/T19-1997);

(6) Technical Guidelines for Construction Project Environmental Risk Assessment

(HJ/T169-2004);

(7) Functional Area Standards of Jilin Province Surface Water DB22/388-2004;

(8) Technical Methods for Making Local Emission Standards of Atmospheric Pollutant

(GB/T13201-91).

1.3.4 Executive Standard

In accordance with environmental function division of Tonghua City, this project will

follow up the following standards.

1.3.4.1 Environmental Quality Standard

(1) Ambient air

The ambient air of the area where the project is located belongs to class II, and the

ambient air in the assessment area will follow up the secondary standard in Ambient Air

Quality Standard (GB3095-1996). For details, please refer to table 1.3-1.

Table 1.3-1 Ambient Air Quality Standard Unit: mg/m3

Serial Number Pollutant Executive Standard Daily

Average Hourly

Average Assessed Object

1 SO2 Ambient Air Quality Standard

GB3095-1996secondary standard

0.15 0.5 Ambient air of project

area

2 TSP 0.3 3 PM10 0.15 4 NO2 0.12 0.24

(2) Surface water

The waste water from this project will enter into Tonghua City Urban Sewage Disposal

Plant (sewage disposal plant was established in 2009) through urban sewage pipe

network and finally be drained into Hun River after disposal; according to Functional

Area of Jilin Province Surface Water (DB22/388-2004), it is Hun River reach from

Wudao River section (contrasting section of Tonghua City) to Minzhu section

(provincial controlling section). The water body function of Hun River belongs to class

III. For details, please refer to table 1.3-2.

Page 8: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-6-

Table 1.3-2 Environmental Quality Standards for Surface Water

Assessment Factor Unit Class Ⅲ Standard source pH - 6-9

GB3838-2002 class III, * is class III referring to Environmental Quality Standard of Songhua

River Water System as a reference

CODcr mg/L ≤20 BOD5 mg/L ≤4 NH3 mg/L ≤1.0 SS* mg/L <25*

Petroleum class mg/L ≤0.05

(3) Acoustical Environment

Acoustical Environment quality of project area will follow up the second-class standard

in GB3096-2008 Acoustical Environment Quality Standard. For details, please refer to

table 1.3-3.

Table 1.3-3 Acoustical Environment Quality Standards Assessment Factor Unit Period of Time Standard Threshold Standard Source

Equivalent sound level

dB(A)

Day time 60 Proposed factory area GB3096-2008 “class II” Night time 50

Day time 70 Traffic noise along both sides of highway

GB3096-2008 “class IV ” Night time 55

1.3.4.2 Emission Control Standard for Pollutant

(1) Atmospheric pollutant

Emission control of exhaust pollutant from laboratory will follow up the secondary

standard in Integrated Emission Standard for Atmospheric Pollutant (GB16297-1996).

For details, please refer to table 1.3-4.

Page 9: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-7-

Table 1.3-4 Integrated Emission Standards for Atmospheric Pollutant (GB16297-1996)

Pollutant

Maximum Acceptable Emission

Concentration mg/m3

Maximum Acceptable Emission Rate, kg/h

Monitoring Concentration Threshold of Fugitive Emission

Height of exhaust funnel

m

Secondary level Monitoring point Concentration

mg/m3

Particulate matter 120

15 3.5 Maximum Concentration

Point outside of the Unit Border

Invisible to the naked

eyes 20 5.9

Sulfuric acid Mist 45

15 1.5 Maximum Concentration

Point outside of the Unit Border

1.2 20 2.6

Mercury and its

compound 0.7

15 0.0015 Maximum Concentration

Point outside of the Unit Border

0.0012 20 0.0026

Phenols 100 15 0.10 Maximum

Concentration Point outside of the Unit Border

0.080 20 0.17

(2) Standard for water pollutant discharge

The project will discharge waste water into urban sewage disposal plant and then be

drained into Hun River. Conventional pollutant emission concentration in domestic

sewage and waste water from laboratory will follow up the tertiary standard in

GB8978-1996 Integrated Discharge Standard for Sewage; effluent concentration of

heavy metal will follow up the maximum acceptable emission standard of the first-class

pollutant in GB8978-1996 Integrated Discharge Standard for Sewage.

Page 10: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-8-

Table 1.3-3 Standards for Water Pollutant Discharge Category of

pollution source

Pollution Agent Unit Control Standard

Standard Source Primary standard

tertiary standard

Waste water

pH - 6~9 6~9

GB8978-1996 Integrated Discharge Standard for

Sewage

COD mg/L 100 500

BOD5 mg/L 30 300

SS mg/L 70 400

Ammonia nitrogen mg/L 15 -

Anilines mg/L 1.0 5.0 Animal and vegetable

oils mg/L 20 100

Nitrobenzene class mg/L 2.0 5.0 Anionic surface active

agent (LAS) mg/L 5.0 20

Organophosphorus pesticide (calculated by

P) mg/L

No Detect

0.5

Total Mercury mg/L 0.05 maximum acceptable emission standard of the

first-class pollutant in Integrated Discharge Standard for Sewage

Total arsenic mg/L 0.5

Total lead mg/L 1.0

Total chrome mg/L 1.5

Notes: if Tonghua City Urban Sewage Disposal Plant has not been completed when the project is completed and in operation, the primary standard shall be carried out; after urban sewage disposal plant is completed, the tertiary standard shall be carried out.

(3) Standard on emission of environmental noise within the boundary of an industrial

enterprise

Noise within the boundary of an industrial enterprise during the operation period shall

follow up the second-class standard in GB12348-2008 Emission Standard for Industrial

Enterprises Noise at Boundary; Noise within the boundary of an industrial enterprise

during the construction period shall follow up (DB22/272-2001) Noise Threshold for

Construction Site.

Page 11: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-9-

Table 1.3-3 Noise Emission Standards Category of

Pollution Source

Pollution Agent

Day-time Threshold

dB(A)

Night-time Threshold

dB(A)

Relevant Regulations Standard Source

Construction (boundary of an industrial enterprise)

Equivalent sound level

75 55 Earthwork phase DB22/272-2001

Noise Standard for Construction

Site

70 55 Structure phase

65 55 Decoration phase

Operation period

(boundary of an industrial enterprise)

Equivalent sound level

60 50 Second-class area

standard in GB12348-2008

1.4 Laboratory Grading Basis

In accordance with Health Industry Standard of the People’s Republic of China (WS

233-2002) General Guidelines for Bio-safety in Microbiological and Biomedical

Laboratories, classification and grading of laboratory are shown in table 1.4-1.

Table 1.4-1 Classification and Grading of Laboratory basis are as follows

GRADING SYMBOL BASIS

First-grade bio-safety protection laboratory

BSL—1

Laboratory structure and facilities, safety regulation for operations, safety equipments are applicable to microorganisms without pathogenic effect known to healthy adults, such as common microorganism laboratory and so on used for teaching.

Second-grade bio-safety protection laboratory

BSL—2

Laboratory structure and facilities, safety regulation for operations, safety equipments are applicable to microorganisms which have moderate potential harm to human being or environment.

Third-grade bio-safety protection laboratory

BSL—3

Laboratory structure and facilities, safety regulation for operations, safety equipments are applicable to pathogenic microorganisms and toxin which can make human being infect serious even feral disease by breathing, usually, there is vaccine for preventing infection. Research on AIDS virus (excluding serology experiments) shall be carried out in the third-grade bio-safety protection laboratory.

Fourth-grade bio-safety protection laboratory

BSL—4

Laboratory structure and facilities, safety regulation for operations, safety equipments are applicable to pathogenic microorganisms and its toxin which have highly hazard, transmit via aerosol or unknown routines, without effective vaccine or treatment method. Unknown microorganisms similar to the above-mentioned status must be done in the fourth-grade bio-safety protection laboratory. After owning sufficient data, decide to treat such microorganism or toxin in the fourth-grade or inferior laboratories.

Page 12: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-10-

According to project analysis, the project laboratory will only carry out pesticide,

fertilizer residue, origin environment monitoring, and irrigation water inspection and so

on of agricultural products (foodstuff, vegetable, fruit etc.); the microorganism

laboratory only carries out common microorganism experiments. Therefore, under

common condition, the microorganisms are the ones without pathogenic effect known

to healthy adults. So, the physical and chemical laboratories in this project are common

laboratories, and common microorganism laboratory is BSL1 first-grade bio-safety

protection laboratory.

2 Main Environmental Impact and Mitigation Measures

2.1 Existing Pollutant Emission and Pollutant Prevention and

Control Measures Analysis

(1) Exhaust gas

Only part of Tonghua City Agricultural Products Quality and Safety Inspection Center

Laboratories have ventilation equipments, the rest of them without ventilation

equipments are ventilated naturally. During experiment process, opening window for

ventilation from time to time not only affects the accuracy of experiment data but also

has certain effect on experimenters and surrounding residential areas.

There is no dinning hall at present, and it adopts central heating.

(2) Waste water

The existing waste water from experiment and domestic sewage is directly drained into

downcast pipe network of city planning. There are 12 employees in the institute at

present, and quantity of domestic wastewater effluent is 0.5m3/d. At present, the

laboratory only determines heavy metal residual quantity and surplus; there are regular

and entrusted inspections; waste water from experiment without discharge rule belongs

to intermittent discharge; daily wastewater discharge is about 0.5m#/d; there are

acid-base waste water, heavy metal and organic reagent and so on; there is no separate

treatment measures and facilities; the waste water shall be drained into urban sewerage

and drainage pipe network.

Waste water from the laboratory is less but the water quality is relatively complex,

Page 13: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-11-

over-proof discharge hazardness is great. During the reconstruction, make production

sewage and domestic sewage diffluent, and drain the waste water from laboratory after

reaching the standard.

(3) Noise

According to the monitoring results of Tonghua City Environment Monitoring Center

Station, all noises within the boundary of an industrial enterprise reach second-class

standard, which have less effect on surrounding acoustical environment.

2.2 Environmental Impact Assessment Analysis

2.2.1 Environmental Impact Analysis during Construction Period

(1) Ambient air impact analysis

The project is the project of technological transformation. Main construction contents

are indoor operation and purchasing installation equipments. During the construction

period, environmental impact is relatively less. During the period of indoor decoration,

when loading and unloading bulk powder (granular) materials, preparing feed and

transporting bulk building materials by carrying vehicles, if they are over-loaded or

without preventive measures, materials shall hang down in transit and produce dust.

Engineering transportation and construction machines may cause certain impact on

atmospheric environment quality of local area; with the closing of the construction

period, these impacts will disappear.

(2) Environmental impact analysis of surface water

The project employs local construction team to carry out the construction; there is not

camp building; the washroom of Agricultural Products Quality and Safety Inspection

Center is still in use; domestic sewage is drained into drainpipe network of city planning,

which has less effect on water environment.

(3) Construction noise

The project is the project of technological transformation. During the construction

period, machines such as electric drill, sawing machine and so on used during indoor

decoration will inevitably cause construction noise, but they are all indoor operations;

arranging construction time reasonably and operating with windows closed will reduce

Page 14: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-12-

impact on external environment. With the closing of construction period, these impacts

will disappear.

(4) Solid waste

Indoor decoration of the project during construction period will create less construction

waste, and the builders will create some domestic garbage, the garbage will become

breeding ground for mosquitoes and flies if not treated in time and produce foul smell

and cause effect on the surrounding environment.

In order to avoid the effect of solid waste on the environment, the construction waste

created during the construction period shall be removed in time and piled up in places

designated by municipal departments or used as materials of road construction; special

domestic garbage box shall be set at the construction site to uniformly collect domestic

garbage and carry them to urban garbage landfill to prevent casual throwing-away.

Reasonable treatment can eliminate disadvantageous effect of solid waste on external

environment.

2.2.2 Environmental Impact Analysis during Operation Period

(1) Exhaust gas

Exhaust gases from this project mainly indicate a small quantity of acid mist, NO2 and a

small amount of exhaust gas of organic solvent discharged by organic solvent created

by carrying out inspection experiment, which shall be discharged after reaching the

standard.

Some laboratories creating exhaust gas are arranged with exhaust hood during the

transformation. Exhaust gas negative pressure from experiment shall be collected and

discharged through purifying treatment with high-efficiency filter.

Heat supply source during heating period of this project is central heating. The project

itself has no boiler house, chimney, or fume emission. There is no dinning hall for

employees or oil fume emission.

(2) Waste water

Waste water discharged outside of this project mainly comes from laboratory and

employees’ daily life.

Page 15: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-13-

After the completion of this project, total waste water discharge will be 3.5m3/d; the

experiment and inspection waste water discharge is 3m3/d and domestic sewage

discharge is 0.5m3/d. The domestic sewage and production sewage will be diffluent

during the transformation.

Each pollutant emission concentration in domestic sewage is COD250mg/L,

BOD200mg/L, SS200mg/L; the water quality can reach the tertiary standard in

GB8978-1996 Integrated Discharge Standard for Sewage, which can be drained

directly into urban sewerage and drainage pipe network. Main pollutants of experiment

waste water discharged during assay and inspection are acid-base, heavy metal and

various chemical reagents, various additives and so on; the waste water from the

laboratory is less in discharge, but the contents are complex; through analogy

investigation, pollutant emission concentration in waste water from experiment is about

COD600mg/L, BOD5400mg/L, SS210mg/L, and it contains heavy metal of different

degree. Direct emission without treatment will cause negative effect on surface water

body, and it shall be drained into urban sewerage and drainage pipe network after

reaching the tertiary standard in GB8978-1996 Integrated Discharge Standard for

Sewage.

Tonghua City Urban Sewage Disposal Plant under construction is planned to be

completed and put into operation at the close of 2009, and the project commissioning

date is 2011; therefore, the waste water discharged when the project is completed and

put into operation can be directly drained into urban sewerage and drainage pipe

network and treated by urban sewage disposal plant, which has less impact on water

environment.

(3) Noise

Noises of this project are mainly from multi-functional oscillator of the laboratory,

air-conditioner, and ventilation installation blower and so on in the laboratory. Noise

source intensity is about 75-90dB. Therefore, these equipments should be set indoors

and also build sound insulation room, install sound insulation board on walls, and add

cushion blocking when installing equipments to make noise within the boundary of an

industrial enterprise reach second-class standard.

Page 16: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-14-

(4) Solid waste

After the completion of this project, main solid wastes will be domestic garbage and

solid waste from laboratory and so on.

① Waste agricultural product (vegetable, fruit, foodstuff etc.), animal husbandry

product and aquatic product samples

When carrying out experiment of the project, take 0.5-1kg or so experimental sample

according to different experiment requirements, draw a sample at random when doing

experiment for inspection, and store one sample in sample retained room. Samples

stored in the sample retained room for agricultural products are generally kept for 3-6

months or so and destroyed together when they expiry. According to analogy estimation,

waste sample quantity is about 1.2t/a. Waste agricultural product (animal husbandry

product, aquatic product) samples belong to common solid waste and they will be sent

to urban garbage disposal plant with domestic garbage for treatment.

② Experimental equipments and apparatuses (one-off), waste liquid and waste culture

medium from experiment

After the completion of this project, production quantity of one-off experimental

equipments and apparatuses, consumables (test paper etc.) and damaged apparatuses

(glass ware) used in experiment is about 11kg/a; the production quantity of waste liquid

and waste culture medium from experiment is about 41.8kg/a. Experimental equipments

and apparatuses (one-off) and waste liquid created by experiment are hazardous wastes,

which shall be uniformly sent to Changchun City Lantian Hazardous Wastes Disposal

Center Co., Ltd. for disposal.

③ Replaced waste filtering material or active carbon of filter

In order to guarantee the efficiency of high-efficiency particle air filter, waste filtering

material or waste active carbon board of filter shall be replaced after 6 months or so,

and the production quantity is about 0.2t/a; the replaced waste filtering material or

waste active carbon board shall be sent back to original producing unit or Changchun

City Lantian Hazardous Wastes Disposal Center Co., Ltd. for burning treatment.

④ Sewage sludge created by sewage treatment

Production quantity of sewage sludge from sewage disposal plant is about 75kg/a. The

Page 17: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-15-

heavy metal in the sewage sludge created is hazardous waste, which shall be stored

perfectly and sent to Changchun City Lantian Hazardous Wastes Disposal Center Co.,

Ltd. for treatment.

⑥ Domestic garbage

According to the calculation of 0.5kg per person every day, daily production quantity

will be 8.5kg/d, and annual production quantity will be 2.1t/a; therefore, the

environmental sanitation department will uniformly recycle and send them to urban

garbage landfill for sanitary landfill.

According to National Hazardous Waste Category (2008), solid wastes created by this

project contain common solid waste and hazardous waste. Mismanagement will cause

hazardous effect on the surrounding environment; different disposal modes should be

adopted according to different natures; common solid wastes and hazardous wastes can

not be disposed by blending. Reasonable disposal will prevent secondary pollution due

to mismanagement of hazardous wastes.

2.3 Environmental Impact Mitigation Measures

2.3.1 Environmental Protection Aim

This project is located at No. 11, Xinguang Road, Tonghua City; surrounding sensitive

objectives and distances are shown in table 2.3-1.

Table 2.3-1 Surrounding Sensitive Objectives and Distances

Name of Sensitive Point Orientation Minimum Distance (m) Remarks Outpatient Building of Tonghua City Central

Hospital Northeast 120m 833 Patients’ room

Laboratory building of Jingyu Middle School Northeast 195m

154 Faculty members and 2050 students in

school

Residential Building South 10 m 6-storey residential building

13-storey residential building under construction North 10 m

1-2 storey for commercial purpose and 3-13 storey for residential purpose

Analysis from general situation of surrounding environment indicates that there are

Page 18: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-16-

more sensitive points within close range around the laboratory proposed to be rebuilt;

favorable measures should be taken to reduce impact on the surrounding environment

during design, planning, construction and operation periods.

Design and construction of laboratory shall satisfy BSL-1 laboratory basic

requirements.

2.3.2 Environmental Impact Mitigation Measures during Construction

Period

Choose construction unit with certain capacity by way of bid. When the construction

unit signs engineering construction contract with contractor, environmental impact

mitigation measures during the construction period should be listed in the constriction

contract of the project, and the contractor shall promise to abide by and implement them.

Contractor and construction supervisor are required to accept relevant trainings on

environmental protection and environmental management. Provincial and municipal

project offices assign persons or employ environmental experts to examine

“implementation status of regulations on protection of construction environment” to

construction site regularly, and settle problems in time after found.

Please refer to table 2.3-2 for environmental impact mitigation measures during

construction period.

Page 19: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-17-

Table 2.3-1 Environmental Impact Mitigation Measures during Construction Period Category Environmental

Impact Factor Pollution Prevention and Control Measures

Construction period

Ambient air (1) Intensify management, cultural construction, load and unload building materials lightly; dirt etc. adhesive to surface of vehicles before leaving construction site shall be removed as clear as possible; vehicles transporting lime, sandstone materials, cement, fly ash etc. easily creating dust shall be covered with tarpaulin. (2) Try to make lime and sand soil stacking sites etc. not in the open air as much as possible, if it has to be stacked open, sprinkle water on them to increase surface water content and prevent dust. (3) Sprinkle water to reduce dust when removing walls. (4) Spoil should be removed in time to low-lying sites designated by municipal administration department for filling or sent to garbage landfill. Overload is forbidden when loading and transporting, and vehicles loaded with soil can not make soil out on the way. Passing by urban district, vehicles should run at section and time designated by municipal government. (5) Burning wastes and garbage in the construction site at random is not allowed. (6) Labor protection for builders should be done well, and they should wear dust mask and so on.

Water environment

Camp building during the construction period is not prepared. The existing indoor washrooms are used, and less construction waste water is drained into sewer after precipitation.

Acoustical environment

(1) Possibly arrange construction time The project area is surrounded by residential buildings, which is near to the residential area. In order to reduce impact of construction noise on acoustic environment of surrounding residential area, scientific construction plan shall be established, and prevent using many high-noise equipments together as far as possible; construction time of equipments with high noise, impact strength and strong vibration (such as churn drill and so on) should be arranged at day time, and night (22:00-6:00 next day) construction is forbidden. (2) Bid units are required to choose construction machines and equipments with low noise. (3) Intensify communication and education on builders, reduce man-made noise.

Solid wastes (1) Construction waste should be disposed by classification; construction waste with recycle value should be recycled by special person, and those without recycle value should be transported and stacked at designated sites according to requirements of municipal and planning departments. (2) Domestic garbage recycle box should be set for domestic garbage from construction, which will be uniformly sent to Tonghua City urban garbage disposal field by environmental sanitation department for sanitary landfill.

Page 20: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-18-

2.3.3 Environmental Impact Mitigation Measures during Operation

Period

2.3.3.1 Ambient Air Impact Mitigation Measures

Work nature of laboratory, inspection room not only makes higher request for indoor

temperature and humidity, but different requirements and standards for cleanness of air.

In order to guarantee indoor temperature, humidity and cleanness of air for experiment

and inspection work, the transformation will follow up relevant requirements in

Building Technology Specifications for Bio-safety Laboratory GB50346-2004 to set

exhaustion device and install high-efficiency filter.

(1) Ventilation, exhaustion system optimization operating criteria

1) There will be gas and particle harmful to human health when doing chemical

experiments. In order to guarantee personnel health, harmful gas and particle must be

cleared away effectively and in time, and the laboratory should ensure certain negative

pressure;

2) There is good air distribution in laboratory, air velocity and turbulence scale of blast

air and return air can be controlled within smaller range. Ventilation rate in laboratory

can be controlled effectively, and the air in laboratory should be substituted completely

to make sure freshness.

(2) Ventilation and exhaustion system in laboratory

Forced exhaustion system: all experiments in laboratory directly creating toxic and

harmful gas must be done in fume hood. Forced fume hood is set in laboratory and

inspection room where toxic and harmful gas is created; waste gas created by negative

pressure collection during experiment and inspection shall be discharged outside after

treatment with high-efficiency particle air filter (active carbon filter). The filtration

efficiency of high-efficiency particle air filter is not lower than that of category B

(efficiency is not lower than 99.97%).

Ventilation system: mechanical smoke extraction ventilation systems are set in corridor,

stair case, and washroom and so on, which can remove contaminated air at any time.

Mechanical ventilation systems are set in local laboratories and inspection rooms to

Page 21: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-19-

solve indoor ventilation problems without experiments and inspection work.

(2) Height of exhaust funnel

Height of exhaust funnel of various exhaustion systems is 3m higher than that of

building roof.

(3) Risk prevention measures

If air cleaning system meets with an accident or the contaminated area is under positive

pressure, the alarm will work at once, so experiment should be stopped and start

emergency programs.

Strict safety responsibility system should be established in laboratory.

2.3.3.2 Water Environmental Impact Mitigation Measures

Drainage system should be cleaned up and diffluent; establish separate pipeline for

domestic sewage and production sewage. Quantity of domestic wastewater effluent is

less; the concentration of COD in waste water is 250mg/L, BOD5150mg/L or so;

effluent concentration can reach the tertiary discharge standard of Integrated Discharge

Standard for Sewage (GB8978-1996); therefore, the domestic sewage can be drained

into drainpipe network without treatment.

Waste water from the laboratory is less in discharge, but the contents are complex; there

is acid, base, organic and micro heavy metal, which has greater hazardness and be

drained after treatment.

(1) Designed water quantity and water quality of sewage disposal plant

Production quantity of waste water of inspection experiment is about 3m3/d. It is

proposed to establish sewage disposal plant with design capacity of 5m3/d. In

consideration of possible malfunction and accident discharge in sewage disposal plant,

it is proposed to establish a set of 10m3 reservoir for regulation and water storage of

accident discharge and intermittent discharge of waste water.

(2) Treatment programs for production waste water

Aiming at water quality, water quantity and discharge requirements of waste water,

integrating recommendation of researchable plans, the environmental assessment will

analyze and contrast technical economy and operation effect of the following several

Page 22: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-20-

sewage disposal programs.

Program one: biochemical process (H/O)

Biochemical process is sewage biochemical treatment method widely adopted, which is

suitable to treat dispose organic waste water of high concentration; it covers smaller

area and runs steadily; it is easy to operate, resistant to impact and it has strong carrying

capacity.

Please refer to figure 2.3-1 for its technical process.

Program two: whole-set small-scale integrated laboratory sewage disposal equipment

The waste water discharge of this project is less, which can be directly disposed with

whole-set equipment. At present, there are many sewage disposal plants manufacturing

“laboratory series waste water processing machine” in China. This series of waste water

processing machines mainly adopt technologies such as neutralizing and coagulating

and precipitation, active carbon catalyze-ozone oxidation, biological active carbon

absorption and so on, which cover smaller area, with higher automation degree, better

processing effect, less running cost and so on; unattended operation basically can be

realized. The machine gains scientific and technological achievements appraisal

certificate of Guangdong Province Science and Technology Department (YKJZ [2005]

Sludge

Waste water

Production sewage Grille regulating

tank Primary

settling tank

Transport filter cake outward

Tank O

Pressure filter

Effluent

Disinfecting tank

Regulating pre-aeration tank

Sludge receptacle Sludge concentration

tank

Tank H

Secondary setting tank

Sludge back flow

Figure 2.3-1 Flow Chart of Sewage Disposal with Biochemical Method

Page 23: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-21-

No. 287); it is inspected and demonstrated by authoritative organizations such as

Chinese Academy of Sciences Guangzhou Institute of Geochemistry ; processing effect

can completely satisfy national relevant discharge standard; it gets better effect in

practical application in Guangzhou University, Guangzhou Medical College,

Chongqing City Environmental Monitoring Center, Zhongshan Medicine Inspection

Institute, and Yuexiu Diseases Control Center and so on.

1) Technical process and principle

Waste water initially is drained into regulating tank through collecting system for

regulating water quality and water quantity, and then driven into sewage processing

machine reaction tank by pump evenly and constantly, and passes pH controller; add

certain quantity of NaOH aqueous solution with metering pump and regulate pH value

between 8~9, and add coagulant PAC and coagulant acid PAM.

Under alkaline conditions, acid in waste water is neutralized; ions of heavy metals such

as iron, cadmium, copper, manganses, nickel, and lead and so on will react with OH-

chemically to create hydroxide precipitate; meanwhile, under the action of condensation

and flocculation of PAC and PAM, the precipitates created condense with each other;

suspended particles in waste water and some inorganic matter and organics are absorbed

to form massive cotton-like alumen ustum.

Waste water will flow automatically into sloped-tube setting tank; some cotton-like

alumen ustum settles naturally depending on gravity action to remove suspended matter,

heavy metal ion, and some organics. Sludge in sludge bucket should be cleaned up

regularly and sent to relevant departments for burning, landfill or other treatments.

Effluent from the setting tank will be then driven into active carbon ozone oxidation

tank by pump. Due to the function of resistance of filling, waste water is evenly

arranged and seep slowly from top to bottom. At the same time, taking air as raw

material, the ozone created by ozone producer penetrates active carbon filling from

bottom to top of oxidation pool through gas distribution system, or be absorbed into

water by way of negative pressure through Venturi ejector; during the process of

sufficient contact of gas and liquid, part of organics, bacteria, chroma, stink and so on in

waster water will be eliminated after physical and chemical actions such as absorption,

Page 24: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-22-

retention, impaction, and rewinding and so on of active carbon with huge pore structure

and specific surface area; the rest are removed by ozone with strong oxidation

performance, better sterilization and deodorization, purification and decolorizing, and

degrading organics abilities under the catalysis of active carbon.

Waste water finally enters into active carbon biofilter; part of little suspended matter,

micro metal tiny organics not eliminated yet will be eliminated after physical and

chemical actions such as absorption, and retention and so on of active carbon with huge

pore structure and specific surface area; the rest will be eliminated through degradation

by anaerobic, aerobic and facultative bacteria and so on in microbial film which are

attached to active carbon; processes of retention and absorption of active carbon and

degradation and desorption of microorganism happen alternatively and circularly. Till

now, waster water can reach discharge standard.

The whole waste water treatment process is automatically controlled by PLC

programming. There is floating ball liquid level controller in the regulating tank; the

pump will automatically stop at the state of low liquid level, and start at the state of high

liquid level; there is liquid level meter in medicine-adding box, and it will make alarm

in short of medicine and stop running. The whole machine can basically realize

unattended operation.

Flow Chart of Sewage Treatment

2) Products property:

★Adopt technologies such as neutralizing and coagulating and precipitation, chemical

oxidation, membrane separation, active carbon catalyze--ozone oxidation, biological

Waste water

Regulating tank

Reaction tank Se

tting

ta

nk

Ozone producer

Oxidation pool

Active carbon filter

Discharge after

reaching standard

PH meter

Page 25: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-23-

active carbon absorption and so on to treat various pollutants in waste water;

★ Microcomputer program monitors and controls water quality changes and treatment

process of waste water in real time to realize whole-day and full-auto operation, and

unattended operation;

★ Utilize PH meter, ORP meter and imported metering pump to accurately control

medicine quantity, and set liquid level controller, alarm for shortage of medicine and

automatic soil discharging device and so on;

★ Adopt advanced Venturi fluidic oxygenator, and the gas and water can contact

sufficiently contact and react completely;

★ Be easy to operate, runs steadily with long service life and low operation and

maintenance charges;

★ Cover small area, and it can be set inside or outside according to different conditions;

★ It can be specifically designed and manufactured according to different requirements

of users.

3) Scope of application:

It is widely used in universities and colleges, scientific research units, inspection

organizations, chemical laboratories to comprehensively treat experiment waste water.

4) Main technical parameters:

Table 2.3-1 Main Technical Parameters Items Technical Parameters

Treatment Flow (m3/d) 5

Clearance (%)

Heavy metal (total lead, total manganese, total zinc, total mercury, total arsenic etc.) ≥96

Chemical oxygen demand ≥93

Trichloromethane ≥93

Toluene ≥93 Phenol ≥93

Organophosphorus pesticide ≥90

Disinfection efficiency (%) ≥91 Dung coliform flora (mpn/L) ≤220

Total number of bacteria (cfu/L) ≤7500 Noise (dB) ≤65

Price (inclusive of pie network) 200 thousand Yuan

According to scheme comparison, the assessment holds that laboratory wastewater

Page 26: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-24-

discharge is intermittent discharge, and water quality of waste water discharged varies

due to different monitoring contents, which is not suitable to be treated with

biochemical process (program one).Under same waste water quantity and water quality,

processing effect of program two is stable, and the resistance to impact is stronger; it is

widely used, which is special laboratory sewage treatment whole-set device; therefore,

program two is recommend. Total investment of the sewage treatment facility is about

200 thousand Yuan (processing capacity is 5m3/d) and the operation cost is about 1

Yuan/ton water.

2.3.3.3 Acoustic Environmental Impact Mitigation Measures

The following measures are taken aiming at noise prevention and control of this project:

(1) Adopt low-noise equipments when designing.

(2) Set independent sound insulation room for equipments with higher noise, and install

sound insulation door and so on.

(3) Adopt vibration reduction method for equipment base.

After control, noise can reach the secondary standard of GB12348-2008 Noise Standard

for Industrial Enterprises at Boundary.

2.3.3.4 Solid Wastes Environmental Impact Mitigation Measures

Solid wastes created by this project contain common solid waste and hazardous waste,

which should be treated by classification.

(1) Disposal of common solid waste:

Common solid wastes such as waste agricultural product (animal husbandry product,

poultry, aquatic product) samples from experiment and domestic garbage etc. will be

uniformly sent to urban garbage disposal field by environmental sanitation department

for sanitary landfill.

(2) Disposal of hazardous waste:

Waste pesticide (veterinary medicine, fishery medicine), fertilizer samples are

hazardous wastes, which should be uniformly recycled and sent to the original

producing unit for united treatment; Hazardous wastes such as experimental equipments

and apparatuses (one-off), culture medium, overdue experimental medicines or reagents,

Page 27: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-25-

sludge, waste active carbon, animal fecaluria and fodder residue containing heavy metal

created by sewage disposal plant should be collected by classification and sent to

Changchun City Lantian Hazardous Wastes Disposal Center Co., Ltd. for treatment.

During transportation, abide by “hazardous waste transfer and manifest management

measures” strictly.

Disposal modes for different solid wastes are shown in table 2.3-1. Table 2.3-1 Production Quantity and Disposal Method of Solid Waste Name of Solid

Waste Category of Waste

Industry Source and Waste Code

Packing and Storage Mode Disposal Method

1 Agricultural product (animal

husbandry product, aquatic product) samples

for inspection

Common solid waste

Original packing

Send to the original producing unit or environmental sanitation department uniformly recycles and send them to urban garbage landfill for sanitary landfill

2 One-off experimental

equipments and apparatuses,

consumables and damaged

apparatuses

HW49 Hazardous

waste

Waste created by chemistry

and biology laboratories

of non-specific

industry 900-047-49

Closed container

According to National Hazardous Waste Category (2008), wastes created by laboratory are hazardous and they should be in airtight package and sent to Changchun City Lantian Hazardous Wastes Disposal Center Co., Ltd. for burning.

3 Waste liquid and waste culture medium etc. created by experiment

Put in 10kg glass bottle, send once half a year or a year

4 Waste filtering material and active carbon replaced by

high-efficiency filter

Replace filter board once every 3-6 months

5 Sludge of sewage disposal plant

Transport with closed tank car after pressure filtration and disinfection

6 Domestic garbage Common solid waste

Store in the designated dustbin

Environmental sanitation department uniformly recycles and send them to urban garbage landfill for sanitary landfill

2.3.3.5 Risk Prevention Measures and Emergency Preplan

(1) Laboratory design and construction should satisfy BSL-1 laboratory basic

Page 28: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-26-

requirements.

1) Hand-washing basin should be set near the exit of each laboratory, and the water

faucet should be automatic responsive, handle-type or foot-operated, and furnished with

disinfectant soap for washing hands.

2) There should be sterilizing equipments and facilities for air and object surface in

laboratory.

(2) Environmental pollution emergency preplan should be established and reported to

local county-level People’s Government Environmental Protection Competent

Administrative Department for record, and do regular practice.

(3) If leakage or diffusion from laboratory causes or may cause serious environmental

pollution, emergency measures should be taken in time, and report it to units and

residents who may be endangered, and report to local People’s Government

Environmental Protection Competent Administrative Department and relevant

department to accept investigation.

(4) Laboratories creating hazardous wastes should establish prevention measures and

emergency preplans for fortuitous accidents according to regulations on prevention and

control of environmental pollution by solid waste in China, and report accidents to local

People’s Government Environmental Protection Competent Administrative Department

above county level for record.

3 Enforcement Body

3.1 Environmental Management Organization

3.1.1 Structure of Environmental Management Institution

Structure chart of environmental management organization of this project during

construction and operation periods is shown in figure 3.1-1 and figure 3.1-2.

Page 29: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-27-

Top environmental

supervision organ

Jilin Province Environmental Protection

Bureau

Tonghua City Agricultural Products Quality and Safety Testing and Inspection Integrated Center

Tonghua City Environmental Protection

Agency

Jilin Province Project Office of the World Bank

Environment Department of World

Bank

Environmental Impact Assessment Unit

Tonghua City Agriculture Committee

Environmental Supervision unit

Project Design Unit Project Supervision Unit

Local environmental

supervision organ

Accountability unit for

environmental measures during

construction period

Project Contractor

Figure 3.1-1 Environmental Management Organization Chart during Construction Period

Page 30: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-28-

Environmental management

content during operation period

Local environmental

supervision organ

Top environmental

supervision organ

Jilin Province Environmental Protection

Bureau

Tonghua City Agricultural Products Quality and Safety Testing and Inspection Integrated Center

Tonghua City Environmental Protection

Agency

Jilin Province Project Office of the World Bank

Environment Department of World

Bank

Tonghua City Agriculture Committee

Environmental Supervision unit

Accountability unit for

environmental measures during operation period

Director in charge of environmental

protection

Figure 3.1-2 Environmental Management Organization Chart during Operation Period

Part-time environmental protection personnel

Daily environmental management

Operation of pollution control facilities

Page 31: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-28-

3.1.2 Duty of Environmental Management Organization

According to characteristics of the project, environmental protection enforcement of this

project should be supervised by Jilin Province Environmental Protection Bureau and

Tonghua City Environmental Protection Agency, and accepts supervision of relevant

departments of the World Bank. During construction period, environmental supervisor

should be assigned to assist construction party with field examination.

Duties of all relevant environmental management organizations are as follows:

Environmental Department of the World Bank: according to relevant environmental

protection requirements of the World Bank, take charge of supervising the whole

process of the project, and put forward requirements for environmental protection of the

project.

Jilin Province Environmental Protection Bureau: according to domestic relevant

laws and regulations, take charge of supervising the whole process of the project, and

put forward requirements for environmental protection of the project; meanwhile, take

in charge of completion acceptance of “three simultaneousness” of the project; examine

the implementation of environmental management plan and review environmental

supervision plan and environmental monitoring report.

World Bank Loan Project Leading Group Office of Jilin Province (Jilin Province

Project Office): assist Environmental Department of the World Bank with

environmental supervision.

Tonghua City Environmental Protection Agency: according to requirements of

Environmental Department of the World Bank and Jilin Province Environmental

Protection Bureau, take charge of supervising the whole process of the project.

Supervise and examine prevention and control conditions of pollution by laboratory

wastewater, exhaust gas, noise and hazardous waste. Order those with illegal act to

rectify and improve in given time. Examination conditions and treatment results should

be recorded and kept on file after being signed by examiners and feed back to the unit

examined.

Tonghua City Agriculture Committee: make unified plans on the project, deploy and

Page 32: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-29-

coordinate early-stage preparations of the project, project implementation and

supervision and management. Make environmental supervision on the project during

construction period and operation period. Supervise environmental protection facility

“three simultaneousness” project construction situation to ensure project process go

smoothly.

Tonghua City Agricultural Products Quality and Safety Testing and Inspection

Integrated Center: ensure relevant environmental management measures of

environmental management organization, the World Bank are carried out, and assist

environmental management department with daily supervision.

Environmental supervisor: assist construction party in taking charge of supervising

the implementation status of environmental protection measures of construction site,

and assist environmental management organization in daily environmental supervision.

Main duty of environmental supervising engineer:

(1) Ensure all project permits and requirements and environmental management plans

are carried out before commencement of the project.

(2) Verify all employees in construction unit and operation unit carry out environmental

protection measures.

(3) Communicate with builders to help explain on-site environmental requirements;

provide suggestions for remedial measures, and provide remedial measures for projects

not conforming to initial intention; issue specifically formal guide for construction unit

and operation unit according to requirements.

(4) Communicate with construction unit and operation unit, and building consultant to

enhance communication; gain some other opinions on special problems to let building

management engineer quickly know those problems occurring in construction process,

which is helpful to solve problems; if the project causes potential damage to sensitive

target or project exists in project.

(5) Supervise implementation of environmental monitoring plan during construction

period, and supervise environmental protection facility “three simultaneousness” project

construction situation to ensure final completion time and pass environmental protection

acceptance smoothly.

Page 33: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-30-

Environmental protection personnel: carry out environmental protection laws and

regulations and standards, grasp environmental situation of inspection center, count and

analyze pollutant emission conditions, organize and establish environmental protection

plans and annual plans for the whole field, organize implementation; take charge of

environmental management, communication and education of environmental

knowledge and dissemination of new technology of the whole filed; examine running

conditions of environmental protection facilities regularly, solve problems found in time;

grasp running conditions of unit environmental protection facilities, establish pollution

source file, file of environmental protection facilities operation, make statistics on

environmental protection; establish and reserve experiment file, and the file should

record experimental activities and working status of facilities and equipments, and

conditions of harmless treatment, central treatment and inspection of waste water,

exhaust gas and hazardous waste created by experimental activities according to the

facts; establish environmental protection monitoring plan in accordance with

requirements of higher environmental protection departments, and organize and

coordinate to accomplish monitoring assignments. Coordinate to treat relevant pollution

accidents and pollution dispute, supervise and examine implementation status of “three

simultaneousness” system for newly-built, rebuilt, expanded projects and take part in

completion acceptance of environmental protection facilities and so on.

3.2 Environmental Monitoring Organization and Duty

According to characteristic of this project, construction unit will not set environmental

monitoring organization, and environmental monitoring can be entrusted to Tonghua

City Environmental Monitoring Station.

Tonghua City Agricultural Products Quality and Safety Testing and Inspection

Integrated Center and environmental supervising engineer will take charge of

supervision work of construction site, and environmental monitoring work during

construction and operation periods, mainly supervising environmental monitoring plan

during construction and operation periods according to monitoring plan in

environmental assessment.

Page 34: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-31-

Main duty: sincerely carry out national relevant environmental protection laws and

regulations and specification, establish and perfect all rules and regulations, accomplish

monitoring assignments; establish monitoring and analysis data statistics file and make

environmental report; accomplish environmental monitoring assignments entrusted by

Inspection Center; intensify maintenance and preservation and checking of

environmental monitoring instruments and equipments to ensure normal process of

monitoring.

Monitoring staff should take appointment with certificate, and be responsible for all

environmental monitoring materials; and they should be familiar with manufacturing

technique to improve business quality constantly and accept assessment of superiors.

3.3 Duty of Contractor

Choose contractor with capacity. Environmental impact mitigation measures during

construction period should be contained in bid document of the contractor, and at last it

should be included in construction contract as contract requirement on project

contractor to make sure environmental management plan is effectively carried out.

Duties of contractor are as follows:

(1) Contractor and construction supervisor must accept trainings on environmental

protection and environmental management before commencing construction; contractor

should assign one full-time environmental worker for the project. These environmental

workers should accept trainings in training plan to be competent for their work.

(2) During construction, contractor should communicate and confer with the masses in

the area where the project is located; set a bulletin board in each construction unit to

notify the public of detailed construction activities and construction time. Meanwhile,

provide contact person and telephone number so that the public can lodge a complaint

against construction activities and provide suggestions.

(3) Environmental protection management on site; construction unit should arrange

professional environmental protection personnel by itself taking charge of project

environmental management during construction period when taking good measures to

prevent and control sewage, exhaust gas, noise, and solid waste; the unit should furnish

Page 35: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-32-

acoustic meter to test environmental sensitive points around the project to ensure

acoustic environment of environmental sensitive points are controlled within quality

standard of acoustic environment.

(4) Reasonably arrange construction time. Not transport building materials in rush hour;

carrying vehicles should run according to designated line; construction creating high

noise such as demolishing walls or decoration should be done at daytime, and it is

forbidden at nighttime.

(5) Get done with occupational health management, safety management, and social

management of builders.

3.4 Personnel Training

Construction unit, contractor and supervising engineer must take part in compulsory

environmental, health and safety training before commencement of the project.

3.4.1 Training for Newly-added Full-time, Part-time Personnel in

Environmental Protection during Construction Period

Construction unit will entrust unit with quality to train full-time and part-time personnel

in environmental protection of construction and supervising units. The trainees are

engineering technique principals and full-time managerial personnel of all construction

and supervising units.

Course contents include:

1) National and Jilin Province laws and regulations, documents and relevant

requirements on environmental protection in construction project management;

2) Environmental measures and environmental protection requirements during

construction period put forward in project design;

3) Environmental protection guide of this project during construction period.

Environmental protection design principal in environmental protection bureau, design

unit and relevant experts in environmental assessment unit and monitoring unit can be

invited to give training and teaching.

Page 36: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-33-

3.4.2 Training for Newly-added Full-time, Part-time Personnel in

Environmental Protection during Operation Period

Environmental protection department will take charge of organizing and carrying out

training for newly-added part-time (or full-time) personnel in environmental protection

during operation period; relevant environmental protection experts in universities,

scientific research institutions and operation units can be employed to give lessons; and

they can take part in short-time training class.

Environmental protection training cost during construction and operation periods are 50

thousand Yuan totally.

Table 3.4-1 Schedule of Training Plan for Environmental Protection Personnel

Stage Classification Number of Person (Person) Time

Cost (Ten Thousand

Yuan)

Design and planning periods

Study on national advanced laboratories and pollution prevention and control project

1 Design and

planning periods

1.0

Construction period

Environmental protection personnel in construction unit and contractor unit

One person for each one After

confirming contractor and

before commencement

0.6

Environmental supervising engineer

One person in construction unit and one person in operation unit

0.6

All builders 30 persons 0.5

Before operation

Environmental management personnel in operation unit

1

After completion and before project

operation

0.5

Environmental personnel in operation unit

2 1.0

Experimental technical personnel in operation unit, communication and education and training on environmental protection

12 0.8

5.0

Page 37: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-34-

Table 3.4-2 Training Contents during Construction Period Training Content Training Term

Common environmental knowledge for builders

Introduce environmental impact factors and environmental protection measures related to environment; Introduction to environmental sensitive areas in construction area and noticeable environmental problems, and introduction to adjacent areas in construction area; Roles and duties of environmental management design engineer, environmental supervisors, building supervisors and keynotes of environment problem report; Waste management in camp building and construction site; Pollution control measures in construction site; Penalty for breaching regulations, laws and regulations;

Hold half-day study class on site

Common health and safety for builders

Include spread and protection paths; prevent HIV/AIDS and STD. Prohibition against alcoholic drinks and drug Process of seeking for medical assistance at state of emergency and non-emergency, and seeking for other related medical assistance. (Such as STD inspection, consultation) General knowledge on health and safety includes some basic process: traffic safety, electricity utilization safety, explosion, fire, and hazardous waste management Use individual protection apparatus Penalty for breaching laws and regulations

Hold half-day study class on site

Table 3.4-3 Training for Environmental Management Personnel of Operator

Trainee Training Content Training Term Environmental management personnel

World Bank project management procedure Filling, publicizing, communicating and report system of environmental information Environmental risk contingency Process of health and safety inspection and declaration

One day

Study on advanced technique and environmental management

Study on national advanced laboratories and pollution prevention and control project

Environmental personnel

Utilization of equipments includes standards, test, method, sample transfer, data quality control and monitoring and report requirements; Environmental risk contingency: Potential leakage and overflow, environmental and personal effect of leakage and overflow; Emergency reaction process includes preferential response, position and use of responding facility

Two days

All experimenters

World Bank project management procedure Treatment, disposal notices of “the three wastes” created during experiment; Proper use of environmental protection equipments; Environmental risk contingency: Potential leakage and overflow, environmental and personal effect of leakage and overflow; Emergency reaction process includes preferential response, position and use of responding facility

Before completion of project, one day.

Page 38: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-35-

4 Environmental Monitoring Plan

4.1 Aim of Environmental Monitoring

Environmental monitoring includes construction and operation periods. The aim is to

comprehensively and duly grasp pollution trend of project proposed to be built and learn

of environmental quality changes, area of effect of project construction and

environmental quality trend during operation period; feed back information to

competent department in time and provide scientific basis for environmental

management of the project.

4.2 Monitoring Implementation

Environmental monitoring during construction period and operation period is entrusted

by project contractor or operator to Tonghua City Environmental Monitoring Station,

which is national environmental quality monitoring certification unit with complete

equipments and powerful technical force, which can better accomplish environmental

monitoring assignment it undertakes.

According to the predicted outcome of environmental impact, taking sensitive point

polluted more obviously as monitoring point, and in accordance with pollution

conditions during construction and operation periods, confirm monitoring contents

according to acoustic environment, ambient air, surface water environment, ground

water environment affected greatly, and confirm monitoring factors according to

characteristic factor of pollution; monitoring analysis method will conform to the

method of relevant projects in Technical Specifications on Environmental Monitoring

issued by State Bureau of Environmental Protection, and assessment criterion will

follow up national standard confirmed by environmental assessment.

4.3 Environmental Monitoring Program

According to characteristics of project, environmental management of project during

operation period is merged into environmental management plan of the Inspection

Center. Environmental monitoring program of the project is mainly for environmental

monitoring during the construction period, main aim of environmental protection during

Page 39: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-36-

the construction period is to protect residents within 100m around the laboratory

building.

Environmental monitoring points: set environmental monitoring point at the position

close to environmental sensitive point target (residential area) in the section where

construction centers according to construction progress of the project; at the same

position, monitor ambient air and environmental noise of function area.

Page 40: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-37-

Table 4.3-1 Environmental Monitoring Plan at the Stage of Planning/Design

Consideration/Problem/Effect Management/Mitigation Measures Monitoring Cost (Ten

Thousand Yuan) Monitoring Item Time/Frequency/Duration Responsible

Institution 1. Waste water 1.1 Drainage system should be cleaned up and

diffluent; establish separate pipeline for domestic sewage and production sewage. 1.2 Establish a sewage disposal plant for experiment, discharge concentration of conventional pollutant in sewage from experiment after treatment reaches the tertiary standard in GB8978-1996 Integrated Discharge Standard for Sewage; discharge concentration of heavy metal reaches maximum acceptable emission standard of the first class of pollutant in GB8978-1996 Integrated Discharge Standard for Sewage.

Examine and verify design

Brought into procedure for engineering design and examination and approval

Design and examination and approval departments

Included in cost of design

2. Exhaust gas 2.1 Design ventilation and exhaustion systems according to relevant requirements in Building Technology Specifications for Bio-safety Laboratory GB50346-2004. 2.2 Mechanical smoke extraction ventilation systems are set in corridor, stair case, and washroom and so on, which can remove contaminated air at any time. Mechanical ventilation systems are set in local laboratories and inspection rooms to solve indoor ventilation problems without experiments and inspection work.

Examine and verify design

Brought into procedure for engineering design and examination and approval

Design and examination and approval departments

Included in cost of design

3. Noise 3.1 Adopt equipments with low noise, adopt vibration reduction method for equipment base, blower and pump etc. with high noise should be installed in sealed rooms, adopt soundproof doors and windows for rooms installed with equipments with high noise.

Examine and verify design

Brought into procedure for engineering design and examination and approval

Design and examination and approval departments

Included in cost of design

Page 41: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-38-

Table 4.3-2 Environmental Monitoring Plan during Construction Period

Consideration/Problem/Effect Management/Mitigation Measures Monitoring Cost (Ten

Thousand Yuan) Monitoring Item Time/Frequency/Duration Responsible

Institution 1. Domestic sewage from builders

1.1 Utilize original building washroom, domestic sewage is drained into urban sewerage and drainage pipe network

1.1.1 Examine whether the domestic sewage is drained into urban sewerage and drainage pipe network, domestic sewage is not allowed to drain at random

Construction period Construction unit, construction supervisor

Cost is included in cost of construction and supervision 2. Construction dust 2.1 Sprinkle water and reduce dust,

stacking and transportation of powdered raw material should be covered with tarpaulin

2.1.1 Examine whether there is dust Gusty and dry weather during construction period

Construction unit, construction supervisor

3. Noise 3.1 Choose equipments with low noise, plan construction time reasonably, avoid machines with strong noise from affecting surrounding residents 3.2 Replace uncultured construction technique with high noise with advanced construction technique with low noise

3.1.1 Construction site boundary reaches Noise Threshold for (GB12523-90) Construction Site

Construction period, surrounding field, once per month, twice per day (daytime, nighttime)

Construction unit, construction supervisor

1.5

4. Construction waste 4.1 Construction waste should be treated by classification, arrange special person to recycle the construction waste with recycle value; 4.2 Carry the construction waste without recycle value to local landfill for construction waste.

4.1.1 Examine whether recycle by classification. 4.1.2 Examine whether carry to designated landfill.

Construction period Construction unit, construction supervisor

Cost is included in cost of construction and supervision

5. Domestic garbage from workers

5.1 After collecting intensively, carry to Tonghua City domestic garbage landfill

5.1.1 Examine whether domestic garbage is collected intensively and sent to Tonghua City domestic garbage landfill

Construction period Construction unit, construction supervisor

Page 42: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-39-

Table 4.3-3 Environmental Monitoring Plan during Operation Period

Environmental Consideration/Problem/Effe

ct Management/Mitigation Measures

Monitoring Cost (Ten Thousand Yuan/Year

) Monitoring Item Time/Frequenc

y/Duration Responsible Institution

1. Exhaust gas from laboratory

1.1 Keep laboratory and inspection room ventilated and cleaned and the exhaust system under normal operation, exhaust high above the ground after purification and reaching the standard. 1.2 Operations creating toxic and harmful chemical gases should be done in fume hood. Set forced fume hood in inspection room, waste gas created by negative pressure collection during inspection shall be discharged into atmosphere through high exhaust funnel after being treated with high-efficiency particle air filter and reaching standard. 1.3 Mechanical smoke extraction ventilation systems are set in corridor, stair case, and washroom and so on, which can remove contaminated air at any time. Mechanical ventilation systems are set in local laboratories and inspection rooms to solve indoor ventilation problems without experiments and inspection work. 1.4 Replace high-efficiency particle air filter board regularly (6 months) to ensure rate of high-efficiency particle air filter reach more than 99.97%.

1.1.1 Exhaust emission of laboratory reaches the secondary standard in Integrated Emission Standard for Atmospheric Pollutant (GB16297-1996). Monitor exhaust emission port of laboratory: TSP, SO2, total hydrocarbon

Inspect four times per year

Tonghua City Environmental Protection Monitoring Station

2.0

Page 43: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-40-

2. Waste water: waste water created by experiment and domestic sewage from employees

1.1 Drainage system should be cleaned up and diffluent; establish separate pipeline for domestic sewage and production sewage. 1.2 Keep experimental sewage disposal facility under normal operation. 1.3 Sludge created by sewage disposal will be sent to Changchun City Lantian Hazardous Wastes Disposal Center Co., Ltd. for treatment.

1.1.1 Discharge of conventional pollutant in domestic sewage and experiment sewage reaches the tertiary emission standard of Integrated Discharge Standard for Sewage (GB8978-1996), and the emission of heavy metal should reach maximum acceptable emission standard of the first class of pollutant in GB8978-1996 Integrated Discharge Standard for Sewage. pH, COD, BOD, ammonia nitrogen, heavy metal (determine mercury, arsenic, lead etc. according to inspection contents), total coliform (piece/L)

Monitor four times every year;

Tonghua City Environmental Protection Monitoring Station

1.5

3. Noise 2.1 Keep sound insulation device under normal operation

2.1.1 Boundary reaches the first-class standard of Noise Standard for Industrial Enterprises at Boundary (GB12348-2008) Daytime ≤55dB(A) nighttime ≤45dB (A)

Around the boundary, four times per year, twice per day (daytime, nighttime)

Tonghua City Environmental Protection Monitoring Station

0.5

Page 44: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-41-

4. Solid waste

4.1 Disposal of common solid waste: Common solid wastes such as waste animal husbandry product, poultry, aquatic product samples from experiment and domestic garbage etc. will be uniformly sent to urban garbage disposal field by environmental sanitation department for sanitary landfill. 4.2 Disposal of hazardous waste: Hazardous wastes such as experimental equipments and apparatuses (one-off), culture medium, overdue experimental medicines or reagents, and sludge, waste active carbon etc. containing heavy metal created by sewage disposal plant should be collected by classification and sent to Changchun City Lantian Hazardous Wastes Disposal Center Co., Ltd. for treatment.

4.1.1 Examine whether different solid waste is collected intensively and sent to designated disposal plant or landfill

Examine once per month

Tonghua City Environmental Protection Monitoring Station

Page 45: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-42-

5 Environmental Management Plan Monitoring Estimation Implementation of EMP measures involves many units, so channels of fund sources are

different. Most environmental activities are project measures. Therefore, they should be

provided by project construction units and operation units, and included in project cost.

The cost will be nailed down and listed in bid document for bidding. Please refer to

table 6.1-1.

Table 6.1-1 Provisional Budget for Environmental Management Plan Monitoring Items Environmental

Supervision/Overhead Expenses

Monitoring Cost Training Cost Total

Budget during construction period

(Yuan)

10000 15000 27000 52000

Budget during operation period

(Yuan/year)

- 40000 23000 63000

Through estimating, total cost of project EMP is 11.5 thousand Yuan.

6 Report Contractor, construction unit, supervising unit and project office should record and

report project progress, implementation status of EMP, environmental quality

monitoring outcome and so on to relevant department in time during implementation of

the project, which mainly contains the following six parts:

(1) Environmental supervising engineer of the project will make detailed record on

implementation status of EMP by the month, and submit monthly report to project

owner and municipal (state) project office; the monthly report should contain

implementation status of environmental protection measures, development condition of

environmental monitoring and monitoring data.

(2) Contractor and operator make detailed record on project progress and

implementation status of EMP by the quarter and report the quarterly report to project

office, and send a duplicate of monthly report to state and municipal bureaus in time.

(3) After accomplishing entrusted monitoring assignments, the monitoring unit should

submit monitoring report to contractor (operator) and environmental supervising

engineer in time.

Page 46: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-43-

(4) State and municipal project offices should submit project progress report to

provincial project office, and send a duplicate of it to provincial environmental

protection bureau in time. The project progress report (semiannual report) prepared by

the project office must contain implementation content of EMP, such as implementation

progress and effect of EMP, especially environmental monitoring outcome and so on.

(5) If any serious violation of environmental protection, environmental supervising

engineer and project office will report to local competent administrative department for

environmental protection, and report to a higher body gradually.

(6) Performance report of EMP must be finished and submitted to the World Bank

within requested time by the World Bank.

Performance report of EMP contains the following key contents:

1) Project progress;

2) Implementation situation of EMP: include implementation situation of training plan,

implementation status of environmental protection measures of the project, and

development condition of environmental monitoring and main monitoring data;

3) Whether there is public complaint; if any complaint, record main content of

complaint, resolutions and degree of public satisfaction;

4) Implementation plan of EMP in the next year.

7 Public Participation

7.1 Information Disclosure

According to relevant regulations on Temporal Method of the Public Participation in

Environmental Impact Assessment (HF [2006] No. 28), environmental assessment unit

should post public notice in surrounding residential area around the project area on Apr.

16, 2009, release environmental impact assessment information bulletin of the project in

Jilin Province Environmental Information Network on Jun. 5, 2009, and send concise

edition of environmental impact assessment report and first draft of environmental

management plan of the project to Provincial Project Office and Research Academy of

Environmental Sciences for further public opinions. There is no public report of an

offence or complaint during duration of public summons, or feedback suggestions.

Page 47: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-44-

7.2 Public Participation Investigation

(1) Hold Public participation forum

Forum preparation:

On Jul. 6, 2009, laboratory Project Working Team of Tonghua City Inspection Center

notifies residents to hold public forum on environmental impact assessment of

laboratory project of Tonghua City Inspection Center at 10 a.m. on July 6. There are 26

persons (including organizers and participants) taking part in the forum.

Location of forum: Station Master Room of Tonghua City Agro-Technical Extension

Integrated Station

Time: 10 a.m., Monday, Jul. 6, 2009

List of forum organizers: 5 persons including Zhao Fucheng and so on; please refer to

table 7.2-1.

List of Persons (Residents) Taking Part in the Forum: 21 persons including Song Yajie,

please refer to table 7.2-2.

Forum Scene Forum Scene

Forum Scene Forum Scene

Page 48: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-45-

Table 7.2-1 List of Organizers of Public Participation in Residents’ Forum Table 1 List of Organizers of Public Participation in Forum of Tonghua City Inspection Center Laboratory Project Name Sex Unit Title Tel Zhao Fucheng Male Tonghua City

Agricultural Committee

Deputy Director

13943407167

Li Yafeng Male Tonghua City Agricultural Products Quality and Safety Supervision and Testing Station

Researcher 13944545801

Li Chuanjun Male Tonghua City Land Fertilizer Workstation

Researcher 13894538203

Ye Baoku Male Tonghua City Plant Protection Station

Researcher 13604457696

Xiao Zengmin Male Tonghua City Agricultural Science Station

Senior Agronomist

13943585839

Table 7.2-2 List of Residents of Public Participation in Public Participation Table 3 Attendance Book of Public Participation in Forum of Tonghua City Inspection Center Laboratory Project

Name

Unit

Title

Tel.

Residential

area

Distance from

Proposed Construction

Site

Signature

Song Yajie

Self-employed business

3621125 No. 11 Xinguang

Road

30 Song Yajie

Sun Fujuan

Self-employed business

13894519745 No. 11 Xinguang

Road

80 Sun Fujuan

Jiang Yazhen

Retired 3615133 No. 11 Xinguang

Road

50 Jiang Yazhen

Zhou Xizhen

Retired 13069276661 No. 11 Xinguang

Road

30 Zhou Xizhen

Sun Shulan

Retired 13654354038 No. 11 Xinguang

Road

80 Sun Shulan

Miao Dezhen

Retired 3621590 No. 11 Xinguang

Road

30 Miao Dezhen

Wan Yuhua

Retired 15943581590 No. 11 Xinguang

Road

80 Wan Yuhua

Page 49: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-46-

Zhang Yulan

Retired 15043558436 No. 11 Xinguang

Road

30 Zhang Yulan

Gao Chao

Farm Machine Management

Station

Engineer 13500956977 No. 11 Xinguang

Road

30 Gao Chao

Li Xiaohai

Farm Machine Management

Station

Senior Technician

13674358399 No. 11 Xinguang

Road

50 Li Xiaohai

Liang Shufen

Agricultural Sciences

Integrated Station

Senior Agronomist

3616692 No. 11 Xinguang

Road

50 Liang Shufen

Chen Zhixun

Farm Machine Management

Station

Engineer 15043559188 No. 11 Xinguang

Road

30 Chen Zhixun

Qiao Runping

Training class for cadre

Senior Economist

13834553989 No. 11 Xinguang

Road

30 Qiao Runping

Zhang Xiuli

Seed Control Station

Senior Agronomist

3962116 No. 11 Xinguang

Road

30 Zhang Xiuli

Table 3 Attendance Book of Public Participation in Forum Tonghua City Inspection Center Laboratory Project

Name

Unit

Title

Tel.

Resident

Area

Distance from Proposed

Construction Site

Signature

Wang Dapeng

Municipal Agricultural Committee

Assistant Agronomist

13843599752 No. 11 Xinguang

Road

30 Wang Dapeng

Meng Qingyun

Self-employed 3617455 No. 11 Xinguang

Road

30 Meng Qingyun

Liu Baotian

Municipal Agricultural Committee

Researcher 13364357705 No. 11 Xinguang

Road

80 Liu Baotian

Na Aili Self-employed 3624686 No. 11 Xinguang

Road

30 Na Aili

Qiao Junzhe

Municipal Plant Protection

Station

Agronomist 3999883 No. 11 Xinguang

Road

80 Qiao Junzhe

Sang Lidong

Self-employed 13766189599 No. 11 Xinguang

Road

30 Sang Lidong

Liu Fengqin

Retired 2972105 No. 11 Xinguang

Road

50 Liu Fengqin

Huang Shulin

Municipal Jingyue Middle

School

3652199 No. 11 Xinguang

Road

190 Huang Shulin

Zhang Yuguo

Municipal Jingyue Middle

School

3652168 No. 11 Xinguang

Road

190 Zhang Yuguo

Page 50: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-47-

Minutes:

On Jul. 6, 2009, laboratory project working team of Tonghua City Inspection Center

holds residents’ forum in the Station Master Room of Tonghua City Agro-Technical

Extension Integrated Station; there are 21 residents near the laboratory taking part in the

forum. The laboratory project working team firstly introduces general situation, and

environmental management plan of the project, and gives account of effulent pollution

problem commonly concerned by people: the first is: through inspection of Provincial

Agricultural Products Inspection Center, the up-to-standard rate of agricultural products,

especially vegetable reaches 90-95%, but the agricultural products quality and safety

conditions are not optimistic; it is imperative under the situation to build agricultural

products safety inspection center. The second is to emphasize public participation by

utilizing World Bank loan item, seeking for opinions from nearby residents, which will

be beneficial to smooth development of the project. The third is not to build laboratory

newly, but to rebuild the building on the basis of three laboratories such as Agricultural

Sciences Station, Plant Protection Station, and Clay Fertilizer Station, which will

discharge less pollutants. Main reasons: 1. Purchase newer and more advanced

apparatuses and equipments, less sample weight, higher inspection accuracy, less

discharged pollutants. 2. Inspections of pesticide, veterinary medicine, fishery medicine

products are entrusted to provincial relevant departments. 3. Exhaust gas from the

laboratory will be collected by way of negative pressure and filtered with

high-efficiency particle air filter, and discharged through exhaust funnel after reaching

standards; sewage created will be treated with sewage disposal device and discharged

after reaching national standards; For solid wastes, common solid wastes will be sent to

urban garbage disposal plant for united treatment after classification; the hazardous

wastes will be collected intensively, and gradually sent to Changchun City Lantian

Hazardous Wastes Disposal Plant for united treatment. The project will not cause great

effect on the surrounding environment.

For possible environmental impact factors and proposed environmental protection

measures, the project team seeks for opinions from nearby residents, and deeply learns

of public awareness of the significance and function of project construction and

Page 51: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-48-

opinions on regional environmental quality, and earnestly hears suggestions and

opinions of residents on environmental protection of the project, and fills in the

questionnaire. At the forum, they commonly discuss the benefits of this project to

agricultural products quality and safety, and widely hear opinions and suggestions of the

masses. Some residents air their opinions on the project and put forward suggestions,

now make a summary as follows:

1) Jiang Yazhen (No. 11, Xinguang Road, worker 70-year old)

Question: exhaust gas from the laboratory during the operation will cause effect on

residents’ life, and prevention and control measures should be intensified.

Reply of the project team: exhaust gas from the laboratory will be collected by way of

negative pressure and filtered with high-efficiency particle air filter, and discharged

through exhaust funnel after reaching national standards, which will not cause effect on

nearby residents; especially the provincial and municipal environmental protection

departments will supervise it, please set your mind at rest.

2) Zhang Xiuming (No. 11, Xinguang Road, retired cadre, 64-year old)

Question: what will the Inspection Center inspect? Do not carry out project inspection

experiments of microorganism and viruses etc. causing harm to human being or

environment.

Reply of the project team: the Inspection Center will inspect pesticide, heavy metal and

harmful and toxic matters of agricultural products such as foodstuff, vegetables, fruit,

animal husbandry products and aquatic products and so on and the agricultural

environment such as soil, water and atmosphere and so on and the sanitary conditions of

agricultural products; the inspection of pesticide, veterinary medicine and fishery

medicine etc. causing greater effect to the environment will be entrusted to provincial

relevant departments.

Forum conclusions:

The masses taking part in the forum discuss other matters of the inspection center; at

last, they unanimously hold that it is to make transformations on the original laboratory,

and the project construction is beneficial to improve laboratory environment and

agricultural products quality and safety of our city and province, which can guarantee

Page 52: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-49-

safe and secure agricultural products for local masses; therefore, they hold that the

project should be constructed as soon as possible.

Because the proposed laboratory building is near to residential area, the assessment

suggests installing equipments such as blower and so on with high noise in sealed room.

If the design requires installing equipments on the roof, it is suggested to build simple

sound insulation room to reduce noise of blower.

(2) Visit Tonghua City Jingyu Middle School

The project team specially seeks for opinions from Huang Shulin and Zhang Yuguo,

representatives of Tonghua City Jingyu Middle School (200m or so away from the

proposed construction site in the northeast) on the proposed construction site. The

representatives of the school have some considerations for the project at the beginning,

but the project team explains that the construction site is only for laboratory, and the

project is just to enlarge and rebuild the existing laboratory building; at last the

representatives agree with the project construction.

(3) Statistics and analysis on summarized results of public questionnaire

The forum recovers 21 copies of public questionnaires in the public participation

investigation, and there are 2 copies of questionnaires recovered through visiting and

investigating after the forum, totally 23 copies. The findings of investigation indicate

that only 4.3% is satisfied with agricultural products quality and safety of Jilin Province.

73.9% is not satisfied; 100% of the informants holds that the agricultural products

quality and safety of Jilin Province needs to be improved, and the construction of this

project is beneficial to improve agricultural products quality and safety; 56.5% of the

public holds that they are mostly worried about problems in the construction period, and

only 4.5% holds that the construction will cause effect on the environment, which

accords with the practical situation; main impacts during the construction period involve

air contamination and noise contamination, which occupies 69.6% and 56.5%

respectively. 95.6% persons hold that these effects can be prevented and controlled by

adopting effective measures, only 4.4% (one person) holds that he has no idea about it;

100% of the public is in favor of the construction.

Page 53: Environmental Management Plan of Inspection Center ... · Environmental Management Plan of Tonghua City Agricultural Products Quality and Safety Inspection Center Construction Project

Environmental Management Plan

-50-

8 Dispute Complaint Channel

8.1 Establishment and Constitution of Complaint Organization

In order to better guarantee legal right of person affected, complaint system will be

established, which provides a convenient, transparent, fair and efficient complaint path

for persons affected. For this reason, leading group for environmental impact complaint

acceptance for this project is established. The team leader of Tonghua City

Environmental Protection Agency Inspection Team will be the part-time group leader.

Its group members are from Jilin Province Agriculture Comprehensive Development

Office, Tonghua City Environmental Monitoring Station, and environmental assessment

unit and so on. Environmental impact complaint acceptance office is responsible for

collection and arrangement, and puts forward handling suggestions after consulting with

relevant responsible units.

8.2 Complaint Procedure

Leading group and office of complaint acceptance will accept complaint within one

week after the commencement of project, and put complaint hotline telephone and

mailbox into operation. Detailed complaint procedures are as follows:

If a person affected holds that his right in any aspect of environmental protection is

encroached, he can file a complaint to complaint acceptance office in written or oral

form. For oral complaint, member of complaint acceptance office should record in

detail and arrange it, and submit handling suggestions within two weeks.

If the complainant is not satisfied with the suggestion of complaint acceptance office, he

can file a complaint to Jilin Province Environmental Protection Bureau in written form

within one month after receiving handling suggestions, and the Environmental

Protection Bureau will give handling suggestions within three weeks.

If the complainant is still not satisfied with handling suggestions of Municipal

Environmental Protection Bureau, he can appeal to local People’s Court for hearing and

adjudication after receiving handling suggestions according to Civil Procedure Law of