Environmental Impact Assessment for Expansion of Ferro Alloys unit Production (Addition of 2 x 9 MVA Submerged Electric Arc Furnace) at Plot No.368, APIIC Growth Centre, Bobbili Village & Mandal, Vizianagaram District, Andhra Pradesh Season : December 2016 to February 2017 Project Proponent: M/s. Berry Alloys Limited Plot No.368, APIIC Growth Centre, Bobbili Village & Mandal, Vizianagaram District, Andhra Pradesh. Environment Consultant: Sri Sai Manasa Nature Tech Pvt. Ltd., QCI/NABET Accredited Vide S. No. 137, (Dated 05.02.2018 displayed on NABET website ) Plot No. 74/A, Flat No 102, Central Bank Building Kalyan Nagar, Hyderabad 500038 E-mail: [email protected] , web: www.ssmntgroup.com Contact no. 040-2316333, Fax No.: 040-23816222 February 2018 File no.: J-11011/1129/2007-IA-II(I) FINAL REPORT AFTER PUBLIC HEARING

Upload: nguyencong

Post on 20-Aug-2018

258 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Environmental Impact Assessment for

Expansion of Ferro Alloys unit Production (Addition of 2 x 9 MVA Submerged Electric Arc Furnace)

at Plot No.368, APIIC Growth Centre, Bobbili Village & Mandal,

Vizianagaram District, Andhra Pradesh

Season : December 2016 to February 2017

Project Proponent: M/s. Berry Alloys Limited

Plot No.368, APIIC Growth Centre, Bobbili Village & Mandal, Vizianagaram District, Andhra Pradesh.

Environment Consultant:

Sri Sai Manasa Nature Tech Pvt. Ltd., QCI/NABET Accredited Vide S. No. 137, (Dated 05.02.2018 displayed on NABET website )

Plot No. 74/A, Flat No 102, Central Bank Building Kalyan Nagar, Hyderabad 500038

E-mail: [email protected] , web: www.ssmntgroup.comContact no. 040-2316333, Fax No.: 040-23816222

February 2018

File no.: J-11011/1129/2007-IA-II(I)

FINAL REPORT AFTER PUBLIC HEARING

Page 2: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

DECLARATION OF CONSULTANT

Declaration by Experts contributing to the EIA report for M/s. Berry Alloys Limited Expansion of Ferro Alloys unit Production (Addition of 2 x 9 MVA Submerged Electric Arc Furnace) at Plot No.368, APIIC Growth Centre, Bobbili Village & Mandal, Vizianagaram District, Andhra Pradesh. 3(a) Metallurgical industries (ferrous & non ferrous) Category-"A" As per EIA Notification 2006 and its Amendment there of. I, hereby, certify that I was a part of the EIA team in the following capacity that developed the above EIA. EIA Coordinator Mr. Vipin Kumar

Signature

Date

Period of involvement Contact information

16/05/2018

December 2016 to May 2018

Functional Area Experts

S.No.

1.

2.

3.

4.

5.

Functional areas

AP

WP

SHW

SE

EB

Name of Expert

Mr. Vipin Kumar

Dr. CH Rajani Kumari

Ms. Reshma Thakur

Mr. A.Mohan Reddy

Dr. CH Rajani Kumari

Involvement (period and task)

Site visits followed by selection of monitoring locations, Supervision of air quality monitoring, Identification of probable impacts of different air emission from the plants/ facilities proposed, suggesting most suitable control device and contribution to EIA documentation. Site visit & supervision & checking of sampling locations for surface water & Ground water samples & their analysis results, Water use auditing, water balance, water budgeting, water conservation and developing scheme for reuse of water, identification of impacts, finalization of mitigation measures and contribution to EIA documentation. Identification of waste generated from the site, confirming adequacy of mitigation measures for management of hazardous waste and contribution to EIA documentation Conducting baseline socio-economic surveys through interviews/ questionnaire from the surrounding area/villages of the proposed project, impact identification and mitigation measures for incorporating to EIA documentation Site visit and conduct of ecological survey and preparation of status report for rare endangered and threatned species of animals and plants and also species protected under national laws, assessment of the impacts of proposed project activities on the biological environment and contribution to EIA documentation

Signature and Date

Page 3: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

S. No.

6.

7.

8.

9.

10.

11.

12.

Functional areas

HG

GEO

SC

AQ

NV

LU

RH

Name of Expert

Mr. N.H. Reddy

Dr. N.H. Reddy

Mr. Sunderao Duggaraju

Mr. Subramanyam Adapa

Mr. Subramanyam Adapa

Mr. Subramanyam Adapa

Mr. K. Raji Reddy

Involvement (period and task)

Understanding and representing groundwater conditions, supervision of groundwater sampling locations,

Signature and Date

finalization of survey findings, /\/ ��identification of impacts, suggestion of mitigation measures and contribution to the EIA documentation Identification of impacts, suggestion of mitigation measures and /\/ �..t.-':t-­contribution to the EIA documentation cl Site visits followed by selection of monitoring locations, Supervision of soil quality monitoring, Identification of probable impacts of different air emission from the plants/ facilities proposed, suggesting most suitable control device and contribution to EIA documentation. Evaluation of meteorological data with collected secondary data, modeling

)

and prediction, identification of J7o ..., t,.,

impacts, finalization of mitigation I �- S:, measures and contribution to EIA � · documentation Checking of noise sampling results, .,. J � analysis of data, identification of I L , �. OU I � impacts and mitigation measures, and 'f? / contribution to EIA documentation. Generation and analysis of data related to land use pattern. Development of landuse maps of study area using ArcGIS / related tools, site visit for ground truth survey, finalization of landuse maps, contribution to EIA documentation. Identification of hazards and hazardous substances Preparation of impacts diagrams & mitigation measures, preparation of disaster management plan, contribution to EIA documentation.

Declaration by the Head of the Accredited Consultant Organization/ authorized person

I, Dr. CH Rajni Kumari, hereby, confirm that our experts prepared the EIA report for M/s. Berry Alloys Limited (Expansion of Ferro Alloys unit Production (Addition of 2 x 9 MVA Submerged Electric Arc Furnace Plot No.368, APIIC Growth Centre, Bobbili Village & Mandal, Vizianagaram District, Andhra Pradesh. I also confirm that I shall be fully accountable for any mis-leading information mentioned in this statement.

Signature ��a.,_�- �

Name Designation Name of the EIA Consultant Organization

NABET Certificate No. & Valid Date

Dr. CH Rajani Kumari

Mainaging Director

Sri Sai Manasa Nature Tech Pvt. Ltd. Plot No. 7 4/A, Flat No. 102, Central Bank Building, Kalyan Nagar, Hyderabad -500038 NABET/EIA/1518/RA 017 - Nov 18, 2018

Page 4: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad i

CONTENTS

S. No Chapters Page. No. 00 EXECUTIVE SUMMERY ES1-ES13 1.0 INTRODUCTION CH1-1 1.1 Purpose of the Report CH1-1 1.2 Identification of Project & Project Proponent CH1-1 1.3 Project Cost CH1-2 1.4 Nature, Size and Location of Project Site CH1-2 1.5 Project Importance CH1-7 1.6 Scope of Study CH1-7

1.6.1 Methodology of REIA CH1-8 1.6.2 Micro Meteorology CH1-9 1.6.3 Ambient Air Quality CH1-9 1.6.4 Noise Environment CH1-10 1.6.5 Water Environment CH1-10 1.6.6 Land Environment CH1-10 1.6.7 Biological Environment CH1-10 1.6.8 Socio- Economic Environment CH1-10 1.6.9 Prediction of Impacts, Environmental Management Plan & Disaster

Management Plan CH1-11

1.7 Compliance to The Terms of Reference CH2-12 2.0 PROJECT DESCRIPTION CH2-1 2.1 Type of Project CH2-1 2.2 Need for the Project CH2-1 2.3 Location of the Project & Site Layout CH2-1 2.4 Size or Magnitude of Operation CH2-4 2.5 Raw Material Requirement CH2-5

2.5.1 Material Balance CH2-6 2.5.2 Source of Raw Materials CH2-6 2.6 Utilities CH2-6

2.6.1 Water Requirement CH2-6 2.6.2 Land Requirement CH2-7 2.6.3 Power Requirement CH2-7 2.6.4 Man Power Requirement CH2-8 2.7 Technology and Process Description CH2-8

2.7.1 Basic Process CH2-8 2.8 Plant Facilities & Other Requirements CH2-13

2.8.1 Raw Material Receipt and Storage Yard CH2-13 2.8.2 Raw Material Handling System CH2-13 2.8.3 Submerged Electrical Arc Furnace for proposed Expansion CH2-13 2.8.4 Hot Metal Handling CH2-14 2.8.5 Control & Instrumentation (C & I) CH2-14 2.8.6 Utilities & Services CH2-14 2.9 Pollution Control Equipment and Its Description CH2-16

2.10 Project Implementation Schedule CH2-18 3.0 DESCRIPTION OF ENVIRONMENT CH3-1 3.1 Study Area, Period, Components & Methodology CH3-1

Page 5: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad ii

S. No Chapters Page. No. 3.1.1 Study Area CH3-1 3.1.2 Study Period CH3-1 3.1.3 Environmental Components CH3-1 3.1.4 Methodology CH3-1 3.2 Baseline Environment CH3-3

3.2.1 Micro Meteorology Of Study Area CH3-3 3.2.2 Wind Pattern During Study Period (From December 2015 – February

2016) CH3-3

3.3 Ambient Air Quality CH3-5 3.3.1 Identifications Of Various Industrial Operations In The Study Area CH3-5 3.3.2 Topography / Terrain And Sensitive Areas Of The Study Area CH3-5 3.3.3 Identification of Ambient Air Quality Monitoring Stations CH3-5 3.3.4 Sampling & Testing Methodology CH3-6 3.3.5 Analysis Of Baseline Concentrations CH3-6 3.4 Noise Environment CH3-9 3.5 Water Environment CH3-12 3.6 Land Environment CH3-17

3.6.1 Soil Quality CH3-17 3.7 Geology and Hydrogeology CH3-20

3.7.1 General CH3-20 3.7.2 Physiography and Drainage CH3-20 3.7.3 Geology CH3-20 3.7.4 Geomorphology and Geohydrology CH3-21 3.7.5 Soil and Land use CH3-21 3.7.6 Geotechnical Characteristics and Natural Hazards CH3-21

3.8 Land Use Studies CH3-21 3.8.1 Objectives CH3-21 3.8.2 Methodology CH3-22 3.8.3 Land use Based on Secondary Data CH3-22 3.9 Ecology CH3-25

3.9.1 Introduction CH3-25 3.9.2 Methodology CH3-25 3.9.3 Terrestrial Ecological Status CH3-25 3.9.4 Endangered Animals CH3-27 3.10 Socio-Economic Survey CH3-27

3.10.1 Methodology Adopted for the Study CH3-27 3.10.2 Review of Demographic and Socio-Economic Profile- 2011 CH3-27 3.10.3 Demography CH3-28 3.11 Traffic Survey CH3-29 4.0 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES CH4-1 4.0 Introduction CH4-1 4.1 Impacts During Construction Phase CH4-2

4.1.1 Impact on Air Quality CH4-2 4.1.2 Impact on Water CH4-2 4.1.3 Impact on Noise CH4-2 4.1.4 Impact on Land Use CH4-3 4.1.5 Impact on Soil Quality CH4-3 4.1.6 Impact on Ecosystem CH4-3 4.1.7 Mitigation Measures during Construction Phase CH4-4

Page 6: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad iii

S. No Chapters Page. No. 4.1.8 Facilities for Construction Workforce CH4-5 4.2 Impact during Operational Phase CH4-5

4.2.1 Impact on Land Use CH4-5 4.2.2 Impact on Soil Quality CH4-6 4.2.3 Impact on Topography CH4-6 4.2.4 Impact on Air Environment CH4-6 4.2.5 Stack Height Estimation CH4-8 4.2.6 Meteorological Data CH4-8 4.2.7 Application Of Iscst3 For Prediction Of Ground Level Concentration CH4-9 4.2.8 Noise Environment CH4-14 4.2.9 Water Environment CH4-18

4.2.10 Solid Waste Generation CH4-18 4.2.11 Traffic Details CH4-18 4.2.12 Rain Water Harvesting /Recharge Plan CH4-19 4.2.13 Socio-economic Impacts CH4-19

5.0 ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE) CH5-1 5.1 Analysis of Alternative Technology CH5-1 5.2 Analysis of Alternative Sites CH5-1 6.0 ENVIRONMENTAL MONITORING PROGRAM CH6-1 6.0 Introduction CH6-1 6.1 Environmental Monitoring CH6-1 6.2 Monitoring Points / Locations And Components CH6-1 6.3 Monitoring Parameters and Frequency CH6-2 6.4 Monitoring Methodologies CH6-2 6.5 Reporting and Documentation CH6-2 6.6 Budget and Procurement Schedule CH6-3 7.0 ADDITIONAL STUDIES CH7-1 7.0 Introduction CH7-1 7.1 Risk Assessment CH7-1

7.1.1 Risk during Construction Phase CH7-1 7.1.2 Risk during Operational Phase CH7-4

7.1.3 Risk Analysis Methodologies CH7-4 7.2 Potential Risk Area Assessment in Ferro Alloys Plant CH7-8

7.3 Disaster Management Plan CH7-8 7.3.1 Definition CH7-8 7.3.2 Scope CH7-8 7.3.3 Objective CH7-8

7.3.4 Identification of Hazards CH7-9 7.3.5 Safety Measures for Storage and Handling of Chemicals CH7-9

7.4 Emergency Planning CH7-10 7.4.1 General CH7-10 7.4.2 Emergency Planning for Disaster due to Fire CH7-11 7.4.2.1 Classification of Fire CH7-11 7.4.3 Need of Establishing a Fire Fighting Group CH7-11 7.4.4 Inspection CH7-12 7.4.5 Procedure for Extinguishing Fire CH7-12 7.4.6 Fire Fighting with Water CH7-12

Page 7: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad iv

S. No Chapters Page. No. 7.4.7 Sources of Water for Fire Fighting CH7-12 7.4.8 Fire Fighting with Fire Extinguishers CH7-12 7.5 On–Site Emergency Plan CH7-13

7.5.1 Introduction CH7-13 7.6 Preparation of Plan CH7-13 7.6.1 Alarm System CH7-13 7.6.2 Communication CH7-13 7.6.3 Fire Protection System CH7-14

7.6.3.1 Fire Fighting System CH7-14 7.6.4 First Aid CH7-14 7.6.5 Security CH7-15 7.6.6 Safety CH7-15 7.6.7 Evacuation Procedure CH7-15 7.6.8 Emergency Control Center CH7-15 7.6.9 Communication Equipments and Alarm Systems CH7-16

7.6.9.1 Sirens CH7-16 7.6.10 Personal Protective Equipments CH7-17 7.6.11 Procedure for Testing and Updating the Plan CH7-18 7.6.12 Disclosure of Information to Worker and Public Awareness System in

Existence and Anticipated CH7-18

7.7 Off-Site Emergency Preparedness Plan CH7-19 7.8 Occupational Health and Safety CH7-22 7.9 Public Consultation CH7-26 8.0 PROJECT BENEFITS 8.0 Introduction CH8-1 8.1 Improvement in Physical Infrastructure CH8-1 8.2 Improvement in Social Infrastructure CH8-1 8.3 Employment Potential CH8-2 8.4 Other Tangible Benefits CH8-2 9.0 ENVIRONMENTAL COST BENEFIT ANALYSIS 9.0 Introduction CH9-1

10.0 ENVIRONMENTAL MANAGEMENT PLAN CH10-1 10.0 Introduction CH10-1 10.1 Pollution Control System CH10-2

10.1.1 Air Environment CH10-2 10.1.2 Action Plan to Control Fugitive Emission CH10-2 10.1.3 Waste Water Environment CH10-3 10.1.4 Solid Waste Environment CH10-3 10.1.5 Noise Environment CH10-3 10.1.6 Green Belt Development CH10-3

10.1.6.1 Eco System CH10-4 101.6.2 Plantation Techniques CH10-5 10.1.6.3 Aftercare and Monitoring CH10-5 10.1.6.4 Baseline data and Potential Impacts of the Study Area CH10-5 10.1.6.5 Recommendation on Green Belt Development CH10-6 10.1.7 Occupational Health and Safety CH10-8 10.1.8 Personnel Protective Equipments CH10-8

Page 8: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad v

S. No Chapters Page. No. 10.2 Overall Recommendation and Implementation Schedule CH10-10

10.2.1 Introduction CH10-10 10.2.2 Implementation Schedule and Environmental Management Cell. CH10-10 10.2.3 Budget for Implementation Environment Management Plan CH10-11 10.2.4 Budget for CSR Activity CH10-11 11.0 SUMMARY AND CONCLUSION CH11-1 11.0 Introduction CH11-1 11.1 Environmental Clearance CH11-1 11.2 Terms of Reference CH11-1 11.3 Brief Description of Project CH11-1 11.4 Mitigation Measures CH11-2

11.4.1 Air Pollution Control Measures CH11-2 11.4.2 Water Quality Management CH11-2 11.4.3 Noise Pollution Control CH11-2 11.4.4 Greenbelt Development and Plantation CH11-3 11.5 Conclusion CH11-3 12.0 DISCLOSURE OF CONSULTANT CH12-1

ANNEXURE 1 Terms of Reference 2 EC Compliance Report 3 Existing EC Letter 4 Existing CFO Letter 5 Map of Industrial Area 6 List of Major Industries in Surrounding 7 Safety Health and Environment Policy of Company 8 AAQ Data 9 Socio economic Impact Report

10 Public Hearing Details

LIST OF FIGURES

Figure 1.1 Location Map CH1-4 Figure 1.2 Google Image of the Project Site CH1-5 Figure 1.3 10 KM Study Area Map of the Project Site CH1-6 Figure 2.1 Plant Layout CH2-2 Figure 2.2 Site Photographs CH2-3 Figure 2.3 Process Flow Chart of Ferro Alloy Project CH2-8 Figure 2.4 Typical Manufacturing Process of Ferro Manganese CH2-11 Figure 2.5 Typical Manufacturing Process of Silico Manganese CH2-12 Figure 3.1 Environmental Parameters Sampling Photographs CH3-2 Figure 3.2 Wind Rose Diagram CH3-4 Figure 3.3 Ambient Air Quality Monitoring Stations CH3-7 Figure 3.4 Noise Monitoring Locations CH3-11 Figure 3.5 Water Sampling Locations Map CH3-16 Figure 3.6 Soil Sampling Locations Map CH3-19 Figure 3.7 Pie Diagram for Land Use Pattern in the Study Area CH3-22

Page 9: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad vi

Figure 3.8 FCC map of the 10 Km Study Area CH3-23 Figure 3.9 Landuse Map of the Study Area CH3-24 Figure 4.1 Ground Level Concentrations of PM CH4-12 Figure 4.2 Ground Level Concentrations of NOx CH4-13 Figure 4.3 Noise Dispersion Contour CH4-16 Figure 7.1 Emergency Control Plan CH7-17

Figure 10.1 Greenbelt/Green Cover Plan CH10-7 Figure 10.2 Environmental Management Cell CH10-10

LIST OF TABLES

Table 1.1 Project Details CH1-2 Table 1.2 Environmental Attributes And Frequency Of Monitoring CH1-11 Table 2.1 Salient Features of the Project Site CH2-4 Table 2.2 Existing and Proposed Products Quantities CH2-5 Table 2.3 Raw Material Characteristics CH2-5 Table 2.4 Ferro Manganese Material Balance CH2-6 Table 2.5 Silico Manganese Material Balance CH2-6 Table 2.6 Material Balance for Production CH2-6 Table 2.7 Water Requirement CH2-7 Table 2.8 Land Break Up Details CH2-7 Table 2.9 Noise Generating Sources CH2-17 Table 3.1 Climatological Data (IMD Based) CH3-3 Table 3.2 Site Specific Climatological Data (December 2016 to February 2017) CH3-4 Table 3.3 Ambient Air Quality Monitoring Stations CH3-5 Table 3.4 Sampling and Testing Methodology CH3-6

Table 3.5(A) Particulate Matter – PM10 CH3-8

Table 3.5(B) Particulate Matter – PM2.5 CH3-8

Table 3.5(C) Sulphurdioxide - SO2 CH3-8

Table 3.5(D) Oxides of Nitrogen – NOx CH3-8 Table 3.5(E) Carbon Monoxide – CO CH3-9 Table 3.5(F) Ammonia – NH3 CH3-9 Table 3.5(G) Ozone – O3 CH3-9

Table 3.6 Ambient Noise Quality Monitoring Stations CH3-10 Table 3.7 Noise Levels during Study Period CH3-10 Table 3.8 Water Sampling Locations CH3-12 Table 3.9 Ground Water Quality CH3-12

Table 3.10 Surface Water Quality CH3-13 Table 3.11 Soil Sampling Locations CH3-17 Table 3.12 Soil Quality Results CH3-17 Table 3.13 Land Use Pattern of the Study Area CH3-22 Table 3.14 Class Wise Distribution of Plant Species CH3-26 Table 3.15 Distribution of Population CH3-28 Table 3.16 Distribution of Population by Social Structure CH3-28

Page 10: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad vii

Table 3.17 Distribution of Literate and Literacy Rates CH3-29 Table 3.18 Highways in the Study Area CH3-29 Table 3.19 Nos. of Vehicles Per Day CH3-30 Table 4.1 Noise Limits For Appliances And Equipments CH4-3 Table 4.2 Nature of Emission And Pollutant CH4-6 Table 4.3 Emission Details of Proposed Furnace CH4-7 Table 4.4 Overall Scenarios Within Study Area CH4-10

Table 4.5 (A) Impact on AAQ locations CH4-10 Table 4.5 (B) Impact on AAQ locations CH4-11

Table 4.6 Expected Noise Levels From Different Units CH4-15 Table 4.7 Permissible Noise Levels CH4-15 Table 4.8 Rain Water Harvesting/Recharge Details CH4-18 Table 6.1 Post Project Environmental Monitoring Locations CH6-1 Table 6.2 Parameters and Frequency for Post Project Environmental

Monitoring CH6-2

Table 6.3 Environment Monitoring Budget CH6-3 Table 7.1 Risk and Mitigation Measures during the Construction Phase CH7-1 Table 7.2 Potential Risk Area inside the Plant CH7-8 Table 7.3 Contact details for Emergency purposes CH7-18

Table 10.1 Action Plan to Control Fugitive Emissions CH10-3 Table 10.2 Specific Plantation for the distillery Unit CH10-6 Table 10.3 EMP Budget CH10-11 Table 10.4 Cost of CSR Activity CH10-11

----------------------

Page 11: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-1

CHAPTER 1 INTRODUCTION

1.1 PURPOSE OF THE REPORT

M/s Berry Alloys Limited (BAL) is ferroalloys manufacturing facility at plot no 368, APIIC growth

center, Bobbili, Vijayanagaram district, Andhra Pradesh. BAL proposes expansion of existing

manufacturing unit for Ferro Alloys Manufacturing. It is proposed to set up the additional 2 x 9

MVA MVA Electric Arc Furnace along with Existing 4 x 9 MVA Electric Arc Furnace.

The existing project was accorded environmental clearance vide Lr.no. J- 11011/ 1129/ 2007-

IA-II (I) dated 7th July 2017 Consent to Operate was accorded by AP State pollution Control

Board vide lr. no. APPCB/ VSP/ VZM/ 160/ HO/ CFO/ 2015 - 3602 dated 05.08.2015 validity of

CTO is up to 31st Aug. 2018.

The Furnace details of existing plant, proposed expansion and total capacity after proposed

expansion is as follows:

Product Existing Quantity Proposed Quantity After Expansion

Electric Arc Furnace 4 X 9 MVA 2 X 9 MVA 6 X 9 MVA

In view of the above BAL had made online application vide proposal no.

IA/AP/IND/71918/2017 dated 29th December 2017 along with the application in prescribed

format (Form-I), copy of pre-feasibility report and proposed ToRs for undertaking detailed EIA

study as per the EIA Notification, 2006 for the project mentioned above. The proposed project

activity is listed at Sl. No. 3(a) Metallurgical industries (ferrous & non-ferrous) under Category

“A” EIA Notification, 2006 and the proposal is appraised at Central level.

The Expert Appraisal Committee considered the project in the 28th meeting held on February

5th to 7th, 2018 and prescribed Terms of References is incorporated in the EIA report

(Annexure 1).

The Environmental Impact Assessment (EIA) report preparation and the corresponding work

are entrusted to our Environmental consultant M/s Sri Sai Manasa Nature Tech Pvt. Ltd. Earlier

granted on 7th July 2017 was based on the EIA prepared using the baseline data collected during

winter season i.e. from Dec.2016 to Feb.2017. Since the data is not older than three years BAL

requested to EAC to consider the same baseline data. Accordingly EAC permitted to use the

baseline data for preparation of EMP subject to not older than Three year at the time of Appraisal

of the project.

Page 12: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-2

1.2 IDENTIFICATION OF PROJECT & PROJEC PROPONENT PROJECT: The proposed project is expansion in production of ferroalloys adding 2 x 9 MVA submerged

Electrical Arc Furnace. After expansion total Furnace capacity will be 6 x 9 MVA.

Product Details

Product Existing Quantity Proposed Quantity After Expansion Ferro Manganese 86400 TPA or 43200 TPA or 129600 TPA or Silico Manganese 72000 TPA or 36000 TPA 108000 TPA or Ferro Silica 25200 TPA or - 25200 TPA or

Ferro Chrome 36000 TPA - 36000 TPA Project Proponents

The project proponents are M/s. Berry Alloys Limited, incorporated in 2007 under companies

act 1956 with their registered office at Suit No: 308, Ashoka House, 3A, Hare Street, Kolkata –

700001.

1.3 PROJECT COST

The estimated project cost of the proposed expansion is Rs. 12.0 crores out of which Rs. 50.00

Lakhs will be incurred for implementing the EMP and 30 lakhs for ECR activities.

1.4 NATURE, SIZE AND LOCATION OF PROJECT SITE

The proposed project is an expansion project for manufacturing Ferro Alloys. The proposed

project is categorized as major enterprise based on its cost according to Department of

Industries, Andhra Pradesh. The production quantity of the additional expansion project is

Ferro Manganese – 43200 TPA (OR) Silico Manganese – 36000 TPA. The proposed project is to

be located in the existing project site at Plot No: 368 APIIC Industrial Growth Centre Bobbili,

Vizianagaram District, Andhra Pradesh. Details of the project are given in Table 1.1. The project

location map is given in Figure 1.1, Google image of the project is given in Figure 1.2 and 10 km

study area map is given in Figure 1.3.

Table 1.1: Project Details

Details of the Study Area

District & State Vizianagaram, Andhra Pradesh

Mandal Bobbili

Land use Industrial

Topography of the Area Gently Plain

Soil Type Red Soil

Land Availability 13.42 Acres

Page 13: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-3

Latitude 18o32’25” North Longitude 83o20’37” East

General Climatic Conditions

Average Maximum Temperature 45o C Average Minimum Temperature 16o C

Annual Rainfall 968.8 mm

Relative Humidity 65 – 75%

Wind period

Pattern during the study Predominantly Southwest followed by South East & North East.

Accessibility Nearest Highway About 65 kms Nearest Railway Station Bobbili Railway Station –3kms

Nearest Airport Vishakapatnam – 80 kms

Nearest City Visakhapatnam - 80 kms

Nearest Village Bujarayalavalasa– 1.0 km

Historical / Important Places within Study area Archaeologically Important Site Nil Historically Important Site Bobbili Fort – 4.0 kms Sensitive Places Nil Sanctuaries / National Parks Nil Forest Area Nil

Page 14: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-4

Page 15: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-5

Figure 1.1: Location Map of the Project Site

Page 16: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-6

Figure 1.2: Google Image of the Project Site

Page 17: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-7

Figure 1.3: 10 KM Study Area Map of the Project Site 1.5 PROJECT IMPORTANCE TO THE COUNTRY

Ferro alloys, in particular Ferro-manganese and Silico-manganese are used by steel and

stainless steel industry. In steel industry, the above mentioned Ferro-alloys are used as de-

oxidizing agents and to improve the properties of steel for different applications. Demand for

Ferro-manganese, medium carbon silicon-manganese and low carbon Silico-manganese has

gone up due to usage of these Ferro-alloys in stainless steel.

Ferro alloy industry, which is totally dependent on the steel industry in the country, has

touched another mile stone in production as well as exports. The overall production has

increased considerably during 2006-07 and achieved a record highest production of 2.00

million tons as compared to 1.65 million tons in 2005-06, registering a growth of 21.21 % due

to higher domestic consumption, exports and increase in steel production. The units have

continued to register profitability over the previous year.

The increasing demand in carbon steel and stainless steel within the country and globally is a

welcome sign for the Ferro alloy industry for the coming years. Consumption of manganese

alloys and chrome alloys have increased considerably in line with increase in steel and stainless

steel production, and is expected to increase further with higher growth rate in both the steel

sectors.

According to the Indian Ferro Alloy Producers Association (IFAPA), the ferroalloy industry

continued to be affected by recession with sluggish demand and constraints of high power

tariff anti-dumping duty on input material, reductants, and anti-dumping duty on exports of

ferroalloys.

The signs of revival in the fortunes of the steel industry, both globally and domestically, has

brought cheer to a largely neglected industry — ferroalloys — whose fortunes are inextricably

linked with that of steel.

1.6 SCOPE OF STUDY

The scope of the study includes preparation of Environmental Impact Assessment study with

detailed characterization of various environmental components such as air, noise, water,

land, biological and socio economic within an area of 10 km radius around the proposed

project site located at Plot No.368, APIIC Growth center, Bobbili (Village & Mandal),

Vizianagaram (District), Andhra Pradesh as per the latest guidelines of MoEFCC and the EIA

study was conducted during the period of December 2016 – February 2017.

Page 18: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-8

The main objectives of characterization are as follows:

• To assess the existing baseline status of air, water, noise, land, biological and socio-

economic environments within the project site and around 10 km radius of the study area

• To identify and quantify significant impacts due to the proposed activity on various

environmental components through prediction of impacts.

• To evaluate the beneficial and adverse impacts of the proposed activity.

• To prepare an Environmental Management Plan (EMP) detailing control technologies and

measures to be adopted for mitigation of adverse impacts if any, as a consequence of the

proposed activity.

• To prepare a Post Project Monitoring Program for checking and regulating the

environmental quality of the project and help in sustainable development of the area.

1.6.1 Methodology of EIA

Any developmental activity is expected to cause impacts on surrounding environment during

the construction and operation phases. The impacts may be adverse or beneficial. In order to

assess the impacts due to the proposed activity, an Environmental Impact Assessment study

has been conducted within an area of 10 km radius around the project site as per Terms of

Reference prescribed by the Expert Appraisal Committee-1 (Industry) in its 28th meeting held

on 5th - 7th February, 2018 for prescribing TORs for undertaking detailed EIA /EMP study.

The various steps involved in Environmental Impact Assessment study are divided into the

following phases.

Identification of significant environmental parameters and assessing the existing status

within the impact zone with respect of air, water, noise, soil, biological and socioeconomic

components of environment.

Prediction of impact on air quality taking into consideration the proposed emissions to

project the overall scenario.

Prediction of impact on Water, Land, Biological and Socio Economic Environment

Evaluation of total impacts after superimposing the predicted scenario over the baseline

scenario to prepare an Environmental Management Plan.

The methodology adopted for studying the various individual components of environment is

described below.

Page 19: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-9

1.6.2 Micro Meteorology

An auto weather monitoring station to record meteorological parameters was installed at

proposed project site. Wind speed, Wind direction, maximum, and minimum temperatures,

relative humidity, cloud cover was recorded on hourly basis continuously covering the entire

three months from December 2016 – February 2017.

Wind speed & Wind direction data recorded during the study period were used for

computation of relative percentage frequencies of different wind directions. The

meteorological data thus collected has been used for interpretation of the existing Ambient Air

Quality status, and the same data has been used for prediction of impacts of future scenario

due to the activities of the proposed scheme.

1.6.3 Ambient Air Quality

The scenario of the existing ambient air quality in the study region has been assessed through

a network of 8 ambient air quality stations during the study period within an area of 10 km

radius around the project area. The monitoring network was so designed such that

representative samples are obtained from the upwind direction, down wind and cross wind

directions of the proposed project site. These monitoring sites have been established keeping

in view the available climatologically norms of predominant wind direction and wind speed of

this particular region.

The following points were also taken into consideration in designing the network of sampling

stations:

1. Topography/ Terrain of the study area

2. Populated areas within the study area

3. Residential and sensitive areas within the study area.

4. Magnitude of the surrounding industries

5. Representation of regional background levels

6. Representations of cross sectional distribution in downward direction.

Ambient Air Quality monitored 24 hours per day for PM2.5, PM10, SO2, NOx and CO at 8 stations

within 10km radius of the project site once in twice per a week for the study period.

Pre-calibrated respirable dust samplers have been used for monitoring of the existing AAQ

status. Methodologies adopted for sampling and analysis were, as per the approved methods

of Central Pollution Control Board (CPCB). Maximum, minimum, average and percentile values

Page 20: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-10

have been computed from the raw data collected at all individual sampling stations to

represent the ambient air quality status of the study area.

1.6.4 Noise Environment

Noise monitoring has been carried out at eight locations to identify the impact due to the

existing sources on the surroundings in the study area. Noise levels were recorded at an

interval of 30 minutes during the day and night times to compute the day equivalent, night

equivalent and day-night equivalent level.

1.6.5 Water Environment

Eight groundwater samples and eight surface water samples from various locations around the

project site within 10 km radius were collected for assessment of the existing physico-chemical

and bacteriological quality. Methodologies adopted for sampling and analysis were according

to the IS methods. Field parameters such as pH, Temperature were monitored on site. The

parameters thus analyzed were compared with IS 10500. The activities surrounding the source

during sampling were taken into consideration in interpretation of the water quality of that

particular source.

1.6.6 Land Environment

Ground truth studies were conducted to identify the land use in and around 10 km radius of

the site. Representative soil samples were collected from- eight sampling locations within an

area of 10 km radius around the proposed project site for analysis of the physico chemical

characteristics to assess the cropping pattern, microbial growth etc. standard procedures were

followed for sampling and analysis. The samples collected were also analyzed to check the

suitability for growth of native plant species in and around the project site.

1.6.7 Biological Environment

Intensive survey of flora and fauna of the project site and its surroundings extending up to a

radius of 10 Km has been collected during the study period.

As for as the fauna is concerned, both primary and secondary data have been collected from

various government departments such as forest, agriculture, fisheries and animal husbandry to

clearly understand the status of fauna. Quadrant method has been used for sampling of flora.

1.6.8 Socio- Economic Environment

Details on economic status of various villages within an area of 10 km around the project site

have collected. Information on existing amenities has been collected to determine the

developmental activities. Such developmental activities would result in upliftment of the

Page 21: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-11

economic status in the area.

All the above environmental parameters have been used for identification, evaluation and

prediction of significant impacts.

1.6.9 Prediction Of Impacts, Environmental Management Plan & Disaster Management Plan

Various technical aspects of the proposed project have been studied to identify the significant

impacts, which would arise from the proposed activity. The identified impacts have been

quantified through prediction of impacts to estimate the post project scenario.

Identified impacts due to proposed project have been studied in detail to predict the impacts

on various environmental components. Predicted scenario has been superimposed over the

baseline (pre-project) status of environmental quality to derive the ultimate (post-project)

scenario of environmental conditions.

Environmental Management Plan (EMP) for this proposed project details the control

measures, which will be suitable for proposed expansion to maintain environmental quality

within the stipulated limits specified by State Pollution Control Board/CPCB/MoEFCC.

Table 1.2 Environmental Attributes and Frequency of Monitoring

Attribute Parameters Frequency of Monitoring

Ambient Air Quality

SPM, RSPM 24 hourly samples twice a week for four weeks at eight locations.

Ambient Air Quality

SO2, NOx 8 hourly samples average to 24 hrs for four weeks at eight locations.

Meteorology Surface: Wind Speed, direction, Temperature, relative humidity and rainfall

Surface: Continuous monitoring station for entire study period on hourly basis and also data collection from Secondary sources.

Water Quality Physical, Chemical and Bacteriological parameters

Once during the study period at ten locations

Biology Existing Flora and Fauna Through field visit during the study period and substantiated through Secondary sources.

Noise Levels Noise levels in dB(A) Hourly observations for 24 hours per location

Page 22: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-12

Soil Characteristics

Parameters related to agricultural and afforestation potential

Once during the study period at eight locations

Land Use Trend of land use change for Different categories

Data from various Government agencies.

Socio-economic Aspects

Socio-economic characteristics, labour force characteristics, population statistics and existing amenities in the study area.

Field Survey and Census Handbook, 2011

1.7 COMPLIANCE TO THE TERMS OF REFERENCE

Compliance to the additional terms of reference issued by MoEFCC is given below:

A. Specific TOR: S.

No. TOR Point Compliance of TOR Points

1 Public Hearing to be conducted by the concerned State Pollution Control Board.

Draft EIA report will be submitted at State Pollution control Board for Public Hearing.

2 The issues raised during public hearing and commitment of the project proponent on the same along with time bound action plan to implement the commitment and financial allocation thereto should be clearly provided.

After completion of Public hearing point wise reply will be enclosed in EIA report.

3 The Enterprise Social Commitment (ESC) programme shall be based on the issues raised in the public hearing and the Social impact assessment study so carried out should form part of EIA and EMP report.

After getting minutes of the Public Hearing detailed Enterprise Social Commitment (ESC) programme will be designed and will be submitted in EIA report.

4 The EIA/EMP Shall be prepared for cumulative with the existing and proposed expansion.

The report is prepared for Cumulative impacts.

B. General TOR

S.

No. TOR POINT Compliance of TOR Points

1 Executive Summary Attached with EIA Report 2 Introduction i) Details of the EIA Consultant

including NABET accreditation Details are Given in Chapter 12.

ii) Information about the project Details are given in Chapter 1, Subheading

Page 23: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-13

proponent 1.2 iii) Importance and benefits of the

project Details are given in Chapter 8.

3 Project Description 1 Cost of project and time of

completion. The estimated project cost of the proposed expansion is Rs. 12 crores out of which Rs. 30.00 Lakhs will be incurred for implementing the EMP and 30 lakhs for CSR activities.

2 Products with capacities for the proposed project.

The proposed project is an expansion of ferro alloys unit with adding 2 x 9 MVA submerged Electric Arc furnace. After expansion total furnace capacity will be 6 x 9 MVA.

3 If expansion project, details of existing products with capacities and whether adequate land is available for expansion, reference of earlier EC if any.

The proposed project is an expansion of ferro alloys unit with adding 2 x 9 MVA submerged Electric Arc furnace. After expansion total furnace capacity will be 6 x 9 MVA. The proposed unit will be installed within the existing premises.

4 List of raw materials required and their source along with mode of transportation.

Details are given in Chapter 2, Sub heading 2.5.

5 Other chemicals and materials required with quantities and storage capacities

Details are given in Chapter 2, Subheading 2.5.

6 Details of Emission, effluents, hazardous waste generation and their management.

Emission details are given in Chapter 4, Subheading 4.2.4 Effluent details are given in Chapter 4, Subheading 4.2.10 Solid waste generation details are given in Chapter 4, Subheading 4.2.11

7 Requirement of water, power, with source of supply, status of approval, water balance diagram, man-power requirement (regular and contract)

Additional 30 KL water will be required for proposed expansion. The water details are given in Chapter 2, Subheading 2.6.1. Manpower details are given in Chapter 2, Subheading 2.6.4

8 The project proponent shall furnish the requisite documents from the competent authority in support of drawl of ground water and surface water and supply of electricity.

Water will be sourced from APIIC Growth Centre. Power will be sourced from state electricity board.

9 Process description along with major equipments and machineries, process flow sheet (Quantative) from raw material to products to be provided

Details are given in Chapter 2, Subheading 2.7

10 Hazard identification and details of Details are given in Chapter 7.

Page 24: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-14

proposed safety systems 11 Copy of all the Environmental

Clearance(s) including Amendments thereto obtained for the project from MOEF/SEIAA shall be attached as an Annexure. A certified copy of the latest Monitoring Report of the Regional Office of the Ministry of Environment and Forests as per circular dated 30th May, 2012 on the status of compliance of conditions stipulated in all the existing environmental clearances including Amendments shall be provided. In addition, status of compliance of Consent to Operate for the ongoing /existing operation of the project from SPCB shall be attached with the EIA-EMP report.

Existing Environment Clearance Copy is Attached as Annexure 3. Copy of the Operate is attached as Annexure 4.

12 In case the existing project has not obtained environmental clearance, reasons for not taking EC under the provisions of the EIA Notification 1994 and/or EIA Notification 2006 shall be provided. Copies of Consent to Establish/No Objection Certificate and Consent to Operate (in case of units operating prior to EIA Notification 2006, CTE and CTO of FY 2005-2006) obtained from the SPCB shall be submitted. Further, compliance report to the conditions of consents from the SPCB shall be submitted.

Not Applicable

4 Site Details 1 Location of the project site covering

village, Taluka/Tehsil, District and State, Justification for selecting the site, whether other sites were considered.

Details are given in Chapter 1, Subheading 1.4

2 A toposheet of the study area of radius of 10km and site location on 1:50,000/1:25,000 scale on an A3/A2 sheet. (including all eco-sensitive areas and environmentally sensitive places)

Topo Map is given in Chapter 1, Figure 1.3.

3 Co-ordinates (lat-long) of all four corners of the site.

Coordinates of the project site is given in Chapter 1, Table 1.1.

Page 25: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-15

4 Google map-Earth downloaded of the project site. Layout maps indicating existing unit as well as proposed unit indicating storage area, plant area, greenbelt area, utilities etc. If located within an Industrial area/Estate/Complex, layout of Industrial Area indicating location of unit within the Industrial area/Estate.

Google Image of the project site is given in Chapter 1, Figure 1.2. Layout map of the project site is given in Chapter 2, Figure 2.1. The map of industrial estate is given in Annexure - 5

5 Photographs of the proposed and existing (if applicable) plant site. If existing, show photographs of plantation/greenbelt, in particular.

Photographs of the Plant site is given in Chapter 2, Figure 2.2.

6 Landuse break-up of total land of the project site (identified and acquired), government/private - agricultural, forest, wasteland, water bodies, settlements, etc shall be included. (not required for industrial area)

Not Applicable.

7 A list of major industries with name and type within study area (10km radius) shall be incorporated. Land use details of the study area

Proposed project comes under the Notified Industrial Area. The list of major industries is given in Annexure 6

8 Geological features and Geo-hydrological status of the study area shall be included.

Geological and Hydro geological details are given in Chapter 3, Subheading 3.7.

9 Details of Drainage of the project upto 5km radius of study area. If the site is within 1 km radius of any major river, peak and lean season river discharge as well as flood occurrence frequency based on peak rainfall data of the past 30 years. Details of Flood Level of the project site and maximum Flood Level of the river shall also be provided. (mega green field projects)

Not Applicable.

10 Status of acquisition of land. If acquisition is not complete, stage of the acquisition process and expected time of complete possession of the land.

Not applicable

11 R&R details in respect of land in line with state Government policy.

Not applicable

5 Forest and wildlife related issues (if applicable): 1 Permission and approval for the use

of forest land (forestry clearance), if Not applicable

Page 26: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-16

any, and recommendations of the State Forest Department. (if applicable).

2 Land use map based on High resolution satellite imagery (GPS) of the proposed site delineating the forestland (in case of projects involving forest land more than 40 ha).

Not applicable

3 Status of Application submitted for obtaining the stage I forestry clearance along with latest status shall be submitted.

Not applicable

4 The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the project location and the recommendations or comments of the Chief Wildlife Warden-thereon.

None

5 Wildlife Conservation Plan duly authenticated by the Chief Wildlife Warden of the State Government for conservation of Schedule I fauna, if any exists in the study area.

Not Applicable

6 Copy of application submitted for clearance under the Wildlife (Protection) Act, 1972, to the Standing Committee of the National Board for Wildlife

Not Applicable

6. Environmental Status 1 Determination of atmospheric

inversion level at the project site and site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall.

Details are given in Chapter 3, Subheading 3.2

2 AAQ data (except monsoon) at 8 locations for PM10, PM2.5, SO2, NOX, CO and other parameters relevant to the project shall be collected. The monitoring stations shall be based CPCB guidelines and take into account the pre-dominant

Details are given in Chapter 3, Subheading 3.3

Page 27: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-17

wind direction, population zone and sensitive receptors including reserved forests.

3 Raw data of all AAQ measurement for 12 weeks of all stations as per frequency given in the NAQQM Notification of Nov. 2009 along with – min., max., average and 98% values for each of the AAQ parameters from data of all AAQ stations should be provided as an annexure to the EIA Report.

Details are given in Chapter 3, Subheading 3.3

4 Surface water quality of nearby River (60m upstream and downstream) and other surface drains at eight locations as per CPCB/MoEF&CC guidelines.

Details are given in Chapter 3, Subheading 3.5

5 Whether the site falls near to polluted stretch of river identified by the CPCB/MoEF&CC.

Not Applicable

6 Ground water monitoring at minimum at 8 locations shall be included.

Details are given in Chapter 3, Subheading 3.5

7 Noise levels monitoring at 8 locations within the study area.

Details are given in Chapter 3, Subheading 3.4

8 Soil Characteristic as per CPCB guidelines.

Details are given in Chapter 3, Subheading 3.6

9 Traffic study of the area, type of vehicles, frequency of vehicles for transportation of materials, additional traffic due to proposed project, parking arrangement etc.

Details are given in Chapter 4, Subheading 4.2.12

10 Detailed description of flora and fauna (terrestrial and aquatic) existing in the study area shall be given with special reference to rare, endemic and endangered species. If Schedule-I fauna are found within the study area, a Wildlife Conservation Plan shall be prepared and furnished.

Details are given in Chapter 3, Subheading 3.9.

11 Socio-economic status of the study area.

Details are given in Chapter 3, Subheading 3.10

7 Impact Assessment and Environment Management Plan 1 Assessment of ground level

concentration of pollutants from the stack emission based on site-specific meteorological features. In case the

Details are given in Chapter 4 Subheading 4.2.4

Page 28: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-18

project is located on a hilly terrain, the AQIP Modelling shall be done using inputs of the specific terrain characteristics for determining the potential impacts of the project on the AAQ. Cumulative impact of all sources of emissions (including transportation) on the AAQ of the area shall be well assessed. Details of the model used and the input data used for modelling shall also be provided. The air quality contours shall be plotted on a location map showing the location of project site, habitation nearby, sensitive receptors, if any.

2 Water Quality modelling – in case, if the effluent is proposed to be discharged in to the local drain, then Water Quality Modelling study should be conducted for the drain water taking into consideration the upstream and downstream quality of water of the drain.

Not Applicable Zero discharge norms will be adopted

3 Impact of the transport of the raw materials and end products on the surrounding environment shall be assessed and provided. In this regard, options for transport of raw materials and finished products and wastes (large quantities) by rail or rail-cum road transport or conveyor-cum-rail transport shall be examined.

Details are given in Chapter 4, Subheading 4.2.12

4 A note on treatment of wastewater from different plant operations, extent recycled and reused for different purposes shall be included. Complete scheme of effluent treatment. Characteristics of untreated and treated effluent to meet the prescribed standards of discharge under E(P) Rules.

Water will be required for Cooling and Domestic purposes. Cooling waste water will be re circulated in system. Domestic effluent will be treated in Septic tank and disposed in Soak Pit. Zero discharge norms will be adopted.

5 Details of stack emission and action plan for control of emissions to meet standards.

Details are given in Chapter 4, Subheading 4.2.4

6 Measures for fugitive emission control

Water sprinkling will be done to control the fugitive emission.

7 Details of hazardous waste Details of waste generation are Given in

Page 29: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-19

generation and their storage, utilization and disposal. Copies of MOU regarding utilization of solid and hazardous waste shall also be included. EMP shall include the concept of waste-minimization, recycle/reuse/recover techniques, Energy conservation, and natural resource conservation.

Chapter 4, Subheading 4.2.11. EMP Details are given in Chapter 10.

8 Proper utilization of fly ash shall be ensured as per Fly Ash Notification, 2009. A detailed plan of action shall be provided.

Not Applicable

9 Action plan for the green belt development plan in 33 % area i.e. land with not less than 1,500 trees per ha. Giving details of species, width of plantation, planning schedule etc. shall be included. The green belt shall be around the project boundary and a scheme for greening of the roads used for the project shall also be incorporated.

Green belt Details are given in Chapter 10, Subheading 10.1.6.

10 Action plan for rainwater harvesting measures at plant site shall be submitted to harvest rainwater from the roof tops and storm water drains to recharge the ground water and also to use for the various activities at the project site to conserve fresh water and reduce the water requirement from other sources.

Rain Water harvesting Details are given in Chapter 4, Sub heading 4.2.13.

11 Total capital cost and recurring cost/annum for environmental pollution control measures shall be included.

Details are given in Chapter 10, Table 10.4.

12 Action plan for post-project environmental monitoring shall be submitted.

Details are given in Chapter 6, Subheading 6.2.

13 Onsite and Offsite Disaster (natural and Man-made) Preparedness and Emergency Management Plan including Risk Assessment and damage control. Disaster management plan should be linked with District Disaster Management Plan.

Details are given in Chapter 7.

8 Occupational health

Page 30: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-20

1 Details of existing Occupational & Safety Hazards. What are the exposure levels of above mentioned hazards and whether they are within Permissible Exposure level (PEL). If these are not within PEL, what measures the company has adopted to keep them within PEL so that health of the workers can be preserved,

Details are given in Chapter 10, Subheading 10.1.7.

2 Details of exposure specific health status evaluation of worker. If the workers’ health is being evaluated by pre designed format, chest x rays, Audiometry, Spirometry, Vision testing (Far & Near vision, colour vision and any other ocular defect) ECG, during pre placement and periodical examinations give the details of the same. Details regarding last month analyzed data of abovementioned parameters as per age, sex, duration of exposure and department wise.

Details are given in Chapter 7, Subheading 7.8.

3 Annual report of heath status of workers with special reference to Occupational Health and Safety.

Details are given in Chapter 10, Subheading 10.1.7.

4 Plan and fund allocation to ensure the occupational health & safety of all contract and casual workers.

Details are given in Chapter 7, Subheading 7.8.

9 Corporate Environment Policy 1 Does the company have a well laid

down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report.

Yes, attached as Annexure 7.

2 Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions? If so, it may be detailed in the EIA.

Yes

3 What is the hierarchical system or Administrative order of the company to deal with the environmental issues and for ensuring compliance with the environmental clearance conditions? Details of this system

Yes, Details are given in Chapter 10, Figure 10.2

Page 31: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-21

may be given. 4 Does the company have system of

reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism shall be detailed in the EIA report

Yes

5 Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to the labour force during construction as well as to the casual workers including truck drivers during operation phase.

Details are given in Chapter 4, subheading 4.1.8

6 Enterprise Social Commitment (ESC) Detailed CSR Plan is given in Chapter 10, Subheading 10.2.4

7 Adequate funds (At least 2.5 % of the project cost) shall be earmarked towards the Enterprise Social Commitment based on Public Hearing issues and item-wise details along with time bound action plan shall be included. Socio-economic development activities need to be elaborated upon.

Detailed CSR Plan is given in Chapter 10, Subheading 10.2.4

8 Any litigation pending against the project and/or any direction/order passed by any Court of Law against the project, if so, details thereof shall also be included. Has the unit received any notice under the Section 5 of Environment (Protection) Act, 1986 or relevant Sections of Air and Water Acts? If so, details thereof and compliance/ATR to the notice(s) and present status of the case.

Not Applicable

9 A tabular chart with index for point wise compliance of above TORs.

Complied

10 The TORs prescribed shall be valid for a period of three years for submission of the EIA-EMP reports along with Public Hearing Proceedings (wherever stipulated).

Noted

The following general points shall be noted: i All documents shall be properly All documents has been properly indexed,

Page 32: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-22

indexed, page numbered. page numbered. ii Period/date of data collection shall

be clearly indicated. Noted

iii Authenticated English translation of all material in Regional languages shall be provided.

Noted

iv The letter/application for environmental clearance shall quote the MOEF file No. and also attach a copy of the letter.

Attached

v The copy of the letter received from the Ministry shall be also attached as an annexure to the final EIA-EMP Report.

Noted

vi The index of the final EIA-EMP report must indicate the specific chapter and page no. of the EIA-EMP Report

Noted

vii While preparing the EIA report, the instructions for the proponents and instructions for the consultants issued by MOEF vide O.M. No. J-11013/41/2006-IA.II (I) dated 4th August, 2009, which are available on the website of this Ministry shall also be followed.

Noted

viii The consultants involved in the preparation of EIA-EMP report after accreditation with Quality Council of India (QCl) /National Accreditation Board of Education and Training (NABET) would need to include a certificate in this regard in the EIA-EMP reports prepared by them and data provided by other organization/Laboratories including their status of approvals etc. Name of the Consultant and the Accreditation details shall be posted on the EIA-EMP Report as well as on the cover of the Hard Copy of the Presentation material for EC presentation.

Details are given in Chapter 12.

ix TORs’ prescribed by the Expert Appraisal Committee (Industry) shall be considered for preparation of EIA-EMP report for the project in addition to all the relevant information as per the ‘Generic

Noted

Page 33: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-23

Structure of EIA’ given in Appendix III and IIIA in the EIA Notification, 2006. Where the documents provided are in a language other than English, an English translation shall be provided. The draft EIA-EMP report shall be submitted to the State Pollution Control Board of the concerned State for conduct of Public Hearing. The SPCB shall conduct the Public Hearing/public consultation, district-wise, as per the provisions of EIA notification, 2006. The Public Hearing shall be chaired by an Officer not below the rank of Additional District Magistrate. The issues raised in the Public Hearing and during the consultation process and the commitments made by the project proponent on the same shall be included separately in EIA-EMP Report in a separate chapter and summarised in a tabular chart with financial budget (capital and revenue) along with time-schedule of implementation for complying with the commitments made. The final EIA report shall be submitted to the Ministry for obtaining environmental clearance.

METALLURGICAL INDUSTRY (FERROUS AND NON FERROUS)

S.

No. ToR Points Compliance of TOR Points

1 Complete process Flow Diagarme each unit, its Process and Operations, along with material and energy inputs and out pots (Material and energy balance)

Detailed flow chart is given in Chapter 2, Figure 2.3.

2 Emission from Sulphuric acid plant and sulphur musk management

Not Applicable

3 Details on installation of continuous emission monitoring system with recording with proper display

Continuous emission monitoring system with recording with proper display will be installed.

4 Details on Toxic material including fluoride emissions

Not Applicable.

5 Details on Stack Height Details are given in Chapter 4, Table 4.3.

Page 34: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH1-24

6 Details on ash disposal and management

Not Applicable

7 Complete process flow diagram describing process of lead/zinc/Aluminum etc.

Not Applicable

8 Details on smelting, thermal refining, melting, slag fuming, and Waelz kiln operation.

Not Applicable

9 Details on holding and de gassing of molten metal from primary and secondary aluminum, material pre treatment and from melting and smelting of secondary aluminum

Not Applicable

10 Details on toxic material content in the waste material and its composition and end use (particularly slag)

Slag will be sold to brick manufactures.

11 Trace metals in waste material especially in slag

Not Applicable

12 Plan for trace metal recovery Not Applicable 13 Trace metal in Water Not Applicable. No water will be used in

process.

------------------

Page 35: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-1

CHAPTER 2 PROJECT DESCRIPTION

2.1 TYPE OF PROJECT

BAL is having Ferro Alloys manufacturing facility and present implemented 4 x 9 MVA

submerged Electrical Arc Furnaces for manufacturing of Ferro Alloys at Plot No: 368, APIIC

Growth Centre, Bobbili, Vizianagaram District of Andhra Pradesh. BAL is now proposing for the

expansion of the Ferro alloy facility by installing additional 2 x 9 MVA submerged electric Arc

furnace for production of additional Ferro Manganese – 43200 TPA (OR) Silico Manganese –

36000 TPA.

2.2 NEED FOR THE PROJECT

Ferro alloys, in particular Ferro-manganese and Silico-manganese are used by steel and

stainless steel industry. In steel industry, these above mentioned Ferro-alloys are being used as

a de-oxidizing agents and also adding as an alloy to improve the properties of steel for

different applications. As the nickel become costlier day-by-day, R&D is taking place to replace

nickel with manganese. This has become successful in some grades of stainless steel. Demand

for Ferro- manganese, medium carbon silicon-manganese and low carbon Silico- manganese

has gone up due to usage of these Ferro-alloys in stainless steel. Ferro alloy industry, which is

totally dependent on the steel industry in the country, has touched another mile stone in

production as well as exports.

The increasing demand in carbon steel and stainless steel within the country and globally is a

welcome sign for the Ferro alloy industry for the coming years. Consumption of manganese

alloys and chrome alloys have increased considerably in line with increase in steel and stainless

steel production, and is expected to increase further with higher growth rate in both the steel

sectors.

2.3 LOCATION OF THE PROJECT & SITE LAYOUT

BAL is located at Plot No: 368, APIIC Industrial Growth Center Bobbili town, Vizianagaram

District of Andhra Pradesh. The geographical location of the proposed project site falls at the

longitude 83o20’59” E and latitude 18

o32’15” N.

The general location of the proposed project site is shown in Chapter 1, Figure - 1.1.

Topo Map showing the 10 km radius of the study area is given in Chapter 1, Figure - 1.3.

Salient features of the study area are presented in below Table - 2.1. The Project Site Layout is

Page 36: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-2

shown in Figure - 2.1. Photographs of the project site are shown in Figure - 2.2.

Figure 2.1: Plant Layout

Page 37: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-3

Figure 2.2: Site Photographs

Proposed Expansion Area

Page 38: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-4

Table – 2.1: Salient Features of the Project Site

Details of the Study Area

District & State Vizianagaram, Andhra Pradesh

Mandal Bobbili

Land use Industrial

Topography of the Area Gently undulating.

Soil Type Red Soil.

Land Availability 13.42 Acres

Latitude 18o32’15” North

Longitude 83o20’63” East

General Climatic Conditions

Average Maximum Temperature 45o C

Average Minimum Temperature 16o C

Annual Rainfall 968.8 mm

Relative Humidity 65 – 75%

Wind period

Pattern during the study Predominantly Southwest followed by South East & North East.

Accessibility

Nearest Highway About 65 kms Nearest Railway Station Bobbili Railway Station –3kms.

Nearest Airport Vishakapatnam – 80 kms.

Nearest City Visakhapatnam - 80 kms.

Nearest Village Bujarayalavalasa– 1.0 km.

Historical / Important Places within Study area

Archaeologically Important Site Nil

Historically Important Site Bobbili Fort – 4.0 kms

Sensitive Places Nil

Sanctuaries / National Parks Nil

Forest Area Nil

2.4 SIZE OR MAGNITUDE OF OPERATION

BAL proposed to produce 43,200 TPA of Ferro Manganese or Silico Manganese by installing

additional 2 nos. of 9 MVA Submerged Electric Arc Furnaces in the process of its expansion.

The existing production quantities and proposed production quantities are given below:

Page 39: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-5

Table 2.2: Existing and Proposed Products Quantities

Product Existing Quantity

Proposed Quantity After Expansion

Ferro Manganese 86400 TPA or 43200 TPA or 129600 TPA or Silico Manganese 72000 TPA or 36000 TPA 108000 TPA or Ferro Silica 25200 TPA or - 25200 TPA or Ferro Chrome 36000 TPA - 36000 TPA

2.5 RAW MATERIAL REQUIREMENT

The raw materials required for the production of Ferro-manganese and Silico-manganese are:

• Manganese ore, • Ferro-manganese slag,

• Quartz, • Dolomite, • Coal • Coke The raw material requirement for the production of Ferro Manganese, Silico Manganese per

day is formulated based on the working days of the plant. The working days of the plant are

330 days per year. The raw material requirement per day is given in Table 2.3

Table 2.3: Raw Material Characteristics

Description Physical Chemical Manganese Ore Size : 6 – 75 mm

Moisture : 5% max Mn : 44% Fe : 5% Al

2O

3 : 5%

SiO2 : 6%

MgO : 1.3% P : 0.6% S : 0.005% CaO : 0.6%

Ferro-manganese Slag (generated in Ferro - manganese process)

Size : 25 - 75mm Moisture : 0.5% max

MnO : 32.0 – 35.0% FeO : 0.8% Al

2O

3 : 10.5%

SiO2 : 30.0%

CaO : 10.0% MgO : 9.0%

Dolomite Size : 25 - 50mm Moisture : 0.5% max

MgO : 21.0% CaO : 31.0% SiO

2 : 0.8%

Quartz Size : 25 - 50mm Moisture : 0.5% max

SiO2 : 97.0%

Page 40: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-6

2.5.1 Material Balance

The material balance is given in Table 2.4, Table 2.5 and Table 2.6.

Table 2.4: Ferro Manganese

S. No. Raw Materials Quantity (MT)

1 Manganese Ore (with Average Mn 44%)

2.1 – 2.4 2 Coke (with average Fixed Carbon 80%)

0.30

3 Coal (with average Fixed Carbon 60%)

0.3 4 Dolomite

0.2

Table 2.5: Silico Manganese

S. No. Raw Materials Quantity (MT) 1 Manganese Ore (with Average Mn 44%)

2.5 – 2.8

2 Coke (with average Fixed Carbon 80%)

0.40 3 Coal (with average Fixed Carbon 60%)

0.40

4 Dolomite

0.2

Table 2.6: Material Balance for Production

S. No. Components Quantity

1 Manganese Ore High Grade 1000 Kgs.

2 Manganese Ore Low Grade 1200Kgs.

3 Ferro Manganese Slag 500Kgs.

4 Coke 400Kgs.

5 Coal 400Kgs.

6 Quartz 200Kgs.

7 Dolamite 200Kgs. 2.5.2 Source of Raw Materials

Ore & Metal Company Limited/Open Market

2.6 UTILITIES

2.6.1 Water Requirement

The manufacturing process of Ferro Alloys does not require water at any stage. The water

requirement in the Project will be for cooling purpose, domestic consumption and green belt

development. The existing unit requires 60 KLD of water and second phase (proposed phase)

requires 30 KLD of water. Total initial water requirement for the project will be 90 KLD. This

requirement will be met from APIIC Growth Centre. The details of water requirement for

different purposes are presented in Table 2.7

Page 41: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-7

Table 2.7: Water Requirement

Item Water Requirement in

KLD

(4 x 9 MVA)

Water Requirement in

KLD

(2 x 9 MVA)

Total Water

Requirement

(KLD)

Cooling Purpose 50 25 75 Domestic Purpose 10 5 15 Dust Suppression Greenbelt Total 60 30 90

Water Balance

There is no generation of process wastewater in the proposed project. Cooling water is

continuously re-circulated in the cooling water circuits, heat exchangers and discharged to the

sump or holding tank cooling towers where evaporation losses drift losses and spillages are

encountered. Domestic waste water will be sent to the septic tank followed by soak pit. Zero

Discharge norms will be followed.

2.6.2 Land Requirement

M/s. Berry Alloys Limited has acquired 13.42 acres of land in Growth Center APIIC. The

proposed expansion activity will be established within the existing plant area only. The land

breakup details are presented in Table 2.8.

Table 2.8: Land Break-up Details

S No Particular Existing (Acres)

Proposed (Acres)

After Expansion (Acres)

1 Plant Area 7.6 1.38 8.98 2 Greenbelt 4.44 - 4.44 3 Future Expansion 1.38 - -

Total 13.42 1.38 13.42

2.6.3 Power Requirement

The existing power requirement is 30000 KVA and additional 15000 KVA will be required for

proposed expansion. The power will be sourced from the Eastern Power Distribution Company

of Andhra Pradesh Limited.

2.6.4 Man Power Requirement

The skilled/semiskilled /unskilled manpower required for the proposed Project is estimated is

50 nos. and the existing Man Power is 120. The man power requirement will be fulfilled from

Page 42: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-8

the surrounding villages, to help for the improvement of the socio economic status in the

surrounding rural areas.

2.7 TECHNOLOGY AND PROCESS DESCRIPTION

Most of the Ferro alloys e.g., Ferro Manganese and Silico Manganese are produced by smelting

process. Smelting of the charged material is carried out in an electrical arc furnaces equipped

with transformer of proper rating.

2.7.1 Basic Process

Ferro-alloys are produced by reducing metals from their oxides contained in ores by using a

suitable reduction under conditions created to ensure a high recovery of the valuable

elements from the starting materials. Such reduction reactions are characterized by stability of

an oxide at high temperatures. The stability of all oxides will become more stable with

increasing temperature. An element which forms a stronger oxide can under appropriate

conditions be used as reductant for a less strong oxide. The reaction will proceed successfully if

the difference of oxygen involved with a small difference, favorable conditions should be

formed to make the reaction proceed.

The presence of iron or iron oxides can facilitate some reduction processes. Iron dissolves the

reduced element, forms a compound with it, and thus lowers the melting point of an iron

element alloy is lower than that of the pure element, e.g. in Ferro-manganese production, and

therefore the reaction of reduction of the element can proceed at a lower temperature.

Figure: 2.3 Process Flow Chart of Ferro Alloy Project Ferro-Manganese Process

Ferro Manganese is produced from manganese ores, which have the principle constituent of

manganese mainly in the form of Oxides the balance usually being iron, aluminum, magnesium

Page 43: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-9

oxides and Silicon. For making Ferro-manganese, coke is used as a reductant and fluxes like

limestone or dolomite are added to the reaction mixture if the Calculation of the slag

composition demands such additions. Such reactions are carried out in submerged arc

furnaces, which operate, as a rule, by continuous process. The electrodes in these furnaces

are immersed into the solid charge. The furnace is recharged as the solid is being smelted and

the alloy & slag are periodically removed.

Smelting Procedure

The charge for smelting Ferro-manganese is made up with the mixture of 2317 kg of

Manganese ore, 676 kg of reductant and 396 kg of dolomite.

The charge is loaded into the furnace from a charging apparatus which essentially is an

electrically driven carriage moving on a monorail. The carriage has a loading chute. Coke

breeze is first loaded from furnace bins to the charging apparatus, followed by ore. This

sequence of charging ensures more thorough mixing of the charge and prevents sticking of

moist ore fines to the walls of charging apparatus. In order to prevent separation of the charge

into components, the entire batch is poured into a pile on the charge and a specific amount of

dolomite is added to it. After that the piles are gathered into cones around the electrodes.

The charging apparatus can deliver the charge only to the front side of electrodes. The

materials are pushed to the rear side of electrodes by means of long rabbles and are partly

thrown by shovels from piles prepared on the working stage at the rear corners of the furnace.

Charging is continued as the materials settle down at the electrodes. A cone around an

electrode should be 300-400 mm above the charge level. The electrodes are maintained at a

depth of 1100-1400 mm with their ends being spaced 600-800 mm from the furnace bottom.

Owing to deep placing of the electrodes, the high temperature zone is covered with a layer of

charge 800-1000 mm thick. The spacing between the electrodes and furnace bottom prevents

overheating of the metal and evaporation of manganese.

Gases should evolve evenly over the whole surface of the furnace top. With fine materials used

for smelting Ferro-manganese, gases tern to escape through blowholes they from near an

electrode and therefore in that case it is especially important to maintain a high cone of charge

at the electrodes and pierce the materials at the cone base.

When the charge is moist, hot charge may fall down or even be splashed together with slag

from beneath the electrodes. This can occur owing to Accumulation of gases in the melting

zone with a poor gas permeability of the charge. Drying of manganese ore is an indispensable

Page 44: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-10

operation in the process. The use of dry ore and coke breeze ensures a higher productivity,

lower consumption of electric energy, stable process conditions and better labor conditions.

With a deficiency of reductant in the charge, manganese cannot be reduced fully and the

content of manganese oxide in the slag and that of phosphorus in the metal increase. With a

large excess of reductant the content of silicon in the metal increase the depth of electrode

placing diminished, the high- temperature zone rises to a higher level and the heat and

reducing ability of gases are utilized less efficiently. The position of electrodes in the furnace is

controlled by giving manganese ore beneath them if a deeper immersion of an electrode is

needed, or coke breeze, if an electrode should be raised higher.

The metal and slag are tapped successively from all the two tap holes. The slag ratio in the

smelting of Ferro-manganese by a flux less process is within 1.0 – 1.2. The slag is separated

from metal during tapping by means of a skimmer arrangement. Moulds are arranged in a

cascade under the spout; a partition is placed into the first mould, with its lower edge 60 – 70

mm below the pouring nose of the mould. Slag is retained by the partition and flows over into

the ladle while.

Silico-Manganese Manufacturing Process

Silico-manganese an alloy of manganese with silicon and iron is a semi- product used for

smelting of medium and low carbon Ferro-manganese. As mentioned earlier, Silico-manganese

is also employed as a complex deoxidant in steel making and (upon melting together with

aluminium) to produce a complex manganese-silicon-aluminium (M-K-A) deoxidant. The

process for smelting Silico-manganese essentially consists in manganese and silicon being

simultaneously reduced from manganese Silicontes, slag, ore and quartzite. The process relies

on a higher temperature than that needed for smelting Ferro-manganese. The process is

carried out continuously under slag having a ratio of 1:1. Charging and furnace top

maintenance are done essentially in the same way as in Ferro-manganese. The metal and slag

are tapped from the furnace every two hours. The thick slag at tapping entrains much of metal

beads, which has a negative effect on manganese recovery. The slag can be made more fluid

by adding raw dolomite.

The metal and slag are tapped through same tap hole in a similar way to Ferro-manganese.

Page 45: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-11

Figure 2.4: Typical Manufacturing Process of Ferro Manganese

Page 46: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-12

Figure 2.5: Typical Manufacturing Process of Silico Manganese

Page 47: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-13

2.8 PLANT FACILITIES & OTHER REQUIREMENTS

2.8.1 Raw Material Receipt and Storage Yard

The raw material viz., Manganese Ore, Coke, Coal, Quartz, Dolomite etc., will be received by

trucks and stacked separately in stockyard. The materials will be procured in required size

range and quality and no further processing is required. These raw materials will be stored in

yards with concreted flooring. Coke and coal will be stored under closed sheds, while the other

raw materials will be stored in open concreted yards.

2.8.2 Raw Material Handling System

The raw materials will be fed to a Ground Hopper of 20m3 capacities by dumper and pay

loader and will be transferred from ground hopper by a belt conveyer or to a screen house,

where the under size material will be screened out and the correct size material will then be

conveyed to storage bunkers. There will be 8 numbers of M. S. storage bunkers in the Bunker

House, where different raw materials will be stored in each bunker. The bunkers will be fed

with reversible conveyors.

The raw materials will be mixed as per the material balance and weighed in 2 sets of weigh

Hoppers (1 set for each of 4 nos of day bunkers). The weigh hoppers will be provided with

suitable load cells to record the weight of each raw material that form the recipe of the

material mix. The material after weighing in the required proportion will be conveyed through

a belt conveyor, monorail to the furnace top where 9 numbers of charging Hoppers are

provided right on top of the furnace shell.

The charging hoppers will be connected with charging chutes and slides gates, through which

the material is fed into the furnace around the three electrodes, as and when required. The

slide gates will be operated pneumatically for which a suitable Air Compressor shall be

provided. The entire weighing and feeding system will be controlled through an Automatic

Bath Weighing System.

2.8.3 Submerged Electrical Arc Furnace fro proposed expansion

For smelting the raw material the additional submerged arc furnace of 2 x 9 MVA capacities

will be installed. The furnace shell will be lined with fire clay bricks followed by Silicon

carbide bricks and then carbon tamping paste. The furnace shell will be externally water

cooled by spray nozzles. In addition to the furnace shell, water-cooling system shall be

provided for:

Cooling of current conducting bus tubes and copper clamps,

Page 48: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-14

Electrode holding pressure ring

Furnace hood

A suitable Cooling Tower with necessary pipeline shall be installed to bring down the

temperature of circulation water and re-circulate the same.

The three electrodes will be suspended and regulated with the help of a Hydraulic System,

consisting of 2 numbers of hydraulic cylinders for each of the three electrodes, a suitable

hydraulic power pack and hydraulic pipeline and hoses.

2.8.4 Hot Metal Handling

There are two numbers of tap holes provided in the furnace shell to take out the metal and

slag from the furnace at regular intervals of about every two hours. The hot liquid metal and

slag will be collected into Cast Iron Moulds. The slag by virtue of its lesser specific gravity floats

on the metal and overflows into Cast Iron Slag pot and the metal is retained in the CI moulds.

The liquid slag will be poured out into sand beds for solidification and the metal will be

allowed to solidify in the CI moulds itself 1no of 10 ton heavy duty EOT crane will be installed

in the tapping bay to facilitate the hot metal handling. After solidification the metal and slag

will be removed from the moulds / sand beds and sent to breaking yard for sizing into

customer- required size. Even though the metal is separated out from the slag due to its

density difference, some amount of (about 2-5%) metal is always entrapped into the slag.

Hence the slag after solidification is sent to a Metal Recovery Plant where the slag is crushed,

screened and then subjected to water jigging to separate the entrapped metal from slag. This

metal will then be sent to packing section and the slag is sent to dump yard.

2.8.5 Control & Instrumentation (C & I)

The Instrumentation and control system will be provided with microprocessor based

Distributed Control System (DCS) and control devices, analogue instruments for local control. It

will perform the functions of monitoring, control, alarm, protection and interlock, diagnosing,

performance monitoring, trending etc. The plant will have a Central Control Room (CCR) and

Local Control Rooms (LCR) as required.

2.8.6 Utilities & Services

The following utilities and services shall be required.

Compressed Air System

A compressed air system shall be provided to cater the needs of service requirements such as

slide gates pollution control equipment etc. The total requirement of compressed air shall be

Page 49: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-15

around 30 cum/hr at 7 KG per cm2.

Electrical Power Supply and Distribution

The other major input in the proposed alloys manufacturing process is the electricity. The

electricity will be drawn from the grid at 132 KV voltages to the switching station in the in-

house substation wherein required HT switchgear, Capacitors, MCCs will be installed. This

electricity will be then transferred to the furnace transformer, which will be basically 9 MVA

transformer where it is further stepped down from 132 KV to the operating voltage of about

100 -110 volts. In order to improve the reactive power and reduce the losses suitable Capacitor

Banks will be installed. The electricity from the furnace transformers at a voltage of 100 -110

volts and very high current of about 37,000 – 45,000 amps transferred to the reaction zone

through copper bus tubes - copper clamps - self-baking soderberg carbon electrodes.

All electrical equipment would be provided with earth connection as per Indian Electricity

rules. All buildings will be provided with necessary lightning protection arrangements. I strips/

flats and GI electrodes will be used for earthning and lightning protection.

The Illumination level envisaged for different areas shall be as per industrial norms to ensure

comfort and safety. Flood lightning will be used for open storage areas, Sodium vapor lamps

with reflectors will be used for road lightning. Florescent lamps with reflectors will be used

for low bays of production area, office buildings, strategic units and control rooms to ensure

safety.

Fire Protection Facilities

The Fire protection system for the plant shall be consisting of:

Hydrant System for all the areas of the plant

High velocity water spray system for Transformers

Automatic fire detection and alarm system

Manual fire alarm system

Portable fire extinguishers

The components of the fire protection system will confine to BIS mark /TAC approved type.

The system shall be designed based on safety requirements and generally conforming to

Traffic Advisory Committee (TAC) regulations and National Fire Protection Association of

America.

The fire detection and alarm system shall be designed according to IS 2189 standards. The

system shall consist of addressable type one loop fire alarm panel located at the control room,

Page 50: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-16

addressable smoke detectors, addressable type heat detectors, manual call points and

electronic hooters.

Portable type fire extinguishers of DCP type shall be located in the TG building, Control room,

MCC rooms etc.

2.9 POLLUTION CONTROL EQUIPMENT AND ITS DESCRIPTION

The pollution control equipment proposed in the plant will be pulse jet bag filters. In a Jet

Pulse Dust collector the dirty gases enter through inlet manifold to the hopper where

separation of coarse dust particles takes place. The reminder will pass with the gases to the

filtering space. Filtering takes place from outside to inside of bags, Dust particles are deposited

on the outside surface of the bags while the clean gases pass through the out let manifold and

finally to the atmosphere through ID fan. These bags will be cleaned intermittently through

compressed air pulses in reverse direction.

Details of Bag Filters

Working principle of Bag Filter

In a Jet Pulse Dust collector the dirty gases enter through inlet manifold to the hoppers where

separation of coarse dust particles takes place. The remainder will pass with the gases to the

filtering space. Bags will be secured in the tube sheet through flange and suspended from top.

Wire cages will be provided to prevent the bags from collapsing. Filtration takes place from

outside to inside of bags. Dust particles will be deposited on the outside surfaces of the bags

while the clean gases pass through the outlet manifold and finally to the atmosphere through

ID fan.

The bags will be cleaned intermittently through compressed air pulsed in reverse direction. A

Short pulse of compressed air will be directed downwards from a header into a row of bags;

causing the bags to flex and dislodge the dust cake from outside the bags, the dust falls into

the hopper by gravity and hence into the dust handling system. One to few rows of bags will

be pulsed at time after a predetermined period. The entire cleaning cycle will be fully

automatic and based on time mode. All timings will be adjusted in the field to ensure optimum

cleaning efficiency and compressed air consumption.

Wastewater Generation and Treatment

No process wastewater will be generated from the Ferro Alloy manufacturing process. The

water for cooling of the equipment shall be circulated in a closed circuit. It will be pumped

from the cold sump and sent to the equipment through necessary pipelines. After cooling

Page 51: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-17

different parts of the equipment, the hot water returns to the top of cooling tower. The

required degree of cooling of hot water is done through the cooling tower and it is stored in

the cold sump for recirculation. Some make up water will always necessary to be added to the

cold sump to compensate for evaporation loss, drift loss, process loss and leakage loss. The

water in the cooling system for the furnace and for compressors will be treated to the levels as

specified by the equipment. Domestic waste water generated will be treated in septic tank

followed by soak pit.

Noise Generation and Control

In the proposed development, the major noise generating equipments will be from the

compressors, transformers etc. Noise will be continuously generated from such sources. The

noise levels of the individual equipment will not be more than 85 dB (A) at one meter distance.

Provision of Personal Protective Equipment (PPE) to the workers in high noise generating areas

would eliminate/ minimize such impacts to a great extent. Important noise generating sources

have been identified in the proposed plant and the noise levels expected to be in the following

range as given in Table 2.9.

Table 2.9: Noise Generating Sources

S. No Sources Noise level in dB(A) [1 m away]

Nature of Noise

1 Air compressors 85.0 Continuous 2 Transformer 75.0 Continuous

It can be seen from the above table that all the noise levels at 1m distance from the

equipment will be in the range of about 75-90dB(A).

Noise Control

Acoustic enclosures will be provided wherever required to control the noise levels below 90 dB

(A). Wherever, it is not possible technically to meet the required noise levels, PPE will be

provided to the workers. The wide green belt around the plant will attenuate the noise levels

outside the plant boundary.

Solid Waste Generation and Disposal

The slag generated in manufacturing of Ferro Manganese will be used in Silico Manganese

manufacturing process. The generated slag and bag filter dust will be stored and disposed in

earmarked area systematically and scientifically as per CPCB guidelines. Effort will be taken to

utilize various purposes at end use.

Page 52: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH2-18

2.10 PROJECT IMPLEMENTATION SCHEDULE

The proposed expansion project for producing Ferro Alloys with all the facilities for the

production proposed to be commissioned within 10 months from the zero date.

The zero date for the project shall be from the date of financial tie-up and getting required

clearances from various departments.

--------------

Page 53: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-1

CHAPTER 3 DESCRIPTION OF ENVIRONMENT

3.1 STUDY AREA, PERIOD, COMPONENTS AND METHODOLOGY

Description of the baseline environmental status in and around the proposed expansion

project depicts the existing environmental conditions regarding the meteorology, air, water,

noise, soil, biological and socio- economic environment.

3.1.1 Study Area

Study area comprising of the area within a 10 km radius of the proposed expansion project as

the centre for environmental monitoring and data collection.

3.1.2 Study Period

The baseline data generation for the EIA-EMP has been carried out during December 2016 to

February 2017 for three months.

3.1.3 Environmental Components

The environmental components like Meteorology, Ambient Air Quality, Water Quality, Noise

Levels, Soil Quality, Geology & Hydrology, Traffic study and Socio-economic conditions which

are most likely to be influenced by the setting up an industry were carried out during the study

period. Secondary data like meteorological data from Indian Meteorological Department

(IMD), Geology, Hydrogeology, Census data were collected from various government and non-

government agencies. The monitoring photographs are given in Figure 3.1.

3.1.4 Methodology

The methodology adopted for conducting the studies are:

Reconnaissance of the study area;

• Selection of sampling locations based on the predominant wind directions recorded by the

nearest India Meteorological Station (IMS);

• Existing topography of the study area;

• Location of existing surface water bodies like rivers, lakes/ponds and streams; and

• Location of villages/towns/sensitive areas, and areas, which represent baseline conditions;

The BAL has not started its first phase production as the construction of the first phase is

under the process. Therefore there will not be operational pollution from the project. Hence

the EIA study is conducted normally without considering the pollution effects of the first phase

production. The establishments of baseline for valued environmental components are

described in the following sections.

Page 54: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-2

Figure 3.1: Environmental Parameters Sampling Photographs

Page 55: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-3

3.2 BASELINE ENVIRONMENT

The baseline environmental quality represents the background environmental scenario of

various environmental components such as air, noise, water, and land and socio economic

status of the study area. The general study area covers 10 km radius of the proposed plant site.

3.2.1 Micro Meteorology of Study Area

Meteorology of the study area plays an important role in the air pollution studies. The

prevailing micro meteorological conditions at the proposed project site will regulate the

dispersion and dilution of air pollutants in the atmosphere. The predominant wind directions

and the wind speed will decide the direction and distance of the most affected zone from the

proposed activity. The meteorological data collected during the monitoring period is very

useful in interpretation of baseline as input for dispersion models for predicting the Ground

Level Concentrations (GLC).

An auto weather monitoring station was installed during the months of from December 2016

to February 2017 to record various meteorological parameters on hourly basis to understand

the wind pattern, Temperature variation, solar insulation and relative humidity variation etc.

Percentage frequencies of wind in 16 directions have been computed from the recorded data

of the study period to plot wind rose diagram. Figure 3.2 represents the wind pattern of the

study period.

3.2.2 Wind pattern during Study Period (from December 2016 to February 2017)

Predominant Wind directions during this period were from the N to NE sector accounting to

about 75.54 % of the total time. Wind speeds during this period were varying between 1 – 20

kmph and some time more than 20 kmph. The wind of less than 1.0 kmph was treated as calm

and calm conditions are 24.46% of the study period time.

Climatology

The IMD based climate data is given in Table 3.1 and Site specific data is given in Table 3.2.

Table 3.1: Climatological Data (IMD Based)

Month Atmosphere Pressure (mb)

Temperature (oC)

Relative Humidity

(%)

Rainfall (mm)

08.30 17.30 Max. Min. 08.30 17.30 January 914.7 913.0 25.3 12.3 66 44 7.2 February 913.5 910.6 28.2 14.7 68 36 2.8 March 912.7 909.0 31.3 17.8 60 37 16.8 April 910.2 907.5 33.9 20.3 65 48 44.2 May 907.8 904.5 34.2 22.2 6Z 49 72.1

Page 56: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-4

Month Atmosphere Pressure (mb)

Temperature (oC)

Relative Humidity

(%)

Rainfall (mm)

June 904.1 901.8 30.9 23.0 70 67 205.6 July 903.0 901.5 25.2 20.3 90 88 420.2 August 904.1 902.4 25.4 20.5 90 84 480.5 September 906.Z 904.0 26.7 20.8 88 83 238.5 October 910.6 90B.2 26.7 18.5 80 75 135.6 November 913.5 911.8 25.4 13.5 73 57 20.1 December 916.0 912.5 24.9 11.4 74 50 4. 2 Range 901.5-914.7 11.4 -34.2 36 - 90 1647.8

(Source: IMD, Vishakhapatnam) Table 3.2: Site Specific Climatological Data (December 2016 to February 2017)

Month Temperature

(oC) Relative

Humidity (%)

Rainfall (mm)

Atmosphere Pressure (mb)

Min Max Min Max Min Max December 2016 11.2 25.4 54 76 1.2 914 922 January 2017 12.8 26.1 47 69 - 910 918 February 2017 14.3 29.5 36 65 - 906 914

Figure 3.2: Windrose Diagram

Page 57: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-5

3.3 AMBIENT AIR QUALITY

In order to identify the background air quality data and also to represent the interference from

various industrial and local activities, screening techniques have been used for identification of

air quality stations in the study areas. The following points have been considered for the

selection of air quality monitoring stations.

Predominant wind directions

Topography of the study area

Terrain and sensitive areas

Populated areas near to the project area

Magnitude of the surrounding industries

3.3.1 Identifications of Various Industrial Operations in the Study Area

The area experiences dry climate and most of the roads in the area are good in condition. The

proposed expansion project is located in the notified Industrial estate and various industrial

operations in the study area are considered in the present study.

3.3.2 Topography / Terrain and Sensitive Areas of the Study Area

The site is located at an elevation of 135 m above mean sea level (MSL). There are no sensitive

areas with the study area. Based on the above, the AAQ stations have been identified and

locations of ambient air quality stations are presented in Table 3.3.

3.3.3 Identification of Ambient air Quality Monitoring Stations

Ambient air quality of the study area has been assessed through a network of 8 ambient air

quality locations. These stations are designed keeping in view of the climatological conditions

of the study region.

Table 3.3: Ambient Air Quality Monitoring Stations

Code Sampling Location Distance (km) w.r.t Project

Direction w.r.t Project

A-1 Project Site -- --

A-2 Paradi 3.0 WSW A-3 Golladi Agraharam 5.0 S

A-4 Somapuram 7.0 SW A-5 Alajangi 7.5 E A-6 Dongaravalasa 5.5 NW A-7 Bobbili 5.5 NE

A-8 Godarayunlyalasa 7.5 S

Page 58: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-6

The above monitoring stations are located such that a representative background ambient air

quality levels are obtained. Figure 3.3 shows the location of ambient air quality monitoring

stations in the study area.

Pre-calibrated R.D. Samplers and High Volume Samplers have been used for monitoring the

existing AAQ status. Maximum, Minimum, Average and Percentile values have been computed

from the raw data collected at all individual sampling stations to represent the Ambient Air

Quality Status.

The Ambient Air Quality studies were carried out during from December 2016 – February

2017. The significant parameters viz. Suspended Particulate Matter (SPM), Respirable

Particulate Matter (RPM), Sulphur dioxide (SO2), Oxides of Nitrogen (NOx) and Carbon

monoxide (CO) were monitored. The data thus obtained is considered for preparing this

report.

3.3.4 Sampling & Testing Methodology

Table 3.4 gives the standard procedures adapted for sampling and testing. The procedures are

in compliance with CPCB & MoEFCC.

Table 3.4: Sampling and Testing Methodology

Parameter Duration of Sampling Recommended Analytical Procedure

PM10 and PM2.5 24 hours - continuous Gravimetric Method as per IS: 5182 SO2 8 hours – continuous Pararosaniline – Colorimetric method

NOx 8 hours - continuous Modified Jacob & Hochheiser method

CO Grab Sample As per IS 5182 3.3.5 Analysis of Baseline Concentrations

Statistical parameters like Arithmetic mean and 98th percentiles have been computed from the

observed raw data for all sampling stations. Minimum and maximum noise levels recorded are

also calculated from the data. The summary of baseline data values minimum, maximum along

with 98th percentile value for PM10, PM2.5, SO2 and NOX are presented in Table 3.5. These are

compared with the Revised National Ambient Air Quality Emission Standards issued by the

Ministry vide G.S.R.no.826 (E) dated November 16, 2009. The detailed monitoring results are

given in Annexure 8.

Page 59: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-7

Figure 3.3: Ambient Air Quality Monitoring Location

Air Quality M

onitoring Location

Page 60: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-8

Table 3.5 (A): Particulate Matter – PM10

Location Name Minimum Maximum Average 98th Percentile Plant area 67.3 74.8 71.0 74.4 Paradi 48.3 55.2 51.4 54.9 Alajangi 44.8 55.9 50.9 55.3 Godryanivalasa 43.1 50.2 47.0 50.2 Somapuram 40.9 49.6 46.2 49.6 Dongaravalasa 37.2 43.8 40.6 43.6 Golladi 55.1 62.3 59.7 62.3 Bobbilli 60.5 69.8 65.3 69.7

Table 3.5 (B): Particulate Matter – PM2.5

Location Name Minimum Maximum Average 98th Percentile Plant area 28.2 31.0 29.5 30.8 Paradi 18.8 21.1 20.0 21.0 Alajangi 17.7 21.9 19.9 21.6 Godryanivalasa 17.5 20.1 18.8 20.0 Somapuram 16.2 19.9 18.1 19.8 Dongaravalasa 14.2 16.3 15.4 16.3 Golladi 22.2 25.4 24.1 25.4 Bobbilli 24.3 28.5 26.2 28.4

Table 3.5 (C): Sulphurdioxide - SO2

Location Name Minimum Maximum Average 98th Percentile Plant area 11.6 12.8 12.1 12.7 Paradi 12.3 14.1 13.2 14.0 Alajangi 12.4 15.2 13.5 15.0 Godryanivalasa 10.2 12.0 11.1 12.0 Somapuram 10.1 12.4 11.2 12.3 Dongaravalasa 9.3 10.9 10.1 10.7 Golladi 11.4 13.2 12.3 13.1 Bobbilli 11.8 13.8 12.8 13.8

Table 3.5 (D): Oxides of Nitrogen – NOx

Location Name Minimum Maximum Average 98th Percentile Plant area 14.1 15.5 14.8 15.4 Paradi 15.0 17.1 16.1 17.0 Alajangi 14.8 18.2 16.2 18.0 Godryanivalasa 13.0 15.0 13.9 14.9 Somapuram 12.7 15.4 14.0 15.3 Dongaravalasa 12.1 13.2 12.7 13.1 Golladi 13.8 16.1 14.8 16.0 Bobbilli 14.7 17.4 16.0 17.2

Page 61: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-9

Table 3.5 (E): Carbon Monoxide – CO

Location Name Minimum Maximum Average 98th Percentile Plant area 0.5 0.7 0.6 0.7 Paradi 0.0 0.0 0.0 0.0 Alajangi 0.0 0.0 0.0 0.0 Godryanivalasa 0.0 0.0 0.0 0.0 Somapuram 0.0 0.0 0.0 0.0 Dongaravalasa 0.0 0.0 0.0 0.0 Golladi 0.0 0.0 0.0 0.0 Bobbilli 0.2 0.2 0.2 0.2

Table 3.5 (F): Ammonia – NH3

Location Name Minimum Maximum Average 98th Percentile Plant area 15.5 17.7 16.4 17.6 Paradi 6.1 7.6 6.7 7.6 Alajangi 6.1 7.9 6.9 7.8 Godryanivalasa 6.3 7.9 7.0 7.9 Somapuram 6.2 7.9 6.7 7.7 Dongaravalasa 5.3 6.8 6.0 6.8 Golladi 10.5 12.3 11.4 12.2 Bobbilli 9.1 13.1 11.5 13.0

Table 3.5 (G): Ozone – O3

Location Name Minimum Maximum Average 98th Percentile Plant area 19.4 23.3 21.5 23.2 Paradi 10.5 13.4 11.5 13.0 Alajangi 11.5 13.8 12.7 13.7 Godryanivalasa 10.5 12.7 11.2 12.7 Somapuram 10.5 12.1 11.3 12.1 Dongaravalasa 9.3 11.2 10.1 11.1 Golladi 15.1 17.6 16.2 17.3 Bobbilli 17.3 21.4 19.7 21.4

3.4 NOISE ENVIRONMENT

The acoustical environment varies dynamically in magnitude and character throughout most

communities. The noise level variation can be temporal, spectral and spatial. The residential

noise level is that level below which the ambient noise does not seem to dropdown during the

given interval of time and is generally characterized by unidentified sources. Ambient noise

level is characterized by significant variations above a base or a residential noise level. The

maximum impact of noise is felt on urban areas, which is mostly due to the commercial

activities and vehicular movement during peak hours of the day.

Measured noise levels displayed as a function of time provides a useful scheme for describing

the acoustical climate of a community. Noise levels records at each station with a time interval

Page 62: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-10

of about 30 minutes are computed for equivalent noise levels. Equivalent noise level is a single

number descriptor for describing time varying noise levels. The equivalent noise level is

defined as mathematically.

10Log1/ TΣ (10Ln/10)

Where L = sound pressure level a function of time dB (A) & T = Time interval of observations

Noise levels during the night time generally drop, therefore to compute Equivalent noise levels

for the night time, noise levels are increased by 10 dB(A) as the night time high noise levels are

judged more annoying compared to the day time. The noise recording stations are shown in

Figure 3.4 and Table 3.6 and the summary of the minimum, maximum, day - equivalent, night

- equivalent and day-night equivalent values computed for various locations in the study area

is presented in Table 3.7.

Table 3.6: Ambient Noise Quality Monitoring Stations

Code Location Distance (km) w.r.t Project

Direction w.r.t Project

N-1 Project Site -- -- N-2 Paradi 3.0 WSW N-3 Alajangi 5.0 S N-4 Golladi 7.0 SW N-5 Somapuram 7.5 E N-6 Godrayanavalasa 5.5 NW N-7 Dongarvalasa 5.5 NE N-8 Bobbili 7.5 S

Table 3.7: Noise Levels during Study Period

Equivalent Noise levels

N1 N2 N3 N4 N5 N6 N7 N8

LMax 69.6 53.9 54 54.1 48.3 49.2 49.5 63.6 LMin 60.2 43.1 43.1 42.8 40.8 41.6 41.6 51.2 Ld 68.4 53.5 53.1 52.7 45.9 48.4 48.5 61.9 Ln 63.0 43.9 43.7 43.3 40.9 42.2 42.2 52.3 CPCB Ld

Ln 75 55 55 55 55 55 55 55 70 45 45 45 45 45 45 45

L min : Minimum Noise Level Recorded L max : Maximum Noise Level Recorded Ld : Day Equivalent Ln : Night Equivalents Ldn : Day-Night Equivalents

It is observed that the noise values obtained were within the prescribed Ambient Air Quality

Standards with respect to Noise.

Page 63: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-11

Figure 3.4: Noise Monitoring Locations

Noise M

onitoring Locations

Page 64: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-12

3.5 WATER ENVIRONMENT

Assessment of baseline data on Water environment includes

a) Identification of surface water sources

b) Identification of ground water sources

c) Collection of water samples

d) Analyzing water samples collected for physico-chemical and biological parameters

Assessment of water quality in the study area has been carried out as per the Indian standard

IS 10500:2012 (drinking water standard). The locations of water sampling are shown in Figure

3.5 and Table 3.8.

Table 3.8 Water Sampling Locations

Code Location Source Distance (km) w.r.t Project

Direction w.r.t Project

GW-1 Plant Area Bore well -- -- GW-2 Paradi Bore well 3.0 WSW GW-3 Alajangi Bore well 7.5 E GW-4 Golladi Bore well 5.0 S GW-5 Sompuram Bore well 7.0 SW GW-6 Godarayunlyalasa Bore well 7.5 S GW-7 Dongaralavalasa Bore well 5.5 NW GW-8 Bobbili Bore well 5.5 NE SW-1 Vegavathi River near

Alajangi (down stream) Surface 7.0 E

SW-2 Vegavathi River near Paradi (upstream)

Surface 3.0 WSW

SW-3 Pond near Embrudivalada Surface 2.5 NE SW-4 Pond in APIIC Growth

Center Surface 3.6 NW

The analytical data of surface water quality and ground water quality is given in Table 3.9 and

Table 3.10.

Page 65: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-13

Table 3.9: Ground Water Quality S.

No. Parameters Unit Limits as

Per IS: 10500:2012

GW 1 GW 2 GW 3 GW 4 GW 5 GW 6 GW 7 GW 8

1 Color CU 5 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 2 pH @ 25.5oC - 6.5-8.5 7.55 7.76 7.53 7.35 7.69 7.88 7.87 7.25 3 Turbidity NTU 1 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 4 Electrical Conductivity μMho/cm Not Specified 777 1297 2711 3578 2012 1467 920 785 5 Total Dissolved solids mg/L 500 481 791 1762 2218 1187 894 598 471 6 Total Suspended Solids mg/L Not Specified <10 <10 <10 <10 <10 <10 <10 <10 7 Alkalinity as CaCO3 mg/L 200 225.4 499.8 597.8 588 323.4 421.4 431.2 313.6 8 Hardness as CaCO3 mg/L 200 323.2 343.4 313.1 858.5 595.9 373.7 404 343.4 9 Calcium as Ca mg/L 75 93.1 60.72 89.05 161.92 105.25 80.96 72.86 101.2

10 Magnesium as Mg mg/L 30 22.08 46.63 22.08 110.44 80.99 41.72 53.99 22.08

11 Chlorides as Cl- mg/L 250 78.84 103.47 330.14 694.78 261.16 167.53 33.5 35.47 12 Sulphates as SO4 mg/L 200 88.9 84.78 173.69 244.49 87.25 89.72 106.19 73.26 13 Nitrate as NO3 mg/L 45 3.31 5.91 30.52 46.92 33.52 16.56 8.36 3.36 14 Sodium as Na mg/L Not Specified 26.8 165.2 402 398 78.9 133.6 52.5 36.5 15 Potassium as K mg/L Not Specified 2.4 2.0 2.0 2.0 3.9 2.3 2 1.3 16 Fluoride as F mg/L 1 0.83 0.53 0.54 0.92 0.78 0.73 0.41 0.57 17 Iron as Fe mg/L 0.3 0.16 0.2 0.21 0.21 0.21 0.17 0.17 0.21 18 Residual Chlorine as Cl mg/L 0.2 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 19 Boron as B mg/L 0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 20 Zinc as Zn mg/L 5 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 21 Odour - Agreeable Agree Agree Agree Agree Agree Agree Agree Agree 22 Lead as Pb mg/L 0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 23 Manganese as Mn mg/L 0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 24 Cadmium as Cd mg/L 0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 25 Copper as Cu mg/L 0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 26 Chromium as Cr mg/L 0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05

27 Cyanide as CN- mg/L 0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 28 Total arsenic (as As) mg/L 0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 29 Mercury (as Hg) mg/L 0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 30 Phenolic Compounds as

Phenols mg/L

0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001

31 Mineral oil mg/L 0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 32 Total Coliform MPN/100

ml Shall not be

detectable in any 100 ml

sample

Absent Absent Absent Absent Absent Absent Absent Absent

33 E-Coli MPN/100 ml

Shall not be detectable in any 100 ml sample

Absent Absent Absent Absent Absent Absent Absent Absent

Note: *Agree - Agreeable

Page 66: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-14

Table 3.10: Surface Water Quality

S. No. Parameters Unit SW1 SW2 SW3 SW4 1 pH @ 25.8oC - 8.11 8.02 7.77 7.8

2 Turbidity NTU <1.0 <1.0 <1.0 <1.0 3 Color CU <5.0 <5.0 <5.0 <5.0 4 Electrical Conductivity μMho/cm 627 589 791 1253 5 Total Dissolved solids mg/L 395 365 466 814 6 Total Suspended Solids mg/L <10 <10 <10 <10 7 Oil & Grease mg/L <2.0 <2.0 <2.0 <2.0 8 Alkalinity as CaCO3 mg/L 254.8 245 352.8 343

9 Hardness as CaCO3 mg/L 252.5 181.8 242.4 363.6

10 Calcium as Ca mg/L 64.76 40.48 44.52 60.72 11 Magnesium as Mg mg/L 22.08 19.63 31.9 51.54 12 Chlorides as Cl- mg/L 37.44 35.47 35.47 167.53

13 Sulphates as SO4 mg/L 69.14 56.8 27.16 45.27

14 Nitrate as NO3 mg/L 1.84 0.18 0.18 0.13

15 Sodium as Na mg/L 31.6 56.5 67.4 119 16 Potassium as K mg/L 1.9 2.5 9.2 9.7 17 Fluoride as F mg/L 0.81 0.57 0.58 0.72 18 Iron as Fe mg/L 0.21 0.24 0.22 0.23 19 Chromium as Cr+6 mg/L <0.05 <0.05 <0.05 <0.05

20 Zinc as Zn mg/L <0.2 <0.2 <0.2 <0.2 21 Chromium as Cr mg/L <0.05 <0.05 <0.05 <0.05 22 COD mg/L 12 10 12 14 23 BOD (3 Days at 27OC) mg/L 3.2 2.59 3.2 3.5 24 Dissolved Oxygen mg/L 5.2 5.3 5.2 5.4 25 Copper as Cu mg/L <0.05 <0.05 <0.05 <0.05 26 Cyanide as CN- mg/L <0.05 <0.05 <0.05 <0.05

27 Phenolic Compounds as Phenols

mg/L <0.001 <0.001 <0.001 <0.001

28 Mercury (as Hg) mg/L <0.001 <0.001 <0.001 <0.001 29 Lead as Pb mg/L <0.01 <0.01 <0.01 <0.01 30 Manganese as Mn mg/L <0.1 <0.1 <0.1 <0.1 31 Cadmium as Cd mg/L <0.003 <0.003 <0.003 <0.003 32 Total arsenic (as As) mg/L <0.01 <0.01 <0.01 <0.01 33 Total Coliform MPN/100ml 32 25 94 84 34 E-Coli MPN/100ml Absent Absent Absent Absent

Groundwater Samples within 10 km Radius

• pH of the ground water samples collected was in the range of 7.7 – 8.11.

• Total Dissolved Solids in the samples was in the range of 365 - 814 m g /l.

• Total Hardness was found to vary between 181.8 – 363.6 mg/l.

• Chlorides concentration was found to vary between 35.47 – 167.43 mg/l.

• Fluoride concentration was found to vary between 0.57 – 0.81 mg/l.

Page 67: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-15

• Sulphates concentration was found to vary between 27.16 – 69.14 mg/l.

• Heavy metal concentrations in all the samples were found to be well within the limits.

Surface Water Samples within 10 km Radius

• Water samples from 8 surface water bodies have been collected and analyzed as per IS

standards

• pH of the surface water samples collected was in the range of 7.25 - 7.88.

• Total dissolved solids in the samples were in the range of 471 - 2218 m g /l.

• Total Hardness was found to vary between 313.1 – 858.5 mg/l.

• Chlorides concentration was found to vary between 33.5 – 694.78 mg/l.

• Fluoride concentration was found to vary between 0.41 – 0.92 mg/l.

• Sulphates concentration was found to vary between 73.26 – 244.49 mg/l.

• Heavy metal concentrations in all the samples were found to be well within the limits.

Page 68: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-16

Figure 3.5 Water Sampling Locations

Water Sam

pling Locations

Page 69: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-17

3.6 LAND ENVIRONMENT

3.6.1 Soil Quality

The soil samples were collected from 8 sampling locations within an area of 10 km radius

around the proposed project for analysis of the physico-chemical characteristics of the

soil quality. The locations of soil sampling stations are given in Table 3.11 and Figure 3.6.

Table 3.11 Soil Sampling Locations

Code Location Distance (km) w.r.t Project

Direction w.r.t Project

S-1 Plant Area -- -- S-2 Paradi 3.0 WSW S-3 Alajangi 7.5 E S-4 Golladi 5.0 S S-5 Sompuram 7.0 SW S-6 Godiranavalasa 7.5 S S-7 Dongaralavalasa 5.5 NW S-8 Bobbili 5.5 NE

The Soil Analysis Results are given in Table 3.12.

Page 70: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-18

Table 3.12: Soil Quality Results

S. No

Parameters S 1 S 2 S3 S4 S5 S6 S7 S8

1 pH 6.56 7.55 7.96 6.93 6.56 6.52 6.59 7.54 2 Electrical Conductivity 137 79 306 455 70 77 88 148 3 Bulk Density 1.22 1.26 1.2 1.24 1.31 1.21 1.28 1.21 4 Moisture Content 3.15 4.2 6.28 4.3 2.94 3.5 4.38 3.84 5 Organic carbon 0.44 0.6 0.62 0.81 0.36 0.52 0.48 0.65 6 Available Calcium as Ca 1553.4 3514.93 2697.34 1103.66 510.82 878.76 674.37 2636.34 7 Available Magnesium as Mg 346.9 1610.68 1164.58 793.04 210.6 433.66 284.96 718.65 8 Available Nitrogen as N 100.3 103.46 134.83 159.92 94.08 112.9 137.98 128.56 9 Available Phosphates as P 86.3 94.86 98.59 104.58 99.59 92.89 89.91 122.55

10 Available Potassium as K 201.5 326.86 353.77 362.68 234.06 262.01 358.2 382.87 11 Texture 12 a) Sand 30.2 12.4 18.6 23.7 51.2 31.6 24.2 25.6 13 b) Slit 60.4 56.8 49.2 43.5 42.5 56.4 61.9 45 14 c) Clay 9.4 30.8 32.2 32.8 6.3 12 13.9 29.4 15 Soil Type Silty

Loam Silty clay

Silty clay

Clay Loam

Sandy Loam

Silty Loam

Silty Loam

Clay Loam

16 Cadmium as Cd <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 17 Chromium as Cr 24.74 20.56 17.66 24.15 21.65 24.43 24.83 20.5 18 Nickel as Ni 24.69 44.62 37.95 41.74 20.65 22.79 33.1 39.85 19 Lead as Pb <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 20 Copper as Cu 22.18 39.51 33.78 36.63 16.47 23.17 31.82 24.13 21 Zinc as Zn 34.02 59.57 48.28 50.83 28.34 36.25 33.16 38.64 22 Sodium Absorption

Ratio(SAR) 0.15 0.41 0.36 0.12 0.28 0.2 0.25 0.1

Conclusion

The following are the highlights of soil quality in the study area are as follows Soil Samples

within 10 km Radius

• PH of the soil samples were found to be in the range of 6.52 – 7.96

• Organic content of the soil samples was found to be medium exhibiting in the range of 0.36

% - 0.81 % and average fertility

• Soils in the area were found to be sandy silty clayey in texture with sand percentage in the

range between 12.4 – 51.2 %, silt between 42.5 – 61.9 % and Clay 6.3 – 32.8 %.

Page 71: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-19

Figure 3.6: Soil Sampling Locations

Soil Sampling Locations

Page 72: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-20

3.7 GEOLOGY AND HYDROGEOLOGY

3.7.1 General

Vizianagaram is a Coastal District of Andhra Pradesh. In Vizianagaram a suite of graphite

bearing calc-silicate granules, veined by syenitic rocks, developed wollastoneite-rich veins at 6-

7 Kbar and >850 oC. During subsequent nearisobaric cooling wollastonite was replaced by

calcite + quartz and a graphic intra growth of fluorite + quartz + clinopyroxene. Titanite with

variable Al and F contents is present throughout the rock. Combining the compositional

variation of titanite and recent experimental data, it is demonstrated that the mineral

assemblage, the composition of coexisting fluids and the mobility of Al exert a far greater

control on the composition of titanite than pressure, temperature or the whole rock

composition.

3.7.2 Physiography and Drainage

The district is dominantly hilly in nature, thickly wooded and rugged. The drainage pattern is

sub parallel to sub dendritic.

3.7.3 Geology

The district forms a part of Easter Ghat Mobile belt exposing all the characteristic lithounits of

the Eastern Ghat Supergroup such as the khondalite group is represented by khondalite

(quartz-felspar-garmet-sillimanite-graphite gneiss), calc granulite and quartzite which occur as

impersistent bands within the khondalite. The charnockite group consists of acid,

intermediate, and basic varieties. The migmatite group consists various rock types including

leptynite, porphyroblastic granitioid gneiss, gamet-biotite-hypersthene gneiss, quartzo

felspathic mobilisates and other associated hybrid rocks. Bauxitic laterite occupies several flat

topped and gently slopping hills at elevation at 100m and above. Laterites are mostly

developed on khondalites and rarely on charnockites. Tirupathi sandstone of Gondwana

supergroup occurs unconformably over the Archaean crystallines. This is represented by

coarse sandstone and clays exposed close to the coast. Channel bars and active channels

contain brown silts and coarse sand. The marine sediments of active beach and tidal flat are

seen in the narrow coastal plain. The coastal plain south of Elamanchili is rocky, scarp faced

and believed to be fault controlled. The rocks along the coast bear the impressions of sea level

fluctuations up to an elevation of 145m above MSL. The structural grain of the litho units is

defined by foliation which is considered to have developed because of first phase of folding

and uniformly shows parallelism with the primary layering wherever preserved. The strike of

Page 73: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-21

the foliation varies from NE-SW to NW – SE with moderate to steep dips. The rocks have been

subjected to tight isoclinal folding having regional trend of NE-SW. As a result of cross folding

on NW-SE axis, structural domes and basins have been formed in the area.

3.7.4 Geomorphology and Geohydrology

The main landforms are structural ridges or hogbacks with intermittent softer migmatitic rocks

forming low plains referred to as pediplain pediment complex. The coastal plain is made of

beach ridges, tidal flats and lagoons. A 100 m high scarp is seen along the coast imprints of sea

erosion such as caves, wave cut benches, notches and pitted surfaces. The groundwater in the

major part of the district within the Easternghat supergrop of rocks is fracture controlled the

potentially is high along the fractures and it is low to moderate away from fractures. The

permeability in these rocks is 0.50-20 m/day and specific yield is 0.005-0.025 ltrs/sec. The

ground water occurs at shallow depths in flood plains.

3.7.5 Soil and Land Use

The district is characterized by red loamy soil in the northern part and red sandy soils in the

southern part. Coastal alluvial and sandy soils are seen in the coastal plain. A patch of lateritic

soil occurs in the northeastern part. Upper part of the district is covered by forest land; flood

plains are covered by arable land and the rest by grass lands.

3.7.6 Geotechnical Characteristics and Natural Hazards

The area has been demarcated into two engineering geological provinces mainly based on

bearing capacity/compressive strength and foundation characteristics. Bearing capacity of the

rock types vary from low to high and the foundation characteristics are poor to very good. The

entire area falls under Seismic Zone-II. The coast is erosional type fault controlled, hence is

vulnerable to tremors. The coastal area is prone to cyclonic storms.

3.8 LAND USE STUDIES

Studies on land use aspects of eco-system play important roles for identifying sensitive issues,

if any, and taking appropriate actions for maintaining the ecological balance in the

development of the region.

3.8.1 Objectives

The objectives of land use studies are:

• To determine the present land use pattern;

• To analyze the impacts on land use due plant activities in the study area; and

Page 74: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-22

• To give recommendations for optimizing the future land use pattern vis-a-vis growth of

plant activities in the study area and its associated impacts.

3.8.2 Methodology

For the study of land use, literature review of various secondary sources such as District

Census Handbooks, regional maps regarding topography, zoning settlement, industry, forest

etc., were taken. The data was collected from various sources like District Census Handbook,

Revenue records, state and central government offices and Survey of India (SOI) toposheets

and also through primary field surveys.

3.8.3 Land use Based on Secondary Data

Based on the census report, 10-km radial distance around this Plant Centre has been

considered in the study. These areas were studied in detail to get the idea of land use pattern

in the study area. The land use pattern of the study area is given in Table-3.13 and Figure 3.7.

The FCC map and Land use map are given in Figure 3.8 and Figure 3.9.

Table 3.13: Land Use Pattern of the Study Area

S. No.

Particular Area (ha.) PGA *** (%)

1 Forest Land 18.311 5.825 2 Barren Land 5.195 1.652

3 Water body 19.391 6.169 4 Built-up Land 8.257 2.627 5 Agriculture Land 263.189 83.727 Total 31400 100

(*** Percentage to total geographical area)

Figure 3.7: Pie Diagram for Land Use Pattern in the Study Area

Page 75: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-23

Figure 3.8: FCC Map of the 10 Km Study Area

Page 76: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-24

Figure 3.9: Land use Map of the Study Area

Page 77: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-25

3.9 ECOLOGY

3.9.1 Introduction

A natural ecosystem is a structural and functional unit of nature. It has components, which

exist in harmony and survive by interdependence. Ecosystem has self-sustaining ability and

control the number of organisms at any level by cybernetic rules. The effect of this is that an

ecosystem does not become imbalanced. Development is must for any nation, however, the

development needs a price. The price is paid by one kind of people and natural biota and other

people reap fruits of prosperity. The disparity between the sufferers and enjoyers increases.

The only plausable answer to this is eco-friendly development. The ecological study was

undertaken with the objective of the following:

• to assess the nature and distribution of vegetation in and around the project site;

• to asses the distribution of animal life spectra; and

• to asses the biodiversity and to understand the resource potential.

3.9.2 Methodology

Adopted for the Survey to achieve above objectives a detailed study of the area was

undertaken in 10-km radius area with the project site as its center. The different methods

adopted were as follows: Compilation of secondary data with respect to the study area from

published literature and Government agencies; Generation of first hand data by undertaking

systematic ecological studies in the area; Interrogating local people so as to elicit information

for local plants, animals and their uses; and Gathering data for ethnobiology. The present

report gives the review of published secondary data and the results and general ecological

survey conducted in the month of Jan-2017.

3.9.3 Terrestrial Ecological Status

Floristic Richness

The area shows many algae, fungi, bryophytes and ferns. Algae are present in aquatic bodies

or in marshy places. Fungi, particularly from ascomycetes and basidiomycetes are located on

ground or epiphytically. Lichens of crustose, foliose and fruticose types are present on

different substrates (Lichens, Ascomycetes and Basidiomycetes could be observed near hilly

terrain). Bryophytes occur in wet areas and occasionally on barks of trees and old walls of

houses. The commonly observed bryophtes in this area are Funaria sp. and Polypodium sp.

Fern flora of the study area is insignificant. The aquatic weeds Hydrilla sp. Chara sp. and

Salvinia were observed in small ponds and in agricultural fields.

Page 78: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-26

Life Form Spectrum

Raunkiaer defined life forms as the sum of adaptations of plants to climate. BraunBlanquet

(1951), whose system is adapted in this study, modified the Raunkiaer's system. Following five

of the ten classes created by Braun-Blanquet is present in the study area.

Phanerophytes : Shrubs and trees

Therophytes : Annuals including ferns

Hydrophytes : Water plants except plankton

Hemicryptophytes : Plants with perennial shoots and buds close to surface.

Geophytes : Plants with perennating parts buried in substratum.

During field survey, maximum 308 number of plant species (except algae, fungi and

bryophytes) were recorded from the study area. The plant species observed in the study area

are presented in Table 3.14.

Table 3.14: Class Wise Distribution of Plant Species

S. No.

Species Nos. %

1 Phanerophytes (P) 140 45.5 2 Therophytes (T) 114 37 3 Hydrophytes (H) 08 2.6 4 Hemicryptophytes (He) 39 12.6 5 Geophytes (G) 07 2.3

Total 308 100 Comments on the Life Form Spectrum

Life form spectrum is a reflection of plant community. A plant community is governed by

several factors like climatic, edaphic, topographic and biotic. Even local variations in

environment affect components of plant community. In the study area, maximum number of

species are phanerophytes (45.48%) followed by therophytes (37.10%), hemicryptophytes

(12.58%) and hydrophytes (2.58%). Presence of large number of phanerophytes (shrubs and

trees) and therophytes (annuals or herbaceous vegetation) indicates semiarid to tropical

vegetation structure. Hemicryptophytes (predominantly grasses and sedges) were found to be

significant in the area. These indicate fertile and wet soil in upper layer of soil profile.

Hydrophytes were present in both the seasonal and perennial water bodies.

Conclusions

Detailed ecological studies conducted within 10 km radius of the project site indicates

predominance of Mangifera indica, Tamarindus indica, Borassus flabellifera, Cocos nucifera,

Cassia tora, Cassia occidentlis, Eupatorium odarattum, Zizyphus rotundifolia, Achyranthes

Page 79: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-27

aspera, Parthenium hysterophorus, Tephrosia purpurea species, when compared to tree,

shrub and herb populations observed in the study area. The vegetation structure of the study

area indicates that the floral structure is uniform in nature. The wide variety of herbaceous

members and presence of wide variety of woody members reflects that the study area is a

undisturbed ecosystem. The dominance of herbaceous flora is due to southwest and northeast

monsoon rains and fertility of soil.

National Park/Sanctuary

There are no national parks and sanctuaries present in the study area of 10-km radius of the

project.

3.9.4 Endangered Animals

There are no endangered species found during the study period.

3.10 SOCIO-ECONOMIC SURVEY

The growth of industrial sectors and infrastructure developments in and around the agriculture

dominant areas, villages and towns are bound to create its impact on the socio-economic

aspects of the local population. The impacts may be positive or negative depending upon the

developmental activity. To assess the impacts on the socio-economics of the local people, it is

necessary to study the existing socio-economic status of the local population, which will be

helpful for making efforts to further improve the quality of life in the area of study. To study

the socio-economic aspects of people in the study area around the proposed project site, the

required data has been collected from various secondary sources and supplemented by the

primary data generated through the process of a limited door to door socio-economic survey.

3.10.1Methodology Adopted for the Study

The methodology adopted for the study is based on the review of secondary data, such as

District Census Statistical Handbooks-2011 and the records of National Informatics Center,

New Delhi, for the parameters of demography, occupational structure of people within the

general study area of 10-km radius around the project site.

3.10.2Review of Demographic and Socio-Economic Profile - 2011

The sociological aspects of this study include human settlements, demography, social such as

scheduled castes and scheduled tribes and literacy levels besides infrastructure facilities

available in the study area. The economic aspects include occupational structure of workers.

The salient features of the demographic and socio-economic details are described in the

following sections. Detailed Socio economic study report is given in Annexure 9.

Page 80: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-28

3.10.3Demography

Distribution of Population

As per 2011 census, the study area consists of 170203 persons. The distribution of population

in the study area is given in Table-3.15. The males and females constitute 51.0 % and 49.0 % of

the study area population respectively.

Table 3.15: Distribution of Population

Particulars 0-10 km No. of Households 42885 Male Population 85175 Female Population 85028 Total Population 170203 Average Household Size 4.4 Male % 51.0 % Female% 49.0 %

Average Household Size

The average household size of the study area is 4.4 persons. The low family size could be attributed

to a high degree of urbanization with migration of people with higher literacy levels who generally

opt for smaller family size and family welfare measures.

Gender Ratio

The configuration of male and female indicates that the males constitute to about 51.0 % and

females to 49.0 % of the total population as per 2011 census records. The sex ratio i.e. the number

of females per 1000 males indirectly reveals certain sociological aspects in relation with female

births, infant mortality among female children and single person family structure, a resultant of

migration of industrial workers. The study area on an average has 998 females per 1000 males as

per 2011 census.

Social Structure

As per 2011 census, the percentage of scheduled caste population is 12.5% within 10-km radius

study area. The percentage of Schedule tribe population is 3.7 %. The distribution of population by

social structure is given in Table-3.16

Table 3.16: Distribution of Population by Social Structure

Particulars 0-10 Schedule caste 21275 % To the total population 12.5 % Schedule Tribes 6252 % To the total population 3.7 % Total SC and ST population 27527 % To total population 16.2 %

Page 81: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-29

Other caste population 162676 % To total population 83.8% Total Population 170203

Literacy Levels

The study area experiences an average literacy rate of 56.0%. The distribution of literate and literacy

rate in the study area is given in Table-3.17.

Table 3.17: Distribution of Literate and Literacy Rates

Particulars 0-10 km Total literate 95443 Average literacy (%) 56.0 % Total Population 170203

Occupational Structure

The occupational districbution in the study area points to be predominance of Cultivators

followed by Agricalture Labourers than Household Industry Workers, (2%) are cultivators

followed by Agricaltural Labourers (39%), Other than Household Industry Workers (34%) and

Other Workers (34%).

3.11 TRAFFIC SURVEY

Traffic study measurements were performed at road near plant site to assess impact on local

transport infrastructure due to this proposed project. Road and highway studies are given in

Table-3.18

Page 82: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH3-30

Table 3.18: Highways in the Study Area

T

otal numbers of vehicles per hour under the three categories were determined and given in

Table 3.19.

Table 3.19: No. of Vehicles per Day

S. No. Vehicles Distribution Number of Vehicles Distribution/Day

1. Cars 1760 2. Buses 671 3. Two wheelers 1027 4. Three wheelers 927 5. Trucks 12021

--------------

Name of National/State Highway/Road

Direction Up Down

Road Near Plant Site Bobbilli Ramabhandrampuram

Page 83: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-1

CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES

4.0 INTRODUCTION

Prediction of impacts is the most important component in the Environmental Impact

Assessment studies. Several scientific techniques and methodologies are available to predict

impacts of developmental activities on physical, ecological and socio-economic environments.

Such predictions are superimposed over the baseline (pre-project) status of environmental

quality to derive the ultimate (post-project) scenario of environmental conditions. The

prediction of impacts helps in minimizing the impacts on environmental quality during the

proposed project.

An attempt has been made to predict the incremental rise of various ground level

concentrations above the baseline status in respect to air pollution. The mathematical models

used for predictions in the present study is an EPA approved ISCST3 model which is used on

steady state Gaussian Plume Dispersion Model designed for point sources and area sources for

air quality. The predicted ground level concentrations computed using EPA approved ISCST3

model and plotted as isopleths concentrations.

In case of water, land, biological and socio-economic environment, the predictions have been

made based on available scientific literature and secondary sources of information.

In the earlier chapters, various process and pollution sources were identified. In this chapter,

an attempt has been made to predict the incremental rise of various ground level

concentrations above the baseline status due to the emissions from the proposed project.

BAL proposed to install the 2no’s of 9 MVA submerged electric arc furnaces for manufacturing

the Ferro manganese and Silico manganese production in addition to the 2 x 9 MVA furnaces

which are still under implementation. Hence for estimation of impacts all 6 no.s of 9 MVA

submerged electric arc furnaces were considered. To improve the supportive capacity of the

study area, mitigation measures including the measures to be undertaken at the source level

and an overall action plan at the study area level are detailed.

The impact of the proposed Ferro Alloy is studied in two distinct phases:

• Construction Phase

• Operational Phase

The impacts are regarded as temporary or short-term in construction phase where as long-

term in operational phase.

Page 84: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-2

4.1 IMPACTS DURING CONSTRUCTION PHASE

During the construction activities, activities like leveling of site, construction of plant, and

erection of equipment would be taken-up for which the possible impacts could be as explained

below. These impacts are localized, short lived for majority of the parameters and permanent

positive impact for land use only.

4.1.1 Impact on Air Quality

Site development activities and vehicular movement may cause the release of fugitive dust into

the air. Also due to construction, vehicular traffic playing along the road, there may be

marginal increase in the concentration of SO2, NOx and CO. Regular sprinkling of water is

maintained during construction activities for the dust suppression. The approach roads and

vehicles are properly maintained in good condition to minimize impact due to vehicular traffic.

The impact of activities are temporary and effects during the construction phase are restricted

and confined within the project premises and are expected to be negligible outside the plant

premises. Proper upkeep and maintenance of vehicles, sprinkling of water during this phase,

providing sufficient vegetation, etc., are some of the measures are maintained to reduce the

impacts during the construction phase.

4.1.2 Impact on Water

Water requirement for construction phase will be met from APIIC. So there will not be any

impact on groundwater source in the region. Only foundation and superstructure development

along with curing of the structure are water intensive.

Mostly local labors are employed in the construction phase. In future, if labors are allowed to

stay at site, the number would not be more than 50 workers. At peak demand, the water

requirement for labor camp would be approximately 20 m3/day @ 135 liters per capita per day

(lpcd). These workers shall be accommodated inside the project premises. Temporary

sanitation facility will be provided for the construction labor in terms of septic tank followed by

soak pits. There will be water requirement during construction phase, which will be of

temporary in nature. Thus, a minor impact is envisaged on water, during the construction

phase.

4.1.3 Impact on Noise

The sources of noise during the construction phase are vehicular traffic, construction

equipment like dozers, scrapers, concrete mixers, cranes, hoists, pumps, compressors,

pneumatic tools, saws, vibrators, etc. The noise levels due to operation of the above

Page 85: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-3

equipment will range between 70- 85 dB (A). The noise produced during construction has a

significant impact on the existing ambient noise levels. The major work will be carried out

during the daytime. Staggered operations are carried out to minimize the impact on the

ambient noise levels. The information is given in Table 4.1.

Table 4.1: Noise Limits for Appliances and Equipments

Equipment Noise Limit dB (A) Window Air Conditioner 68 Air Cooler 60 Diesel Generators 85-90 Compactors (rollers), Front Loaders, Concrete Mixers, Cranes, Vibrators, and Saws

75

Source: CPCB, Domestic Appliances and Construction Equipments at the Manufacturing Stage

4.1.4 Impact on Land Use

The proposed Ferro Alloy project is in APIIC Growth Center. There will not be any adverse

impact on land use. Land for the proposed activity is in Industrial development area, thus,

there will be minor changes in the present land use pattern.

The present construction activity employed local people. The proposed construction activities

would attract labor of about 80 to 100 of skilled and unskilled from the nearby villages. Some

skilled workers from outside areas will be housed in the nearby areas. However, local labor

force is preferred to be employed.

4.1.5 Impact on Soil Quality

No blasting is envisaged for either leveling or during the foundation work. The site is plain and

needs very little grading, filling and leveling. The soil at the project site predominantly consists

of clay-sand. The sub-strata of this area are not rocky and uniformly plain. Hence, no impacts

are anticipated.

4.1.6 Impact on Ecosystem

Terrestrial Ecology

The proposed plant is in APIIC, Bobbili Growth Centre for Industries, and the land available for

construction is barren and does not have any flora of importance. Project site is devoid of

forest cover and does not harbor any fauna of importance.

Thus, the impact on terrestrial ecosystem during construction phase will not be there.

Page 86: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-4

Aquatic Ecology

Sanitation facility will be provided to the laborers during construction, there will not be any

discharge of wastewater outside the premises of the plant or any nearby water bodies. Hence,

there will not be any impact on aquatic ecosystem of the study area.

4.1.7 Mitigation Measures During Construction Phase

The impacts during the construction phase on the environment would be of transient nature

and expected to reduce gradually on completion of the construction activities. In order to

mitigate them, the following measures are proposed.

Recommendations

During excavation and transportation over unmetalled roads at the plant site, there is scope

for localized fugitive dust emissions. Frequent water sprinkling in the vicinity of the

construction activity should be done and it should be continued even after the completion of

the construction, as there is scope for heavy truck mobility. The industry shall make provision

for water sprinklers.

Since, there is possibility of fugitive dust from the construction activity, material handling and

from the truck movement in the premises of the proposed project site, the industry is going for

extensive tree plantation.

BAL has provided suitable toilet facilities to allow proper standards of hygiene. Sanitation in

terms of septic tanks followed by soak pits are provided for the construction workers.

The noise effect on the nearest inhabitants due to construction activity will be negligible. On-

site workers are given PPE. Noise prone activities were restricted to the extent possible for

daytime hours only. The construction activities are staggered to minimize the noise impact.

An area earmarked for vehicle equipment maintenance is located in such a manner to prevent

contamination of surface and groundwater sources. Unauthorized dumping of waste oil is

prohibited for the same.

A proper garage area is earmarked for servicing of construction vehicles. Hazardous materials

like paints drums, etc., are stored in areas earmarked for the waste storage.

Hazardous wastes generated during construction phase may include lubricants, oil filters and

batteries. Pollution risks may arise from leakage and spillage of oil or fuel through poor

protection, vehicle damage or the accidental opening of valves. Potential pollution problems

may arise from storage, treatment and transportation of contaminated soils; and residual

paints and solvents. The hazardous waste material stored is and shall be disposed to

Page 87: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-5

authorized vendors on periodic basis.

On completion of construction activity, the rubble/ rubbish will be cleared and all un-built

surfaces reinstated and suitably landscaped with plantation. This will also enhance the esthetic

beauty of the plant and will help to boost the working environment during the operational

phase.

As far as possible, local labor is employed, so that need for construction camp is minimized.

Moreover, local labor is also available from the nearby villages. This will benefit the nearby

areas as well.

4.1.8 Facilities for Construction Workforce

The contractor shall be asked to provide following facilities to construction work force:

First Aid: At work place, first aid facilities shall be maintained at a readily accessible place

where necessary appliances including sterilized cotton wool etc. shall be available. Ambulance

facilities shall be kept readily available at workplace to take injured person to the nearest

hospital.

Potable Water: Sufficient supply of water fit for drinking shall be provided at suitable places.

Sanitary Facility: Within the precinct of work place, latrines and urinals shall be provided at

accessible place. These shall be cleaned at least twice during working hours and kept in a good

sanitary condition. The contractor shall conform to sanitary requirement of local medical and

health authorities at all times.

Canteen: A canteen on a moderate scale shall be provided for the benefit of workers.

Security: Proponent shall provide necessary security to work force in co-ordination with state

authorities.

4.2 IMPACT DURING OPERATIONAL PHASE

The possible beneficial and adverse impacts on each component of environment due to

operation of plant are assessed and predicted below:

4.2.1 Impact on Land Use

As mentioned earlier, the plant site falls in a notified Industrial area for industrial development,

there will not be any negative impact on the land. Only the existing land use pattern on site will

be changed. An industrial structure will be developed. In addition, the site will be beautifully

landscaped and the greenbelt will be developed to increase the aesthetic view of the land.

Thus, impact on land use will be beneficial and permanent.

Page 88: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-6

4.2.2 Impact on Soil Quality

During operation activity, the major solid waste as slag will be generated from the Ferro

Manganese Plant, which will be utilized as raw material for Silico Manganese. The slag

generated during production of Silico Manganese will be granulated and used for filling low-

lying areas.

During the operation phase, carefully designed landscaped areas and plantation will be

maintained. No significant impact is expected on the soils in and around the site, due to the

following management measures:

• Sewage water will be treated and recycled for gardening

• The entire site area will be well-paved and thus, there will be no leaching of any substances

in case of spills.

• Sludge from septic tank will be composted and used as manure for the development of

greenbelt. The manure will be organic in nature and will act as soil enricher.

Thus, the quality of the soil will improve and therefore, the impact on soil will be positive.

4.2.3 Impact on Topography

General topography of area is plain terrain and the entire project site is reasonably leveled.

However, development of land for civil works requires requisite filling, grading, leveling. Thus,

the impact on topography will be minimum and positive.

4.2.4 Impact on Air Environment

The present baseline concentrations were monitored in the EIA study. The additional emissions

are mainly from 4 x 9 MVA furnaces which are under implementation stage and 2 x 9 MVA

submerged electric arc furnaces which are proposed.

The proposed project activity will result in air emissions from the following areas.

a) Raw material Handling and storage area

b) Main Submerged Arc Furnace

c) Ferro manganese & Silico manganese storage and loading area.

The proposed submerged arc furnace being electrically operated, no fuel will be used. Hence

no major emissions are envisaged. The nature of emissions from the above units is detailed

below in Table 4.2.

Page 89: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-7

Table 4.2: Nature of Emission and Pollutant

Particular Nature of Emission Pollutant

Raw material handling & storage area Fugitive

Particulate

Matter

Main submerged arc furnace Fugitive and Flue gas

Ferro manganese & Silico manganese storage

and handling area

Fugitive

Fugitive dust emissions confine to area of emission source and its spread to further areas is

limited. Hence the impact of the fugitive dust is confined to the maximum of 50 m around the

source at a lower height of 5 – 10 m. BAL will incorporate the various pollution control systems

in the fugitive dust prone areas while designing of the plant.

The major air emissions from the proposed project, which will have the impact on the

surrounding is mainly from the Submerged Arc Furnace section where the dust is release

through flue gases to the atmosphere.

BAL will provide 6 tall stacks for each of the proposed furnaces to exhaust the flue

gas emissions. The major pollutants emitted from the unit will be particulate matter,

sulphur dioxide and oxides of nitrogen. The hot gases released from the furnace will

be of high temperature. BAL proposes to install Gas Cleaning Plant for controlling dust

emission. The hot gas emitted from the furnace will be conditioned by using radiant

coolers to reduce the temperature before entering the GCP.

The flue gases with a temperature of about 130 oC will be deducted in the Bag filter designed

for an outlet concentration of less than 50 mg/Nm3. The details of emission considered for

estimation of impacts are given below in Table 4.3.

Table 4.3 Emission Details of Proposed Furnace

Particular 6 NO’S OF 9 MVA Submerged Arc Furnaces

No. of stacks 6 Height of stack (m) 30 Diameter of stack (m) 1.5 Temperature of flue gas (oC) 130

Velocity of flue gas (m/s) 18

Volumetric Flow Rate (Nm3/sec) 23.5 Particulate matter at outlet of bag filter (gm/sec/stack) (@ 50mg/Nm3 at outlet ) 1.18

Page 90: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-8

Sulphur Dioxide Emission (gm/sec/stack) ----- Oxides of Nitrogen (gm/sec/stack) 2.35

4.2.5 Stack Height Estimation

BAL already proposes to install five tall stacks for each of the 6 no.s of 9 MVA Submerged

Electrical Arc Furnaces. The stack height has been estimated based on CPCB norms.

BAL proposes to install additional 2 numbers of tall stacks of 30 m height each for effective

dispersion of flue gas emissions, which will be generated from the 6 no’s of 9 MVA submerged

electric Arc Furnaces.

Stack Emissions Input Data to the Model

Industrial Source Complex Short Term (ISCST3) regulatory model recommended by United

States Environmental Protection Agency (USEPA) has been used for predicting the incremental

concentrations of PM and NOx form the proposed plant activities. ISCST3 is capable of

modeling multiple sources in simple and complex terrain.

ISCST3 calculates ground level and elevated ambient concentrations or deposition from stack,

volume and/ or area sources. The steady-state Gaussian plume equation for a continuous

source is used to calculate ground level concentrations for stack.

Input parameters required for ISCST3 are given below:

• X and Y co-ordinates for the source

• Source strength in terms of g/sec for NOx and PM

• Height of the stack in meters

• Temperature of the exit gas in degree Kelvin

• Exit velocity of the gas in m/sec

• Diameter of the stack in meters

• Meteorological parameters such as hourly data for wind direction, wind speed, mixing

height and atmospheric stability class

The air pollution modeling carried out represents the worst case operating scenarios. The

pollutants considered for modeling include NOx and Particulate Matter.

4.2.6 Meteorological Data

The meteorological data recorded continuously during the months of December 2016 to

February -2017 on hourly basis on wind speed, wind direction and temperature has been

processed to extract the 24 – hourly mean meteorological data as per the guidelines of IMD

and MoEFCC for application of ISCST3 model. Stability classes computed for the mean hours

Page 91: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-9

are based on guidelines issued by CPCB on modeling. Mixing heights representative of the

region have been taken from the available published literature. The hourly meteorological data

recorded at site is converted to the mean hourly meteorological data as specified by CPCB and

the same has been used in the mode. In absence of site-specific mixing depths, mixing depths

published in “Spatial Distribution of hourly Mixing Depths over Indian Region” by Mr. R.N.

Gupta and recommended by CPCB have been used.

Model Employed

Prediction of cumulative ground level concentration due to emissions from the proposed

project has been computed using EPA approved ISCST3 model.

4.2.7 Application of ISCST3 for Prediction of Ground Level Concentration

ISCST3 Model with the following options has been employed to predict the ground level

concentration due to emissions from the proposed project in the Ferro alloy plant.

Areas being rural, rural dispersion parameters are considered.

Predictions have been carried out to estimate concentration values over radial distance of

10 km around the sources

Emission rates from the point sources and area sources were

considered as constant and during the entire period.

Consideration of settling velocity of the particles

The ground level concentrations computed were as is basis without any consideration of

decay coefficient.

Calm winds recorded during the study period were also taken into consideration

24 hourly (for 24 – hour mean meteorological data as per guidelines of IMD and MoEFCC )

mean ground level concentrations were estimated for the winter season using the mean

meteorological data of December 2016 to February 2017.

Emission Sources Considered for Simulations

Emissions from the 6 no’s 9 MVA Submerged electric Arc furnaces have been considered for

prediction of impacts.

Maximum Ground Level Concentrations:

Ground level concentrations of SPM and NOx were estimated using the mean meteorological

data to project the incremental increase of concentration above baseline concentrations due

to emission from the project.

The resultants values are compared with National Ambient Air Quality Emission (NAAQE)

Page 92: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-10

Standards issued by Ministry vide G.S.R no. 826(E) dated November 16, 2009. Figure 4.1 and

Figure 4.2 represents the spatial distribution of the predicted ground level concentrations of

PM, and NOx due to emissions from the proposed project.

Post Project Scenario

Maximum ground level concentrations are predicted considering 24-hourly mean

meteorological data of during December 2016 to February 2017, superimposed on the

maximum baseline concentrations obtained during the study period to estimate the post

project scenario which would prevail at the post operations phase.

The Overall Scenario with predicted concentrations over the maximum baseline

concentrations is shown below.

Table 4.4 Overall Scenarios within Study Area

24 Hourly Concentrations

Particulate Matter (PM) (µg/m3)

Oxides of Nitrogen (NOx) (µg/m3)

Baseline Scenario (Max) 74.8 18.2

Predicted Ground Level Concentration (Max)

6.66 13.2

Overall Scenario 81.46 31.4 NAAQ Standards 100 80

Impact on Villages

It is observed that based on the predicted concentrations it can be inferred that area is

unlikely to be significantly affected due to the proposed project. The details of incremental

and resultant data are given in Table 4.5.

Table 4.5 Impact on AAQ Locations (PM10)

Location Baseline Concentration (µg/m3)

Incremental (µg/m3)

Resultant (µg/m3)

Plant Area 74.8 4.3 79.1 Paradi 55.2 4.5 59.7 Alajangi 55.9 0.0 55.9 Godryanivalasa 50.2 1.0 51.2 Somapuram 49.6 5.1 54.7 Dongaravalasa 43.8 0.0 43.8 Golladi 62.3 3.5 65.8 Bobbilli 69.8 0.0 69.8

Page 93: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-11

cc

Figure 4.1: Ground Level Concentrations of Particulate Matter

Air Q

ualit

y M

onito

ring

Loca

tions

-100

00.0

0-6

000.

00-2

000.

0020

00.0

060

00.0

010

000.

00

-100

00.0

0-6

000.

00-2

000.

0020

00.0

060

00.0

010

000.

00

-100

00.0

0

-800

0.00

-600

0.00

-400

0.00

-200

0.00

0.00

2000

.00

4000

.00

6000

.00

8000

.00

1000

0.00

-100

00.0

0

-800

0.00

-600

0.00

-400

0.00

-200

0.00

0.00

2000

.00

4000

.00

6000

.00

8000

.00

1000

0.00

Page 94: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-12

Figure 4.2: Ground Level Concentrations of NOx

Air Q

ualit

y M

onito

ring

Loca

tions

-100

00.0

0-6

000.

00-2

000.

0020

00.0

060

00.0

010

000.

00

-100

00.0

0-6

000.

00-2

000.

0020

00.0

060

00.0

010

000.

00

-100

00.0

0

-800

0.00

-600

0.00

-400

0.00

-200

0.00

0.00

2000

.00

4000

.00

6000

.00

8000

.00

1000

0.00

-100

00.0

0

-800

0.00

-600

0.00

-400

0.00

-200

0.00

0.00

2000

.00

4000

.00

6000

.00

8000

.00

1000

0.00

Page 95: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-13

Observations

It is observed from the model output that the incremental concentrations for PM10, and NOx

levels, maximum GLCs were observed to be 2 km in south east direction. It is noted that after

adding the incremental concentrations to maximum baseline values also, the ambient levels

will be within the specified limits.

Hence it can be concluded that, though there will be an increase in GLC levels, no major

significant impact on the air quality due to the proposed project is envisaged.

4.2.8 Noise Environment

During construction, no significant impact is envisaged as most of the construction equipment

produces noise level below 80 dB (A). The noise generated is expected to be intermittent and

of short duration.

During operational phase after the proposed project the major noise generating sources are

plant machinery and generator. These sources will be located far off from each other. Under

any circumstances the noise level from each of these sources will not exceed 75 dB (A). The

present noise levels monitored at proposed plant are in the range of 75.0– 85.0 dB (A)

(Lp total) during the day time as there is construction of the first phase in the site.

Prediction of anticipated noise levels have been computed using point source model. A basic

phenomenon of the model is the geometric attenuation of sound. Noise at a point generates

spherical waves which are propagated outward from the source though the air at a speed of

1,100 ft/sec, with the first wave making an ever increasing sphere with time. As the wave

spreads the intensity of noise diminishes as the fixed amount of energy is spread over an

increasing surface area of the sphere.

The assumption of the model is based on point source relationship i.e. for every doubling of

the distance the noise levels are decreased by 6 dB (A). Point source propagation is defined by

the following equation:

Lp2 = Lp1 - 20 log r2/r1

Where Lp1 and Lp2 are sound pressure levels at points located at distances r1 and r2,

respectively, from the source.

Noise level at the plant boundary, calculated from the above equation, is expected to be less

than 60 db (A). Predictions carried out are on as is basis without taking into consideration any

attenuation factors. Additional attenuation is expected, due to atmospheric effect or its

interaction with objects in the transmission path.

Page 96: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-14

Based on the above principle a noise model “Dhawani” has been developed by National

Environmental Engineering Research Institute (NEERI). The details of the model are as follows:

• Maximum number of sources is limited to 20

• Noise levels can be predicted at any distance depending upon the grid scale

• Model is designed to take topographical conditions (flat, undulated, etc.) terrain

• Coordinates of the sources with respect to the center co-ordinates of 0,0

• Maximum and minimum levels are calculated by the model

• Output of the model in the form of isopleths

• Environmental attenuation factors have not been incorporated in the model

Operational Noise Assessment

Noise generating equipments /machinery in the proposed project is given in table. Predictions

have been made taking into account all operations and utilities reflecting the worst-case

scenario. The predicted Noise Levels along the proposed plant boundary are shown in the

following Table 4.6, which are below the ambient noise standards. It is predicted that the high

noise levels will be limited to work zone only and the noise levels gradually decreases further

away from the source. Therefore, the impact of noise due to Ferro Alloy plant will be negligibly

adverse in nature.

Table 4.6: Expected Noise Levels from Different Units

S. No. Source

1 Air compressors 2 Transformer 3 Raw Material Handling 4 Conveyer System 5 Vehicular Moment

Permissible working noise levels recommended by OSHA with respect to noise and the

duration of exposure in hours are provided in the Table 4.7.

Page 97: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-15

Table 4.7: Permissible Noise Levels

Sound Pressure Level dB (A) Maximum Permissible Exposure Time per Day (Hours)

90 8 92 6 95 4 97 3

100 2 102 1 ½ 105 1 107 ¾ 110 ½ 115 ¼

>115 0

Distance in meter

Figure 4.3: Noise Dispersion Contour

Page 98: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-16

The noise levels expected due to operation of these equipment will range between 85 -100 dB

(A). The noise produced during operation phase will have a significant impact on the existing

ambient noise levels. The major work will be carried out during the daytime.

Mitigation measure proposed

Noise levels generated during this proposed project is confined within the plant and is further

reduced due to attenuation of greenbelt. Noise level at the plant boundary, calculated from

the above equation, is expected to be less than 60 dB (A) without considering any attenuation

factors. BAL will develop the greenbelt in an area of 4.44 acres within the premises. Boundary

plantation developed will be act as a barrier and further reduce the noise levels.

4.2.9 Water Environment

The water requirement of the proposed plant is 90 KLD. The water will be mainly used for

furnace cooling purpose, greenbelt, dust suppression and domestic purpose only. Cooling

water will be continuously recalculated in the cooling circuit and domestic effluent is sent to

septic tank followed by soak pit. The water is supplied for cooling water in electrical Arc

Furnace. The water for other areas i.e. for greenbelt, dust suppression and domestic use is

supplied directly. However, the Plant will be designed for Zero Discharge from the operations.

Wastewater/ sewage generated from domestic activities will be treated in the septic tank

followed by soak pit. Zero discharge norms will be followed.

4.2.10 Solid Waste Generation

The estimated main solid waste generated from this proposed plant is Slag and Dust from bag

filters. About 270 TPD of slag from process and 2.5 TPD of Dust will be collected in the

proposed Bag Filters and this dust will be disposed to brick manufacturing units, where this

dust will be used as 10% substitute for cement.

The details of solid waste generation are given below:

Item Existing (TPD)

Proposed (TPD)

Total (TPD)

Management

Slag 180 90 270 Sold to Brick Manufacturing

Dust From Bag filter 1.5 1.0 2.5 Used in Process

4.2.11 Traffic Details

The proposed additional traffic mainly includes trucks, which are used to transport Raw and

finished material. Hence, only heavy traffic is considered in assessing the impact of traffic. The

Page 99: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-17

proposed truck traffic due to proposed activity is considered in assessing the impact on

surrounding area. The total proposed traffic details are given below:

Material Quantity (TPD) Capacity of Trucks (Tonnes) Number Trucks/Day Existing

Raw 756 30 25 Finished 262 30 9

Proposed Raw 378 30 12 Finished 131 30 5

Total 51

4.2.12 Rain Water Harvesting /Recharge Plan

The storm water disposal system for the premises shall be self-sufficient to avoid any

collection/stagnation and flooding of water. Roof top runoff water will be collected in storage

tank. As we know it is a purest form of water. After proper treatment we can use it for various

purposes. Details are given below:

Table 4.8: Rain Water Harvesting/Recharge Details

S. No. Particulars Catchment Area

in m2 (A) Runoff

Coefficient (C) Rainfall Intensity in m/Annum (I)

Discharge (m3)

1 Area for RWH 40469.45 0.8 0.9 29138 Total 29138

Annually about 29138 m3 water will be conserved by rain water harvesting system and will be

discharge in storage tank.

4.2.13Socio-economic Impacts

The Socio economic Impacts details are given below:

Positive Impacts Negitive Impacts i) There is no loss of land and consequential

livelihoods, as no land acquistion is contemplated.

ii) Creation of employment opportinities for about 100 to 150 local skilled and semi-killed workers during project construction and operation phses.

iii) Multiplier effect due to induced growth during contruction and operational phaes in downstream and upstream project activites for about 150 persons majority of them local youth.

iv) Development/upgradation of vocational and

i) Air & Noice pollution through release of fugitive dust during proposed process.

ii) Increased influx of people, and tranport vehicles putting pressure on the on road network in the visinity.

Page 100: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH4-18

soft skills of about 100 local youth over next five years thus enhancing their empliyability.

v) Emergence of local enterpreneur in complementary activites such as small business transporation, equipment repairs and maintence etc.

---------------

Page 101: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH5-1

CHAPTER 5 ANALYSIS OF ALTERNATIVES

5.1 ANALYSIS OF ALTERNATIVE TECHNOLOGY

Submerged Electrical Arc Furnace technology to produce Ferro Alloys is a well proven

technology all over the world with no technological failures. Hence alternative technologies

are not considered.

5.2 ANALYSIS OF ALTERNATIVE SITES

No alternative site is considered, as this is an expansion project and will be housed in the

existing plant premises of 13.42 acres, located at Plot No.368, APIIC Growth center, Bobbili

(Village & Mandal), Vizianagaram (District), Andhra Pradesh.

The proposed plant site is in accordance with MoEFCC guidelines.

• There are no National Parks/Sanctuaries within 10 km radius.

• The nearest village is 1.0 km distance from the plant site.

---------------

Page 102: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH6-1

CHAPTER 6 ENVIRONMENTAL MONITORING PROGRAME

6.0 INTRODUCTION

This chapter presents details of post-project environmental monitoring.

6.1 ENVIRONMENTAL MONITORING

The environmental monitoring will be done to assess performance of pollution control

equipment recommended for proposed project. The sampling and analysis of environmental

attributes including monitoring locations point sites will be as per the guidelines of the Central

Pollution Control Board.

Environmental monitoring will be conducted on regular basis by BAL to assess the pollution

level in and around the project area.

The attributes, which require regular monitoring, are specified underneath:

1] Air quality;

2] Water and wastewater quality;

3] Noise levels;

4] Soil quality;

5] A forestation; and

6] Socio Economic aspects and community development.

6.2 MONITORING POINTS / LOCATIONS AND COMPONENTS

The environmental monitoring points shall be decided considering the environmental

impacts likely to occur due to the operation of proposed project as the main scope of

monitoring program is to track, timely and regularly, the change in environmental

conditions and to take timely action for protection of environment. The monitoring

points/location and components of significance shall be as per Table 6.1.

Table 6.1: Post Project Environmental Monitoring Locations

S. No. Environmental Components

Monitoring Points/ Location

1. Ambient Air • Check wind direction • Select two point in downwind direction • Take one point within site • Take one points in up wind direction • Take one point in cross wind direction

2. Water (Ground Water and Surface Water)

• Take one upstream and downstream sample of surface water. Minimum distance 500 m.

• Take 4 nos. ground water sample from nearby villages.

Page 103: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH6-2

S. No. Environmental Components

Monitoring Points/ Location

Waste water • One sample from wastewater tank.

3. Emission • Stack monitoring of 2 times a year if operated. 4. Noise • 4 locations near by work place.

• 4 location in surrounding area 5. Greenbelt/Vegetation

Cover • Check plant growth and survival of plants

6. Soil • 4 locations in nearby villages.

6.3 MONITORING PARAMETERS AND FREQUENCY

The monitoring parameters and frequency of monitoring shall be as per Table-6.2.

Table 6.2: Parameters and Frequency for Post Project Environmental Monitoring

Sr.No Item Parameters Frequency 1. Ambient Air quality PM10,PM2.5, SO2, NOx, CO, etc. Continuous online 2. Noise Equivalent noise level- dB (A) Monthly as per

CPCB/MOEFCC guidelines

3. Soil, Solid wastes and Manure / Compost

pH , Humidity, Texture, Organic matter, N, P, K, Sulphate, Calcium, Magnesium, C:N ratio.

Quarterly as per CPCB/MOEFCC guidelines

4. Greenbelt Number of plantation (Units), Number of Survived plants/ trees, Number of poor plants/ Trees

Ongoing- round the year

5. Environmental Audit As per Direction of ISO 14001 Once in a Year as per CPCB/MOEFCC guidelines

6.4 MONITORING METHODOLOGIES

Monitoring of environmental samples shall be done as per the guidelines provided by

MoEF&CC / CPCB/ SPCB. The method followed shall be recommended / standard method

approved / recommended by MoEF & CC / CPCB.

6.5 REPORTING AND DOCUMENTATION

The records of the monitoring program shall be kept on regular basis for all aspects of the

monitoring. Separate records for water, wastewater, solid wastes, air emission, soil and

manure / compost shall be prepared and preserved regularly.

Immediately upon the completion of monitoring as per the planned schedule, report shall

be prepared and necessary documents shall be forwarded to the concerned person.

Methodology of monitoring (sampling and analysis) shall be prepared as separate documents

as SOP (Standard Operating Procedure) wherever required.

Page 104: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH6-3

The records showing results /outcome of the monitoring programs shall be prepared as per

the requirement of the schedule mentioned above.

Regularly, these documents and records shall be reviewed for necessary improvement of

the monitoring plan / mitigation measures / environmental technologies as well as for

necessary actions of Environmental Management Cell.

6.6 Budget and Procurement Schedule

On regular basis, Environment Management Cell shall inspect the necessity and availability

of the spares suitability of technology materials, services and maintenance status. The Cell

shall make appropriate budget for the purpose. Regular record review for any change in

financial requirement of environment management shall be done and appropriate budgetary

provisions shall be made. Along with other budgets, Budget for environmental

management shall be prepared and revised regularly as per requirement. The budget shall

include provisions for:

Environmental Monitoring Program

Operation and Maintenance of Environmental Technologies / Equipments

Laboratory works for Environmental management activities

Emergency Purchase of necessary material, equipments, tools, services

Annual Environmental Audit.

Preparing environment statement.

Budget for Environmental Monitoring

The total capital investment on environmental control measures is envisaged to be about

Rs.5.058 Lakh. Details are given in Table-6.3

Table 6.3: Environment Monitoring Budget

S.No Activity Cost in Rs lacs 1. Air Environment Monitoring 1.83 2. Stack Monitoring 0.40 3. Soil Quality Monitoring 1.26 4. Water Quality Monitoring 0.98 5. Noise Monitoring 0.588 Total 5.058

---------------

Page 105: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-1

CHAPTER 7 ADDITIONAL STUDIES

7.0 INTRODUCTION

Ferro Alloys plant is associated with potential hazards that effect to the employee and

environment. It would normally require the assistance of emergency services to handle it

effectively. The operation shall be taken out under the well management and control by the

qualified safety manager.

Disaster management plan has to be formulated with an aim of taking precautionary steps to

avert disasters and also to take such action after the disaster which limits the damage to the

minimum.

7.1 RISK ASSESSMENT

Risk assessment study for the 6 x 9 MVA Submerged Electric Arch Furnace project done for

construction and operational Phase.

7.1.1 Risk during Construction Phase

Construction phase of the proposed expansion of the project is divided into following

activities:

a. Site Leveling;

b. Construction of Roads;

c. Excavation;

d. Construction of building;

e. Construction of high-rise structure (i.e. Stack);

f. Material Handling (Loading and Un loading);

g. Cutting and Welding; and

h. Installation of Machineries.

Risk and mitigation measures during the construction phase is given in Table 7.1

Table 7.1: Risk and Mitigation Measures during the Construction Phase

Activity Hazards Risk Mitigation Measures Site Leveling Due to heavy vehicle

movement accident may happen. Snakes may bites to workers.

Physical injury, Life loss and organ damage

• Providing PPEs to workers

• Appointing the qualified persons for the particular job.

• Speed limit control • Providing Training

Page 106: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-2

Activity Hazards Risk Mitigation Measures Construction of Road

Loading and Unloading of material may cause accident. Heavy Vehicle movement may cause accident. Hot material cause burn injury.

Physical Injury Life loss Burn

• Providing PPEs to workers

• Appointing the qualified persons for the particular job.

• Valid license for Heavy vehicle operator will be mandatory.

• Speed limit control • Providing Training

Excavation • Excavation collapses • Excavated material • Falling objects or

objects near an excavation

• Powered mobile equipment

• Slips, trips, and falls • Hazardous

atmospheres • Flooding/water

hazards • Underground facilities

Property Loss Physical injury Life loss

• Work Permit System will be followed.

• Only experienced person will asset to team.

• Excavated material will be stacked safely.

• Area will be barricaded. • Training will be

Provided to all workers • PPEs will be provided. • Unauthorized person

entry will be banned. Construction of building

Heavy Material may fall down during loading and unloading Structure may fall down if poor practice done Waste stored in open may cause cut in feet Storage of fuel may cause fire Workers may fall down from the height.

Physical Injury Life loss Physically handicapped Property Loss

• Work permit system will be adopted.

• PPEs will be provided to all workers.

• IS code will be followed for Building construction.

• Fuel will be stored separately area will be isolated from ingenious material.

• Fire extinguisher will be provided

• Height work permit will be issued to the person.

• Safety belt will be provided to workers working on above 1.8 M height.

• Adequate trainings will be provided for specific job works.

Page 107: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-3

Activity Hazards Risk Mitigation Measures Commissioning of high-rise structure (i.e. 30-m height Stack);

Material may fall down Fall Hazards

Physical injury Life loss

• High rise structure will be constructed as per detailed engineering drawing.

• Safety belt will be provided to workers working on above 1.8 M height.

• Height work permit will be implemented

• Proper training will be provided for scaffolding.

• PPEs will be provided. Material Handling (Loading and Un loading)

Extra weight lifting can cause strain in body mussels

Physical Injury • Material will lift as per safety norms.

• PPEs will be provided. Cutting and Welding

Welding, cutting, and allied processes produce molten metal, sparks, slag, and hot work surfaces can cause fire or explosion if precautionary measures are not followed. Electric shock from electrical welding and cutting equipment can result in death or severe burns. Gas cylinder can cause fire accident.

Physical Injury Burn Injury Property loss Life loss

• Hot work permit will follow.

• Standards Work Procedure will be developed.

• Training will be provided

• Job will be assigned to only authorized person

• Proper PPEs will be provided.

• Loose connection will be avoided.

• Area will be barricaded • Gas cylinder will be

stored as per guidelines Installation of Machineries.

Due to over load lifting belt break out Un authorized operator of Lifting and Crain can create an emergency During placement of machinery structure may collapse

Property loss Physical Injury Life loss

• Only authorized person will operate the machine

• Appropriate Belt will be used for lifting of material

• During lifting and placing of material area will be man free.

• Appropriate platform will be designed as per the load bearing calculation.

Page 108: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-4

Additional Risk control Measures

• Detailed Construction Hazard Identification Risk Assessment study will be done and

accordingly safety manual will be prepared.

• First aid facility will be provided.

• 24 hrs Ambulance facilities will be provided.

• Safety Gate meeting will be conducted.

• Authorized contractor will be selected.

• Safety officer will be appointed.

• Training to the workers will be provided.

• Top to bottom safety culture will be developed.

• Safety slogan and instruction will be pasted at appropriate location.

• Emergency control Numbers will be provided inside the project site at various locations.

• All safety instruction will also be provided to all contractors.

7.1.2 Risk during Operational Phase

Activities requiring assessment of risk due to occurrence of most probable instances of hazard

and accident are both onsite and off-site.

On-site

Exposure to fugitive dust, noise, and other emissions.

Housekeeping practices requiring contact with solid and liquid wastes.

Emission/spillage etc. from storage and handling.

Unsafe condition and unsafe act.

Off-site

Exposure to pollutants released from offsite/ storage/related activities

Contamination due to accidental releases or normal release in combination with natural

hazard

Deposition of toxic pollutants in vegetation / other sinks and possible sudden releases

due to accidental occurrences

7.1.3 Risk Analysis Methodologies

Risk assessment often requires the synthesis of risk profiles, which represent the probability

distribution of total annual loss due to a certain set of events or activities. These assessments

usually involve estimation of losses for several sub-classifications of the overall process and

synthesis of the results into an aggregate risk profile.

Page 109: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-5

Main risk assessment technologies are:

Hazard and operability study (HAZOP), and

Fault Tree Analysis (FTA)

HAZOP Study

The HAZOP study is a systematic technique of identifying hazards of operability problems of a

process and lists all possible deviations from normal operating condition and how they might

occur. The consequences of the process are assessed and the means available to detect and

correct the deviations are examined. Thus, within the entire process all “credible” deviations

that could lead to hazardous events or operability problems are identified.

Fault Tree Analysis (FTA)

FTA is primarily a means of analyzing non-identifiable hazards. Hazards of top events (the

ultimate happening that is to be avoided) are first identified by other techniques such as

HAZOP. Then all combinations of individual failures that can lead to that hazardous event show

the logical format of the fault tree. Estimating the individual probabilities and then using the

appropriate arithmetical expressions can calculate the top event frequency.

Hazard Identification and Risk Assessment (HIRA)

There are three steps used to manage health and safety at work:

1. Spot the Hazard (Hazard Identification)

2. Assess the Risk (Risk Assessment)

3. Make the Changes (Risk Control)

Spot the Hazard

A hazard is anything that could hurt you or someone else.

Examples of workplace hazards include:

• Frayed electrical cords (could result in electrical shock);

• Boxes stacked precariously (they could fall on someone);

• Noisy machinery (could result in damage to your hearing).

Assess the Risk

Assessing the risk means working out how likely it is that a hazard will harm someone and how

serious the harm could be.

For example:

• Ask your supervisor for instructions and training before using equipment;

• Ask for help moving or lifting heavy objects;

Page 110: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-6

• Tell your supervisor if you think a work practice could be dangerous.

Make the Changes

The best way to fix a hazard is to get rid of it altogether. This is not always possible, but

your employer should try to make hazards less dangerous by looking at the following

options (in order from most effective to least effective):

• Elimination - Sometimes hazards - equipment, substances or work practices - can be

avoided entirely. (e.g. Clean high windows from the ground with an extendable pole

cleaner, rather than by climbing a ladder and risking a fall.)

• Substitution - Sometimes a less hazardous thing, substance or work practice can be used.

(e.g. Use a non-toxic glue instead of a toxic glue.)

• Isolation - Separate the hazard from people, by marking the hazardous area, fitting

screens or putting up safety barriers. (e.g. Welding screens can be used to isolate welding

operations from other workers. Barriers and/or boundary lines can be used to separate

areas where forklifts operate near pedestrians in the workplace.)

• Safeguards - Safeguards can be added by modifying tools or equipment, or fitting guards

to machinery. These must never be removed or disabled by workers using the

equipment.

• Instructing workers in the safest way to do something - This means developing and

enforcing safe work procedures. Students on work experience must be given information

and instruction and must follow agreed procedures to ensure their safety.

• Using personal protective equipment and clothing (PPE) - If risks remain after the

options have been tried, it may be necessary to use equipment such as safety glasses,

gloves, helmets and ear muffs. PPE can protect you from hazards associated with jobs

such as handling chemicals or working in a noisy environment.

Sometimes, it will require more than one of the risk control measures above to effectively

reduce exposure to hazards.

Risk Classification Table: Based on Likelihood/Controls Rating x Severity Rating Almost certain 5 5 10 15 20 25 Likely 4 4 8 12 16 20 Possible 3 3 6 9 12 15 Unlikely 2 2 4 6 8 10 Rare 1 1 2 3 4 5 Likelihood / Control

Rating 1 2 3 4 5 Severity Rating

Page 111: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-7

The definition of risk level and acceptance criteria is given below:

Risk level Category Acceptability on necessry action and timescale LO

W R

ISK

1 – 3 Low

No additional controls are required unless they

can be inplemented at very low cost (in terms of time,

money and efforts), actions to further reduce these

risks are assigned low priority. Arrangements should

be made to ensure that the controls are maintained.

Mod

erat

e R

ISK

4 – 8 Medium

Consideration should be given as to whether the risks can

be lowered, but the costs of additional risk reduction

measures should be taken into account. The risk

reduction measures should be implemented within a

defined time period. Arrangement should be made to

ensure that the controls are maintained, particulary if

the risk levels are associated with extremely harmful

consequences and very harmful consequences.

HIG

H RI

SK

09 – 14 High

Substantial efforts should be made to reduce the risk. Risk

reductino measures should be implemented urgently

within a defined time period and it might be

necessary to consider suspending or restricting the

activity, or to apply interim risk contrls ar maintained,

controls. Arrangements should be made to ensure

that the controls are maintained, particulatly if the

riks levels are associated with extremely harmful

consequences and very harmful consequences.

15 – 25 Very high

These risks are unacceptable. Substantial improvements in

risk controls are necessary, so that the risk is reduced

to an acceptable level. The work activity should be

halted until risk controls are implemented that

reduce the risk so that it is no longer very hign. If it is

not possible to reduce risk the work should remain

prohibited.

Review of HIRA Study

- At least once in a year;

- Amendments / addition in legal requirements;

Page 112: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-8

- Change in process or products handled;

- Internal and external audit results, including Specialized / Third Party Audits;

- Occurrence of accident, emergency;

- While initiating any corrective and preventive action;

- While purchasing and erecting any new equipment / machinery / building.

7.2 POTENTIAL RISK AREA ASSESSMENT IN FERRO ALLOYS PLANT

The potential risk area inside the plant is given in Table 7.2.

Table 7.2: Potential Risk Area inside the Plant

Block/Area Hazards Identification Fuel Storage Area Fire, Spontaneous Combustion, Dust emission Storage of LDO/HFO Fire Production area Heat, and current

7.3 DISASTER MANAGEMENT PLAN

7.3.1 Definition

A major emergency in an activity/project is one which has the potential to cause serious injury

or loss of life. It may cause extensive damage to property and serious disruption both inside

and outside the activity/project. It would normally require the assistance of emergency

services to handle it effectively.

7.3.2 Scope

An important element of mitigation is emergency planning, i.e. identifying accident possibility,

assessing the consequences of such accidents and deciding on the emergency procedures,

both on site and off site that would need to be implemented in the event of an emergency.

Emergency planning is just one aspect of safety and cannot be considered in isolation from the

proposed expansion and hence before starting to prepare the plan, works management will

ensure that the necessary standards, appropriate to safety legislation, are in place.

7.3.3 Objective

The overall objectives of the emergency plan will be:

To localize the emergency and, eliminate it; and

To minimize the effects of the accident on people and property.

Elimination will require prompt action by operations and works emergency staff using, for

example, fire–fighting equipment, water sprays etc.

Minimizing the effects may include rescue, first aid, evacuation, rehabilitation and giving

information promptly to people living nearby.

Page 113: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-9

7.3.4 Identification of Hazards

The following types of hazards may be identified at plant.

Fire in Electric Panels, Oil room.

Waste treatment processes.

Cleaning of barrels, which have held chemical substances.

To deal the above emergencies, the Emergency Plan is prepared.

7.3.5 Safety Measures for Storage and Handling of Chemicals

The chemicals will be directly fed to the bottling unit mechanically and no manual handling will

be involved which will reduce the risk of spillage in the storage area. Following precautionary

measures would be taken for safety

Handling and Storage; Keeping away from heat, sparks and open flame, care will be

taken for avoidance of spillage, skin and eye contact, well ventilation, Use of approved

respirator if air contamination is above acceptable level will be promoted. For Storage

and handling following precautions will be taken:

• Keeping away from oxidizers, heat and flames.

• Avoidance of plastics, rubber and coatings in the storage area.

• Cool, dry, and ventilated storage and closed containers.

• Grounding of the container and transferring of equipment to eliminate static electric

sparks.

In case of any emergency following measures would be taken:

First Aid Measures: For Skin contact, Eye contact, and Inhalation.

Fire Fighting Measures:

• Use of extinguishing media surrounding the fire as water, dry chemicals (BC or ABC

powder), CO, Sand, dolomite, etc

• Foam System for firefighting will be provided to control fire from the fuel storage tank.

The foam thus produced will suppress fire by separating the fuel from the air (oxygen),

and hence avoiding the fire and explosion to occur in the tank. Foam would blanket the

fuel surface smothering the fire. The fuel will also be cooled by the water content of the

foam.

• The foam blanket suppresses the release of flammable vapors that can mix with the air.

• Special Fire Fighting Procedures; Keeping the fire upwind. Shutting down of all possible

sources of ignition, keeping of run-off water out of sewers and water sources. Avoidance

Page 114: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-10

of water in straight hose stream which will scatter and spread fire. Use of spray or fog

nozzles will be promoted, cool containers will be exposed to flames with water from the

side until well after the fire is out.

• Hazardous Decomposition Products: gases of Carbon Monoxide (CO) and Carbon Dioxide

(CO2).

Accidental Release Measures; For Spill Cleanup well Ventilation, Shutting off or removal

of all possible sources of ignition, absorbance of small quantities with paper towels and

evaporate in safe place like fume hood and burning of these towels in a safe manner),

Use of respiratory and/or liquid-contact protection by the Clean-up personnel will be

promoted.

7.4 EMERGENCY PLANNING

7.4.1 General

Disaster Management Plan for an industrial unit is necessarily a combination of various actions

which are to be taken in a very short time but in a present sequence to deal effectively and

efficiently with any disaster, emergency or major accident with an aim to keep the loss of men,

material, plant/machinery etc. to the minimum.

The main functions of the Disaster Management Cell are to prepare a detailed Disaster

Management Plan, which includes:

Identification of various types of expected disaster depending upon the type of the

industrial unit.

Identification of various groups, agencies, departments etc. necessary for dealing with a

specific disaster effectively.

Preparation – by intensive training of relevant teams/groups within the organization to

deal with a specific disaster and keep them in readiness.

Establishment of an early detection system for the disaster.

Development of a reliable instant information/communication system.

Organization and mobilization of all the concerned departments/ organizations / groups

and agencies instantly when needed.

A major disaster that can be expected due to fire in this proposed plant expansion.

Page 115: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-11

7.4.2 Emergency Planning for Disaster due to Fire

Cable rooms, transformer, unit, auxiliary transformers, oil tanks, etc. within the plant are the

likely areas for which disaster management plan is to be made to deal with any eventuality of

fire. Stores, workshop, canteen and administrative building will be included.

7.4.2.1Classification of Fire

Class (A)

Fire involving combustible materials like wood, paper, cloth etc.

Class (B)

Fire due to liquid materials like oil, diesel, petroleum products and all inflammables.

Class (C)

Fires involving domestic and industrial gases like butane and propane etc.

Class (D)

Metal fires etc.

Class (E)

Electrical fires due to short circuiting etc.

7.4.3 Need of Establishing a Fire Fighting Group

A small spark of fire may result into loss of machines and the damage by fire may high

economic losses. This type of losses can be avoided by preventing and controlling the fire

instantly for which fire–fighting group will be established.

Establish which would house and keep in readiness, the following types of equipment and

arrangements.

CO2 extinguishers

Dry powder chemical extinguishers

Foam extinguishers

80 mm. spray hoses

Fire brigade

Fire hydrant

Protocol (chemical to combat oil fires).

In order to avoid fire in cable galleries, all the power and control cables of FRLS type (Fire

Resistant Low Smoke) will be used.

Page 116: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-12

7.4.4 Inspection

Fire alarm panel (electrical) will cover the entire plant. The inspection group will periodically

inspect fire extinguishers in fire stations and machines and other places.

The groups will display emergency telephone number boards at vital points.

The group will regularly carry out general inspection for fire.

7.4.5 Procedure for Extinguishing Fire

The following steps will be taken during a fire accident in the system:

As soon as the message is received about fire, one of the systems will be diverted to the place

of the fire accident along with a staff member.

Simultaneously plant fire station will be informed by phone walkie for fire brigades and fire

stations of nearby area.

In the meanwhile, the pipe system will be operated to obtain maximum pressure on output. In

case cables are within the reach of fire, power supply will be tripped and the cables shifted.

7.4.6 Fire Fighting with Water

Adequate and reliable arrangement is required for fighting the fire with water such as:

1. Provision for Fire brigade and Fire hydrant.

2. Arrangement of pipelines along and around all vulnerable areas.

3. Provision of valves at appropriate points to enable supply of water at the required

place/area or divert the same to another direction/pipe line.

4. Provision of overhead tanks which will be providing with the water during power failure

and it would work by the gravitational force.

7.4.7 Sources of Water for Fire Fighting

The following two sources of water have been considered for firefighting:

Overhead Tank

Raw Water Reservoir

7.4.8 Fire Fighting with Fire Extinguishers

To deal with fire – other than carbonaceous fires, which can be deal with by water – suitable

fire extinguishers are required to do the job effectively. It is therefore, necessary to keep

adequate number of extinguishers in readiness at easily approachable places. Adequate

number of fire stations would be:

Further, other spray groups from the system will be diverted to the spot.

In case of fire in the belt, belt will be cut near the burning portion to save the remaining

Page 117: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-13

parts.

After extinguishing the fire, the area will be well prepared for reuse.

Foam System for firefighting will be provided to control fire from the fuel storage tank.

The foam thus produced will suppress fire by separating the fuel from the air (oxygen),

and hence avoiding the fire and explosion to occur in the tank. Foam would blanket the

fuel surface smothering the fire. The fuel will also be cooled by the water content of the

foam.

The foam blanket suppresses the release of flammable vapors that can mix with the air.

7.5 ON–SITE EMERGENCY PLAN

7.5.1 Introduction

The views of the possible hazards that can arise out of the daily operations in the plant, various

measures are adopted to prevent the occurrence of a major accident. This comprises of:

Built in safety measures, alarms, trips and interlocks etc.

Standard safe operating and maintenance procedures permit system etc.

Training of all the involved staff in normal and emergency operating procedures.

Training of all employees in safety, fire fighting and first aid.

However, in spite of these precautions, it is required to foresee situation of major accident and

plan for taking timely action to minimize the effects of such incident on the safety and health

of persons working in the plant as well as those living around the premises.

7.6 PREPARATION OF PLAN

7.6.1 Alarm System

A siren shall be provided under the control of Security office in the plant premises to give

warning. In case of emergencies this will be used on the instructions to shift in charge that is

positioned round the clock. The warning signal for emergency shall be as follows:

– Emergency Siren: Waxing and waning sound for 3 minutes.

– All clear signal: Continuous siren for one minute.

7.6.2 Communication

Walkies and Talkies are located at strategic locations; internal telephone system EPBX with

external P&T telephones would be provided.

Page 118: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-14

7.6.3 Fire Protection System

7.6.3.1Fire Fighting System

The fire protection system for the unit is to provide for early detection, alarm, containment

and suppression of fires. The fire detection and protection system has been planned to meet

the above objective an all–statutory and insurance requirement of Tariff Advisory Committee

(TAC) of India. The complete fire protection system will comprise of the following.

(a)Fire brigade

Automatic / manual fire detection and alarm system

(b)Fire Hydrant

Fire hydrant will be provided at all around in the plant as per TAC Norms.

(c)Portable fire extinguishers

Various areas of the plant will have one or more of the above system depending upon the

particular nature of risk involved in that area.

(d)Portable Chemical Fire Extinguishers

These are intended as a first line of defense, and hence will be stationed at strategic locations

in different buildings and also for outdoor facilities. Portable fire extinguishers will be foam

type; carbon dioxide type and multipurpose dry chemical (MPDC) type.

(e)Fire Detection and Alarm System

Fire detection and alarm system an effective means of detection, visual indication of fire

location and audible alarm of any fire at its incipient stage. This system will comprise fire alarm

panels, automatic fire detectors, manual call points and fire siren (hooter).

The main fire alarm panel will provide both visual and audible alarm of fire in any protected

areas of the plant.

Manual break glass type fire alarms will be provided at strategic locations where high hazards

exits.

Automatic fire detectors will be provided for coal handling areas and in plant areas such as

control rooms, switchgear rooms, cable galleries etc.

7.6.4 First Aid

A first aid centre with adequate facilities shall be provided. It shall be maintained round the

clock by a compounder cum dresser and a doctor. An Ambulance shall also be provided at site

to carry affected people to hospital.

Page 119: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-15

7.6.5 Security

The security requirements of the company premises shall be taken care of by CSO assisted by a

Fire In charge. The team, apart from the normal security functions will manage the role

required during a disaster management operation as a part of the crisis control team.

7.6.6 Safety

The safety wing led by a Safety Manager will meet the requirement of emergencies round the

clock. The required safety appliances shall be distributed at different locations of the plant to

meet any eventualities. Poster/placards reflecting safety awareness will be placed at different

locations in the plant area.

7.6.7 Evacuation Procedure

As the major hazard is only due to fire, which has more or less localized impact no mass

evacuation, procedures are required. Evacuation would involve only the people working very

close to the fire area.

7.6.8 Emergency Control Center

Provision is made to establish an Emergency Control Centre (ECC) from which emergency

operations are directed and coordinated. This centre is activated as soon as on–site emergency

is declared.

The ECC consists of one room, located in an area that offers minimal risk being directly

exposed to possible accidents.

During an emergency, the Emergency Management Staff, including the site controller will

gather in the ECC. Therefore, the ECC is equipped with adequate communication systems in

the form of telephones and other equipments to allow unhampered organisations and other

nearby facility personnel.

The ECC provides shelter to its occupants against the most common accidents; in addition, the

ECC’s communication systems are protected from possible shutdown. The ECC has its own

emergency lighting arrangement and electric communication systems operation.

Only a limited and prearranged number of people are admitted to the ECC, when in use. This

eliminates unnecessary interference and reduces confusion.

The ECC is always ready for operation and provided with the equipment and supplies

necessary during the emergency such as:

– Updated copies of the On–site Disaster Management Plan.

– Emergency telephone numbers.

Page 120: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-16

– The names, phone number, and address of external agencies, response organizations and

neighbouring facilities.

– The adequate number of telephone (more than two).

– Emergency lights, Clocks, Personal protective equipment.

– List of fire extinguishers with their type no. and location, capacity, etc.

– Safety helmets – List of quantity and location.

– Status boards/message board.

– Material safety data sheets for chemicals handled at the facility.

– Several maps of the facility including drainage system for surrounding area showing:

Areas where hazardous materials are stored.

Plot plans of storage tanks, routes of pipelines, all water permanent lines etc.

The locations where personal protective equipment are stored.

The position of pumping stations and other water sources.

Roads and plant entrances.

Assembly areas and layout of Hydrant lines.

7.6.9 Communication Equipments and Alarm Systems

This kind of equipment is absolutely vital for notifying accident; make the emergency known

both inside and outside of the facility, and coordinating, the response actions among the

various groups involved in response operations.

In particular, this equipment is used to communicate within the facility; communicate between

the facility and outside organizations; and inform the public.

Different communications systems can vary in effectiveness, depending on the task. The most

common types installed in the plant are given below.

7.6.9.1Sirens

These are audible alarm systems commonly used in facilities. In case of any emergency siren

will be operated short intermittently for 1.5 minutes.

An alarm does more than just emergency warning. It also instructs people to carry out specific

assignments, such as reach to assembly point for further instructions and actions, or carry out

protective measures; this can be achieved only if the people are familiar with the alarm

systems and are trained to respond to it.

Page 121: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-17

7.6.10 Personal Protective Equipments

This equipment is used mainly for three reasons; to protect personnel from a hazard while

performing rescue/accident control operations, to do maintenance and repair work under

hazardous conditions, and for escape purposes. The list of Personal Protective Equipment

provided at the facility and their locations are available in ECC.

Effective command and control accomplish these functions necessitates personal trained in

this On–site Disaster Management Plan with adequate facilities and equipments and

equipment to carry out their duties and functions. These organizations and the facilities

required to support their response are summarized in the following subsections. Emergency

Control Plan is given in Figure 7.1 and list of contact person during emergency is given in Table

7.3.

Figure 7.1: Emergency Control Plan

Incident

Page 122: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-18

Table 7.3: Contact Details for Emergency Purposes

Telephone Numbers of Police, Fire Brigade, Hospitals and Other outside Emergency Services S.No. Emergency Contacts Phone Numbers

1 Fire Brigade 08944-255299 2 District Collector 08922-276712 3 Police Station 08944-255333 4 Ambulance 9705988022 5 Hospital 08944-253955

Telephone Numbers and Addresses of Fire Key Personnel S.No. Name Designation Mobile No.

1 Mr.M.Srinivasa Raju Plant Head 7331188779 2 Mr.Shiv Kumar Sharma Plant Administration Head 9491031281 3 Mr.Ramesh Security 9866100057 4 Mr.G.Durga Prasad Head Operations 7331188771 5 Mr.Shaik Abdul Sukhur Head Mechanical 7331188776 6 Mr.M.Nagaraju Head Elect&Inst. 9000202760 7 Mr.G.Raghu Safety Officer 7330669916 8 Mr.B.Narisingh Rao Medical Officer 9000202764

7.6.11Procedure for Testing and Updating the Plan

Simulated emergency preparedness exercises and mock fire fighting exercises including mutual

aid scheme resources and in conservation with district emergency authority to be carried out

time to time.

7.6.12Disclosure of Information to Worker and Public Awareness System in Existence and

Anticipated

– Safety awareness among workers by conserving various training programmes and

Seminars, competition, slogans etc.

– Practical exercise.

– Distribution and practices of safety Instructions.

– Safety Quiz contests.

– Display of Safety Posters and Safety Slogans.

– Developing Safety Instructions for every Job and ensuring these instructions/booklets

or manuals by the workers.

Page 123: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-19

7.7 OFF-SITE EMERGENCY PREPAREDNESS PLAN

The task of preparing the Off-Site Emergency Plan lies with the district collector; however the

off-site plan will be prepared with the help of the local district authorities. The proposed plan

will be based on the following guidelines.

Introduction

Off-site emergency plan follows the on-site emergency plan. When the consequences of an

emergency situation go beyond the plant boundaries, it becomes an off-site emergency. Off-

site emergency is essentially the responsibility of the public administration. However, the

factory management will provide the public administration with the technical information

relating to the nature, quantum and probable consequences on the neighboring population.

The off-site plan in detail will be based on those events which are most likely to occur, but

other less likely events which have severe consequence will also be considered. Incidents

which have very severe consequences yet have a small probability of occurrence will also be

considered during the preparation of the plan. However, the key feature of a good off-site

emergency plan is flexibility in its application to emergencies other than those specifically

included in the formation of the plan.

The roles of the various parties who will be involved in the implementation of an off-site plan

are described below. Depending on local arrangements, the responsibility for the off-site plan

will be either rest with the works management or, with the local authority. Either way, the

plan will identify an emergency co-coordinating officer, who would take the overall command

of the off-site activities. As with the on-site plan, an emergency control center will be setup

within which the emergency co-coordinating office can operate.

An early decision will be required in many cases on the advice to be given to people living

“within range” of the accident - in particular whether they should be evacuated or told to go

indoors. In the latter case, the decision can regularly be reviewed in the event of an escalation

of the incident. Consideration of evacuation may include the following factors.

• In the case of a major fire but without explosion risk (e.g an oil storage tank), only houses

close to the fire are likely to need evacuation, although a severe smoke hazard may

require this to be reviewed periodically;

• If a fire is escalating and in turn threatening a store of hazardous material, it might be

necessary to evacuate people nearby, but only if there is time; if insufficient time exists,

people should be advised to stay indoors and shield themselves from the fire.

Page 124: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-20

Aspects to be considered in the Off-Site Emergency Plan

The main aspects, which will be included in the emergency plan, are:

Organization

Details of command structure, warning systems, implementation procedures, emergency

control centers.

Names and appointments of incident controller, site main controller, their deputies and other

key personnel.

Communications

Identification of personnel involved, communication center, call signs, network, lists of

telephone numbers.

Specialized Knowledge

Details of specialist bodies, firms and people upon whom it may be necessary to call i.e. those

with specialized chemical knowledge, laboratories.

Voluntary Organizations

Details of organizers, telephone numbers, resources etc

Chemical Information

Details of the hazardous substances stored or procedure on each site and a summary of the

risk associated with them.

Meteorological Information

Arrangements for obtaining details of weather conditions prevailing at the time and weather

forecasts.

Humanitarian Arrangements

Transport, evacuation centers, emergency feeding, treatment of injured, first aid, ambulances,

temporary mortuaries.

Public Information

Arrangements for dealing with the media press office; informing relatives, etc.

Assessment

Arrangements for: (a) collecting information on the causes of the emergency; (b) reviewing the

efficiency and effectiveness of all aspects of the emergency plan.

Role of the Emergency Co-coordinating Officer

The various emergency services will be co-ordinate by an emergency coordinating officer

(ECO), who will be designated by the District Collector. The ECO will liase closely with the site

Page 125: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-21

main controller. Again depending on local arrangements, for very severe incidents with major

or prolonged off-site consequences, the external control will be passed to a senior local

authority administrator or even an administrator appointed by the central or state

government.

Role of the Local Authority

The duty to prepare the off-site plan lies with the local authorities. The emergency planning

officer (EPO) appointed will carry out his duty in preparing for a whole range of different

emergencies within the local authority area. The EPO will liase with the works, to obtain the

information to provide the basis for the plan. This liaison will ensure that the plan is

continually kept up-to-date.

It will be the responsibility of the EPO to ensure that all those organizations which will be

involved off site in handling the emergency, know of their role and are able to accept it by

having for example, sufficient staff and appropriate equipment to cover their particular

responsibilities. Rehearsals for off-site plans will be organized by the EPO.

Role of Police

Formal duties of the police during an emergency include protecting life and property and

controlling traffic movements.

Their functions will include controlling bystanders evacuating the public, identifying the dead

and dealing with casualties, and informing relatives of death or injury.

Role of Fire Authorities

The control of a fire will be normally the responsibility of the senior fire brigade officer who

would take over the handling of the fire from the site incident controller on arrival at the site.

The senior fire brigade officer will also have a similar responsibility for other events, such as

explosions. Fire authorities in the region will be apprised about the location of all stores of

flammable materials, water and foam supply points, and fire-fighting equipment. They will be

involved in on-site emergency rehearsals both as participants and on occasions, as observes of

exercises involving only site personnel.

Role of Health Authorities

Health authorities, including doctors, surgeons, hospitals, ambulances, and so on, will have a

vital part to play following a major accident, and they will form an integral part of the

emergency plan.

Page 126: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-22

For major fires, injuries will be the result of the effects of thermal radiation to a varying

degree, and the knowledge and experience to handle this in all but extreme cases may be

generally available in most hospitals.

Major off-site incidents are likely to require medical equipment and facilities additional to

those available locally, and a medical “mutual aid “scheme should exist to enable the

assistance of neighboring authorities to be obtained in the event of an emergency.

Role of Government Safety Authority

Factory Inspectors of the region may like to satisfy themselves that the organization

responsible for producing the off-site plan has made adequate arrangements for handling

emergencies of all types including major emergencies. They may wish to see well documented

producers and evidence of exercise undertaken to test the plan.

In the event of an accident, local arrangements regarding the role of the factory inspector will

apply. These may vary from keeping a watching brief to a close involvement in advising on

operations.

7.8 OCCUPATIONAL HEALTH AND SAFETY

Large industries, in general, and chemical plants in particular where multifarious activities are

involved during construction, erection, testing, commissioning, operation & maintenance, the

men, materials and machines are the basic inputs. Along with the boons, the industrialization

generally brings several problems like occupational health and safety.

Occupational Health

Occupational health needs attention both during construction & erection and operation &

maintenance phases. However, the problem varies both in magnitude and variety in the above

phases.

Construction & Erection

The occupational health problems envisaged at this stage can mainly be due to constructional

accident and noise.

To overcome these hazards, in addition to arrangements to reduce it within TLV’s personal

protective devices should also be supplied to workers.

Operation and Maintenance

The problem of occupational health, in the operation and maintenance phase is due to

Respirable dust and noise. With suitable engineering controls the exposures can be reduced to

less than TLV limits and proper personnel protective devices should be given to employees.

Page 127: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-23

The working personnel should be given the following appropriate personnel protective

devices.

• Industrial Safety Helmet

• Crash Helmets

• Zero power plain goggles with cut type filters on both ends.

• Zero power goggles with cut type filters on both sides and blue colour glasses

• Chemical goggles

• Welders equipment for eye & face protection

• Cylindrical type earplug

• Ear muffs

• Dust masks

• Canister Gas mask

• Self contained breathing apparatus

• Leather apron

• Aluminized fiber glass fix proximity suit with hood and gloves

• Boiler suit

• Safety belt/lime man’s safety belt

• Leather hand gloves

• Asbestos hand gloves

• Acid/Alkali proof rubberized hand gloves

• Canvas cum leather hand gloves with leather palm

• Lead hand glove

• Electrically tested electrical resistance hand gloves

• Industrial safety shoes with steel toe

• Rubber boots (alkali resistant)

• Electrical safety shoes without steel toe and gum boots

Full fledged hospital facilities should be made available round the clock for attending

emergency arising out of accidents, if any. All working personnel should be medically examined

at least once in every year and at the end of his term of employment. This is in addition to the

pre-employment medical examination.

Page 128: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-24

Safety Plan

Safety of both men and materials during construction and operation phases is of concern. The

preparedness of an industry for the occurrence of possible disasters is known as emergency

plan. The disaster in the plant is possible due to leakage of hazardous chemicals, collapse of

structures and fire/explosion etc.

Keeping in view the safety requirement during construction, operation and maintenance

phases, plant has formulated safety policy with the following regulations:

• To allocate sufficient resources to maintain safe and healthy conditions at work;

• To take steps to ensure that all known safety factors are taken into account in the design,

construction, operation and maintenance of plants, machinery and equipment;

• To ensure that adequate safety instruction are given to all employees;

• To provide wherever necessary protective equipment, safety appliances and clothing,

and to ensure their proper use;

• To inform employees about materials equipment or processes used in their work which

are known to be potentially hazardous to health or safety;

• To keep all operations and methods of work under regular review for making necessary

changes from the point of view of safety in the light of experience and upto date

knowledge;

• To provide appropriate facilities for fist aid and prompt treatment of injuries and illness at

work;

• To provide appropriate instruction, training, retraining and supervision to employees in

health and safety, first aid and to ensure that adequate publicity is given to these matters;

• To ensure proper implementation of fire prevention methods and an appropriate fire

fighting service together with training facilities for personnel involved in this service;

• To organize collection, analysis and presentation of data on accident, sickness and incident

involving personnel injury or injury to health with a view to taking corrective, remedial and

preventive action;

• To promote through the established machinery, joint consultation in health and safety

matters to ensure effective participation by all employees;

• To publish/notify regulations, instruction and notices in the common language of

employees;

Page 129: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-25

• To prepare separate safety rules for each types of occupation/processes involved in a

project; and

• To ensure regular safety inspection by a competent person at suitable intervals of all

buildings, equipment, work places and operations.

Safety Organization

Construction & Erection Phase

A qualified and experienced safety officer will be appointed. The responsibilities of the safety

officers include identification of the hazardous conditions and unsafe acts of workers and

advice on corrective actions, conduct safety audit, organize training programs and provide

professional expert advice on various issues related to occupational safety and health. He is

also responsible to ensure compliance of works Safety Rules/Statutory Provisions.

In addition to employment of safety officer by plant every contractor, who employs more than

70 workers, should also employ one safety officer to ensure safety of the workers, in

accordance with the conditions of contract.

Operation & Maintenance Phase

When the construction is completed the posting of safety officers should be in accordance

with the requirement of Factories Act and their duties and responsibilities should be as defined

thereof.

Safety Circle

In order to fully develop the capabilities of the employees in identification of hazardous

processes and improving safety and health, safety circles would be constituted in each area of

work. The circle would consist of 5-6 employees from that area. The circle normally should

meet for about an hour every week.

Safety Training

A full fledged training center will be set up. Safety training will be provided by the Safety

Officer with the assistance of faculty members called from Corporate Center, Professional

Safety Institutions and Universities. In addition to regular employees, limited contractor labors

are also provided safety training. To create safety awareness safety films will be shown to

workers and leaflets etc. will be distributed.

Some precautions and remedial measures proposed to be adopted to prevent fires are:

• Compartmentation of cable galleries, use of proper sealing techniques of cable passages

and crevices in all directions would help in localizing and identifying the area of

Page 130: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-26

occurrence of fire as well as ensure effective automatic and manual fire fighting

operations;

• Spread of fire in horizontal direction would be checked by providing fire stops for cable

shafts;

• Reliable and dependable type of fire detection system with proper zoning and interlocks

for alarms are effective protection methods for conveyor galleries;

• Housekeeping of high standard helps in eliminating the causes of fire and regular fire

watching system strengthens fire prevention and fire fighting; and

• Proper fire watching by all concerned would be ensured.

Details of Workers Health Check up

Pre Employment Test

At the time of joining process every new employee under goes Pre Employment medical Test

by the qualified doctors. Medical fitness is compulsory to submit the HR department.

Frequency of Medical Test of Employees

Medical test for all employees will be carried out bi-annually.

Sr. No.

Existing Proposed Pre-Employment Test

Post-Employment Bi-Annual medical test

Post-Employment Bi-Annual Medical test

1 Physical Examination • Weight • Height • Blood Pressure • Chest

Physical Examination • Weight • Height • Blood Pressure • Chest

Physical Examination • Weight • Height • Blood Pressure • Chest

2 Blood Group and RBC test RBC test RBC test 3 Urine Examination Urine Examination Urine Examination 4 Chest X ray Chest X ray Chest X ray 5 Vision test Vision test Vision test 6 Blood Sugar Blood Sugar Blood Sugar 7 ECG ECG ECG 8 Spirometer test Spirometer test Spirometer test 9 Color and Vision Test Color and Vision Test Color and Vision Test

10 Audiometry test Audiometry test Audiometry test Adequate fund INR 5.0 Lakhs per year will be allocated under occupational health and safety

plan. Workers' health will be evaluated by pre designed format, chest x rays, Audiometry,

Spirometer, Vision testing (Far & Near vision, colour vision and any other ocular defect) ECG,

during pre placement and periodical examinations.

Page 131: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-27

7.9 PUBLIC CONSULTATION

Public Hearing details were conducted on 26.04. 2018. The details of public hearing are given in Annexure 11. The point wise response and

action plan is given below:

DETAIS OF ISSUES RAISED DURING PUBLIC HEARING OF PROPOSED EXPANSION OF EXISTING FERRO ALLOYS UNIT OF M/s. BERRY ALLOYS LIMITED, APIIC, PLOT NO.368, GROWTH CENTER (INDUSTRIAL ESTATE), BOBBILI (V) & (M), VIZIANAGARAM (D), ANDHRA PRADESH HELD ON 26.04.2018 AT 11.00A.M

LOCATION: M/S. BERRY ALLOYS LIMITED, APIIC, PLOT NO. 368, GROWTH CENTER, BOBBLLI (V) & (M), VIZIANAGARAM DISTRICT

S.No Name of the Person Issues Raised Reply by Project Proponent Action Plan 1. Sri G. Rama Rao, M.

Boorjavalasa Village He expressed that they have given their lands to M/s Berry alloys, M/s Impex alloys and to the Electrical Office in anticipation that the industries will give job opportunities and also that they will develop both socially and economically. He Stated that no justice has happened to him in spite of asking the management several times regarding job. He also stated that the people who have not given their lands to the industry are happily working in the industry. He also stated that he will approach the court and will commit suicide before the gate of the industry if the

The entire land of 1350 Acres was acquired by APIIC and developed infrastructure and made industrial growth center by making separate plots and allotted to industries. And the agreement was made only after receipt of full payment from industries to APIIC only. So industries are no way concerned for the dues of farmers which they have to get from APIIC. Even though there is no written agreement but all the unskilled labour in the present plant were sourced from local villages only and also committed in the public hearing in presence of District Collector that the same no of unskilled labour will

Company committed to provide 30 nos. of employment in the expansion project and preference will be given to Local Villagers.

Page 132: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-28

management fails to give him job.

be engaged for the future expansion also.

2. Sri Sunanda Reddy, NGO, Hyderabad

He welcomed the proposed project state that the water, air, and land pollution may be arrested at any stage, what they require is the job opportunities of around 4 to 5 lakhs only in spite of 1 cr students remain unemployed project unconditionally to eradicate the unemployment problems. Further, he suggested the following to the management: 1. To take up health study in

the surrounding villages in 10 Km radius.

2. To provide water harvesting structures.

3. More Greenbelt shall be developed with avenue plantation and medicinal value plants as the population got increased to 130cr from 30cr at the time of independence.

4. The industry has to take welfare activities based on demands forming a co-ordination committee with PCB, administration and

Berry Alloys management conveyed Thanks and always committed for the development in surrounding area.

Yearly once Health Status and health checkup will be done in nearby villages. In this regards company allotted INR 5.0 lakhs for this proposal. Already water harvesting structure had been established in few locations and also will do more harvesting structures in nearby villages. Plantation in surrounding villages will be taken up by BAL. BAL will frame dedicated CSR team to look after CSR Activity based on need based in surrounding villages. Company committed to provide 30 nos. of employment in the expansion project and preference will be given to Local Villagers. For skill development programe company allocated INR 5.0 lakhs.

Page 133: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-29

local villages. 5. Employment to the locals. 6. Skill development centers to

be provided at the villages to make them suitable for jobs and provide employment to local & neighboring villagers. He further stated that there is no need to conduct public hearing in the Growth center and shall accord permission un-conditionally.

3. Sri Ramesh Naidu, AP

NGO He welcomed the project stated that after bifurcation of the state there is no development and hence in order to resolve the unemployment problem the government has to accord permissions to the industry un-conditionally.

Berry Alloys management conveyed Thanks. The management will provide employment to the local people on priority basis as per their qualifications and suitability.

Same as Point 1

4. Sri. B. Nandi Goud, Ap. President NGO

He welcomed the proposed project stated that environment permissions shall be given. He stated that it is not wrong that the local people seeking jobs in the industry because they have lost their lands. He stated that the industry has developed green belt of acres out of 13

Berry Alloys management conveyed Thanks and always committed for the development of local villages.

BAL is providing employment to local villagers.

Page 134: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-30

acres. He further viewed that as part of pradhana Manthri Uvajana Pathakam, the government is giving jobs and hence the industry shall also give them the jobs.

5. Sri. Y. Chennakesava Reddy, NGO, Kadapa

He welcomed the proposed project he suggested that the management shall provide employment, CSR budget must be spent in the surrounding effected villages. He stated that as the government has acquired the lands from the farmers 25 Yrs ago, the government has to provide the jobs not the private industries and also stated that the compensation shall be given to the farmers besides providing employment.

Agreed with thanks BAL will frame dedicated CSR team to look after CSR Activity based on need based in surrounding villages Total budget earmarked under CSR is INR – 30 Lakhs

6. Sri Chandra Rao, Panukuvalasa Village.

He welcomed the proposed project stating that due to industrialization the area will develop both economically and socially. He further stated that the countries Germany and Japan developed due to industrialization only besides solving the unemployment problems. He felt happy that the

Berry Alloys management conveyed Thanks and always committed for the development of local villages.

Same as point 1

Page 135: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-31

management has provided job opportunities to the people of surrounding 15 villages in the existing project, water plant to Burjavalasa and Panukuvalasa villages and also distributed uniforms to the blind school and stated that the industry shall take up more development activities in the villages.

7. Sri Janardhan Reddy, NGO, Hyderabad

He welcomed the proposed project stating that present industry does not do any harm. Further, he suggested the following to the management: 1. To take up necessary

measures to eradicate the pollution.

2. To increase the CSR budget from the present budget of 30 lakhs.

3. To provide employment to the locals forming a committee and a meeting shall be planned with DRO.

Berry Alloys management conveyed Thanks

Pollution control Device will be installed (i.e Bag filter) to control the air pollution. Adequate stack height will be provided to better dispersion of air pollutants Online monitoring system will be provided for new stack. Dust management will be done through water sprinklers. Preference will be given to local person for employment. INR 50 Lakhs is earmarked for Environmental management

8. Sri. Gorle Rama Rao, M. Burjavalasa

He welcomed the proposed project stating that people in

Berry Alloys management conveyed Thanks and always committed for the

Company committed to provide 30 nos. of employment in the expansion

Page 136: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-32

Village. the surrounding 15 villages are working in the industry and will generate more job opportunities in the present expansion project.

development of local villages. project and preference will be given to Local Villagers.

9. Sri Vijaya Reddy, NGO, Hyderabad

He welcomed the proposed project and informed that he is attending all the public hearing since the inception of S.O.No. He also stated that industry has to establish without violating the norms as it is a democratic country. He further stated that we have to welcome the industry in order to develop the area. Further he stated that the industry shall carryout the study of water, land and air to ascertain the facts before the establishment of the project and after commencing the operations of the project. He suggested the management to take up the latest technology.

Berry Alloys management conveyed Thanks and always committed for the development of local villages.

----

10. Sri. S. Eswara Rao, Sarpanch, M. Boorjavalasa Village

He welcomed the proposed project and informed that M/s Berry Alloys was established in this area before 10 years back. The existing unit has provided employment of about 50 to 60 to their village and he felt happy

Berry Alloys management conveyed Thanks and always committed for the development of local villages.

BAL will be done plantation in surrounding area. INR 5.0 lakhs is earmarked for Plantation under CSR

Page 137: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-33

that the upcoming / expansion project may also generate employment for the villagers. He suggested that the industry shall take up Avenue Plantation., Growth center industries collectively to establish public health center in their village appointing a doctor.

11. Sri. N. Ravi Kumar, NGO

He welcomed the proposed project and stated industry shall take the demand oriented village welfare programs. The establishment of industries has to be encouraged as the state being an Annapurna Andhra Pradesh. He further stated that the government has to establish such growth centers in view of development.

Berry Alloys management conveyed Thanks and always committed for the development of local villages.

BAL will conduct village welfare program on periodic intervals on health and carrier oriental.

12. Sri. L. Chandra Sekhar, Paryavarana Karya Kartha

He welcomed the proposed project and stated that the management shall have to provide employment to the local people only besides adopting the villages, establishing PHC, free distribution of Medicines and greenbelt development.

Berry Alloys management conveyed Thanks.

BAL will conduct village welfare program on periodic intervals on health and carrier oriental.

13. Sri Gorle Krishna Murthy Naidu, Ex.

He welcomed the proposed project and stated that

Berry Alloys management conveyed Thanks and always committed for the

-------

Page 138: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-34

Sarpanch, M. Boorjavalasa Village.

establishment of the industries generates employment as there is no agricultural activity in the area. He further stated that the industries in growth center have taken up pollution control measure unlike hitherto.

development of local villages.

14. Sri. B. Parasuram Naidu, M. Panukuvalasa Village

He welcomed the proposed project and stated that M/s Berry Alloys was constructed on his own land which was acquired for the purpose of development of Bobbili Growth Center. He stated that earlier, people use to migrate from their village but now they have returned due to development of Growth center. He further stated that the lands acquired for the growth center belongs to Burjavalasa (P) but not from the Bobbili (p). He further stated that the government shall verify the status half yearly as to whether the industries are complying or not. He further viewed that the management has to provide employment to the local people only and stated that the industries shall have to follow the guidelines and

Company committed to provide 30 nos. of employment in the expansion project and preference will be given to Local Villagers.

---

Page 139: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH7-35

systems which are framed on the paper.

15. G. Lakshman Rao, Ex. Sarpanch, M. Boorjavalasa Village

He stated that the industry has to take up measures to control the pollution and also shall take care of health of the villagers. He further felt happy that M/s Berry Alloys is supplying drinking water at the rate of 5/liter

Berry Alloys was conducted AAQ monitoring in the study area as a part of EIA study and found results of AAQ (PM10, PM2.5, SOx, NOx and CO) with in the NAAQM norms. Further, Online Monitoring system has already installed and connected to the APPCB server.

----

--------------

Page 140: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH8-1

CHAPTER 8 PROJECT BENEFITS

8.0 INTRODUCTION

The proposed Expansion plants would bring forth many positive socio-economic improvements

due to its varied production line comprising of:

8.1 IMPROVEMENT IN PHYSICAL INFRASTRUCTURE

• This project will improve the overall physical infrastructure in this area Rain water

harvesting will be done for groundwater recharging that will improve the ground water

table in the area.

• The availability of groundwater will be a boon to the surrounding vegetable and other

product farmers.

• BAL shall maintain the roads in good conditions so that the road connectivity will improve

for surface transport, villagers will be benefitted.

• Greening drive in the area will remove the barren land configuration and give a pleasant

look and improve biodiversity

8.2 IMPROVEMENT IN SOCIAL INFRASTRUCTURE

• Proposed project will not disturb the existing pattern of demographic structure

• No R & R Plan is required as the industry will be located in barren land already procured.

• By the presence of this industry, local transporters will have business.

• The villagers will have employment opportunity and livelihood and basic amenity support

for better future.

• Overall business environment will grow which will ensure improvement in banking

insurance, investment and courier services.

• Fire fighting facilities will be now more easily available at doorstep of villagers.

• Education level of local community is expected to rise due to flow of funds and avenues of

livelihood being available.

• Improvement in primary health centers (PHC) will help in health status of residents in this

area. Augmentation in the areas of medical facilities will occur.

• Health awareness may also help in family planning decision making. Living in harmony is an

impotent aspect of the society, this will become possible by this venture

Page 141: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH8-2

• The corporate social responsibilities (CSR) initiatives are focused on employees, the

communities around its facilities and the environment running these activities. Providing

vocational training to make them self-sufficient

• Unit will actively support the efforts of primary education to the children’s of economically

weaker sections of the society. More opportunity in the field of education

• On the environment front active drive of tree plantations across villages and training

lectures in-house undertaken

8.3 EMPLOYMENT POTENTIAL

• Proposed industry expansion and its supporting activities need many types of people right

from manual to managerial strength in a pyramid.

• The raw material growing and caring may need unskilled and skilled workers. Project

activities will require skilled, semi skilled and unskilled workers.

• The overall potential including garage, loading unloading and small shop owners is

substantial. The local people can get a good share out of these opportunities.

• It is expected that additional people will get employment. Increase Job opportunities for

the local people as well as immigrants.

• Employment in tertiary sector is expected to be improved in the region.

• There would be increase in the commercial, business and shopping centers due to influx of

population in the region to cater the needs of existing population.

• There may be a development of infrastructural facilities due to proposed activity in the

region.

• It would also result in the appreciation of land values around these areas.

• Indirect benefit to the local people by providing opportunities for starting small / medium

scale business in trade and commerce.

• Overall improvement of the peripheral human habitat in the project area.

8.4 OTHER TANGIBLE BENEFITS

• Both tangible and non-tangible benefits will result from this activity and many of those are

described as above.

• Flood control by rain water arresting and harvesting. Erosion control by nalla training,

terracing and bonding.

• Groundwater levels increase by recharging by rainwater harvesting.

• Time saving by quicker transport available in the area.

Page 142: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH8-3

• Aesthetics improvement by general greenery with emphasis on biodiversity.

• Developed economy strengthens demographic set up that will bring weightage to secure

better school-subsidy and health institute.

• Improved safety security in surrounding with better law and order.

• Symbiosis and sustainable development will be the ultimate objectives of the proposed

project.

--------------

Page 143: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH9-1

CHAPTER 9 ENVIRONMENTAL COST BENEFIT ANALYSIS

9.1 INTRODUCTION

Not required as this doesn’t comes under scope.

--------------

Page 144: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH10-1

CHAPTER 10 ENVIRONMENTAL MANAGEMENT PLAN

10.0 INTRODUCTION

The environmental management plan consists of the set of mitigation, management,

monitoring and institutional measures to be taken during implementation and operation to

eliminate adverse environmental impacts or reduce them to acceptable levels. The present

environmental management plan addresses the components of environmental affected during

construction of the plant and by the different activities forming part of the manufacturing

processes.

Environmental Policy

i. Overall conservation of environment.

ii. Minimization of waste generation and pollution.

iii. Judicious use of natural resources and water.

iv. Safety, welfare and good health of the work force and populace.

v. Ensure effective operation of all control measures.

vi. Vigilance against probable disasters and accidents.

vii. Monitoring of cumulative and long time impacts.

viii. Ensure effective operation of all control measures.

Annual review of the entire system and various environment management as well as process

control and monitoring systems shall be done. Environment monitoring shall be done to collect

the data on air, water, soil, noise etc. and duly recorded. Environmental Management Plan

which shall be implemented is detailed under the following heads:

i. Pollution Control Systems

ii. Waste Minimization and Resource Conservation

iii. Occupational Health and Safety

iv. Socio-Economic Development

v. Greenbelt Development Plan

Standards operating procedures, formats will be developed and records will be maintained.

Provision of internal audit will be made. Any NCs/Observation will be directly conveyed to

Management and accordingly corrective and preventive action will be taken.

Page 145: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH10-2

10.1 POLLUTION CONTROL SYSTEM

Detailed study of the pre-project commissioning environment and also the likely (and

predicted) implications after the plant commissioning suggests that the following

preventive/control measures are considered necessary to reduce the adverse impact to the

utmost practicable limit.

10.1.1 Air Environment

i. Stack height would be approx 30 m (6 nos.) for gaseous emission confirming to the CPCB

norms. D. G. Sets, stack height of 3.0 m above the roof level will be maintained.

ii. Stack emission level will be kept within permissible limit by installation of bag filter and

online stack emission monitoring will be done.

iii. Ambient air quality and stack emission would be regularly monitored and effective

control exercised, so as to keep limits on stack emission loads would be met honestly at

all the time.

iv. In order to avoid fugitive emissions from different sources, water will be sprayed. Also

the roads within the premises will be concreted to prevent dust emission.

v. The ambient air monitoring will be carried out regularly in the work zone and

surrounding areas, to check that ambient air levels of the contaminants, are well below

the stipulated norms.

vi. Green belt around the periphery and within premises will be developed which will help in

attenuating the pollutants emitted by the plant.

10.1.2 Action Plan to Control Fugitive Emission

Main source of fugitive emissions is transportation of men and material during operational

phase of project. To control fugitive emissions following measures shall be adopted:

i. In order to avoid fugitive emissions from different sources spraying of water shall be

used,

ii. The roads within the premises will be concreted / paved to avoid vehicular emissions,

iii. All transportation vehicles shall carry a valid PUC (Pollution under Control) Certificate,

iv. Proper servicing and maintenance of vehicles will be carried out,

v. Regular sweeping of all the roads and floors will be done,

vi. 33% of the total plant area will be developed as green area. Green belt act as surface for

settling of dust particle and thus will reduce the particulate matter in air, and

Page 146: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH10-3

vii. Ambient air quality will be regularly monitored and effective control exercised, so as to

keep emission within the limits. (Table 10.1).

Table 10.1: Action Plan to Control Fugitive Emissions

S. No. Emissions Sources Management measures

1. Vehicular emissions Paved roads

Regular sweeping

Water sprinkling through mobile tankers

CPCB Guidelines will be followed

10.1.3 Waste Water Environment

The proposed project would be based on “Zero Liquid Discharge” (ZLD).

10.1.4 Solid Waste Environment

Slag will be sold to brick manufactures and bag filter dust will be used in process.

10.1.5 Noise Environment

Various components of industrial operations will cause some amount of noise, which will be

controlled by proper maintenance and compact technology.

i. Time to time oiling and servicing of machineries will be done.

ii. Acoustic enclosure for Turbine and D.G. sets will be provided.

iii. Green belt development (plantation of dense trees across the boundary) will help in

reducing noise levels in the plant as a result of attenuation of noise generated due to

plant operations, and transportation.

10.1.6 Green Belt Development

Green belt planning will be done with ecological perspectives for plant of BAL plant taking

into consideration the nature of pollutants, availability of space and dominant wind

directions. Recommendations given by expert committee on plantation requirements in the

premises of the plant would be fully implemented. This will help in reducing the

concentration of pollutants and will also be effective in attenuating noise levels.

BAL has social obligation to recreate the environmental status by providing thick green cover

to suppress fugitive emission and provide aesthetic beauty. Trees form the important part of

the biosphere in the Eco-system.

It will be exercised as follows:

i. Green belt development in and around the project site will help in to attenuate the

pollution level.

Page 147: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH10-4

ii. Out of the total plant area 33% land will be utilized for green belt development and

plantation will be done as per Central Pollution Control Board (CPCB) Norms.

iii. Native species will be given priority for Avenue plantation.

iv. The periphery will be devoted to generation of green belt area.

10.1.6.1 Eco System

Environment, which is the sum of both non-living and living factors existing at a place,

interacts and influences the ecology of the area. Ecology is an important component

comprising of flora (vegetation and micro plant species) and fauna (wildlife and terrestrial

micro organisms).

The biotic or physical factors include topography, soils, climate etc that are influenced by

natural perils and/or pollution. On the other hand, biotic factors include living things such as

flora, fauna, wildlife and human beings. A change in the physical factors can bring about a

change in the biotic factors thereby changing the ecology of the area.

Living beings generally adapted to a particular setting (habitat or ecosystem) and are

organized into natural groupings (communities) with mutual dependencies among their

members. An ecosystem comprises of both plant and animal populations that involve total

nutrient and energy economics associated with the entire system. A series of recognizable

ecosystem alterations, called ecological successions, may occur due to certain imposed

changes in the natural community.

Living beings show various responses and sensitivities to outside influences resulting in an

ecological imbalance or change in habitat or ecosystem. Moreover, changes in pollution

levels due to project activities may also alter the ecology of the environment. Project

activities may produce adverse ecological impact of direct or indirect nature, which can be

either short term or long term, depending on the nature of the action. Although every

impacted environment has some recovery potential, the extent of recovery would depend on

the type, degree and location of the impact as well as on mitigative measures initiated to

achieve recovery.

Generally, short-term impacts are immediate and direct result of environmental changes

that may occur at the inception of the proposed project. These changes may be self-

corrective through natural recovery processes, after the completion of the construction

phase. On the other hand, long-term impacts result from major indirect environmental

changes, which are caused during the operational phase of a project.

Page 148: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH10-5

10.1.6.2Plantation Techniques

Green belt will be developed within the Plant premises covering a total area of about 4.44

Acres (33%) of total Plant area. The plantation work for green belt development will be

carried out as per CPCB guidelines, local species would be preferred.

10.1.6.3Aftercare and Monitoring

Investment on reclamation would be futile without adequate and timely aftercare. Aftercare

includes weeding, soil working, mulching and fertilizing, and if possible, irrigation to promote

better growth of the planted seedlings. The vegetated area would be protected from grazing

of animals until the plants are above the level of damage. Wherever necessary, fencing

would be erected on the boundaries of reclaimed areas.

Monitoring of the programme is the only way to improve both the long-term and short-term

planning. It involves two important aspects, namely site investigation and record keeping.

10.1.6.4Baseline data and Potential Impacts of the Study Area

The flora and fauna of an area shows a certain affinity to the existing environmental setting.

Due to the proposed facility, there could probably be a change in the environmental

surroundings for a short duration due to the construction phase and for a long term due to

the operation of the project activities. Thus, in order to predict the ecological impacts from

the proposed project, it is necessary to detail the baseline data.

The potential impacts on the ecology of the study area are discussed below:

i. As no wastewater from the proposed project will be discharged outside the premises,

there will be no impact on the ecology of the study area due to wastewater arisen from

the proposed project.

ii. The flora and fauna of the area could be disturbed if the various air pollutants discharged

from the proposed facility would not be maintained within specified permissible limits.

But project authority has already mentioned the adequate stack height, etc. Thus, the

potential impact of air emission can be rated as no impact.

iii. Moreover, the proposed green belt would help in reducing the adverse impacts further if

any.

iv. On the periphery of the plant a series of trees will also be planted.

Page 149: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH10-6

10.1.6.5 Recommendation on Green Belt Development

A green belt or tree plantation around the proposed plant shall help to arrest the effects of

particulate matter and gaseous pollutants in the area besides playing a major role in

environmental conservation efforts. Green belt development and plantation programme for

the proposed project shall also be a part of the proposed plan.

For effective control of air pollutants in and around the proposed industry, a suitable green

belt will be developed by taking into consideration the following criteria. The green belt

would;

a. Mitigate gaseous emissions

b. Have sufficient capability to arrest accidental release.

c. Effective in wastewater reuse.

d. Maintain the ecological balance.

e. Control noise pollution to a considerable extent.

f. Prevent soil erosion.

g. Improve the aesthetics.

Taking the above-mentioned criteria into consideration, the proposed green belt would be

covering around 33% of the total area. The green belt would be consisting of shrubs, trees,

avenue trees, revenue trees, crops and potted plants. All the species suggested are pollution

tolerant, besides having an aesthetic appeal. All the species suggested are pollution tolerant,

besides having an aesthetic appeal. Greenbelt development recommended plant species are

given in Table 10.2. The greenbelt plan is shown in Figure 10.1.

Table 10.2: Specific Plantation for the Proposed Unit

Type of Plantation Suggested Plants Trees suggested for avenue plantations in the

proposed industry Samanea saman, Dalbergia sissoo, Delonix regia,

Azadirachta indica, Casuarina equisetifolia, Saraca indica etc.

Plantation suggested for potted plants Agave americana, Erytheimum plant, Datura fastuosa, Jatropa glanoculifolia, Bougainvillae,

Codiaeum variegatum sp. Trees suggested for live hedge fencing around

the industry Euphorbia, Ficus religiosa, Ficus benghalensis,

Azadirachta India, Thespesica populaenia, Mangifera indica

Trees suggested for reforestation of land and revenue plantations and waste water usage

Tectona grandis, Dalbergia sissoo, Azadirachta indica, Tamarindus indica, Mangifera India, Anona

squamosa, Casuarina equisetifolia.

Page 150: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH10-7

Figure 10.1: Greenbelt/Green Cover Plan

Page 151: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH10-8

10.1.7 Occupational Health and Safety

Production of Material involves storage handling and use of several chemicals. Some of these

chemicals are toxic and hazardous in nature. Information about these chemicals is therefore

important for the safety of the employees and the plant. Besides, the health status of the

employees is also important which may be affected due to exposure to these chemicals. The

exposures may be sudden and accidental or for a long period. In both of the cases there will

be different health effects. Therefore safety measures dealing with these chemicals are of

vital importance and will be followed judiciously.

1. In order to ensure good health of workers, regular health check-up of the plant workers

will be carried out.

2. Occupational health surveillance programme will be taken as a regular exercise for all the

employees and their records maintained.

3. Proper storage and handling precautions will be taken. The storage area will be cool, dry

and well ventilated away from any source of heat, flame or oxidizers.

4. Use of Personal Protective Equipment (PPEs) will be encouraged. Proper training on use

of PPEs, characteristics of the material handled and safety precautions to be adopted will

be given to the workers.

5. Fire safety measures will be incorporated within the factory premises. All the fire

extinguishing media such as water, dry chemicals, CO2, sand, dolomite, etc. will be kept in

vital locations.

6. Mock drills will be arranged for the worker to test the effectiveness of the training

program from time to time and the way to react in case of emergency.

7. Safety precautions will be displayed in the premises on the banners, boards etc.

8. Both On-site and Off-site emergency preparedness plan will be drawn.

10.1.8 Personnel Protective Equipments

Goggles:

The workers will be asked to use goggles who work on washing of bottles, filling, sealing of

bottles cap for protection of their eyes in case bottles are broken.

Rubber Gumboots:

These will be provided to person who handles sulphuric acid. Full suit having hand-gloves,

goggles, helmet and aprons will be provided.

Page 152: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH10-9

Face Shield Helmet:

The person deputed for welding work will be provided with face shield helmet.

Medical Facilities

The Factory will be provided with the following medical facilities to handle any emergency:

1. Well equipped First Aid Boxes will be provided in each Section of the factory.

2. The First Aid Boxes will be distinctively marked with a Red Cross on green background

and contain the following equipment/accessories:

a) Small sterilized dressings.

b) Medium size sterilized dressings

c) Large size sterilized dressings

d) Large size sterilized burn dressings

e) Packets sterilized cotton

f) Snake bite Lancet

g) Pair of scissors

h) Bottle of Potassium Permanganate

i) Bottle containing 2% of alcoholic solution of iodine.

j) Bottle of Sol. Volatile having the dose and mode of administration indicated on the label

k) One copy of first aid leaf-let

l) Bandages

n) Adhesive plaster

o) Triangular bandage

p) Packets of safety pins

q) Supply of suitable splints

r) One tournequet

In case of need factory will be having dispensary to give effective medical facility to workers.

In dispensary, sufficient stock of medicines will be available to provide to workers in case of

any major emergent situation. We will keep one Registered Medical Practitioner (Qualified

Medical Officer) as Incharge of the Dispensary with a Qualified Compounder. A vehicle will

be always available to shift the sick/injured person to District Hospital.

Page 153: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH10-10

10.2 OVERALL RECOMMENDATION AND IMPLEMENTATION SCHEDULE

10.2.1 Introduction

The mitigation measures suggested in earlier Chapters 4 are to be implemented so as to

reduce the impact on the environment due to proposed project. The implementation of

these recommendations could be done in phases so that, the most important mitigation

measures would be implemented first and the mitigation measures, which are less

important, could be implemented later.

Along with the implementation of these mitigation measures, monitoring schedule and

infrastructural requirements for environmental protection detailed in previous chapter are

important for environmental control measures.

10.2.2 Implementation Schedule and Environmental Management Cell.

Proposed plant will be completed within 6-8 months from zero date. Environment

monitoring and implementation measures shall be supervised by environment management

cell.

Environmental Management cell structure is given in Figure 10.2.

Figure 10.2: Environmental Management Cell

Plant Head

Manager Production

Environmental Engineer

Environmental Officer

Page 154: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH10-11

10.2.3 Budget for Implementation Environment Management Plan

Details of environment management plan are given in Table 10.4

Table 10.4: EMP Budget

S. No Item

Recurring Cost per annum

(Lac)

Capital Cost (Lac)

1 Air Pollution Control 3.0 20.00 2 Water Pollution Control 0.50 5.00 3 Noise Pollution Control 0.15 03.00 4 Environment Monitoring and Management 5.05 03.00 5 Occupational Health 1.00 10.00 6 Green Belt 0.25 3.00 7 Salary of EMP staff 6.0 00 8 Safety management. 0.15 4.00 9 Laboratory and chemicals 2.0 2.00

Total 18.1 50.0 10.2.4 Budget for CSR Activity

Details of budget for CSR activity are given in Table 10.5.

Table 10.5: Cost of CSR Activity

Activity Year wise Budgects (Rs.Lacks)

1st

Year 2nd

Year 3rd

Year 4th

Year 5th

Year Total

1. Health Camps 1.0 1.0 1.0 1.0 1.0 5.0

2. Voactional Skill Development programmes 1.0 1.0 1.0 1.0 1.0

5.0

3. Entrepreneurship awareness camps 1.0 1.0 1.0 1.0 1.0 5.0

4. Setting up a Library and Carrer Counseling Centere 1.0 1.0 1.0 1.0 1.0

5.0

5. Maintence of roads 1.0 1.0 1.0 1.0 1.0 5.0

6. Driking Water facility 1.0 1.0 1.0 1.0 1.0 5.0

Total 30.0

--------------

Page 155: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH11-1

CHAPTER 11 SUMMARY AND CONCLUSION

11.0 INTRODUCTION

Environmental Impact Assessment (EIA) is a process, used to identify the environmental, social

and economic impacts of a project prior to decision-making. It is a decision making tool, which

guides the decision makers in taking appropriate decisions for proposed projects. EIA

systematically examines both beneficial and adverse consequences of the proposed project

and ensure that these impacts are taken into account during the project designing.

11.1 ENVIRONMENTAL CLEARANCE

As per the Environmental Impact Assessment (EIA); Notification S.O. 1533, 14-09-2006 issued

by MoEFCC, Government of India, the proposed ferroalloys expansion project is categorized as

Category – A project, which mandates obtaining prior Environmental Clearance from MoEFCC,

GOI, NEW DELHI.

11.2 TERMS OF REFERENCE

BAL submitted the application for Environmental Clearance as per the new notification along

with prescribed Form1, proposed Terms of Reference for EIA study and pre-Feasibility report

on the project in November 2016. The Expert Appraisal Committee considered the project in

the 28th meeting held on February 5th to 7th, 2018 and prescribed Terms of References is

incorporated in the EIA report.

11.3 BRIEF DESCRIPTION OF PROJECT

The proposed project is expansion in production of ferroalloys adding 2 x 9 MVA submerged

Electrical Arc Furnace. After expansion total Furnace capacity will be 6 x 9 MVA.

Product Details

Product Existing Quantity

Proposed Quantity After Expansion

Ferro Manganese 86400 TPA or 43200 TPA or 129600 TPA or Silico Manganese 72000 TPA or 36000 TPA 108000 TPA or Ferro Silica 25200 TPA or - 25200 TPA or Ferro Chrome 36000 TPA - 36000 TPA

Page 156: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH11-2

Project Proponents

The project proponents are M/s. Berry Alloys Limited, incorporated in 2007 under companies

act 1956 with their registered office at Suit No: 308, Ashoka House, 3A, Hare Street, Kolkata –

700001.

11.4 MITIGATION MEASURES

11.4.1AIR Pollution Control Measures

Following measures will be taken to control air/fugitive pollution during mining operation:

i. Stack height would be approx.. 30 m (6 nos.) for for gaseous emission confirming to the

CPCB norms. D. G. Sets, stack height of 3.0 m above the roof level will be maintained.

ii. Stack emission level Swill be kept within permissible limit by installation of bag filter and

online stack emission monitoring will be done.

iii. Ambient air quality and stack emission would be regularly monitored and effective

control exercised, so as to keep limits on stack emission loads would be met honestly at

all the time.

iv. In order to avoid fugitive emissions from different sources, water will be sprayed. Also

the roads within the premises will be concreted to prevent dust emission.

v. The ambient air monitoring will be carried out regularly in the work zone and

surrounding areas, to check that ambient air levels of the contaminants, are well below

the stipulated norms.

vi. Green belt around the periphery and within premises will be developed which will help in

attenuating the pollutants emitted by the plant.

11.4.2 Water Quality Management

The proposed project would be based on “Zero Liquid Discharge” (ZLD)

11.4.3 Noise Pollution Control

Various components of industrial operations will cause some amount of noise, which will be

controlled by proper maintenance and compact technology.

i. Time to time oiling and servicing of machineries will be done.

ii. Acoustic enclosure for Turbine and D.G. sets will be provided.

iii. Green belt development (plantation of dense trees across the boundary) will help in

reducing noise levels in the plant as a result of attenuation of noise generated due to

plant operations, and transportation.

Page 157: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH11-3

11.4.4 Greenbelt Development and Plantation

Details of the Greenbelt development plan have been incorporated in Chapter 10 (EMP) of

section 10.1.6.

11.5 CONCLUSION

As discussed, it is safe to say that the project is not likely to cause any significant impact on the

ecology of the area, as adequate preventive measures will be adopted to contain the various

pollutants within permissible limits. Green belt development around the area will also be

taken up as an effective pollution mitigative technique, as well as to control the pollutants

released from the premises of the project.

--------------

Page 158: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH12-1

CHAPTER 12 DISCLOSURE OF CONSULTANT

12.0 INTRODUCTION

The consultant engaged for the preparation of the EIA/EMP of the project is M/s Sri Sai

Manasa Nature Tech Pvt. Ltd. Realizing the need for multi-disciplinary and pragmatic

approach To environment management, a few dedicated experience started M/s Sri Sai

Manasa Nature Tech Pvt. Ltd. company as a consultancy organization in 2006 registered as

company and ISO 9001:2008 Certified Company and accreditation by NABET. Our team

consists of specialists in environmental consulting, regulatory compliance and review,

site investigation, emergency response, environmental laboratory, site assessment, and data

usability-related experience. These individuals have worked together on similar projects, and

the leaders have been commended by their clients for accomplishment on other successful

projects.

M/s Sri Sai Manasa Nature Tech Pvt. Ltd. has its own Environmental laboratory with a name

of KIWIS Eco Laboratory at Pragathi Nagar Hyderabad under EPA (Environmental Protection

Act) from the MoEFCC, Govt. of India, New Delhi and by National Accreditation Board for

testing and Calibration Laboratories (NABL).

The list of the project team has been summarized below:

S. No. Name & Designation Qualification Experience

1 Dr. Ch. Rajani Kumari (Managing Director) EIA Coordinator and FAE (EB, AQ, WP & ISW)

M. Sc. Ph. D. (Environment Science)

17 years of experience in the field of EIA Studies and Environmental Management

2 Mr. Subramanyam Adapa (Executive Director) EIA Coordinator & FAE (AP, AQ, LU and N)

M. Tech. (Env. Engg.), 16 years of experience in the field of EIA Studies and Environmental Management.

3 Mr. Vipin Kumar (General Manager) EIA Coordinator & FAE (AP, AQ & SHW)

M. Tech. (Env. Engg.) 11 years of experience in the field of EIA Studies and Environmental Management.

4 Mr. Vishnu Sharma EIA Coordinator & FAE (WP & RH)

B. Tech. (Chemical) 10 Years of Experience in the field of EIA studies and Environmental Management.

5 Ms. Reshma Thakur EIA Coordinator & FAE (MSW)

M. Tech. (Env. Engg.) 14 years of experience in the field of EIA Studies and Environmental Management.

Page 159: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Draft EIA for Expansion in Production of Ferroalloys Unit by Adding 2 x 9 MVA submerged Electrical Arc Furnace. M/s. Berry Alloys Limited

Sri Sai Manasa Nature Tech (P) Ltd., Hyderabad CH12-2

S. No. Name & Designation Qualification Experience

6 Mr. I Durga Prasad M. Sc. Approved FAE in Socio Economy More than 40 Years of Experience

7 Mr. A. Mohan Reddy MSW Approved FAE in Socio Economy More than 4 Years of Experience

8 Mr. Sundara Rao M. Sc. Approved FAE in Soil Conservation

9 Mr. N. H. Reddy M. Tech. Approved FAE in Hydrogeology and Geology More than 20 Years of Experience

10 Mr. K. Rajesham M. Sc. (Env. Sc. & Tech.) FAA for WP in SW More than 2 years of experience

11 Dr. Desi Sreekanth M. Sc., Ph. D Approved FAE for WP Team Member & having 6 years of Experience

12 Dr. Siva Ramakrishana D M. Sc., Ph. D Team Member (Proposed for WP, AP) More than 6 years experience

13 Dr. Nalini Vijayalaxmi M. Sc., Ph. D Team Member (Proposed for WP, AP) More than 2 years experience

14 Mr. Ahamad Alisha Md. M. Sc. (Env. Sc.) Team Member (Proposed for WP, AP) More than 2 years experience

15 Mr. M. Chaitanya Babu M. Sc. (Env Sc.) Team Member (Proposed for MSW & AP) More than 4 years of experience

16 Mr. Rajesh Mankar B. E., PGDEM Team Member (Proposed for NV, AP & AQ) More than 15 years of experience

17 Mr. T. Manideep M. Tech. Env. Management Team Member (FAE for AP, AQ, SW) More than 4 years of experience

--------------

Page 160: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Annexure 1: Terms of Reference

.F. No. J-11011/1129/2007- IA-Il(I) Government of India

Ministry of Environment. Forest and Climate Change (Impact Assessment Division)

To Mis Berry Alloys Limited Plot No. 368, APIIC Growth Centre, Bobbili (Manda!), District Vizianagaram, Andhra Pradesh- 535558

Indira Paryavaran Bhawan Jor Bagh Road. Aliganj.

ew Delhi - 110003 E-mail: [email protected]

Tel: 011-24695319

Dated: 27th February, 2018

Subject: Proposed expansion in production of Ferro Alloys Unit located at plot no. 368, APHC Growth Centre, Bobbili Vizianagaram District, Andbra Pradesh of Mis Berry Alloys Limited - Prescribing Terms of Reference for Expansion regarding.

Sir,

This has reference to your online application vide proposal no. IA/AP/IND/71918/2017 dated 29th December 2017along with the application in prescribed format (Form-I ), copy of pre­feasibility report and proposed ToRs for undertaking detailed EIA study as per the EIA Notification, 2006 for the project mentioned above. The proposed project activity is listed at SI. No. 3(a) Metallurgical industries (ferrous & non-ferrous) under Category "A" ETA Notification. 2006 and the proposal is appraised at Central level.

2.0 M/s. Berry Alloys Ltd. proposes expansion of existing manufacturing unit for Ferro Alloys Manufacturing. It is proposed to set up the additional 2 x 9 MV A MV A Electric Arc Furnace along with Existing 4 x 9 MV A Electric Arc Furnace.

3 .0 The existing project was accorded environmental clearance vide Lr.no.J-1 l O I l/ I 129/2007-IA-II (I) dated 7th July 2017 Consent to Operate was accorded by AP State pollution Control Board vide Ir. no.APPCBNSP/VZM/160/HO/CF0/2015-3602 dated 05.08.2015 validity of CtO is up to 31st Aug.2018. The Furnace details of existing plant, proposed expansion and total capacity after pro osed ex ansion is as follows:

Product

Electric Arc Furnace

4.0 pro

Product

------------- -

Existing uanti

4 X 9 MVA 2 X 9 MVA

Proposed Quantity

Page 1 of 12

After Expansion

6 X 9 MVA

and total capacity after

After Expansion

Page 161: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Ferro Manganese 86400 TPA ·-

43200 TPA 129600 TPA OR OR OR OR

Silico Manganese 72000 TPA 36000 TPA 108000 TPA OR OR OR

Ferro Silica 25200 TPA - 25200 TPA OR OR OR

Ferro Chrome 36000 TPA - 36000 TPA

5.0 The proposed unit will be located at Plot No. 368, APIIC Growth Center (notified industrial Area) Village: Bobbili, Taluka: Bobbili, District: Vizianagaram State: Andhra Pradesh. The topography of the area is slightly undulating (flat/undulated) and reported to fall between 18°32' I 5" North Latitude and 83°20'63" East Longitude in Survey of India Topo Sheet No. 65 N/6, at an elevation of 135 m AMSL.

6.0 The land area acquired for the proposed plant is 13.42 Ha. Total land the Government land. No forestland involved. The entire land has been acquired. Of the total area 4.44 ha (33%) land will b d fi b l d I e use or green et eve opment.

SNo Particular Existing Proposed After Expansion (Acres) (Acres) (Acres)

I Plant Area 7.6 1.38 8.98

2 Greenbelt 4.44 - 4.44 3 Future Expansion 1.38 - -

Total 13.42 1.38 13.42

7.0 No National Park/Wildlifo Sanctuary/Biosphere Reserveffiger Reserve/Elephant Reserve etc. are reported to be located in the core and buffer zone of the project. The area also does not report to fonn corridor for Schedule-I fauna.

8.0 pro

Total project cost is approx 12.0 Crore rupees. Proposed employment generation from d ·11 b ~o d' I d I 50 . d' I pose pro1ect w1 e) nos. 1rect emp ovment an nos in Irect emp ovment.

I Item Existing P roposed Tota l

(INR) (INR) (INR) I ~roposed EMP Cost 50 Lakhs 50 Lakhs JOO Lakhs I Prooosed CSR 50 lakhs 30 Lakhs 80 Lakhs IESR Cost 50 Lakhs 30 Lakhs 80 Lakhs l

9 .0 The targeted production capacity of the after expansion will be Ferro Manganese -129600 TPA or Silica Manganese -I 08000 TPA or Ferro Silica 25200 TPA or Ferro Chrome 36000 TPA. The ore for the plant would be procured from local market. The ore transportation will be done th h d Th d . fi d. ffi roug roa . e propose capacity or t erent products for new site area as below:

Name of unit No. of units Capacity of each

~ Unit Total Capacity

Proposed 2 Furnace 9MVA Ferro Mangan I 43200 TPA or Silico I Manganese - 36000 I

~ . I TPA

I 0.0 The electricity load of 45.0 MY A will be sourced from Eastern Power Distribution Company of Andhra Pradesh.

Page 2 of 12

Page 162: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

11.0 Proposed raw material and f ucl requirement for project are Manganese Ore, Ferro manganese Slag, Dolomite and Quartz. The requirement would be fulfilled by Local market as well as Plant Generated Slag.

12 0 Th d ·1 f I'd e eta1 so SO I waste generate an it s management 1s as d d. ' fi II 0 ows: Item Existing Proposed Total Management

(TPD) (TPD) (TPD)

Slag 180 I 90 270 Sold to Brick

I Manufacturing

Dust from Bag filter 1.5 1.0 2.5 Used in Process

13.0 Water Consumption for the proposed project will be 30 KLD and waste water generation w·11 b ·1 fi D ·11 b d S k ti II db S k 't I e nt rom process. omeshc waste water w1 e treate ept1c tan 0 owe ,y oa p1.

ltem ( Water Requirement in Water Requirement I Total Water I KLD in KLD Requirement I (4 x 9 MVA) (2 x 9 MVA) (KLD)

I Cooling Purpose I 50 25 t- 75

Domestic Purpose 10 5 15

Oust Suppression I Greenbelt l Total 60 30 I 90

14.0 The proponent has mentioned that there is no court case or violation under El/\ Notification to the project or related activity.

15.0 The EIA Consultant: Sri Sai Manasa Nature Tech Pvt Ltd., Hyderabad; Accreditation No. sr. No 146, April IO 2017.

16.0 The proposal was considered by the Expert Appraisal Committee (Industry-I) during its 28th meeting held on 5th to 7th February, 2018 for prescribing ToRs for undertaking detailed EIA/EMP study. The PP has made detailed presentation on proposal along with £IA consultant.

17.0 A fier detailed deliberation, the committee observed that the earlier EC granted on Th July 2017 was based on the EIA/EMP prepared using the baseline data collected during Winter season i.e. from December 2016 to February 2017. Since the data is not older than 3 years. as requested by PP, can be used for preparation of EMP subject to not older than 3 years at the time of appraisal of the project.

18.0 After detailed deliberations, the Committee recommended to issue the ToR and prescribed following specific ToRs, in addition to the standard ToR. for undertaking detailed EIA-EMP study in addition to the generic ToR enclosed at Annexure I read with additional ToRs at Annexure-2.

i. Public Hearing to be conducted by the concerned State Pollution Control Board.

11. The issues raised during public hearing and commitment of the prqject proponent on the same along with time bound action plan to implement the commitment and financial allocation thereto should be clearly provided.

Page 3 of 12

Page 163: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

111. The Enterprise Social Commitment (ESC) programme shall be based on the issues raised in the public hearing and the social impact assessment study so carried out should form part of ElA and EMP report.

1v. The EINEMP shall be prepared for cumulative with the existing and proposed expansion.

J 9.0 The undersigned is directed to inform that the Ministry of Environment. Forest and Climate Change (MoEF&CC) after accepting the recommendation of the EAC (Industry-I), hereby decided to accord ToRs for the above project.

20.0 It is requested that the draft ElA Report may be prepared in accordance with the above mentioned specific ToRs and enclosed generic ToRs and additional ToRs and thereafter further necessary action including conduct of public consultation may be taken for obtaining Environment Clearance in accordance with the procedure prescribed under the EIA Notification, 2006 as amended.

21.0 The ToRs are valid for a period of three years from today i.e.27.02.2018 and will expire on 26.02.2021. However, this period could be further extended by a maximum period of one year provided an appl ication is made by the project proponent at least three months before the expiry of the validity period, together with updated Form-I, based on proper justification.

~~» (Sharath Kumar P~ rla)

Scientist 'F'/Director Copy to:-

1. The Secretary, Department of Environment, Government of Andhra Pradesh Secretariat Hyderabad.

2. The Chairman, Central Pollution Control Board, Parivesh Rhawan, CBD cum office complex, East Arjun Nagar, Delhi- I I 0032.

3. The Chairman, Andhra Pradesh State Pollution Control Board. Paryavaran Bhawan, A-3 Industrial Estate, Sanath Nagar, Hyderabad - 500 018.

4. The Additional Principal Chief Conservator of Forests(C), Ministry of Environment, Forest and Climate Change, Regional Office (SEZ), 1st and nnd Floor, Hand loom Export Promotion Council, 34, Cathedral Garden Road, Nungambakkam, Chennai - 600034

5. The District Collector, Vizianagaram District, Government of Andhra Pradesh .

6. Guard File/Record File/Monitoring File.

7. MoEF&CC website.

Page 4 of 12

\ .. ~'< ~~~ .

(Sharath Kumar Pallerla) Scientist 'F'/Director

Page 164: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

ANNEXURE-1

GENERIC TERMS OF REFERENCE (ToR) 1N RESPECT OF INDUSTRY SECTOR

1. Executive Summary 2. Introduction

i. Details of the EIA Consultant including NAB ET accreditation 11. Information about the project proponent iii. Importance and benefits of the project

3. Project Description 1. Cost of project and time of completion. 11. Products with capacities for the proposed project. iii. If expansion project, details of existing products with capacities and whether

adequate land is available for expansion, reference of earlier EC if any. iv. List of raw materials required and their source along with mode of transportation. v. Other chemicals and materials required with quantities and storage capacities v1. Details of Emission. eftluents, hazardous waste generation and their management. vii. Requirement of water, power, with source of supply, status of approval, water

balance diagram, man-power requirement (regular and contract) v111. The project proponent shall furnish the requisite documents from the competent

authority in support of drawl of ground water and surface water and supply of electricity.

ix. Process description along with major equipment and machineries, process flow sheet (Quantative) from raw material to products to be provided

x. Hazard identification and details of proposed safety systems. xr. Expansion/modernization proposals:

a. Copy of fill.the Environmental Clearance(s) including Amendments thereto obtained for the project from MoEF&CC/SEIAA shall be attached a, an Annexure. A ccrtifit:d copy of the latest Monitoring Report of the Regional Office of the Ministry of Environment, Forest and C limate Change as per circular dated 30th May, 2012 on the status of compliance of conditions stipulated in all the existing environmental clearances including Amendments shall be provided. Jn addition, status of compliance of Consent to Operate for the ongoing / existing operation of the project from SPCB/PCC shall be attached with the EIA-EMP report.

b. In case the existing project has not obtained environmental clearance, reasons for not taking EC under the provisions of the EIA Notification 1994 and/or EIA Notification 2006 shall be provided. Copies of Consent to Establish/No Objection Certificate and Consent to Operate (in case of units operating prior lo EIA Notification 2006, CTE and CTO of FY 2005-2006) obtained from the SPCB shall be submitted. Further, compliance report to the conditions of consents from the SPCB shall be submitted.

4. Site Details

1. Location of the project site covering village. Taluka/fehsil, District and State, Justification for selecting the site, whether other sites were considered.

ii. A toposheet of the study area of radius of I 0km and site location on 1 :50,000/1:25,000 scale on an A3/A2 sheet. (including all eco-sensitive areas and environmentally sensitive places)

iii. Co-ordinates (lat-long) of all four corners of the site.

Pages of 12

Page 165: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

iv. Google map-Earth downloaded of the project site. v. Layout maps indicating existing unit as well as proposed unit indicating storage

area. plant area, greenbelt area, utilities etc. Jf located within an Industrial area/Estate/Complex, layoui of Industrial Area indicating location of unit within the Industrial area/Estate.

vi. Photographs of the proposed and existing (if applicable) plant site. If existing, show photographs of plantation/greenbelt, in particular.

vii. Landuse break-up of total land of the prQject site (identified and acquired), government/private - agricultural. forest, wasteland, water bodies, settlements, etc shall be included. (not required for industrial area)

v111. A list of major industries with name and type within study area (10km radius) shall be incorporated. Land use details of the study area

ix. Geological features and Geo-hydrological status of the study area shall be included. x. Details of Drainage of the project upto 5km radius of study area. l fthe site is within

I km radius of any major river, peak and lean season river discharge as well as flood occurrence frequency based on peak rainfall data of the past 30 years. Details of Flood Level of the project site and maximum Flood Level of the river shall also be provided. (mega green field projects)

xi. Status of acquisition ofland. If acquisition is not complete, stage of the acquisition process and expected time of complete possession of the land.

xii. R&R details in respect of land in line with state Government policy

5. Forest and wildlife related issues {if applicable):

1. Permission and approval for the use of forest land (forestry clearance), if any, and recommendations of the State Forest Department. (if applicable).

ii. Land use map based on High resolution satellite imagery (GPS) of the proposed site delineating the forestland (in case ofpr<?iects involving forest land more than -10 ha).

111. Status of Application submitted for obtain ing the stage I forestry clearance along with latest status shall be submitted.

iv. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden-thereon.

v. Wildlife Conservation Plan duly authenticated by the Chief Wildlife Warden of the State Government for conservation of Schedule I fauna. if any exists in the study area.

vi. Copy of application submitted for clearance under the Wildlife (Protection) Act. 1972, to the Standing Committee of the National Board for Wildlife

6. Environmental Status i. Determination of atmospheric inversion level at the project site and site-specific

micro-meteorological data using temperature. relative humidity, hourly wind speed and direction and rainfall.

ii. AAQ data (except monsoon) at 8 locations for PMw, PM2 s, S02. NOx, CO and other parameters relevant to the project shall be collected. The monitoring stations shall be based CPCB guidelines and take into account the pre-dominant wind direction. population zone and sensitive receptors including reserved forests.

Page 6 of 12

Page 166: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

iii. Raw data of all AAQ measurement for 12 weeks of all stations as per frequency given in the NAQQM Notification of Nov. 2009 along with - min., max., average and 98% values for each of the AAQ parameters from data of all AAQ stations should be provided as an annexure to the EIA Report.

iv. Surface water quality of nearby River (60m upstream and downstream) and other surface drains at eight locations as per CPCB/MoEF&CC guidelines.

v. Whether the site falls near to polluted stretch of river identified by the CPCB/MoEF&CC.

vi. Ground water monitoring at minimum at 8 locatio11s shall be included. vii. Noise levels monitoring at 8 locations within the study area. viii. Soil Characteristic as per CPCB guidelines. 1x. Traffic study of the area, type of vehicles, frequency of vehicles for transportation

of materials, additional traffic due to proposed project, parking arrangement etc. x. Detailed description of flora and fauna (terrestrial and aquatic) existing in the study

area shall be given with special reference to rare. endemic and endangered species. If Schedule-I fauna are found within the study area, a Wildlife Conservation Plan shall be prepared and furnished.

xi. Socio-economic status of the study area.

7. Impact Assessment and Environment Management Plan i. Assessment of ground level concentration of pollutants from the stack emission

based on site-specific meteorological features. In case the project is located on a hilly terrain, the AQlP Modelling s~all be done using inputs of the specific terrain characteristics for determining the potential impacts of the project on the AAQ. Cumulative impact of all sources of emissions (including transportation) on the AAQ of the area shall be well assessed. Details of the model used and the input data used for modelling shall also be provided. The air quality contours shall be plotted on a location map showing the location of project site, habitation nearby, sensitive receptors, if any.

11. Water Quality modelling - in case, if the effluent is proposed to be discharged in to the local drain, then Water Quality Modelling study should be conducted for the drain water taking into consideration the upstream and downstream quality of water of the drain.

iii. Impact of the transport of the raw materials and end products on the surrounding environment shall be assessed and provided. In this regard, options for transport of raw materials and finished products and wastes (large quantities) by rail or rail-cum road transport or conveyor-cum-rail transport shall be examined.

1v. A note on treatment of wastewater from different plant operations, extent recycled and reused for different purposes shall be included. Complete scheme of effluent treatment. Characteristics of untreated and treated effiuent to meet the prescribed standards of discharge under E(P) Rules.

v. Details of stack emission and action plan for control of emissions to meet standards. vi. Measures for fugitive emission control vii. Details of hazardous waste generation and their storage, utilization and disposal.

Copies of MOU regarding utilization of solid and hazardous waste shall also be included. EMP shall include the concept of waste-minimization, recycle/reuse/recover techniques, Energy conservation. and natural resource conservation.

viii. Proper utilization of fly ash shall be ensured as per Fly Ash Notification, 2009. A detailed plan of action shall be provided.

Page 7 of 12

Page 167: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

ix. Action plan for the green belt development plan in 33 % area i.e. land with not less than l,500 trees per ha. Giving details of species, width of plantation, planning schedule etc. shall be included. The green belt shall be around the project boundary and a scheme for green ing of the roads used for the project shall also be incorporated.

x. Action plan for rainwater harvesting measures at plant site shall be submitted to harvest rainwater from the roof tops and storm water drains to recharge the ground water and also to use for the various activities at the project site to conserve fresh water and reduce the water requirement from other sources.

xi. Total capital cost and recurring cost/annum for environmental pollution control measures shall be included.

xii. Action plan for post-project environmental monitoring shall be submitted. xiii. Onsite and Offsite Disaster (natural and Man-made) Preparedness and Emergency

Management Plan including Risk Assessment and damage control. Disaster management plan should be linked with District Disaster Management Plan.

8. Occupational health

1. Details of existing Occupational & Safety Hazards. What are the exposure levels of above mentioned hazards and whether they are within Permissible Exposure level (PEL). If these are not within PEL, what measures the company has adopted to keep them within PEL so that health of the workers can be preserved,

11. Details of exposure specific health status evaluation of worker. If the workers' health is being evaluated by pre-designed format, chest x rays, Audiometry, Spirometry, Vision testing (Far & Near vision, colour vision and any other ocular defect) ECG, during pre-placement and periodical examinations give the details of the same. Details regarding last month analysed data of abovementioned parameters as per a:ge, sex, duration of exposure and department wise.

111. Annual report of health status of workers with special reference to Occupational Health and Safety.

1v. Plan and fund allocation to ensure the occupational health & safety of all contract and casual workers.

9. Corporate Environment Policy

1. Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the E IA report.

ii. Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement/ deviation / violation of the environmental or forest norms / conditions? If so, it may be detai led in the E lA.

iii. What is the hierarchical system or Administrative order of the company to deal with the environmental issues and for ensuring compliance with the environmental clearance conditions? Details of this system may be given.

1v. Does the company have system of reporting of non-compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism shall be detailed in the EIA report

Page 8 of 12

Page 168: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

10. Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to the labour force during construction as well as to the casual workers including truck drivers during operation phase.

11. Enterprise Social Commitment (ESC)

1. To address the Public Hearing issues. 2.5% of the total prqject cost of (Rs .............. crores), amounting to Rs ............. crores, shall be earmarked by the project proponent. towards Enterprise Social Commitment (ESC). Distinct ESC projects shall he carved out based on the local public hearing issues. Project estimate shall be prepared based on PWD schedule of rates for each distinct Item and schedule for time bound action plan shall be prepared. These ESC projects as indicated by the prqjcct proponent shall be implemented along with the main project. Implementation of such program shall be ensured by constituting a Committee comprising of the project proponent, representatives of village Panchayat & District Administration. Action taken report in this regard shall be submitted to the Ministry's Regional Office. No free distribution/donations and or free camps shall be included in the above ESC budget

12. Any litigation pending against the project and/or any direction/order passed by any Court of Law against the project, if so, details thereof shall also be included. Has the unit received any notice under the Section 5 of Environment (Protection) Act, 1986 or relevant Sections of Air and Water Acts? If so, details thereof and compliance/ATR to the notice(s) and present status of the case.

13. A tabular chart with index for point wise compliance of above To Rs.

14. The ToRs prescribed shall be valid for a period of three years for submission of the EIA­EMP reports along with Public Hearing Proceedings (wherever stipulated).

The following general points shall be noted:

1. All documents shall be properly indexed, page numbered. ii. Period/date of data collection shall be clearly indicated.

iii. Authenticated English translation of all material in Regional languages shall be provided. 1v. The letter/application for environmental clearance shall quote the MOEF&CC file No. and

also attach a copy of the letter. v. The copy of the letter received from the Ministry shall be also attached as an annexure to

the final EJA-EMP Report. vi. The index of the final EJA-EMP report must indicate the specific chapter and page no. of

the EJA-EMP Report vii. While preparing the EJA report, the instructions for the proponents and instructions for the

consultants issued by MOEF&CC vide 0.M. No. J-1101 3/41/2006-JA.II (I) dated 4th

August, 2009, which are available on the website of this Ministry shall also be followed. viii. The consultants involved in the preparation of EIA-EMP report after accreditation with

Quality Council of India (QCl)/National Accreditation Board of Education and Training (NABET) would need to include a certificate in this regard in the EIA-EMP reports prepared by them and data provided by other organization/Laboratories including their status ofapprovals etc. Name of the Consultant and the Accreditation details shall be posted on the ElA-EMP Report as well as on the cover of the Hard Copy of the Presentation makrial for EC presentation.

Page 9 of 12

Page 169: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

ix. ToRs' prescribed by the Expert Appraisal Committee (Industry) shall be considered for preparation of EIA-EMP report for the project in addition to all the relevant information as per the 'Generic Structure of EIA' given in Appendix 1H and lllA in the EIA Notification, 2006. Where the documents provided are in a language other than English, an English translation shall be provided. The draft EIA-EM P report shall be submitted to the State Pollution Control Board of the concerned State for conduct of Public Hearing. The SPCB shall conduct the Public Hearing/public consultation, district-wise, as per the provisions of EIA notification, 2006. The Public Hearing shall be chaired by an Officer not below the rank of Additional District Magistrate. The issues raisc::d in the Public Hearing and during the consultation process and the commitments made by the project proponent on the same shall be included separately in EIA-EMP Report in a separate chapter and summarised in a tabular chart with financial budget (capital and revenue) along with time-schedule of implementation for complying with the commitments made. The final EIA report shall be submitted to the Ministry for obtaining environmental clearance.

********

Page 10 of 12

------ -

Page 170: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

ANNEXURE-2

METALLURGICAL INDUSTRY {FERRO US AND NON-FERROUS)

I. Complete process flow diagram describing each unit, its processes and operations, along with material and energy inputs & outputs (material and energy balance).

2. Emission from sulphuric acid plant and sulphur muck management.

3. Details on installation of Continuous Emission Monitoring System with recording with proper calibration system

4. Details on toxic metals including fluoride emissions

5. Details on stack height.

6. Details on ash disposal and management

7. Complete process flow diagram describing process of lead/zinc/copper/ aluminium. etc.

8. Details on smelting, thermal refining, melting, slag fuming, and Waelz kiln operation

9. Details on Holding and de-gassing of molten metal from primary and secondary aluminium, materials pre-treatment, and from melting and smelting of secondary aluminium

I 0. Details on toxic metal content in the waste material and its composition and end use (particularly of slag).

11. Trace metals in waste material especially slag.

12. Plan for trace metal recovery

13. Trace metals in water. *****

Page 11 of 12

Page 171: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Executive Summary

Executive summary of the report in about 8-10 pages incorporating the following:

i. Project name and location (Village. Dist, State, Industrial Estate (if applicable)

ii. Products and capacities. If expansion proposal, then existing products with capacities and reference to earlier EC.

iii. Requirement of land, raw material, water, power, fuel, with source of supply (Quantitative)

i\. Process description in brief, specifically indicating the gaseo use mission, liquid efnuent and solid and hazardous wastes. Materials balance shall be presented.

\. Measures for mitigating the impact on the environment and mode of discharge or disposal.

, i. Capital cost of the project, estimated time of completion

vii. Site selected for the project - Nature of land - Agricultural (single/double crop). barren, Govt/private land, status of is acquisition, nearby (in 2-3 km.) water body, population, with in 10km other industries, forest, eco-sensitive zones, accessibility, (note - in case of industrial estate this infonnation may not be necessary)

\ iii. Baseline environmental data - air quality. surface and ground water quality, soil characteristic, flora and fauna, socio-economic condition of the nearby population

,x. Identification of hazards in handling, processing and storage of hazardous material and safety system provided to mitigate the risk.

x. Likely impact of the project on air. water, land, flora-fauna and nearby population

xi. Emergency preparedness plan in case of natural or in plant emergencies

xii. Issues raised during public hearing (if applicable) and response given

xiii. CSR plan with proposed expenditure.

xiv. Occupational Health Measures

x,. Post project monitoring plan

*******

Page 12 of 12

Page 172: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

1 | M / s . B e r r y A l l o y s L t d .

Environmental Clearance Compliance Report for Proposed Expansion in Production of Ferro Alloys Unit (Adding 2 X9 MVA Submerged Electric Arc Furnace) at Plot No. 368, APIIC Growth Center, Bobbili Village & Mandal, Vizianagaram District, Andhra Pradesh.

Environment Clearance Letter No: F.No. J-11011/1129/2007-IA-II(I) dated: 7th July 2017.

S. No EC Condition Compliance PART - A. Specific Condition

I

The mandated 33% of total area (4.44 acres) covered under green belt shall be carried in the first year of implementation of expansion project with local and broad-leaved species as per the guidelines of CPCB. The additional plantation shall be carried all along the boundary wherever possible with minimum of two rows. In addition, 2,500 trees will be planted in a block in the vacant area available in North-East direction of the plant site

The 4.44 acres of land already earmarked for green belt and Plantation. As per MOEFCC recombination we are in process to plant 2500 trees within vacant land.

ii

The budget allocated (Rs.50 Lakhs) for Enterprise Social Responsibility (ESR) to address the issues raised during the public hearing shall be completed within 7months of commencement of expansion project as per the action plan submitted by PP. The ESR fund shall be allocated as a CAPEX in project mode and monitored periodically once in 3 years.

We will comply the budget allocated (Rs.50 Lakhs) for Enterprise Social Responsibility (ESR) to address the issues raised during the public hearing shall be completed within 7.0 months of commencement of expansion project as per the action plan submitted by PP. The ESR fund shall be allocated as a CAPEX in project mode and monitored periodically once in 3 years.

iii The bag filter shall have capacity of not less than 1.5 times the requirement of the existing plus proposed expansion project.

We will be installed bag filter having capacity more than 1.5 times the requirement of the existing plus proposed expansion project.

iv The slag generated during the process shall be used for brick manufacturing or supply to the end users.

We will send the generated slag to the Bricks manufactures.

v The dust collected in the bag house(s) shall be re- used in the sintered plant.

We will use the bag house collected dust.

vi

Leachate analysis of slag by TCLP test shall be carried once in 6months and shall be reported to Regional Office of the Ministry along with half yearly monitoring report.

The Leachate analysis of slag by TCLP test shall be carried once in 6.0 months and shall be reported to Regional Office of the Ministry along with half yearly monitoring

Page 173: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

2 | M / s . B e r r y A l l o y s L t d .

S. No EC Condition Compliance report.

vii

Occupational Health monitoring of all workmen engaged at shop- floor ,loading and un-loading material/products shall be carried through IME and PME once in 5 years.

Occupational health surveillance for all workers will be done as per MOEFCC recommendation.

viii No effluent shall be discharged outside the plant premises and the project shall adhere to Zero Liquid Discharge (ZLD).

Zero Liquid Discharge (ZLD) norms will be followed strictly.

ix

The project proponent shall install 24*7 air monitoring devices to monitor air emissions, as provided by the CPCB and submit report to Ministry and its Regional Office.

We having online monitoring System for existing unit and we will also provide the online monitoring system for new unit also.

x

In-plant control measures like bag filters, de-dusting and dust suppression system shall be provided to control fugitive emissions from all the vulnerable sources. Dust extraction and suppression system shall be provided at all the transfer points, coal handling plant etc. Water sprinkling system shall be provided to control secondary fugitive dust emissions generated during screening, loading, unloading, handling and storage of raw materials etc.

We are maintained In-plant control measures like bag filters, de-dusting and dust suppression system shall be provided to control fugitive emissions from all the vulnerable sources. Dust extraction and suppression system shall be provided at all the transfer points, coal handling plant etc. Water sprinkling system shall be provided to control secondary fugitive dust emissions generated during screening, loading, unloading, handling and storage of raw materials etc.

xi The COD level in the effluent should be maintained at the prescribed standard and the STP effluent is to be recycled within the premises.

We will maintained the COD level in the effluent should be maintained at the prescribed standard and the STP effluent is to be recycled within the premises.

xii

Continuous stack monitoring facilities for all the stacks shall be provided and sufficient air pollution control devices viz. Electrostatic precipitator (ESP), bag house, bag filters etc. shall be provided to keep the emission levels blow 50 mg/Nm3 and installing energy efficient technology.

We will be complied. Continuous stack monitoring facilities for all the stacks shall be provided and sufficient air pollution control devices viz. Electrostatic precipitator (ESP), bag house, bag filters etc. shall be provided to keep the emission levels blow 50 mg/Nm3 and installing energy efficient technology

Page 174: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

3 | M / s . B e r r y A l l o y s L t d .

S. No EC Condition Compliance

xiii

Efforts shall further be made to use maximum water from the rain water harvesting sources. Use of air cooled condensers shall be explored and closed-circuit cooling system shall be provided to reduce water consumption and water requirement shall be modified accordingly. All the effluent should be treated and used for ash handling, dust suppression and green belt development. ETP sludge should be disposed off scientifically.

The rain water harvesting system will be provided. The are no waste water from the Process. Zero discharge norms will be followed. For domestic waste water septic tank followed by soak pit will be provided.

xiv

All internal roads shall be black topped. The roads shall be regularly cleaned with mechanical sweepers. A 3-tier avenue plantation using native species shall be developed along the roads. Facilities for parking of trucks carrying raw coal from the linked coalmines shall be created within the Unit.

We will be complied. All internal roads will be black topped. The roads will be regularly cleaned with mechanical sweepers. Avenue plantation using native species will be developed along the roads. Facilities for parking of trucks will be provided.

xv The National Ambient Air Quality Emission Standards issued by the Ministry vide G.S.R.No.826(E) dated 16th November 2009 shall be followed.

We are following the National Ambient Air Quality Emission Standards issued by the Ministry vide G.S.R.No.826(E) dated 16th November 2009 .

xvi

Gaseous emission levels including secondary fugitive emissions from all the sources shall be controlled within the latest permissible limits issued by the Ministry vide G.S.R. 414(E) dated 30th May, 2008 and regularly monitored. Guidelines / Code of practice issued by the CPCB shall be followed.

We will be following Gaseous emission levels including secondary fugitive emissions from all the sources shall be controlled within the latest permissible limits issued by the Ministry vide G.S.R. 414(E) dated 30th May, 2008 and regularly monitored. Guidelines / Code of practice issued by the CPCB.

xvii

Regular monitoring of influent and effluent, surface, sub-surface and ground water shall be ensured and treated wastewater shall meet the norms prescribed by the State Pollution Control Board or described under the Environment (Protection) Act, 1986 whichever are more stringent.

We will be complied

xviii

Proper handling, storage, utilization and disposal of all the solid waste shall be ensured and regular report regarding toxic metal content in the waste material and its composition, end use of

We will be complied

Page 175: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

4 | M / s . B e r r y A l l o y s L t d .

S. No EC Condition Compliance solid/hazardous waste shall be submitted to the Ministry’s Regional office, SPCB and CPCB.

xix A time bound action plan shall be submitted to reduce solid waste generated due to the project related activity, its proper utilization and disposal.

We will maintain a time bound action plan shall be submitted to reduce solid waste generated due to the project related activity, its proper utilization and disposal.

xx

Proper utilization of fly ash shall be ensured as per Fly Ash Notification, 1999 and subsequent amendment in 2003 and 2009. All the fly ash shall be provided to cement and brick manufacturers for further utilization and Memorandum of Understanding shall be submitted to the Ministry’s Regional Office.

No fly ash will be generated from the process. Hence not Applicable.

xxi

A Risk and Disaster Management Plan shall be prepared and a copy submitted to the Ministry’s Regional office, SPCB and CPCB within 3 months of issue of environment clearance letter.

We Will be Complied. A Risk and Disaster Management Plan (DMP) shall be prepared and a copy submitted to the Ministry’s Regional office, SPCB and CPCB within 3 months of issue of environment clearance letter. Copy of DMP is Attached.

xxii

The Company shall submit within three months their policy towards Corporate Environment Responsibility which shall inter-alia address

We Will be Complied. Details are Attached.

(i) Standard operating process/procedure to being into focus any infringement/deviation/ violation of environmental or forest norms/conditions, (ii)Hierarchical system or Administrative order of the Company to deal with environmental issues and ensuring compliance to the environmental clearance conditions and (iii)System of reporting of non-compliance/violation environmental norms to the Board of Directors of the company and/or stakeholders or shareholders.

xxiii

The project proponent shall provide for solar light system for all common areas, street lights, Village, parking around project area and maintain the same regularly.

We will be provide solar light system for all common areas, street lights, Village, parking around project area and maintain the same regularly.

xxiv The project proponent shall provide for LED lights in their offices and residential areas.

We will provide LED lights in their offices and residential areas.

xxv Provision shall be made for the housing of We will be made for the housing of

Page 176: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

5 | M / s . B e r r y A l l o y s L t d .

S. No EC Condition Compliance construction labor within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP ,Safe drinking water, medical health care, crèche etc. The housing may be in the form of temporary structures to be removed after the completion of the project.

construction labor within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP ,Safe drinking water, medical health care, crèche etc.

B. GENERAL CONDITIONS:

i The project authorities must strictly adhere to the stipulations made by the Andhra Pradesh Pollution Control Board and the State Government.

We will be strictly adhere to the stipulations made by the Andhra Pradesh Pollution Control Board and the State Government.

ii

No further expansion or modifications in the plant shall be carried out without prior approval of the Ministry of Environment, Forests and Climate Change (MoEF&CC).

We assure you that we will not be done any kind of expansion without Taking permission from MOEFCC.

iii

At least four ambient air quality monitoring stations should be established in the downward direction as well as where maximum ground level concentration of PM10,PM2.5,SO2 and NOx are anticipated in consultation with the SPCB. Data on ambient air quality and stack emission shall be regularly submitted to this Ministry including its Regional office at Chennai and the SPCB/CPCB once in six months.

We will be establish four ambient air quality monitoring stations in the downward direction as well as where maximum ground level concentration of PM10,PM2.5,SO2 and NOx are anticipated in consultation with the SPCB. Data on ambient air quality and stack emission will be regularly submitted to this Ministry including its Regional office at Chennai and the SPCB/CPCB once in six months.

iv

Industrial wastewater shall be properly collected, treated so as to conform to the standards prescribed under GSR 422 (E) dated 19th May, 1993 and 31st December 1993 or as amended form time to time. The treated wastewater shall be utilized for plantation purpose.

There is no waste water from process. Cooling waste water will be reuse in system after adding makeup water.

v

The Overall noise levels in and around the plant area shall be kept well within the standards (85 dB (A) ) by providing noise control measures including acoustic hoods, silencers, enclosures etc. on all sources of noise generation. The ambient noise levels should conform to the standards prescribed under EPA Rules, 1989 viz. 75 dB(A) during day time and 70 dB (A) during night time.

We will be complied. The Overall noise levels in and around the plant area shall be kept well within the standards (85 dB (A) ) by providing noise control measures including acoustic hoods, silencers, enclosures etc. on all sources of noise generation. The ambient

Page 177: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

6 | M / s . B e r r y A l l o y s L t d .

S. No EC Condition Compliance noise levels should conform to the standards prescribed under EPA Rules, 1989 viz. 75 dB(A) during day time and 70 dB (A) during night time

vi Occupational health surveillance of the workers shall be done on a regular basis and records maintained as per the Factories Act.

We will be complied. Occupational health surveillance will be done as per The Factories Act.

vii The Company shall develop rain water harvesting structures to harvest the rain water for utilization in the lean season besides recharging the ground water table.

Rain Water harvesting structure will be constructed and will be attached to raw water pond so this water will reduce the makeup water requirement.

viii

The project proponent shall also comply with all the environmental protection measures and safeguards recommended in the EIA/EMP report. Further, the company must undertake socio-economic development activities in the surrounding villages like community development programmes, educational programmes, drinking water54 supply and health care etc.

We will take care of all environmental protection measures and safeguards recommended in the EIA/EMP report. Further, the company will undertake socio-economic development activities in the surrounding villages like community development programmes, educational programmes, drinking water supply and health care etc.

ix

Requisite funds shall be earmarked towards capital cost and recurring cost/annum for environment pollution control measures to implement the conditions stipulated by the Ministry of Environment, Forest and Climate Change (MoEF&CC) as well as the State Government. An implementation schedule for implementing all the conditions stipulated herein shall be submitted to the Regional Office office of the Ministry at Chennai. The funds so provided shall not be diverted for any other purpose.

We will be are maintain separate account earmarked towards capital cost and recurring cost/annum for environment pollution control measures to implement the conditions stipulated by the Ministry of Environment, Forest and Climate Change (MoEF&CC) as well as the State Government. An implementation schedule for implementing all the conditions stipulated herein will be submitted to the Regional Office of the Ministry at Chennai.

x

A copy of clearance letter shall be sent by the proponent to concerned panchayat, Zila Parishad/Municipal Corporation, Urban Local Body and the local NGO, if any, from whom

We will be Complied.

Page 178: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

7 | M / s . B e r r y A l l o y s L t d .

S. No EC Condition Compliance suggestions/representations, if any, were received while processing the proposal. The clearance letter shall also be put on the web site of the company by the proponent.

xi

The project proponent shall upload the status of compliance of the stipulated environment clearance conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional Office of the MoEF&CC at Chennai. The respective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely;PM10, SO2, NOx (ambient levels as well as stack emissions) or critical sectoral parameters, indicated for the projects shall be monitored and displayed at a convenient location near the main gate of the company in the public domain.

We will be compiled.

xii

The project proponent shall also submit six monthly reports on the status of the compliance of the stipulated environmental conditions including results of monitored data (both in hard copies as well as by e-mail) to the Regional Office of MoEF&CC, the respective Zonal Office of CPCB and the SPCB. The Regional Office of this Ministry at Chennai / CPCB / SPCB shall monitor the stipulated conditions.

We will be submit six monthly reports on the status of the compliance of the stipulated environmental conditions including results of monitored data (both in hard copies as well as by e-mail) to the Regional Office of MoEF&CC, the respective Zonal Office of CPCB and the SPCB.

xiii

The environmental statement for each financial year ending 31st March in Form-V as is mandated to be submitted by the proponent to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of environmental conditions and shall also be sent to the respective Regional Office of the MoEF&CC at Chennai by e-mail.

We will be submit to The environmental statement for each financial year ending 31st March in Form-V to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of environmental conditions and shall also be sent to the respective Regional Office of the MoEF&CC at Chennai by e-mail.

Page 179: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

8 | M / s . B e r r y A l l o y s L t d .

S. No EC Condition Compliance

xiv

The project proponent shall inform the public that the project has been accorded environmental clearance by the Ministry and copies of the clearance letter are available with the SPCB and may also be seen at Website of the Ministry of Environment, Forests and Climate Change (MoEF&CC) at http:/envfor.nic.in.This shall be advertised within seven days from the date of issue of the clearance letter, at least in two local newspapers that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same should be forwarded to the Regional office at Chennai.

We will be Complied.

xv

Project authorities shall inform the Regional Office as well as the Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of commencing the land development work.

We will be inform the Regional Office as well as the Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of commencing the land development work.

---------

Page 180: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 181: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 182: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 183: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 184: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 185: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 186: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 187: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 188: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 189: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 190: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 191: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 192: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 193: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 194: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Annexure 6 List of Major Industries

Page 195: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 196: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 197: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 198: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 199: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Annexure 8: AAQ Data Location : Plant Area

Date Week PM 10 PM 2.5 SO2 NOX CO NH3 O3 Ni Pb As Benzene Benzo(a)Pyrene 03.12.2016 1 69.6 28.7 11.6 14.1 0.58 15.7 21.0 BDL BDL BDL BDL BDL 04.12.2016 1 70.1 29.4 11.8 14.3 0.51 15.9 21.2 BDL BDL BDL BDL BDL 10.12.2016 2 69.8 29.2 11.8 14.3 0.53 15.9 20.8 BDL BDL BDL BDL BDL 11.12.2016 2 72.3 30.3 12.2 14.7 0.55 16.3 21.6 BDL BDL BDL BDL BDL 17.12.2016 3 71.6 30.0 12.1 14.6 0.57 16.2 21.5 BDL BDL BDL BDL BDL 18.12.2016 3 73.9 31.0 12.4 14.9 0.60 16.5 22.0 BDL BDL BDL BDL BDL 24.12.2016 4 72.7 30.1 12.4 15.1 0.58 16.3 21.6 BDL BDL BDL BDL BDL 25.12.2016 4 70.4 29.1 12.0 14.7 0.66 15.9 21.2 BDL BDL BDL BDL BDL 31.12.2016 5 71.2 29.5 12.2 14.9 0.65 16.1 21.1 BDL BDL BDL BDL BDL 01.01.2017 5 69.8 28.9 11.9 14.6 0.66 15.8 19.8 BDL BDL BDL BDL BDL 07.01.2017 6 70.2 29.1 12.0 14.7 0.65 15.9 19.4 BDL BDL BDL BDL BDL 08.01.2017 6 68.1 28.2 11.6 14.3 0.62 15.5 20.6 BDL BDL BDL BDL BDL 14.01.2017 7 69.6 29.4 12.0 15.1 0.62 16.1 21.7 BDL BDL BDL BDL BDL 15.01.2017 7 67.3 28.5 11.6 14.7 0.61 15.7 19.6 BDL BDL BDL BDL BDL 21.01.2017 8 68.6 29.0 11.8 14.9 0.60 15.9 20.2 BDL BDL BDL BDL BDL 22.01.2017 8 70.8 29.9 12.2 15.3 0.61 16.3 21.9 BDL BDL BDL BDL BDL 5.02.2017 9 69.6 29.4 12.0 15.1 0.62 16.1 22.1 BDL BDL BDL BDL BDL

06.02.2017 9 72.0 30.5 12.4 15.5 0.52 17.3 23.3 BDL BDL BDL BDL BDL 12.02.2017 10 71.2 29.1 12.2 14.6 0.50 17.1 23.1 BDL BDL BDL BDL BDL 13.02.2017 10 73.9 30.2 12.7 15.1 0.48 17.6 22.8 BDL BDL BDL BDL BDL 19.02.2017 11 72.7 29.7 12.5 14.9 0.65 17.4 22.6 BDL BDL BDL BDL BDL 20.02.2017 11 74.8 30.6 12.8 15.2 0.65 17.7 22.9 BDL BDL BDL BDL BDL 26.02.2017 12 73.1 29.9 12.5 14.9 0.66 17.4 22.6 BDL BDL BDL BDL BDL 27.02.2017 12 71.5 29.2 12.3 14.7 0.61 17.2 22.4 BDL BDL BDL BDL BDL

Minimum 67.3 28.2 11.6 14.1 0.48 15.5 19.4 0.0 0.0 0.0 0.0 0.0 Maximum 74.8 31.0 12.8 15.5 0.66 17.7 23.3 0.0 0.0 0.0 0.0 0.0 Average 71.0 29.5 12.1 14.8 0.60 16.4 21.5 0.0 0.0 0.0 0.0 0.0

98 Percentile 74.4 30.8 12.7 15.4 0.66 17.6 23.2 0.0 0.0 0.0 0.0 0.0

Page 200: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Location : Paradi.

Date Week PM 10 PM 2.5 SO2 NOX CO NH3 O3 Ni Pb As Benzene Benzo(a)Pyrene

03.12.2016 1 48.3 18.8 12.3 15.0 <0.1 6.1 12.3 BDL BDL BDL BDL BDL 04.12.2016 1 48.9 19.0 12.8 15.6 <0.1 6.3 12.1 BDL BDL BDL BDL BDL 10.12.2016 2 51.6 20.1 13.2 15.9 <0.1 6.2 11.3 BDL BDL BDL BDL BDL 11.12.2016 2 52.3 20.3 13.3 16.0 <0.1 6.5 10.9 BDL BDL BDL BDL BDL 17.12.2016 3 51.6 20.1 13.2 15.9 <0.1 6.1 12.6 BDL BDL BDL BDL BDL 18.12.2016 3 49.6 19.3 12.7 15.4 <0.1 6.5 11.5 BDL BDL BDL BDL BDL 24.12.2016 4 50.3 19.0 12.7 15.8 <0.1 6.6 10.9 BDL BDL BDL BDL BDL 25.12.2016 4 54.6 20.6 13.8 16.9 <0.1 6.9 12.5 BDL BDL BDL BDL BDL 31.12.2016 5 53.1 20.1 13.4 16.5 <0.1 6.5 11.2 BDL BDL BDL BDL BDL 01.01.2017 5 55.2 20.9 14.0 17.1 <0.1 6.6 10.6 BDL BDL BDL BDL BDL 07.01.2017 6 53.7 20.3 13.6 16.7 <0.1 6.9 12.6 BDL BDL BDL BDL BDL 08.01.2017 6 51.2 19.4 12.9 16.0 <0.1 7.1 13.4 BDL BDL BDL BDL BDL 14.01.2017 7 50.9 20.0 12.9 15.5 <0.1 6.9 11.2 BDL BDL BDL BDL BDL 15.01.2017 7 52.6 20.7 13.3 15.9 <0.1 7.6 10.6 BDL BDL BDL BDL BDL 21.01.2017 8 51.2 20.1 14.1 16.8 <0.1 6.9 12.6 BDL BDL BDL BDL BDL 22.01.2017 8 53.6 21.1 13.8 16.1 <0.1 6.5 10.5 BDL BDL BDL BDL BDL 5.02.2017 9 52.9 20.8 13.4 16.0 <0.1 6.9 11.2 BDL BDL BDL BDL BDL

06.02.2017 9 50.8 20.0 12.8 15.4 <0.1 6.8 12.1 BDL BDL BDL BDL BDL 12.02.2017 10 48.6 19.3 12.6 15.8 <0.1 7.5 10.6 BDL BDL BDL BDL BDL 13.02.2017 10 51.2 20.4 13.3 16.5 <0.1 6.1 10.8 BDL BDL BDL BDL BDL 19.02.2017 11 49.2 19.6 12.7 15.9 <0.1 6.9 11.5 BDL BDL BDL BDL BDL 20.02.2017 11 52.3 20.8 13.6 16.8 <0.1 7.6 10.6 BDL BDL BDL BDL BDL 26.02.2017 12 51.8 20.6 13.4 16.6 <0.1 6.8 11.5 BDL BDL BDL BDL BDL 27.02.2017 12 48.8 19.4 12.6 15.8 <0.1 6.2 10.8 BDL BDL BDL BDL BDL

Minimum 48.3 18.8 12.3 15.0 0.0 6.1 10.5 0.0 0.0 0.0 0.0 0.0

Maximum 55.2 21.1 14.1 17.1 0.0 7.6 13.4 0.0 0.0 0.0 0.0 0.0 Average 51.4 20.0 13.2 16.1 0.0 6.7 11.5 0.0 0.0 0.0 0.0 0.0

98 Percentile 54.9 21.0 14.0 17.0 0.0 7.6 13.0 0.0 0.0 0.0 0.0 0.0

Page 201: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Location : Alajangi

Date Week PM 10 PM 2.5 SO2 NOX CO NH3 O3 Ni Pb As Benzene Benzo(a)Pyrene 03.12.2016 1 46.1 18.3 12.8 15.6 <0.1 6.5 12.1 BDL BDL BDL BDL BDL 04.12.2016 1 44.8 17.7 12.5 15.3 <0.1 6.1 11.5 BDL BDL BDL BDL BDL 10.12.2016 2 45.6 18.1 12.7 15.5 <0.1 6.3 11.8 BDL BDL BDL BDL BDL 11.12.2016 2 47.9 19.0 13.3 16.1 <0.1 7.2 12.6 BDL BDL BDL BDL BDL 17.12.2016 3 49.9 19.9 13.9 16.7 <0.1 6.8 11.9 BDL BDL BDL BDL BDL 18.12.2016 3 48.1 19.1 13.4 16.2 <0.1 7.6 13.5 BDL BDL BDL BDL BDL 24.12.2016 4 50.6 19.8 13.8 16.8 <0.1 7.1 13.0 BDL BDL BDL BDL BDL 25.12.2016 4 52.8 20.6 14.3 17.3 <0.1 7.9 13.8 BDL BDL BDL BDL BDL 31.12.2016 5 51.6 20.2 14.0 17.0 <0.1 7.3 13.1 BDL BDL BDL BDL BDL 01.01.2017 5 53.9 21.1 14.6 17.6 <0.1 6.5 12.6 BDL BDL BDL BDL BDL 07.01.2017 6 55.9 21.9 15.2 18.2 <0.1 6.3 12.3 BDL BDL BDL BDL BDL 08.01.2017 6 54.6 21.3 14.8 17.8 <0.1 7.1 12.8 BDL BDL BDL BDL BDL 14.01.2017 7 52.1 20.1 13.5 16.1 <0.1 6.9 12.7 BDL BDL BDL BDL BDL 15.01.2017 7 53.6 20.7 13.9 16.5 <0.1 7.4 13.2 BDL BDL BDL BDL BDL 21.01.2017 8 51.7 20.0 13.4 16.0 <0.1 7.2 13.1 BDL BDL BDL BDL BDL 22.01.2017 8 49.8 19.0 12.8 15.4 <0.1 6.8 12.8 BDL BDL BDL BDL BDL 5.02.2017 9 51.2 19.6 13.1 15.7 <0.1 6.6 12.4 BDL BDL BDL BDL BDL

06.02.2017 9 53.1 20.3 13.2 15.8 <0.1 6.8 12.7 BDL BDL BDL BDL BDL 12.02.2017 10 50.6 19.3 12.6 15.0 <0.1 7.2 13.1 BDL BDL BDL BDL BDL 13.02.2017 10 52.6 20.0 13.1 15.5 <0.1 7.1 13.0 BDL BDL BDL BDL BDL 19.02.2017 11 49.8 18.9 12.4 14.8 <0.1 6.5 12.4 BDL BDL BDL BDL BDL 20.02.2017 11 51.7 20.5 13.4 15.8 <0.1 6.8 12.9 BDL BDL BDL BDL BDL 26.02.2017 12 53.1 21.1 13.8 16.2 <0.1 7.3 13.1 BDL BDL BDL BDL BDL 27.02.2017 12 50.5 20.2 13.2 15.6 <0.1 7.1 13.2 BDL BDL BDL BDL BDL

Minimum 44.8 17.7 12.4 14.8 0.0 6.1 11.5 0.0 0.0 0.0 0.0 0.0 Maximum 55.9 21.9 15.2 18.2 0.0 7.9 13.8 0.0 0.0 0.0 0.0 0.0 Average 50.9 19.9 13.5 16.2 0.0 6.9 12.7 0.0 0.0 0.0 0.0 0.0

98 Percentile 55.3 21.6 15.0 18.0 0.0 7.8 13.7 0.0 0.0 0.0 0.0 0.0

Page 202: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Location : Godryanivalasa

Date Week PM 10 PM 2.5 SO2 NOX CO NH3 O3 Ni Pb As Benzene Benzo(a)Pyrene 05.12.2016 1 45.2 18.1 10.6 13.3 <0.1 6.5 11.2 BDL BDL BDL BDL BDL 06.12.2016 1 43.1 17.3 10.1 12.8 <0.1 6.3 11.5 BDL BDL BDL BDL BDL 12.12.2016 2 44.2 17.7 10.4 13.1 <0.1 6.5 10.9 BDL BDL BDL BDL BDL 13.12.2016 2 46.2 18.5 10.9 13.6 <0.1 6.6 10.6 BDL BDL BDL BDL BDL 19.12.2016 3 45.1 18.2 10.8 13.7 <0.1 6.9 11.3 BDL BDL BDL BDL BDL 20.12.2016 3 47.3 19.1 11.4 14.3 <0.1 6.5 10.8 BDL BDL BDL BDL BDL 26.12.2016 4 46.1 18.6 11.1 14.0 <0.1 6.3 10.6 BDL BDL BDL BDL BDL 27.12.2016 4 48.6 19.6 11.7 14.6 <0.1 6.8 11.5 BDL BDL BDL BDL BDL 02.01.2017 5 47.8 19.1 11.3 14.4 <0.1 7.1 11.9 BDL BDL BDL BDL BDL 03.01.2017 5 49.2 19.7 11.6 14.7 <0.1 7.5 10.6 BDL BDL BDL BDL BDL 07.01.2017 6 50.2 20.1 11.9 15.0 <0.1 7.9 12.1 BDL BDL BDL BDL BDL 08.01.2017 6 48.1 19.2 11.4 14.5 <0.1 7.6 10.6 BDL BDL BDL BDL BDL 16.01.2017 7 47.2 18.6 11.1 13.7 <0.1 7.8 12.3 BDL BDL BDL BDL BDL 17.01.2017 7 45.6 18.0 10.7 13.3 <0.1 6.9 10.6 BDL BDL BDL BDL BDL 23.01.2017 8 46.6 18.4 10.9 13.5 <0.1 6.8 12.7 BDL BDL BDL BDL BDL 24.01.2017 8 44.2 17.5 10.4 13.0 <0.1 6.5 10.5 BDL BDL BDL BDL BDL 07.02.2017 9 45.3 18.1 10.8 13.3 <0.1 6.9 12.6 BDL BDL BDL BDL BDL 08.02.2017 9 47.8 19.1 11.4 13.9 <0.1 7.4 10.9 BDL BDL BDL BDL BDL 14.02.2017 10 48.3 19.3 11.6 14.1 <0.1 7.3 10.8 BDL BDL BDL BDL BDL 15.02.2017 10 50.1 20.0 12.0 14.5 <0.1 7.2 11.2 BDL BDL BDL BDL BDL 21.02.2017 11 49.2 19.9 12.0 14.8 <0.1 6.9 11.5 BDL BDL BDL BDL BDL 22.02.2017 11 47.1 19.1 11.1 13.9 <0.1 6.8 10.6 BDL BDL BDL BDL BDL 28.02.2017 12 48.3 19.6 11.4 14.2 <0.1 6.9 11.5 BDL BDL BDL BDL BDL

Minimum 43.1 17.5 10.2 13.0 0.0 6.3 10.5 0.0 0.0 0.0 0.0 0.0 Maximum 50.2 20.1 12.0 15.0 0.0 7.9 12.7 0.0 0.0 0.0 0.0 0.0 Average 47.0 18.8 11.2 13.9 0.0 7.0 11.3 0.0 0.0 0.0 0.0 0.0

98 Percentile 50.2 20.0 12.0 14.9 0.0 7.9 12.7 0.0 0.0 0.0 0.0 0.0

Page 203: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Location : Somapuram

Date Week PM 10 PM 2.5 SO2 NOX CO NH3 O3 Ni Pb As Benzene Benzo(a)Pyrene 05.12.2016 1 42.6 16.9 10.5 13.4 <0.1 6.3 11.910.6 BDL BDL BDL BDL BDL 06.12.2016 1 40.9 16.2 10.1 13.0 <0.1 6.5 11.5 BDL BDL BDL BDL BDL 12.12.2016 2 41.5 16.5 10.3 13.2 <0.1 6.9 10.8 BDL BDL BDL BDL BDL 13.12.2016 2 43.3 17.2 10.7 13.6 <0.1 6.3 10.6 BDL BDL BDL BDL BDL 19.12.2016 3 42.1 16.7 10.4 13.3 <0.1 6.6 11.9 BDL BDL BDL BDL BDL 20.12.2016 3 44.6 17.7 11.0 13.9 <0.1 6.9 11.9 BDL BDL BDL BDL BDL 26.12.2016 4 45.9 17.9 11.3 14.0 <0.1 6.8 11.8 BDL BDL BDL BDL BDL 27.12.2016 4 47.1 18.3 11.6 14.3 <0.1 6.6 10.6 BDL BDL BDL BDL BDL 02.01.2017 5 46.6 18.1 11.5 14.2 <0.1 6.9 10.6 BDL BDL BDL BDL BDL 03.01.2017 5 48.3 18.8 11.9 14.6 <0.1 6.5 10.7 BDL BDL BDL BDL BDL 07.01.2017 6 47.1 18.5 11.8 14.5 <0.1 6.3 11.5 BDL BDL BDL BDL BDL 08.01.2017 6 49.6 19.5 12.4 15.1 <0.1 6.8 11.8 BDL BDL BDL BDL BDL 16.01.2017 7 48.8 19.2 11.6 14.3 <0.1 7.1 11.4 BDL BDL BDL BDL BDL 17.01.2017 7 46.5 18.3 11.1 13.8 <0.1 7.2 10.6 BDL BDL BDL BDL BDL 23.01.2017 8 47.1 17.9 10.9 13.1 <0.1 6.5 10.9 BDL BDL BDL BDL BDL 24.01.2017 8 45.7 17.4 10.5 12.7 <0.1 6.3 10.5 BDL BDL BDL BDL BDL 07.02.2017 9 46.6 17.8 10.7 12.9 <0.1 7.5 11.8 BDL BDL BDL BDL BDL 08.02.2017 9 48.9 18.6 11.3 13.5 <0.1 6.3 12.1 BDL BDL BDL BDL BDL 14.02.2017 10 47.6 18.1 11.1 13.3 <0.1 6.2 10.6 BDL BDL BDL BDL BDL 15.02.2017 10 45.8 18.4 11.2 14.4 <0.1 6.2 10.9 BDL BDL BDL BDL BDL 21.02.2017 11 46.1 18.5 11.3 14.5 <0.1 6.4 11.4 BDL BDL BDL BDL BDL 22.02.2017 11 48.9 19.6 12.0 15.2 <0.1 7.3 11.5 BDL BDL BDL BDL BDL 28.02.2017 12 47.1 18.9 11.6 14.8 <0.1 7.4 11.7 BDL BDL BDL BDL BDL

Minimum 40.9 16.2 10.1 12.7 0.0 6.2 10.5 0.0 0.0 0.0 0.0 0.0 Maximum 49.6 19.6 12.4 15.2 0.0 7.5 12.1 0.0 0.0 0.0 0.0 0.0 Average 46.0 18.0 11.2 13.9 0.0 6.7 11.2 0.0 0.0 0.0 0.0 0.0

98 Percentile 49.3 19.6 12.2 15.1 0.0 7.5 12.0 0.0 0.0 0.0 0.0 0.0

Page 204: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Location : Dongaravalasa

Date Week PM 10 PM 2.5 SO2 NOX CO NH3 O3 Ni Pb As Benzene Benzo(a)Pyrene 05.12.2016 1 40.1 15.3 10.0 12.9 <0.1 6.3 10.6 BDL BDL BDL BDL BDL 06.12.2016 1 39.6 15.1 9.9 12.8 <0.1 6.1 9.5 BDL BDL BDL BDL BDL 12.12.2016 2 37.2 14.2 9.3 12.2 <0.1 6.2 10.8 BDL BDL BDL BDL BDL 13.12.2016 2 38.6 14.7 9.6 12.5 <0.1 5.9 11.2 BDL BDL BDL BDL BDL 19.12.2016 3 40.1 15.0 10.1 12.7 <0.1 5.6 10.5 BDL BDL BDL BDL BDL 20.12.2016 3 42.3 15.9 10.6 13.2 <0.1 5.8 9.6 BDL BDL BDL BDL BDL 26.12.2016 4 41.5 15.6 10.4 13.0 <0.1 5.4 9.8 BDL BDL BDL BDL BDL 27.12.2016 4 39.7 14.9 10.0 12.6 <0.1 5.3 9.6 BDL BDL BDL BDL BDL 02.01.2017 5 38.2 14.8 9.6 12.6 <0.1 5.5 9.5 BDL BDL BDL BDL BDL 03.01.2017 5 39.1 15.2 9.8 12.8 <0.1 5.8 10.2 BDL BDL BDL BDL BDL 07.01.2017 6 37.7 14.6 9.5 12.5 <0.1 5.6 10.9 BDL BDL BDL BDL BDL 08.01.2017 6 39.9 15.5 10.0 13.0 <0.1 5.8 10.1 BDL BDL BDL BDL BDL 16.01.2017 7 40.5 15.4 10.0 12.5 <0.1 5.9 10.6 BDL BDL BDL BDL BDL 17.01.2017 7 42.3 16.1 10.5 13.0 <0.1 6.1 9.5 BDL BDL BDL BDL BDL 23.01.2017 8 41.6 15.8 10.3 12.8 <0.1 6.6 9.8 BDL BDL BDL BDL BDL 24.01.2017 8 39.9 15.2 9.9 12.4 <0.1 5.4 9.4 BDL BDL BDL BDL BDL 07.02.2017 9 40.5 15.0 10.0 12.1 <0.1 5.9 10.6 BDL BDL BDL BDL BDL 08.02.2017 9 42.2 15.7 10.5 12.6 <0.1 6.5 10.5 BDL BDL BDL BDL BDL 14.02.2017 10 41.5 15.4 10.3 12.4 <0.1 6.3 9.3 BDL BDL BDL BDL BDL 15.02.2017 10 43.8 16.2 10.9 13.0 <0.1 5.4 9.5 BDL BDL BDL BDL BDL 21.02.2017 11 42.9 16.2 10.3 12.9 <0.1 6.8 9.8 BDL BDL BDL BDL BDL 22.02.2017 11 40.1 15.1 9.7 12.3 <0.1 6.5 10.6 BDL BDL BDL BDL BDL 28.02.2017 12 41.7 15.7 10.0 12.6 <0.1 6.6 10.9 BDL BDL BDL BDL BDL

Minimum 37.2 14.2 9.3 12.1 0.0 5.3 9.3 0.0 0.0 0.0 0.0 0.0 Maximum 43.8 16.2 10.9 13.2 0.0 6.8 11.2 0.0 0.0 0.0 0.0 0.0 Average 40.5 15.3 10.1 12.7 0.0 6.0 10.1 0.0 0.0 0.0 0.0 0.0

98 Percentile 43.4 16.2 10.7 13.1 0.0 6.7 11.1 0.0 0.0 0.0 0.0 0.0

Page 205: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Location : Golladi

Date Week PM 10 PM 2.5 SO2 NOX CO NH3 O3 Ni Pb As Benzene Benzo(a)Pyrene

07.12.2016 1 55.1 22.2 11.4 14.1 <0.1 11.6 16.3 BDL BDL BDL BDL BDL 08.12.2016 1 56.3 22.6 11.7 14.4 <0.1 11.0 15.6 BDL BDL BDL BDL BDL 14.12.2016 2 56.0 22.5 11.6 14.3 <0.1 10.5 15.2 BDL BDL BDL BDL BDL 15.12.2016 2 57.9 23.3 12.0 14.7 <0.1 11.2 16.6 BDL BDL BDL BDL BDL 21.12.2016 3 56.1 22.6 11.6 14.3 <0.1 12.1 16.1 BDL BDL BDL BDL BDL 22.12.2016 3 58.6 23.6 12.2 14.9 <0.1 11.5 15.3 BDL BDL BDL BDL BDL 28.12.2016 4 58.1 23.6 12.2 15.1 <0.1 11.9 16.5 BDL BDL BDL BDL BDL 29.12.2016 4 60.2 24.5 12.8 15.7 <0.1 10.6 16.9 BDL BDL BDL BDL BDL 04.01.2017 5 59.3 24.1 12.6 15.5 <0.1 10.8 15.6 BDL BDL BDL BDL BDL 05.01.2017 5 61.2 24.9 13.0 15.9 <0.1 11.5 15.8 BDL BDL BDL BDL BDL 09.01.2017 6 60.5 24.6 12.8 15.7 <0.1 12.1 16.9 BDL BDL BDL BDL BDL 10.01.2017 6 62.3 25.4 13.2 16.1 <0.1 11.6 16.1 BDL BDL BDL BDL BDL 18.01.2017 7 61.5 24.5 12.8 15.2 <0.1 11.9 16.6 BDL BDL BDL BDL BDL 19.01.2017 7 59.2 23.6 12.3 14.7 <0.1 11.8 16.8 BDL BDL BDL BDL BDL 25.01.2017 8 60.8 24.3 12.6 15.0 <0.1 10.6 15.6 BDL BDL BDL BDL BDL 26.01.2017 8 61.9 25.1 12.7 15.1 <0.1 10.9 15.1 BDL BDL BDL BDL BDL 09.02.2017 9 61.5 24.5 12.4 14.8 <0.1 11.5 15.8 BDL BDL BDL BDL BDL 10.02.2017 9 60.1 25.1 12.7 15.1 <0.1 12.3 17.6 BDL BDL BDL BDL BDL 16.02.2017 10 62.1 24.5 12.4 14.8 <0.1 11.5 15.9 BDL BDL BDL BDL BDL 17.02.2017 10 60.4 23.9 11.7 13.9 <0.1 11.6 16.8 BDL BDL BDL BDL BDL 23.02.2017 11 59.6 23.5 11.6 13.8 <0.1 10.8 16.2 BDL BDL BDL BDL BDL 24.02.2017 11 61.5 25.1 12.1 14.3 <0.1 11.5 16.3 BDL BDL BDL BDL BDL

Minimum 55.1 22.2 11.4 13.8 0.0 10.5 15.1 0.0 0.0 0.0 0.0 0.0 Maximum 62.3 25.4 13.2 16.1 0.0 12.3 17.6 0.0 0.0 0.0 0.0 0.0 Average 59.6 24.0 12.3 14.9 0.0 11.4 16.2 0.0 0.0 0.0 0.0 0.0

98 Percentile 62.2 25.3 13.1 16.0 0.0 12.2 17.3 0.0 0.0 0.0 0.0 0.0

Page 206: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Location : Bobbili

Date Week PM 10 PM 2.5 SO2 NOX CO NH3 O3 Ni Pb As Benzene Benzo(a)Pyrene 07.12.2016 1 63.1 25.4 12.3 15.2 0.14 10.2 18.4 BDL BDL BDL BDL BDL 08.12.2016 1 61.2 24.6 12.0 14.9 0.13 9.1 17.3 BDL BDL BDL BDL BDL 14.12.2016 2 60.5 24.3 11.8 14.7 0.15 11.3 19.5 BDL BDL BDL BDL BDL 15.12.2016 2 62.3 25.0 12.2 15.1 0.17 12.1 20.3 BDL BDL BDL BDL BDL 21.12.2016 3 61.6 24.9 12.2 15.1 0.13 11.9 20.1 BDL BDL BDL BDL BDL 22.12.2016 3 64.1 26.0 12.7 15.6 0.14 10.6 18.8 BDL BDL BDL BDL BDL 28.12.2016 4 63.9 25.9 12.7 16.3 0.19 11.1 19.3 BDL BDL BDL BDL BDL 29.12.2016 4 65.8 26.6 13.1 16.7 0.20 12.2 20.4 BDL BDL BDL BDL BDL 04.01.2017 5 64.6 26.4 13.2 16.8 0.19 11.5 19.7 BDL BDL BDL BDL BDL 05.01.2017 5 63.1 25.8 12.9 16.5 0.17 13.1 21.3 BDL BDL BDL BDL BDL 09.01.2017 6 65.7 26.9 13.4 17.0 0.15 12.9 21.4 BDL BDL BDL BDL BDL 10.01.2017 6 67.8 27.7 13.8 17.4 0.14 12.3 20.8 BDL BDL BDL BDL BDL 18.01.2017 7 66.9 26.4 13.2 16.1 0.18 10.6 19.1 BDL BDL BDL BDL BDL 19.01.2017 7 68.7 27.1 13.6 16.5 0.15 11.2 19.7 BDL BDL BDL BDL BDL 25.01.2017 8 67.1 26.5 13.3 16.2 0.17 11.8 20.3 BDL BDL BDL BDL BDL 26.01.2017 8 65.3 25.8 12.9 15.8 0.18 12.5 21.0 BDL BDL BDL BDL BDL 09.02.2017 9 66.3 25.9 12.5 15.4 0.19 12.1 20.6 BDL BDL BDL BDL BDL 10.02.2017 9 64.1 25.1 12.1 15.0 0.20 11.2 19.7 BDL BDL BDL BDL BDL 16.02.2017 10 63.5 24.8 11.9 15.0 0.22 10.9 18.8 BDL BDL BDL BDL BDL 17.02.2017 10 65.9 25.8 12.4 15.5 0.15 11.5 19.4 BDL BDL BDL BDL BDL 23.02.2017 11 67.8 27.7 13.3 16.4 0.17 12.3 20.2 BDL BDL BDL BDL BDL 24.02.2017 11 69.6 28.4 13.7 16.8 0.19 12.1 20.0 BDL BDL BDL BDL BDL

Minimum 60.5 24.3 11.8 14.7 0.22 9.1 17.3 0.0 0.0 0.0 0.0 0.0 Maximum 69.6 28.4 13.8 17.4 0.22 13.1 21.4 0.0 0.0 0.0 0.0 0.0 Average 65.0 26.1 12.8 15.9 0.17 11.6 19.8 0.0 0.0 0.0 0.0 0.0

98 Percentile 69.2 28.1 13.8 17.3 0.21 13.0 21.4 0.0 0.0 0.0 0.0 0.0

Page 207: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Annexure -9

Report on Socio-economic Environment Impact Assessment of

M/s Berry Alloy Limited

Plot No.368, APIIC Growth Centere (Industrial Estate)

Bobbili Village & Mandal Vizianagaram District, Andhrapradesh

Page 208: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

1.0 Introduction

The present Socio - economic Impact Assessment (SEIA) concerns with a Expansion of Ferro Alloys Plant to be setup in a dedicated plant site covering Bobbili Village & Mandal of Vizianagaram District in the of Andhrapradesh.

Any development activity will influence the socio-economic conditions of the population in the region and thus the quality of life (QOL). Socio-economic surrey is necessary in EIA report preparation to predict the changes on social and economic status. Hence baseline data for demographic characteristics, occupational status, education. Health and amenities existing in the project area have been studied as per DOE Guidelines. The possible socio-economic impacts of the proposed project, as emerged from the field survey results, were thoroughly brainstormed by the study team before being validated trough discussions with key stakeholders and opinion leaders who are familiar with the study area. The key potential impact thus zeroed - in were captured and presented in the report.

Any developmental activity will have impact on the socio-economic conditions of the population in the region and they are by on the quality of life. Socio-Economic Impact Assessment helps to get an idea of changes on social, economic and cultural status. Baseline data for Occupational status and Health amenities existing in the study area has been collected by personal interaction with the villagers in the study area and also from secondary sources such as census/statistics, data etc.

Baseline data:

Detailed Socio-economic survey within 10 Km radius of the proposed Ferro Alloys Expansion project has been carried out to assess the pre-project status.

Following parameters have been selected for Socio - Economic profiles:

1. Population composition 2. Housing 3. Agriculture 4. Occupational structure 5. Education 6. Employment 7. Amenities 8. Economy

Page 209: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

The information on the above parameters was collected from the villages in the study area by means of personal interaction with the villagers and Sarpanch of the village. Secondary information on the statistics was also collected from the district handbooks.

2.0 Project Impact Zone

2.1 Project Site The proposed project site forms part of industrial Area by APIIC Growth Centre (Industrial Estate). Plot No: 368, Bobbili Village & Mandal, Vizianagaram District, Andhrapradesh state.

2.2 Geographical Coverage

The geographical coverage for SEIA of the project extends over a 10 km radial distance from the project site and comprises 40 revenue villages spread across the Mandal as detailed in below table.

Page 210: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Details of Villages Comprising Study Area

Socio Economic Demographic Details (Population, literataracy, Workers) No's

S.No Village Total House holds

Total Population

Total literates

Total Illitera

tes

Total workers Total Non

workers

Total Worke

rs

SC Populat

ion

ST Population Male Female Cultiv

ators

Agriculture

Laboures

HHI Other Worke

rs

1 Alluduvalasa 74 118 177 64 231 32 195 - 2 63 232 - 292 2 Dongarevoleso 78 154 176 136 194 87 2 - 6 222 108 1 325 3 Gummidivada 113 198 235 146 287 40 165 - 1 167 266 1 428 4 Gollapalli 111 221 209 241 189 76 150 - 31 166 264 48 168 5 Jogindoravalasa 477 968 961 1,058 871 215 562 13 196 847 1,082 275 31 6 Pedabondapalle 1,089 2,045 2,148 2,175 2,018 327 457 27 238 2,216 1,977 702 349 7 Venkataraidupeta 148 249 298 307 240 88 44 - 55 187 360 19 24 8 Rajupeta 149 276 288 343 221 142 107 1 78 235 329 64 5

9 Janardhana Ranga Rayapuram 227 464 463 475 452 123 286 - 150 365 562 139 2

10 Lingamvalasa 81 158 165 174 149 16 120 20 42 111 212 25 2

11 Komatipalle (Near) Bobbili 951 1,843 1,913 1,916 1,840 475 940 24 513 1,666 2,090 573 2

12 Piridi 1,378 2,719 2,650 2,618 2,751 683 1,414 47 623 2,518 2,851 669 10 13 Krishnapuram 311 593 581 638 536 249 225 2 151 536 638 250 -

14 Jagannadhapuram (Near) Bobbili 340 660 692 677 675 65 373 1 239 670 682 366 -

15 Paradhi 775 1,622 1,663 1,375 1,910 208 1,295 14 282 1,415 1,870 291 6 16 Bhojarajapuram 64 135 132 151 116 42 79 4 36 104 163 - 48

17 Gorla Seetharampuram 244 482 475 506 451 168 271 4 61 448 509 195 111

18 Gunnathotavalasa 381 701 777 807 671 185 204 4 326 729 749 187 141

Page 211: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

19 Rangarayapuram 555 1,068 1,094 1,209 953 369 608 12 311 702 1,460 550 51

20 Janardhanarangarayapuram @ Kunukuvanivalasa

236 458 491 443 506 294 208 - 76 357 592 - -

22 Alajangi 1,440 2,603 2,680 2,471 2,812 544 1,461 19 546 2,214 3,069 1,458 - 23 Bobbili (M) 14,584 28,285 28,534 39,193 17,626 1,023 2,169 495 14,498 36,137 20,682 5,691 1,075

24 Chinna parannavalasa 244 554 511 602 463 161 232 5 72 480 585 85 29

25 Bhavanipuram 40 70 70 79 61 43 28 5 4 60 80 57 - 26 Gollapeta 141 281 307 285 303 9 290 - 57 232 356 100 - 27 Rompalle 663 1,251 1,374 1,258 1,367 210 772 11 168 1,151 1,474 392 332 28 Ramabhadrapuram 2,820 5,533 5,429 5,704 5,258 710 2,322 152 1,527 5,657 5,305 870 153

29 Samarthula Chintalavalasa 137 282 260 275 267 28 4 10 24 258 284 3 -

30 Sompuram 156 355 378 366 367 56 213 1 32 358 375 25 12 31 Ravival 63 122 135 59 198 63 30 - 2 90 167 - 257 32 Badangi 12,225 24,881 24,503 23,853 25,531 9,503 10,035 510 3,488 22,813 26,571 6,577 1,760 33 Gopalarajupeta 148 280 304 224 360 130 138 1 55 246 338 - 70 34 Vengopanduravalasa 219 425 432 383 474 248 144 20 52 393 464 - 56 35 Mallampeta 265 493 519 478 534 199 211 18 45 439 573 226 - 36 Badangi 900 2,524 1,864 2,825 1,563 263 896 8 493 2,633 1,755 1,219 118 37 Kamannavalasa 108 243 243 236 250 81 207 4 8 180 306 6 38 38 Lakshmipuram 256 492 465 416 541 116 417 6 16 399 558 68 300 39 Pindrangivalasa 193 401 433 418 416 253 133 - 54 388 446 16 35 40 Kummandampeta 501 968 999 859 1,108 217 251 14 139 904 1,063 127 22

Total 42,885 85,175 85,028 95,443 74,760 17,741 27,658 1,452 24,697 88,756 81,447 21,275 6,252

* Source Censes;2011

Page 212: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

3.0 Approach Methodology

3.1 Objectives

The primary objectives of the socio-economic impact assesment are:

- Understanding the baseline socio-economic environment obtaining in the impact zone. - Identifying the key stakeholders who are likely to be impacted by the establishment of

the proposed project. - Assessing the positive and negative impacts of the project on the socio-economic

environment in the area. - Suggesting mitigation measures to minimize the native impacts.

3.2 Scope

The scope of socio-economic assessment extends to:

- Assessing the baseline socio-economic environment prevailing in the impact area focusing the core and buffer zones. - Identifying key economic sectors and major sources of livelihood in the study area. - Understanding social structures and lifestyles of people in the area who are likely to be affected the most. - Assessing physical and social infrastructure facilities accessible to the project affected people. - Identifying heritage precinct and archeological monuments, if any in the area which may be affected by the proposed project - Predicting the likely socio-economic impacts as consequence of establishing the project. - Suggesting adverse impact mitigation measures in line with the felt needs, aspirations and expectations of the project affected people. - Preparing an appropriate Socio-economic Environment Management Plan.

3.3 Coverage

The geographical coverage for the socio-economic impact assessment extends to 40 villages located within the 10 km radius from the proposed site.

3.4 Approach

The basic approach to carrying out the SEIA focued on:

Zeroing-in on the project impact area covering all the villages and other habitations falling within the mandatory 10 km radius from the project site.

Page 213: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Collecting the basic information with repect to the village in the project impact area in terms of census village code, name of the Mandal in which a particular village falls, number of households, population level(as per Census 2011) and growth of village population during the last decade, distance from the proposed project site etc.

Gathering macro level socio-economic information, at Mandal level, with the help of econdery data.

Identifying critical knowlwedge/information gaps which impede an objective and reliable aessment of the ocio-economic impacts of the project.

Zeroing-in on the data/information to be colleted fro a fair impact assessment and deciding upon the sources and mean to collecting the same.

Identifying the key stakeholders and potential respondents for collecting the required information.

Drawing a sampling frame and size specifying ample villages,number of households to be contacted for primary data/information collection and agencies to be contacted for eliciting information on various aspects relevent to the study.

Finalisation of survey intruments, constitutions of a survey team and orientation of field investigators.

Carrying out field surveys in the sample villges and simultaneously carrying out data accuracy and reliability checks.

Processing, tabulation and analysi of data with the help of appropriate statistical tools. Interpretation of data to arrive at valid conclusions. Preparing and presentaing SEIA report.

3.5 Methodology

The socio-economic impact assessment of the proposed project relied on a mix of both secondary and primary data collected from various sources. The EIA was carried out in three different stages-Desks Research, Data Analysis and Report Preparation. The methodology adopted in each stage is explained in what follows.

4.0 Baseline Socio-economic Environment

Indutrial developemnet projects of any size and nature will have impacts on people’s way of life, their culture, community, health and wellbeing, their assessts and livelihoods. The impacts could be both negative and positive. Socio-economic impact assesment seeks to identify such impacts and focus on the ways and means to minimize the incidence of negative impacts. It is therefore imperative to understand the baseline socio-economic senerio in the study area to systemetically gauze the magnitude of possible impacts.The study team thus has captured a baic socio-economic profile of the area as presented in what follows.

Page 214: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

4.1 Demographic Profile

The sociological aspects of this study include human ettlements, demography, and social strata such as Scheduled Caste and Scheduled Tribes and literacy levels besides infrastrucute facilities available in the study area. The economic aspects include occupational structure and income levels of workers.

The key demographic of the tudy area comprising 40 villages are presented in below Table.

Sailent Features of Demographics in Study Area

Sl No. Demographic Parameter

Data as per Census 2011 Sailent Features

1

Total Population(No.)

- Males - Females

1,70,203

85,175 85,028

Sex Ratio in the area 51% male and 49% Female.

99 % of the population in the study area is rural population.

2 SCs (No.) 21,275

3 STs (No.) 6,252

4 Average Literacy (%) 49.6%

Average literacy at 21.6% is the minimum in Alluduvalasa village.

Average literace at 68.9% is the maximum in Bobbili.

5 Households (No.) 42,885 Average 4.4 persons per

household -2.3 males and 2.1 females.

4.2 Population

Total population of villages within 10 Km radius of the study area as collected from 2011 census hand book was the percentage of male and female to the total population was 50 % and 50 %. Similarly the percentage of schedule caste and scheduled tribe to the total population were 21% and 1.5 % respectively.

Page 215: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

4.3 Occupational Districbution

The occupational districbution in the study area points to be predominance of Cultivators followed by Agricalture Labourers than Household Industry Workers, (2%) are cultivators followed by Agricaltural Labourers (39%), Other than Household Industry Workers (34%) and Other Workers (34%).

4.4 Livelihoods

4.4.1 Agricalture

Agricalture and alied allied activites - cattle reaing and backyard poultry - are traditionally the predoinant source of livelihood in the area. Jowar and Raagi are the principal food crops raised while Sugarcane & Onion is the major cash crops grown.

Farmaing in the area is largely monsoon dependent as sistainable ittigation facilites are n’t available. Normal annual rainfal in the hovers around 800 mm, while the actual rainfal for the three year period ending 2015-2016 has been substanitially low varying between a minimum of 620 mm in 2014-15and maximun of 700 mm in 2013-2014. The predominant source of irrigarion

Page 216: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

in the area is bore wells which generally yield limited quantities of water. As such, agricalture is largely a subitence activity and a fairly high degree of under employment prevalent.

Agricalture allied activites such as rearing milch cattle and backyard poultry farming are other complementary sources of incomes to the households. Engagement of women in these activites is more common. Some of the women are also engaged in small business as vegitable and flowers vending.

4.5 Lifetyles

No reliable information/data are available, either at the district or mandal levels, on the lifestyles of people. As such, it will ve very difficult to asses the lifestyles in the area with reasonable accuracy. However, based on an impressionistic assesment during the field surveys, it is felt that a majority of the population in the area owns a residence to live in, They have access to basic amenities such as drinking water, electric power, education and healthcare. A majority of the people in the area also have acess to a mobile phone and a cable TV connection. They own a two wheeler as a means of personal transport. Generally participation and interaction amoung the pople in the area is concern during festivals, functions and cultural events. Participation in marriages and mourning is reported to be more common among homogenous social groups.

The recreation facilities in the area are reflected in watching TV,playing, cinima going and partying.

4.6 Physical Infrastructure

All the villages are electrified and connected with all-weather village roads. Pasenger tranportation is essentially provided by the State Road Tranport Corporation. Regular bus facilites exist up to the road heads connecting the villages to the main road/highway. From there shared auto rikshawa connect the villages. Bicycles and motor cycles are also commonly sighted. During rainy season it is generally difficult to reach the interior villages. Almost all the villages have acces to safe drinking water. All the villages are fluoride free.

4.7 Social Infrastructure

A reasonable network of primary and upper primary schools, junior colleges and degree colleges managed by the Government exixts in the area. A few prvately managed educational instutions also exit for schooling.

Healthcare is available a network of Government run PHCs. Private Clinics also exist in the area. Relatively better medicare facilites are available at Bagalkot town.

Page 217: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

4.8 Archaeological Monuments

No archaeological monuments, heritage percincts or religious places are noticed in the study area that may be adversely affected by the establihment of the proposed project.

4.9 Sources of Livelihood:

Agricalture and allied activites are the predominant of livelihood for the house hold population, followed by other souces such as self-employment and wage employment in the household industry.

48% of the houehold population is engaged ascultivators follwed by agricatureal labourers 42% . Employment in Household industry is nominal.

5.0 Predicted Impacts little

The socio-economic impacts af the proposed project could be assessed in terms of demand supply aspects for good and services in the area, pressure on natural resources and infrastructure, grouth of industry, sustsinability of livelihoods and employment.

Some indirect impacts can also be understood interms of public health and safety, preserving local culture and aesthetics of the archaeological monuments and heritage precincts.

Based on a cloe understanding and assesment, the socio-economic impacts of the proposed project predicted as follows:

Positive Impacts Negitive Impacts

i) There is no loss of land and consequential livelihoods, as no land acquistion is contemplated. The proposed site forms part of Private patta land.

ii) Creation of employment opportinities for about 45 to 50 local skilled and semi-killed workers during project construction and operation phses.

iii) Multiplier effect due to induced growth during contruction and operational phaes in downstream and upstream project activites for about 100 persons majority of them local women and youth.

iv) Development/upgradation of vocational and soft skills of about 100 local youth over next five years thus enhancing their empliyability.

i) Air & Noice pollution through release of fugitive dust during operational process leading to possible incidence of respiratory diseases, irrigation of eyes and noe etc., for people living in the core impact zone.

ii) Possible adverse impact on crop productivety as a result of fugitive dust setting on plants in the vicinity.

iii) Increased influx of people, and tranport vehicles putting pressure on the already underdeveloped road network in the vivinity.

Page 218: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

v) Emergence of local enterpreneur in complementary activites such as small business transporation,equipment repairs and maintence etc.

vi) Strengthening of pyical infrastructure such as roads and power network.

There are no heritage precincts and archaeological monuments in the project site vicinity that would be adversely impacted by the proposed expansion project.

6.0 Mitigation of Adverse Impacts

6.1 Mitigation Measures

The project proponent would be required to initate the following measures to minimize the possible negative impacts, as a conswquence of setting up his proposed project at plot no.368, APIIC Growth center, Bobbili, Vijayanagaram district, Andhra Pradesh, on the surrounding socio-economic environment:

- Install appropritate dust control equipment to check air pollution - Organise monthly health camps in the area to check the incidence of any respiratory and

other related disorders. - Organisinig voactional and soft skills development programmes for the youth to enhance

their employability. - Conduct Enterpreneurship Development Camps to nature enterpreneurial talents amoung

the local youth.

6.2 Budject for CSR activites

A Suggestive plan for developing the Socio - Economic environment in the project impact area together with indicate budgets for a five year period is presented below:

Activity Year wise Budgects (Rs.Lacks)

1st

Year 2nd

Year 3rd

Year 4th

Year 5th

Year Total

1. Health Camps 1.0 1.0 1.0 1.5 1.5 6.0

2. Voactional Skill Development programmes 1.0 1.0 1.5 1.5 2.0 7.0

3. Entrepreneurship awareness camps 1.0 2.0 2.0 2.0 2.0 9.0

4. Setting up a Library and Carrer Counseling Centere 1.0 1.0 1.0 1.0 1.0 5.0

5. Maintence of roads 2.0 2.0 3.0 3.0 3.0 13.0

Page 219: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

6. Driking Water facility 2.0 2.0 2.0 2.0 2.0 10.0

Total 6.0 7.0 8.5 9.0 9.5 50.0

The project proponents may leverage the relative Government schemes of assitance for entrepreneurship development and voactionsl skill development for effectively augmenting requisite funds for implementing its socio-economic environment management plan.

Further, the project proponents would prudently dovetail the socio-economic environment management plan activites and budgets in with the relevent provisions of the new Companies Act.

- - - - x x x - - - -

Page 220: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Annexure 10

Fauna and Flora Found during the study in 10 km Study Area of the Proposed Expansion of M/s.

Berry Alloys Limited Unit at Plot No. 368, APIIC Growth Center, Bobbili Village & Mandal,

Vizianagaram District, Andhra Pradesh.

A. Flora in the Study Area

Table 1: List of Trees, Shrubs and Perennial Climbers Found in the Forests of the Study Area

Scientific name Common or Local name Family Abrus precatorius Guruvinda Fabaceae Acacia auriculiformis Australian Wattle Mimosaceae Acacia farnesiana Muriki thumma Mimosaceae Acacia leucophloea Tella tumma Mimosaceae Acacia nilotica Nalla tumma Mimosaceae Acaia holosericea Holosericea Mimosaceae Achrus sapota Sapota Sapotaceae Aegle marmelos Maredu Rutaceae Ailanthus excelsa Peddamaanu Simaroubaceae Alangium salvifolium Ooduga Alangiaceae Albizia lebbek Dirisanam Mimosaceae Alhagi camelorum Camel thorn Fabaceae Allamanda cathartica Allamanda Apocynaceae Ancardium occidentale Cashew nut Anacardiaceae Annona squamosa Custard apple Annonaceae Artocarpus heterophyllus Jack fruit Moraceae Azadirachta indica Vepa Meliaceae Bauhinia racemosa Aare chettu Caesalpiniaceae Bauhinia variegata Mandari Caesalpiniaceae Borassus flabellifer Taati / Taadi Arecaace Breynia retusa Chinna purugudu Euphorbiaceae Breynia vitis-ideae Nalla purugudu Euphorbiaceae Butea monosperma Modugu Fabaceae Callistemon citrinus Indian bottle brush tree Myrtaceae Calotropis gigantea Tella Jilledu Asclepiadaceae Calotropis procera Jilledu Asclepiadaceae Calycoperis floribunda Bonta teega Combretaceae Canthium dicoccum Nalla balusu Rubiaceae Canthium parviflorum Balusu Rubiaceae Capparis zeylanica Kutajamu Capparidaceae Caralluma umbellata Kundeti Kommulu Apocynaceae Carissa spinarum Kalivi / Vaaka Apocynaceae Cascabela thevetia Patcha ganneru Apocynaceae Cassia auriculata Tangedu Caesalpiniaceae Cassia fistula Rela Caesalpiniaceae Casuarina equisetifolia Sarvi Casuarinaceae Catunaregam spinosa Manga / Chinna manga Rubiaceae Cissus vitiginea Adavi Gummadi Vitaceae Cissus quadrangularis Nalleru Vitaceae

Page 221: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Cocos nucifera Coconut Arecaceace

Codiaeum varieigatum Croton Euphorbiaceae Cordia dichotoma Bankiriki Cordiaceae Cosmostigma racemosum Adavitamalapaaku Apocynaceae Crataeva religiosa Urimidi Capparidaceae Dalbergia sisso Sisso or Seesum Caesalpiniaceae Decalepis hahiltonii Maredu kommulu Periplocaceae Dendrocalamus strictus Bamboo / Veduru Poaceae Diospyros chloroxylon Ulinda Ebenaceae Diospyros melanoxylon Tunki Fabaceae Dodonaea viscosa Bandedu Sapindaceae Erythroxylon monogynum Dedaraaku Erythroxylaceae Eucalyptus teretocronis Eucalyptus Myrtaceae Eucalyptus hybrid Eucalyptus / Nilagiri Myrtaceae Euphorbia antiquorum Brahma jemudu Euphorbiaceae Ficus benghalensis Marri Moraceae Ficus racemosa Medi Moraceae Ficus religiosa Raavi Moraceae Grevellia robusta Silver oak Proteaceae Hardwickia binata Yepi Caesalpiniaceae Hemidemus indicus Sugandhapala Periplocaceae Heterophragma roxburghii Kala Goru Bignoniaceae

Holoptelia integrifolia Nemali naara Ulmaceae Ipomoea carnea Rubber mokka Convolvulaceae Jacaranda mimosifolia Jacaranda Bignoniaceae Jatropha glandulifera Wild Castor Euphorbiaceae Kigelia africana Yenugu Paadam Bignoniaceae Lagerstroemia parviflora Chennangi Lythraceae Lantana camara Makkadambu Verbenaceae Leptadenia reticulata Mukkupala Teega Asclepiadaceae Leucaena leucocephala Subabul Mimosaceae Limonia acidissima Velaga Rutaceae Citrus aurantifolia Batavia Rutaceae Citrus limonum Lime Rutaceae Mangifera indica Mamidi Anacardiaceae Maytenus emerginata Danti Celastraceae Millingtonia hortensis Aakaasa malle Bignoniaceae Mimosa polyancistra Thumma Mimosaceae Mimosa rubicaulis Pariki kampa Mimosaceae Mimosops elengi Pogada Sapotaceae Morinda pubescens Togaru Rubiaceae Moringa olivaefera Munaga Moringaceae Muntingia calabura Wild cherry Elaeocarpaceae Opuntia dillenii Naaga Jemudu Cactaceae Oroxylum indicum Dundilam Bignoniaceae Parkinsonia aculeata Jeeluga Widespread Peltophorum pterocarpum Konda chinta Caesalpiniaceae Pergularia daemia Dustapa teega Asclepiadaceae

Page 222: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Phoenix sylvestris Eetha Arecaceae Phyllanthus emblica Usiri Euphorbiaceae

Phyllanthus reticulatus Pulasari / Puliseru Euphorbiaceae

Pithecellobium dulce Seema chinta Mimosaceae Plumeria alba Tella devaganneru Apocynaceae Plumeria rubra Erra devaganneru Apocynaceae Polyalthia longifolia Ashoka Annonaceae Polyalthia pendula Asoka Annonaceae Pongamia pinnata Ganuga Fabaceae Prosopis juliflora English tumma Mimosaceae Prosopis spicigera Jammi chettu Mimosaceae Quisqualis indica Rangoon creeper Combretaceae Samanea saman Nidrabhangi Mimosaceae Sapindus emarginatus Kunkundu Sapindaceae Spathodea companulata Flame of the forest Bignoniaceae Sterculia foetida Adavi badam Sterculiaceae Streblus asper Barranki Moraceae Syzigium cumini Neradu Myrtaceae Tabernaemontana coronaria Nandivardhanam Apocynaceae Tamarindus indica Chinta Caesalpiniaceae Tecoma stans Patcha turai Bignoniaceae Tectona grandis Teak / Teku Verbenaceae Tarenna asiatica Kommi Rubiaceae Terminalia arjuna Tella maddi Combretaceae Terminalia bellerica Taani / Taandra Combretaceae Terminalia catappa Baadam Combretaceae Terminalia tomentosa Nalla maddi Combretaceae Thespecia populnea Ganga Raavi Malvaceae Thevetia nerifolia Yellow oleander Apocynaceae Tylophora indica Kukkapala teega Asclepiadaceae Vitex negundo Vaavili / Nirgundi Verbenaceae Wattakaka volubilis Tummudu teega Asclepiadaceae Wrightia tinctoria Pala –kordusha Apocynaceae Ziziphus mauritiana Regu Rhamnaceae Ziziphus nummularia Nela Regu Rhamnaceae

B. Fauna of the Study Area

Table 2: List of Vertebrates Other than Birds either Spotted or Reported from the Study Area

Scientific Name Common Name WPA Schedule MAMMALS Bandicota bengalensis Indian mole rat IV Bandicota indica Bandicoot rat IV Canis aureus Golden Jackal II Dacnomys millardi Large-toothed giant rat IV Funambulus palmarum Three-striped palm squirrel IV Golunda ellioti Indian bush rat IV Herpestes edwardsii Common mongoose IV

Page 223: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Herpestes javanicus Small Indian mongoose

IV Lepus nigricollis Indian Hare/Blacknaped Hare IV Macaca mulatta Rhesus Macaque II Mus booduga Indian field mouse IV Mus dunni House/Rice-field mouse IV Parascaptor leucura White-tailed Mole IV Rattus rattus Common house rat IV Soriculus leucops Indian long-tailed shrew IV Sus scrofa Indian wild bear III Vulpes bengalensis Indian fox IV REPTILES (P=Poisonous) Ahaetulla nasutus Vine snake II Bungarus caeruleus Common krait (P) II Calotes versicolor Garden lizard IV Coelognathus helena Trinket snake II Daboia russelii Russell's viper (P) II Dendrelaphis tristis Bronzebacked tree snake II Echis carinatus Saw scaled viper (P) II Hemidactylus flaviviridis Wall lizard IV Hemidactylus frenatus Small wall lizard II Lissemys punctata Indian plapshell turtle II Naja naja Cobra (P) II Oligodon arnensis Common kukri II Oligodon taeniolatus Variegated or Russell's kukri II Ptyas mucosa Rat snakes II Ramphotyphlops braminus Blind snake II Varanus bengalensis Common Indian monitor II AMPHIBIANS Bufo melonosticatus South Indian Toad IV Cacopus bystema Burrowing frog IV Hyla arboria Tree Frog IV Rana hexadactyla. Ordinary frog IV Rana tigrina Tiger Frog IV

Table 3: List of Birds either Spotted or Reported from the Study Area

Scientific name Common name Family WPA Schedule

Accipiter badius Shikra Accipitridae IV Acridotheres tristis Common Myna Sturnidae IV Acrocephalus agricola Paddyfield Warbler Sylviidae IV Aegithina tiphia Common Iora Aegithinidae IV Alauda gulgula Oriental Skylark Alaudidae IV Alcedo atthis Common Kingfisher Alcedinidae IV Anas acuta Northern Pintail Anatidae IV Anthus trivialis Tree Pipit Motacillidae IV

Page 224: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Apus affinis Little Swift Apodidae IV Artamus fuscus Ashy Woodswallow Artamidae IV Athene brama Spotted Owlet Strigidae IV Aythya ferina Common Pochard Anatidae IV Bubulcus ibis Cattle Egret Ardeidae IV Cacomantis passerinus Grey-bellied Cuckoo Cuculidae IV Cacomantis sonneratii Banded Bay Cuckoo Cuculidae IV Calidris ferruginea Curlew Sandpiper Scolopacidae IV Calidris minuta Little Stint Scolopacidae IV Calidris ruficollis Red-necked Stint Scolopacidae IV Calidris temminckii Temminck's Stint Scolopacidae IV Caprimulgus asiaticus Indian Nightjar Caprimulgidae IV Caprimulgus indicus Grey Nightjar Caprimulgidae IV Carpodacus erythrinus Common Rosefinch Fringillidae IV Cecropis daurica Red-rumped Swallow Hirundinidae IV Celeus brachyurus Rufous Woodpecker Picidae IV Charadrius dubius Little Ringed Plover Charadriidae IV Chrysomma sinense Yellow-eyed Babbler Timaliidae IV Cinnyris asiaticus Purple Sunbird Nectariniidae IV Clamator coromandus Chestnut-winged Cuckoo Cuculidae IV Columba livia Rock Dove Columbidae IV Copsychus saularis Oriental Magpie-Robin Muscicapidae IV Coracias benghalensis Indian Roller Coraciidae IV

Coracina melanoptera Black-headed Cuckoo-shrike

Campephagidae IV

Coracina melaschistos Black-winged Cuckoo-shrike

Campephagidae IV

Corvus macrorhynchos Large-billed Crow/Jungle Crow

Corvidae IV

Corvus splendens House Crow Corvidae V Coturnix coromandelica Rain Quail Phasianidae IV Coturnix coturnix Common Quail Phasianidae IV Cuculus canorus Common Cuckoo Cuculidae IV Cuculus micropterus Indian Cuckoo Cuculidae IV Cuculus varius Common Hawk-Cuckoo Cuculidae IV Cypsiurus balasiensis Asian Palm Swift Apodidae IV Dendrocitta vagabunda Rufous Treepie Corvidae IV Dicaeum agile Thick-billed Flowerpecker Dicaeidae IV Dicrurus caerulescens White-bellied Drongo Dicruridae IV Dicrurus hottentottus Hair-crested Drongo Dicruridae IV Dicrurus leucophaeus Ashy Drongo Dicruridae IV Dicrurus macrocercus Black Drongo Dicruridae IV

Dinopium benghalense Black-rumped Woodpecker

Picidae IV

Dumetia hyperythra Tawny-bellied Babbler Timaliidae IV Egretta garzetta Little Egret Ardeidae IV

Page 225: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Egretta intermedia Intermediate Egret Ardeidae IV Elanus caeruleus Black-winged Kite Accipitridae IV Emberiza bruniceps Red-headed Bunting Emberizidae IV Eudynamys scolopaceus Common Koel Cuculidae IV Falco tinnunculus Common Kestrel Falconidae IV Ficedula parva Red-breasted Flycatcher Muscicapidae IV Fulica atra Common Coot Rallidae IV Gallinago gallinago Common Snipe Scolopacidae IV Gallinago stenura Pintail Snipe Scolopacidae IV Glareola lactea Little Pratincole Glareolidae IV Gymnoris xanthocollis Yellow-throated Sparrow Passeridae IV Halcyon pileata Black-capped Kingfisher Alcedinidae IV Halcyon smyrnensis White-throated Kingfisher Alcedinidae IV Haliastur indus Brahminy Kite Accipitridae IV Hemiprocne coronata Crested Treeswift Hemiprocnidae IV Himantopus himantopus Black-winged Stilt Recurvirostridae IV Hirundapus giganteus Brown-backed Needletail Apodidae IV Hirundo smithii Wire-tailed Swallow Hirundinidae IV Hydrophasianus chirurgus Pheasant-tailed Jacana Jacanidae IV Hypothymis azurea Black-naped Monarch Monarchidae IV Ictinaetus malayensis Indian Black Eagle Accipitridae IV Ixobrychus minutus Little Bittern Ardeidae IV Lanius cristatus Brown Shrike Laniidae IV Lanius schach Long-tailed Shrike Laniidae IV Leptocoma zeylonica Purple-rumped Sunbird Nectariniidae IV Lonchura malabarica Indian Silverbill Estrildidae IV Lonchura malacca Black-headed Munia Estrildidae IV Lonchura striata White-rumped Munia Estrildidae IV Luscinia brunnea Indian Blue Robin Muscicapidae IV Luscinia svecica Bluethroat Muscicapidae IV Lymnocryptes minimus Jack Snipe Scolopacidae IV Megalaima haemacephala Coppersmith Barbet Ramphastidae IV

Megalaima zeylanica Brown-headed Barbet Ramphastidae IV

Merops leschenaulti Chestnut-headed Bee-eater

Meropidae IV

Merops orientalis Green Bee-eater Meropidae IV Merops philippinus Blue-tailed Bee-eater Meropidae IV Metopidius indicus Bronze-winged Jacana Jacanidae IV Milvus migrans Black Kite Accipitridae IV Mirafra erythroptera Indian Bushlark Alaudidae IV Monticola cinclorhynchus Blue-capped Rock Thrush Muscicapidae IV Monticola solitarius Blue Rock Thrush Muscicapidae IV Motacilla cinerea Grey Wagtail Motacillidae IV Motacilla flava Yellow Wagtail Motacillidae IV Motacilla White-browed Wagtail Motacillidae IV

Page 226: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

maderaspatensis Muscicapa dauurica Asian Brown Flycatcher Muscicapidae IV Oriolus chinensis Black-naped Oriole Oriolidae IV Oriolus xanthornus Black-hooded Oriole Oriolidae IV Passer domesticus House Sparrow Passeridae IV Pericrocotus cinnamomeus Small Minivet Campephagidae IV

Pericrocotus flammeus Scarlet Minivet Campephagidae IV Pernis ptilorhynchus Oriental Honey Buzzard Accipitridae IV Petrochelidon fluvicola Streak-throated Swallow Hirundinidae IV Phalacrocorax fuscicollis Indian Cormorant Phalacrocoracidae IV Phalacrocorax niger Little Cormorant Phalacrocoracidae IV Phragamaticola aedon Thick-billed Warbler Sylviidae IV Phylloscopus magnirostris Large-billed Leaf Warbler Sylviidae IV Phylloscopus trochiloides Greenish Warbler Sylviidae IV

Picus xanthopygaeus Streak-throated Woodpecker

Picidae IV

Pitta brachyura Indian Pitta Pittidae IV Ploceus manyar Streaked Weaver Ploceidae IV Ploceus philippinus Baya Weaver Ploceidae IV Pomatorhinus horsfieldii Indian Scimitar Babbler Timaliidae IV Prinia hodgsonii Grey-breasted Prinia Cisticolidae IV Prinia inornata Plain Prinia Cisticolidae IV Prinia socialis Ashy Prinia Cisticolidae IV Prinia sylvatica Jungle Prinia Cisticolidae IV Psittacula cyanocephala Plum-headed Parakeet Psittacidae IV Psittacula krameri Rose-ringed Parakeet Psittacidae IV Pycnonotus cafer Red-vented Bulbul Pycnonotidae IV Pycnonotus jocosus Red-whiskered Bulbul Pycnonotidae IV Pycnonotus leucogenys White-cheeked Bulbul Pycnonotidae IV Recurvirostra avosetta Pied Avocet Recurvirostridae IV Rhipidura albicollis White-throated Fantail Rhipiduridae IV Rhipidura aureola White-browed Fantail Rhipiduridae IV Rhopodytes viridirostris Blue-faced Malkoha Cuculidae IV Riparia diluta Pale Sand Martin Hirundinidae IV Rostratula benghalensis Greater Painted-snipe Rostratulidae IV Saxicola caprata Pied Bushchat Muscicapidae IV Saxicola torquatus Common Stonechat Muscicapidae IV Saxicoloides fulicatus Indian Robin Muscicapidae IV Stachyris ruficeps Rufous-capped Babbler Timaliidae IV Streptopelia chinensis Spotted-necked Dove Columbidae IV Streptopelia decaocto Eurasian Collared Dove Columbidae IV Sturnus malabaricus Chestnut-tailed Starling Sturnidae IV Sturnus pagodarum Brahminy Starling Sturnidae IV Sturnus roseus Rosy Starling Sturnidae IV

Page 227: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Sturnus vulgaris European Starling Sturnidae IV Surniculus lugubris Asian Drongo-Cuckoo Cuculidae IV Sylvia curruca Lesser Whitethroat Sylviidae IV Tadorna ferruginea Ruddy Shelduck Anatidae IV Threskiornis melanocephalus Black headed Ibis Threskiornithidae IV

Treron phoenicopterus Yellow-legged Green Pigeon

Columbidae IV

Tringa erythropus Spotted Redshank Scolopacidae IV Tringa glareola Wood Sandpiper Scolopacidae IV Tringa nebularia Common Greenshank Scolopacidae IV Tringa ochropus Green Sandpiper Scolopacidae IV Tringa totanus Common Redshank Scolopacidae IV Turdoides affinis Yellow-billed Babbler Timaliidae IV Turdoides caudata Common Babbler Timaliidae IV Turdoides malcolmi Large Grey Babbler Timaliidae IV Turdoides striata Jungle Babbler Timaliidae IV Upupa epops Common Hoopoe Upupidae IV Vanellus cinereus Grey-headed Lapwing Charadriidae IV Vanellus indicus Red-wattled Lapwing Charadriidae IV Vanellus malabaricus Yellow-wattled Lapwing Charadriidae IV Zosterops palpebrosu Oriental White-eye Zosteropidae IV

Aquatic Flora and Fauna of the Study Area

There are small village / irrigation tanks and no perennial water bodies in the study area. All the tanks have become fully dry and there are no aquatic plants or aquatic fauna in the study area.

Page 228: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

)

1]1•'1'1-•-.a . .... , ~ ~ -... _.

' ,1 ~ A.P. POLLUTION CONTRdL stjARD

Regional Office: Plot No. 11, 1 st Floor, Shivaji Colony, Pradeep Nagar, Vizianagaran - 535002

T. SUDARSANAM Environmental Engineer

E-Mail: rov,[email protected] Website: ww.appcb.ap.nic.in Ph. (:)8922-227370

Lr. No. PCB/ROVZ/Tech/ Z-226/2018- 1.J.~ I

Date:01 -05-2018 I

i• T~~

~rl M . Srinivasa Raju, President, M/s. Berry Alloys Limited, 3 rd Floor, Pragathi Royal Apartments, Facor Layout, Latha Hospital lane, Visakhapatnam - 530003 .

Sir,

:

Sub: PCB-RO-Vizianagaram - M/s. Berry Alloys Limited, A~IIC, Plot No.368, Growth Center (Industrial Estate), Bobbili (V) 1 & (f ), Vizianagaram District, Andhra Pradesh State - Public Consultatl'on he! on 26/04/2018 -Public Consulfation Minutes, CD etc., - Submitted L Reg rding .

Ref: 1) EIA Notification No. S.O. No.1533, dated '14/0 /2006 issued by MOE&F, Govt. of India. I'

2) Existing Environmental Clearance Order N,b. F. No. J-11011/1129/2007-IA-II (1), dated 07/07/2011 for 4x9 MVA Submerged Electric Arc Furnace. 1

3) MOEF & CC letter issuing the TOR's vid Order No . J-11011/1P9/2007-IA.I1 ( l), dated 27/02/2018,.

4) I ndustryi,representation letter received this office o 15/03/2018. 5) T.O . Note approv ed by the District Revcmie Officerr Vizianagaram oh

22/03/2018 for conducting Environm enta l Publ'} Consultation on 26/04/2018 (Tl1ursday) at 11.00AM .

6) Paper No~ifl ca ti ons issued in "Eenadu" (Telugl!.I), " T e Times of India" (En!lJlish) on 25/0 3/ 2018 .

7) Public Consultation h e ld on 26/04/2018 near to th existing p r mises of M/s. · f3erry All oy_s Lim ited, APIIC, Plo t Nq. 368, Growth C n ter, Bobblli (V) & (M), Vizianagaram District. I

I I

* * * * * It is to submit that as per the paper notification s iss~ed v ae reference 6 th c ited

public consultation was 1condL1cted on 26/04/2018 at 11: 00 AM f1 r proposa l for setting

up of new 2x9 MVA Su bn;,erged Electric Arc Furnace a long with exlstl1g 4x9 MVA El ectric Arc

Furnace (after expa nsion 6x9 MVA Electri c Arc Furnace) for production of 43,200 TPA of

Ferro Manganese or 36,000 TPA SIiica Manganese after expansion total capacity of pl ant is

as fo.llows: Ferro Mangar11ese @ 1,29,600 TPA (or) Sil ica Ma ndanesJ @ 1,08,000 TPA (or) . I Ferro Silica @ 25,200 TPA (o r) Ferro Chrome @ 3 6,000 TPA. The total project cost of the

I

plant Is Rs.85.16 Cro res ( Existing Rs.73.16 Cro res & Expansion Rs .12 00 Crores) .

' I I Minutes of .the Public Consulta ti on , CD of the Publ ic Consulta tion , Paper

Notifications, Paper Cuttings and Attendance are herewith e11close~ for kind perusal .

I Submitted for kind information and necessary action .

Encl: As above.

Annexure 11Public Hearing Details

Page 229: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

,'

T. SUDARSANAM, Environmen.tal Engineer,

A.P. POLLUTION CONTROL Regional Office; Plot No. 11, 1st loor,

Shivaji Colony, Pra deep Nagar, Vizianagrarn-002

E- Jl;la ll: rJ v [email protected] W ebsite: www.appcb.ap.nir..in

-----------------------------'Pl.:i,./Fax o . 08922-227370

Lr No.PCB/ROVZ/Tech/Z-2°2 6/2018- 1_re-I

Date: 0 1 -05-2018

To 1. Offi ce of the District Collector, Vizianagaram .

7 . Office of the Chief Executive Officer, Zilla Parished, Vlzianagarpm,

3. Office of the General Manager, District Industri es Center, Vizianaga ~ m.

4 . Office of the Member Secretary, A.P. Pollution Control Board, n ar Sun Rise Hospital, Pushpa Hotel Center,. Chalamavarl Street, Kasturibaipet, Vijayawada - 520 010 .

5. Office of the Joint 'Chief Environmental Engineer, APPCEl, Zona Office, Vuda Layout, Madahavadhara, Beh·ind RTA Office, Visakhapatnam - 530018.

6. 0/o. the MoEF & CC, Regional Offi ce (South Eastern Zone), 1st & 2 d Floor, HEPC Building, No. 34, Cathedral Garden Road, Nungambakkam, Chennai - 600 0 3 .

7. Office of the District Revenue Office, Viziana garam District.

8. Office of the Revenue Divisional Office, Parvath ipuram, Vizianaga ra'.1[1 District .

9 . Office of the Tahasildar, Bobbill (Village & Manda!), Vizianagaram D lftrlct .

10 . Gram Panchayat Office, Mettavalasa (V), Bobbili Manda!, Vizianaga ra m District.

11. Gram Panchayat Office, M . Boorjavalasa (V), Bobbili Mandal, Viziana1garam District.

12. Office of the Environmental Engineer, A.P. Pollution Control Boark Regional Office, Plot No.11, 1st Floor, Shivaji Colony, Pradeep Nagar, Vlzlanagaram;- 53 ~ 004.

Sir,

Sub :

Ref:

APPCB - RO - Vizianagaram - M/s. Berry Alloys Limited, APIIct, Plot No.368, Growth Center ( In iustri a l Estate ) , Bobblli (V) & (M), V lzlanagaram Distr ict, Andhra Pradesh State - Pu b lic Consulta t io n held o n 26/04/2 018 - Minut es - Co 1munic,ted - Regarding .

1. EIA Notification No. 5 .0. No.1533, d a ted 14/09/200u issu d by MOE&F, Govt . of I ndia . '

r 2. Exis t ing Environmental Clearance Order No. F. No. J- 1 1 0 ~1/1129/2007- IA-II (I),

da tecl 07/07/2017 for 4x9 MVA Subm erged Electric Arc Fu rnac,e. 3. MOEF & CC letter Issuing the TOR's vide Order No. J-llOil/1129/2007-IA.II (I),

dated 27/02/2018. 4. Industry representation letter received this office on 15/i\03/2 0118. 5. T.O. Note approved by the District Reven ue Officer, V iz anzrna ram on 22/03/2018 for

conducting nviro n menta l Public Consultation on 26/04/2018 (Thursday) at 11.00AM. 6. Paper Notifi ca t ions Issued in "Eenadu" (Te lugu), "The Times of India" (English) on

25/03/2018. : 7. Public Consultation held on 26/04/2018 near to the existing :premises of M/s . Berry

Alloys Limited, APIIC, Plot No . 368, Growth Center, Bobbili (V) & (M), Vizianagaram District . J,'

* * * * * Minutes of the Public Consultation held on 26/04/2018 at 11:00 AM for proposal for

sett ing u p of n ew 2x9 MV/\ Submerged Electric Arc Furn ace a lo ng with ekls ttng 4 x9 MVA Electric Arc Furnace ( a fte r expa nsion 6x9 MVA Electric Arc Furnace ) for prodLjctlo n o f 4 3 ,200 TPA of Ferro Mangan ese or 36 1 0 9 0 TPA Si llco Man ga nese after expans ion tota l capacity pf plant is as follows: Ferro Manganese, @ 1,29,600 TPA ( or) SIii ca Manganes e @ 1f,08, 000 T PA (or) Ferr o S il ica @ 25 , 200 T PA (or ) Ferro Chrome @ 3 6 ,0 00 TPA. The total proj'ect cos t of t he plant is Rs .85 .16 Crores (Existing Rs.73 . 16 Crores & Expansion Rs .12.00i CrorJs ) is co m m u nicated for displaying in the notice boards.

As per EIA Notific:ation, S.O.No. 1533, dated 14/09/20Q6, pr6ceedings of the Public Consultation shall be con spicuously displayed for information to the publi t.

Submitted for kind information and necessary action. /

Encl: Public Consultation Minutes

~ Sri M. Srinivasa Raju, Vice Royal Apartments, Fi3cor Layout, information. '

Yours1 faithfu lly,

! Sci/­ENVIRONMENTAL ENGINEER

I President, M/s . Berry Allo

1y s Limited, 3 rd Floor, Pragathi

Latha Hospital lane, sakha a tn a m - 530003 for

ENVIR MENTV.,~ J&vlRONMENTAI ~ !N\tc " , J F · ~POLL'-!"im.J CONTROL 80.:\RD

Rr.:•:JJ O ,Jr:.. OFF1Ce t .. - ..... ~ - • -

Page 230: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

MINUfES OF THE, ENVIRONMEiNTA.L PUBLIC CONSULTATION FOR I

THE PROIPOSED E?{PANS:CON OF EXISTING FERRO .ALLOY. UNIT OF

M/S.BERRY ALLOfvS L.I!MITED, APIIC, PLOT N0.3i6B, GROWTH !

CENTER (INDU~TRIAL ESTATE), E\OBBILI {V) & (M),

VIZlANAG,l\RAM DISTRICT, ANDHRA PRADESH !HELD OlN

26/04/2018 .AT . :l.:ll;OO AM, NEAR TO TME EXISTING PLANT

PREMISES OF M/s. 81:RRY ALLOYS LIMITED, APlICrr PLOT NO. 368,

GROVVTH CENTER, BOBBILT. (V) & (M), VIZIANAGARAM DISTRICT,

,A.NDHRA PRJ\DESH., INDJA.

The follow ing_gu:e_ Present. Panel Memb~rs:

1 1 Sri. R. '.;, Raj Kumar ,; District Revenue Officer, I·

\/izianaqaram District.

2 Sri. T. Su dar·s,rn,1m , f:nvironm ental Eng ineer, /\PPCB, Regionc1I Office, Vizic1 11agararn.

Al' the outset, while welcoming the gathering, the l::nvironrnentc1I l:ngineer explained the

l'ec:,turi::!s of thEi Ministry c>f Environment and Fore:;ts (MoEF), Government of India, EIA

l'lotificat'on datE~d 1,1/09/2006 . AcoJrding to EIA Notification, Environmental Public consultation

is maqd:itory for getting Environmental CIEiarance for carrying this kind of establishment /

,~xpan:,icn of FEirro Allov }·Janufacturing Units from f\linistry of Environment and Forests and

Climate 1:hang_e_!. 1:l_~w De[L1i. (fvloEF), Govt, of Imlia~ He-· stated that M/s·.- BeW'f '/\lfoy"sTtd~ have

applied lor EnvironrnentaL Clearance for the proposed expansion of Exisl ing Ferro Alloy unit in

Decembt,r'2017 with MoEF, New DEdhi. Tl1e Ministry Authorities have appraised the project and

issued T1Jrms of Referencei; (TORs) to this project: i.e. M/::;, Berry Alloys Ltcl., authorities to go

for Publio: Cons11ltation. He infonnE?d that the press notice wa~; issued on 2S/03/2018 in two '

newsparc::!rs i.e., "l::enaclu" (T1::!lugu) & "The Times of India" (English) ancl disseminated the same

l:o ti ,e general public through beat of tom-tom in the villages intimating about the proposed

Public. Consu ltation to be l1eld on 26/04/2018 with project details fo1· inviting suggestions, • f I

views, comments and objEictions f1·om the public for can·ying out the proposed Expansion Jf

Fe1To .'\lloy Unit by M/s. Berry Alloy; Ltd, APHC, Plot No. 368, Growth Center, I3obbili (V) & (M) ,

Vizi2t1i.:1g ,1rarn C·is1:rict, ,c,ndhra Pradesh, India nd further informed th,11: the EIA report was

Page 231: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

... -- -placed in the offices o f Panchayaths, Tahslldar In English and Telu~JU languages for inh rnal:ion

I

of general public;

One written representation was received within tl-H~ stipulatr3d time i.e. 3D aays I ram the

d,ite of issue of notification favoring the proposed expansion Ferro ~l loy Unit. A': the time of

- ·public hearing · OS- written -repFese-nt-aH0ns were receiv@d~ AH- the -rnp.r~sentatinn:; welcorne_clthe

project stating that th ;~ proposed project management shall assure t o protect the envirnnrnent

in the surroundinq areas, to tc1ke up welfare! activities through CSR budget and also provid e

~rnployment to the local people only. The copies of the same are app2nd1::!d to the rninutes.

The District Re·1enue Officer has expl,1inecl--;-at this un;-is ,1t re ady e~;tablished,'e:<tsting

Ferro Alloy Unit in this area and now the industry :xoposecl to expar,d their production capJcity ' I

bv increasing the furnace capacity with 2x9 MVA Furnaces in additic>n to the existing , fx9 MVJ\ I , ·

--

' tl I

:1 I

I -- 1-- -

I I

I 11

- I-

I I

I

l t

--f arrra ce-;-He,then,recttt es 1:ecH he- pttB+ie-l:e--e*17Fe-S-S-EA-ei-f- E1 f}~Fti on, o-13:i 1~f:t io 115--if- a~~roL-19----il::i~ - - --

-

,,,,,.----

r-- -

p rn posed expansion project

Sri Sriniva!><'J __ Rai1..1, General mcinager of M[s. BtfilLJ.lhfil Limite,cl inforJ11ed thc~t

tl·1~.u:qnsultant wll !_-..:plc:tin the-details-of-the technical -~2 pects of- the _Q_roposE~d 12ro}'ct _alc. r_1~~· _­

with EIA.s.tudy r__ev_e.lation$_, _

§IL..&.. J•'ll~n_a n ·rtg__q_ifi{, ;Sri ~ai M,in ·1.-; a Naturn T,ach Pvt;' Ltd, Con~ul'tanl of the

n.roposed pnu_~~! ha; explained the public about the details of the proposed expansion of 1:he

e-:,ds-Hng--:.Ferro--.A.lloy Unit whi ch a-Fe-as--fonows-:- - --

•!· As per tM Environmer,tc1I Irnpaet As-sessment(EIAJ;notifit2,fior1 s.0.1 '53:3,14"'·0Si-200E, '

issued by MoEF & CC, Govt of lndia, the proposed ferro i:1°lloys f~x 1Jansion project is

categorized as Cate·gory~A project, ~vhich n1andai:es obtc11-ning pr:or envirc nrn,~iita i

clearance from MoEF 81. CC,GOT,NEW DELHI.

•!• M/s. Berry All oys Ltcl.1 proposes new 2x9 MVA .Submerged ~lectric Arc: Furna,:e (afte 1

expansion 6x9 MVA EIE~ctric Arc Furnace!) for pmducti011 ·01' 43, 20(1 --PA ,Jf Ferro

Manganese or :36,000 TPA Silica fvJanganese after expansion . t.otal capacity of pi mt is a~

follows: Ferro Manganes1: @ 1,29,600 TPA (or) Silica Manganese @ 1,08,000 rPA (o r)

Ferro Silica @ ~'.5,200 TPA (or) Ferro Chrome @ 36,000 TPA. The total project cost of th e

plant is Rs.85.16 Crores (Existing Rs .. 73.16 Crorei; & Expansion Rs.12 .01) Crore·,) and it

is propost~d to be established in the existing unit cnly loca ~Fd at API1C, Plot l'J .J.36!3, I'

Gro~th Center (Industrial Estate), Bobbili (V) E'it (M), Vizi ,:lpagararn District, l'.ndlir·a

Pradesh. The ec1pital cost of the expan~;ion project is Rs.12 Crojres.

•!• The Envlronimmtal ConsL1lta nt of the proposed proj ~ct has st u~ lt':cl the- b}lSE'c ~ ne -d ,1ta for

--Amb:leoL Aj.r:.Qo-a llty-,--S_urf c;e & Gm urrd Water QualTty,- No1se-=a1-,'d solT Qu-a lltr\r,!3 stattm-,s ., .

--- ---~---- - - I

---- -

U lffl MW~PD~l -

I

l--

Page 232: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Ir/ n,n=iiu'£<,,,r,-~•~>Ufi~ .... ~-~hW~-~-ffi-~-!!!A~H-~ . .. r!!.....,,~l'nl!f?!,~---•!!1fl!!t~-!'i!-!!!!!'!fl~l'lli4\~IMfW!!!!!!!-!!-~-!!WWW!l!!!i&~~~~i!::ltan!!ifu'.1rn!!!!!~ll'ffl.•'ii,ll .. !"! .. !!!'*'ffi•~-!!ji~W!i!i~!!!!!!!!!!!~!!!~-~~'.11 1: - cc; = ·--- ~·-~~-,,,,_.,,.,.

' ~ ~ . f ' I

ir tl1e surroundin9 io Km rajius f1om the proposed expansion project area to assess tl1e

e ·:isting l:nvironme/1Lal scenario in the area from December 2016 to February 2017 1t..rith 1:;csT3 ComputN riloclelling.

,;, Water is required for cooling. domestic: and devi~lopment of weenbEilt purposes only. The

e ·dsting unit requires 50 f<LI) of wal:er and second phase (proposed phase) requires 30

l<:.D of 1t1al er. The t:')tal wa':er requiri~rnent of the wate1· is about 901<:LD for the pla!1t

a' ter expansiun.

••· T1

1e skill ~d / semiskilled / unskilled manpower required l'or th,~ proposed project is

e :ti mated to be 50 1,111d the ·~xi~;ting man power is 120. The man povver requirement will

b : fulfilled from surrounding villages, to hefp for th 1:! improvement of the socio economic

sl dtus in the surrounding rural c:ireas. I

,:, Auout 33% of the plant site will be developed as greenbelt. The greenbelt developed will

h;!lp in r·=ducing noise level~; in the plant as a result of attenuation of noise generated

d"e i:o pl.mt operatic,ns and transportation.

·:· The status of ambient air qL1ality within the study area was monitored for the period of \

D':!cernber 2016 to: Februar)' 2017 at 8 locations includinu the plant area and in tre

ll·"arby villc1g1:?rs. Tot:al 8 sarnpling location:;; were ~;elected ba:;ed on the meteorological

01

nditions considering upwind ,111cl dcwnwind directions. The values ol' the parameters

w ;th rE:sµecl: to PM10 ,PM2.s ,~02 and NOx are well within the standards.

·:· Li'(ewi:,e, t-ie b,1:;e line noi:,e levels are observed to be well within the limits when

o·,mpared with the national ;tandards. Wl1ile the ground wat:e1· le 111:!ls am also observed

tc , be well within lhe standards.

·~· Tl1

e industry proposed to install Bag filters and air pollution control equipment to the

s1 ,Kk arid will also provide c nline monitoring facility to the stack and connect to AP PCB

and CPCEI. i

•:• Tl1e industry allocated the budget of 35 % for Organization of medical camps in

surroundin~J villages, training, awareness and skill development programmes, women

e111powerm,~nt:, drinking water facility and Educational facilities under CSR activities. i

~r i G.Rama Rao, N, OQQ.!ja v~1lsa Village, stated that Sri. N. T, Rama Rao garu has

start~cl this growth center!with good intention. He expressed that they have given their lands to

M/s l3E~r, v a lloys, M/s Irnpex alloys 3ncl to the Electrical Office in anticipation that the industries

will qi·,e job opportunities and also that they will develop both socially and economically. He

!,tated tl:at no justice has l1appened to him in spite of asking the management several times

rei;iardin,;1 the job. HE~ also ~itated that the people who l1a,te not 9iven their lands to the indust,-y

Page 3 of 6 RE<Sl ()N?J. lJ,', ·/l .. c;

VIZ!AN/•/}/, k\M

Page 233: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

,.' ·\.' -- Wff'lftl-tftIBIWW1'.W"UIUU........U~IAIPWRFJ(ff5illCaa:4--.:a:il~-

'r

are happily working in the industry. He also stated that he will a1)proach lht.: court and will

commit !,Uieide·befon: the gate of the industry if th,:: management fai1:5 to give him the J·)b. --

- Sri sunandaRedd.½_~_G.Qi Hyderabad while welcoming the prnposed -project stated tFi~it-

the water, air and land pollul:ion may bEi arrestee! at any ~:tage, what they require i!, tl1e job

opportunities. He further stated that the state government b; giving job oppo1tunities or cround

__ , I

\' )'

- 4 to 5 lakhs only in spite of 1 Cr students re inaffi · L1nempfoyed;· ·rre - arso stated tni:\t tlYe-· -

government shall accord permission to the. proposed expansion ,,project unconditic,ncllly to \

- - <----

' ,_ -

eradicate the unemploy1T1E~nt problems. Further, he :;u~1ge~;te,q the following t,) thE-

management: ~------ ,. - 1) To take up health study in the surrnundirig villages in 10 Kn~ cl1us.

2) To provide water harvesting structures.

3) More Greenbelt shc1II be developed with avenue plantation ctn1~· medicinal value plants c'lS

__ l_h~opulation g_ot increased to 130 Cr from 30 Cr at the time gf_Jnde endence. __ _

4) The industry has to take welfare activities based 011 demancls forming a co-c,;-dination

committee with PCB, administration and local villaqes. I '1 '

5) Employment to the locals only.

6-) - Skill ctevelolJrrlt:nt centers to he provided at the villages to rnakE! them -suitablP for 'olJ~;

_and_ i:irnvDj~ e1T1plq_yrnent_to_the 1Qcal _& _neig_hboring vjlager'.,.

He further stated that there is no ne,~d to conduct public hearing in th,~ Gl"Ow\ h center

and shall accord penrnssion un-conditionally.

Sri. Ramesh_N?Jidu1 Al> NGO, while welceiming the project ::;tated that after biru1·catiori --- ----~- --l ---

of the state thE!re is no dE~V l? loprnent and hence in order to resolve rhe unemployrnent prnJ) l21 .. l

the government has to accord permissions to the industry uri-concliti ,1ncilly. '

S,.ri.B.Nanfil_!loud,Ap.J>resident NGO, while W•=lcoming the propo~;ed proje :t stated

that the environment permissions shall be- given. He stated that it !s not wrong that th= local

people seeking jobs in the industry because they have lost thE!ir fonds. He stated that the

industry has· developed gr,=en belt of 4 acrE:s out 01' 13 acres. He further viewed that as a oart: of

Praclhana Manthri Uvc1jana Pathakam, the government is qiving johs ancl hence the industry

shall also give them the jobs.

~ri_Y1-~h~.nn~..!cesavai rtedd~;ct.._l(adalli! while welcomiii,g the proposed prnj1~ct, he

suggested that the rnanaqement shall prnvide employment, CSR buclget must be spent in thEi

surrounding effected villages. He stated thc1t as thE! government has acquirt!d th,~ lands from t:hE.i

formers 25 yrs ago, the government hc1s to provide the job~; not the .private inclustries ar,d also

st:atecl that the compensation shall be given to the farmers besides p/ovidinq ,~mployrnhit .

- -- --- S:ri.Cl!_an]!ar 1Rao-,1PatHJ1nNa(ifsa-·Villaq1~·; whfle-weicoinir]g the project stated th-3t duE~

to industrialization th1:, area_ wHLdeve..lap__both.....economically "'nd soi::ially-,- He--1'1:irther~tfitl:d -thal· -. .

the c;ountries Germany ancl Japan developed due to indusl.rializati c1:n only bes,des solvinq t11.e.. _ - - - - - -- ' ~~-~-~-~- 11

- · ·- uner:r,pl·9v_rn:enrproolerns-:-HeTelt happyTl1Elfthe- manageme,1t has prnvidecl job op portunities tci -

,. -- --- ----

. - ---:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:=-_______ --11!11-

• - MWMW111a.llD.a:.-.-.-Wlllil1l!JIF& , ........... _ - - -~--6F6

-- - - lj iilJiiii.WMw:UW lffillilfMi~!B hel RM l¼L tl ! ll -, [ ~

Page 234: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

F ~ . -'

l he people of surrounding 15 villages in the existing project, water plant to Burjav :1\c1sa arid

Panukuvalasa village::; and also distributed uniforms to tl1e blind school anc! stater\ that the

industry shall take up mon~ developmental activities in the villages ..

Sri JanantbJtll.l~ecldy_'t.J~GO, Hvdernb2L~l while welcoming the proposed project ~,tal:ed that l '

the present industry does not do any harm. Further, he sug~1ested the fo \lowi11g to the

management:

1. To take up necessc1 1·y measures to eradicate the pollution.

2. To increc1i;e the CSH budget from the present bu1jge: of 30 lc'\<hs.

3. To provide employment to the lornls fcrming a committee .:ind a ,11Eetinr;, i;hall be

planned with DRO:.

Sri.Gorle rama rno,.M,Burjavalasa Villaq e, while W•:!lcomin9 , tht~ proJect ~;tated 1:hat tile

people in the suri-ounding 15 villag,::!s are working in the industry '.and will g1~nerate more job

opportunities in the preserit expansion project.

Sri Vi@Y£J_fl~!!d.'~GQ..i.Jjyderab,!_g while >Nelcornin~J the proposed pt oject informed that ' '

he is attending .:ill the public hearinq since \:he inception o' S.O.No .. He stated that the ,ndustry

has to be established Vvithout violatin~J the norms as it is a democratic coun 1:ry. !1e further I ,.

stated that we l1ave to welcome the industry in order to develop ;the arec. 1=urther hi~ stated

that the industry shall carryout: the '.:itudy of water, land and air to jscertain the facts ,Jefore tile ' ' '

establishment of the projet:t and after commencing the op:!rations 9f the projl~cl. He sug1Jested !

the management to take up the latest technology. I

Sri S. Eswara _H<'to1-Sarpanch~ Boor·javalsa _ Villa lliJ. while welcomin£1 the proposed

project stated that, M/s Berry Alloys was established in this arec1 . before 10 y,::!ars be ck. The

existing unit has pro·1ided employment of about 50 to 60 to their vjlla~Je an:J he felt I 1appy that

the upcornin~J / expan'.;ion project may also generate emplovment for 1:he viii ::igers. He

·:;uggested that the industry shall tc1ke up Avenue P!antation, Growth cer1ter industrie:o I

collectively to establi::;h Public health center in their village appointing a doctx. ,J_

Sri.N,Ravi- Kum!tr,N.§_Q., while Weltbniing tfo::! project i;tated that the indu:;tr·1 shall cake t1·1E

demand oriented village welfare programs. The establishment of indu~ tri2s l1as to be

encouraged as the state · being a Annapurna Andhra Pradesh. .He further stater' that tt-1(

government has to establish such growth centers in view of develclpm2nt.

Sri. L.Chanllra Seid <-'C.,.P~ ryavarana t<ar¥J1 l<r1rtha, while w,elcorni119 the project state.d

that the management shall have to provide employ111e,1t to the local people on:y besides

aclopling the villages, Eistablishing PIK, free distribution of Medicine·, and greenbelt

development.

Sri Gorle l(r is !111 a . Mu1ttw l\laiclu, Ex. Sar~nclti_ M. _Boorjavaia!;a Vill.,!9e while I

welcoming the proposed project stated that the establishment of the induscries generates

employment as there is 110 agricultural activity in the area. He further stated that the industries

in growth center have taken up pollution control ,.11easures un

Page 235: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

S1j.Jh.J>arasura_m_ N,!J!:l..yJ_J"1. Panukuvalasa Villi!g_,g while welcoming the proposed projecl

sta_ted _ that M/s 13erry Alloy:, was cqnstrLtc_t~cl. 9n _h._is _ow_n !an~l which w21s qJ:qyjred _ for the j

- - purpose-of-deve-lupment-ofr3obhrlr·~rowth-·Center.- .H-e--statect--that--e-a1~lier, people- use to---mtgrats--

. From their villaqe but now they have returned clue to development cir" Growth Center. He further '

stated thar the land:; acquired for the growth center belongs to Burjavalasa (P) but not from the ' .

8<;1bbih=- ( RI r H@ f~1rther stated that- t he-~ove:rnme-nt-shall --verify- tlnr sta-tu~=='half.;.y@arly· as=- to

whel:ller ti ,e indu:~trles are comµ!yinfl or not. He furth£?r viewed that the management has to

provide efnployment to the ilocal peoole only and stated that the industries shall have to follow

tile ~Juidelines and systems which are framed o, the paper.

Sri-G-.-Lak3h mF1n Rao, E-x. Sarpanch, M-. noorjc1valasa Vi'llag-g_ ·~.mes~i his

views stated that the indu. ~ry has to take up measure~; to control the pollution and also shall I

take ca,·e of health of the Villagers. He further felt happy that M/s. Berry Alloys is supplying

drinking water at th,2 rate of; Rs.5/litni.

-fil.ri.tLMi!QlH!..JJ~-fftC wnire werc:cfrnfn~i"the p1·0JecYstated lhat tfie-·111irn21gemerit snalf have to p1 ovide employment to the local people only ,ind to take up development of green belt

in the are,1. He further requested the industries to take up the welfr.1re activities to the villagers ' __ unlike gov,~rnment reckless trend. __ _

~ fa.l!_i_§_,a Rai!µ_Jfic~s~e~~f the ]>~!Jose expari~Jon_ p.I.Qigct while ! =-- - -- -- - -

replying tc the issues ralsc~d in the public hearing stated the followi~g:

__ I

l) He welcomed th~ suggestions made by the public and prim1isecl that they will fulfill all the suggestion~.

;t- :i::t:,[email protected] i-111i l-9-@m 1c n wiU- p 1:ov Id e=.e ,r-1 p Io y+n.ent t0-tl:le-l-GGa I f-) eop I e ... o ~1 priori ty- b~~J.e-1=-­th e-i-1-'--€j-l-) a Ii ti 6a ttens- a t'l 0-S-1:1 I I '.ab i II l:y .

I

]) He i1ssured that p,e company will be established and op1~rated as per Government norms without ca:using any pollution problems to the surroundin9 area.

·, i

While concluding the proceedings of the- Public--Hear'ing, the__: DRO infom1@d that-all- the. ! :.

pr6ceedinqs of the hearing was recorded and will be sent to the Ministry of Environment, Forest

and Climate Ch,inqe, GoJt. of India

Euvi.r_o_ni_n<_'nt~I_ Cle_a_r:ar)_fe. _ _ _ . _

-A~~~i! f::NVl AON, W t \. f.ll!Gll~EER

. \ .l".l'C'LUJT ON (fONil OU10AIU>

. PE:(;ION.A1l Ol;FtCf;

for taking further necessary action in respect of

District' Revenue Officer Vizt,m::igarnm District.

' ~I -------------~-~

,r=- ---- --1 1--

-r T -- - --= 1- - --- r-- -- - -1-

- ---- - - - - - - ------- - --- - - - - ------------------1

', --- --- ---'~----

ml"'Wff'Dli:tlirn•@• •1www..,,1....,.._~~~w.www=•rm wwww11 IIWl«i~ f'IIIVWi ... J!!.11 ...

--------

Page 236: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

al I) 1;!1~·co.P>t1 tf',;, ~ ;~ ,; ;St.l ;-;; ~·, I§ 1er>i:1i~·dl, -~)!fd'~ . ,, ..,, ... . . . ,_; .· " i:;,~,;)od ~<5'\t'f ~.,sg,,,; 1:0 1;1~sn , i\.;);0~:u

;/':

~,,, . ' ) .,~-

==·~ t:if.)• 1. ;) 1;;0:,:;~ 1~;ti..

,,, ):t{,;,, iT '.l~P:'.t,:• HO..:·, '·) o ; .. , •!•: 5(. ..ff. . '<: ~J\'7 • , ,e ··r·;L St:>!t r~~!~i;J=l i

1:-J~ ~) !=- .) °f~':.<!1 .~:: ~~L:

;;,:):' t!...;: •• ,:JtG· 1.,J! n- ~)~ ;;,,. ) :r.,: , .;-

i: ,c ~·

~n~~'. ;: pi;:io'!:~ (,,,~J)!f:,~·

::. 11\?.; 1 ~~( !!!~.' ~'-E_t_

,t,:-t .-· ·~· i.~----;:,,;{c),5{;i ~ti; .:!s .. ~c ,. ~r., ~'~ :g,;SJiL> 't' If .. ' ·,:.(• J. •,J) ~;)•;i~t-· ,.,. Cl ! I • • • ..... ,_ ' "II'

~ t~ ·J!t· 11 !}; t~,; l~·:.t ;at~~ 0

1 ',; ·-~·u, ,:C-,t:,:15:. t-l• '5r,

' .. I ... f 1£ ~R ·:i~'.tJ!t), ~ ·11~: ~. ·J~F t t: ,S · 1 ( ,t:,t

i'.il'irllicTuo. I\JEIO ., oi:J ,1-.,,,i,? 1->1;: :,t., !io·i,b~!-.'.i q~

-S.;i_o•~l;! I' <1:i. .• ~~ I ~ ~~ l!l.)•lcr> ~,r,,,; 1, . ,t~riolf.i 1·,s5: r,~~1 r.-i• !!.l, l iJ~ o~ ... ez ::) T .~ it,b,

c£a,f ~~-i-io!il?ief .~,.J ~e )o•~1c:.» ~D.'f • • >,;JJ_u,. ;,o,, ,;ir,~.s ,..s ,u- ~ ~'!:; ~'I.>; "1l ~.;)it ~lr-

: ?~t.w.J1 '3 _ ,P:~ r.>.~63.JV~i ~lJ •!.t ,~ili,. it>.?:>tn.li it>{; (~.S=•w "' . . l~)C·i~(be• ,, '!:) ,10 jlf ~r-;~ r•u

,~~~~~i) ~~!t ~t~t~~t.:rr~.i!:,-: :>@"1>i$ t!,<S' !I, 'lti"'ibtr>c,.J<o : ,:&.,

;~¾~~: ~ i)c,,i ~>.:.S,a ~~: ~'), , ro.;5,i,~~ ;r,t1p!,i:.n, t;:m,G\ r-/;) ~~C) :~(}~t, .\(pl!);) e:!~ t·~:4, , ';)_OCA . tlci1 @:O ~ I.Fi~ f,, r.>

;)l 3:;~,~?;;7 f·0/l:'/,\ll'J},

o'im, "•!St, ~J !ll, c,1·.S,!.it~!) i 1rair;,t1~c~ ~,,Jun

,)u i~'Y"if5o;~ ·,;1:r-,~~?, ·• !~ 11 1 t:·~r,,O"~ ~-"':f ··,4- ,-\, ~•o( ,fi" ~)Cl',_I.~: ls ~;',n __ J;i 'n" 6~.,..,,;--n ~J"--:n- 3Q;'; ••

t,(,e:1:-J:;:,<:,'5' ~.Sc :!l ~·&,:/fr :i.,.:r !' ~· .;~.::,;;'.; ;t:~o a-,, ,~~:'. ·: ~ ;:;, !'~13"6Jm / ,:,oD ,~~ •·d J \ ~' ~~:,;-~ ca.S;.~.:$c ··';:: : 'J , •

.... I .. .:, .l: I

1 1,51:) ii"•t)Octa>t ,i~;:,s£; r;,:,,1/.: l •·f!!, ~,..5 ~~l: ~:'' Ii ,-f

~ '~;;r,,) ;,11)~J)11..S1§<;;-;•, )!0 I

I 1l•c :i krf{fo:o ~ - ''·"'~·'SJ ltr: .,;t ti_; ~.:l /,;,;lc,i~.:c;:; .J: ,., ,:fJ• ., 1 ,'.i; i ~ <.:Jt:n: J>; f )i~ 1}~t·, u )5 J t ;;:i,, :·rey, c'Pf..ir i ,j,:, !L _f: ,-

~ ;t- r .-<. • •' .,,, .... ,. ' • •· •< A ,;_ -,'l '=" • -r;J 'i 'clae;-, ~.,;, ,.: ,'L~,-•Q, o) ri iJ . ..i,:-.4_,r l<>JJ"',>, o;)n [ ',f o...'c. •o

;7 ~' ;,k,:..;;;y:, -s, :? ,."c.(,;; • ;t I:~ c1 ,}•<f.~.b

- -·--- .... - ..... -----., ---- .. - --.

I )"

~ EN' RONMEN AL f:f.1GINEER

A.P.PO_lUTlON CONT~OL 80AHD Rf:G!ONAL OPPICS

\',,.,\.~ ;-, t,,:·,~/\.RA.M ,A-11 )I., .._

Page 237: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

I '

~- --- ------T'

•. '16·1 ~ <~bJ I - -1

I I ~==~-~-,·~~.~c:5.'3 ~l!llt\s ,t'lctj.)o\?~· ~;oo«>" m , n~~ '-:;;,r,~

1~_111_r:,::iil);1--. ~·>C.cs.;;, !J'><"sucU>o. ali!~ iilo. 11 . .o,;,,,51 .,..,!!), @1!16 ?1">111:i,

I ~~~ 3:ll!:!~>lG:1clo - 035 ooa; a:til"5: 081'""2·2.<!T3TO•

"ll"f("" mm~ . -1i:m:i 1

r,mJ r ,PQ,n, , H<>>,s1'1Um 1'11()di.'> <!16:>:, '6x> P¥"-' "~)'l)tln -.l~o l!IG<> tllcp ~ ~~r, .. ~.e.. ;i.i ,, 1'!13 •

' ;f 1'1-·0U,:aoo ' l "'"~'> ll':l>i;)t:' t ll>uull., l,'!8'00 . \ )~G., .l1lb •r '!?.o:'" 1.\.-01',, ~65 ;JI<>, : 1(113, l{l'',ll l\mMS. , ....,,,>~ tll •IOJ•>• \Jr>cchi ('11>04l<>o), t>ec'1>>011do "1"l!!o1 1,,lo'I "'!!:® ~Ol4 ·, •• , •l ,19 .,~.~'·" '"'1~!1 "13i ~·".Ji t ~,ciO 0 •11 .,~ , ~ • ., .,...,~l!I :,l\ ,i,il~~!111>~bnl!.> 11•'CI> ' ' '-':I"' <!> 'J.,g .o,~~·~•· q:,~1;ip 111,1 ;ll,1,1 ,~.I° 411!!11 , -..:Ina<, ~\.,, '!""'·'" •o Cl.~-~" !lo~ i\11J'\11fu>0<1 ~ ~ 30,000 Cl.11,.,, .,'2dn .lt\11.,;1J :,19! lil. ... on(<l:G 1 11t,,Go• • !~. .,..u,

!1,~ 1Jit-Q1 ~· :· 11,,i;, 1,011,000 ;.,,.,.•1> ""'' 1,,~ ~A~ "".,~o t il.b,,>,!!,, i!lc,, fr~::;, ~"·W'' t!U,, .i,i;t, IY~lt\JJ<,cll) l'I t •,i.» ;;\J,11,o e')•BIW~• rr,>Cu C , BD.111 ~~! '(•~~lit>: T l!,IG IJ) !,? 11n.'),ct1, ._1J illt ldW IJU' !,1~

•il>d)JII) $:·\ 11'~' n>1'i:JJ ·~t}i)elJ(i!IJ ;)o't(lOO,'!I .:le>sl\\lr, l.t'"" 'Plmc<b llratH> ,:it!;IU~ !Q' J~bl=•!I l',>Oo),?)

I "";ilf,;~11 "'' '"\i w,01,olJn liiotl l.' ~ ,C1Jm1 1Uc> ';'"!! m<:1.1 ,e-i5e1 » i,,ttA>lr>.

11J;1'!1:i> 1v.1 l!loi:J 'l'Jl;i l"l1l , nlJ.nt, ~ ,--al-,.-,1"". -t,-~-, ·~,;.:th, ~~,:,11,3 D1f> r:9~l, O&lJIJ{l. ~t4 ~o. :'• 60, 1{}18 ~,,o. rnt>U np_a}{l.)(;j - i,l~th.l

'l0t'\l~"i;r\f'l (::d:lol -~eJo) fJ?.'Jctbi6ritSo ee.n. ('!1.J~i;,1(5 II•5 :J-5i 100.. ;)rr,S ;;Jr•. : OB8A.4, :lT4oc 11,

·----- 8.:!:!!"11: ~·Y9Il!dbqrrinlh>)l:t,ln ·· ___ · _ _ _____ _

i-;· ~f;J~..)if ~;:i~~ 1 ;roc•.b>

1:0,t3)fAIJ'SJ1'

•1!1!! rila,, :,r:a, l{l)rf 1101>t!J, ·6"~0 Clf"•l>o) U>O<i.l» (;(vcU•,:,!,) olll!(J.l,.>' ,si,o ,s·~:­c.,c,\G'•f)il" • O :!•O 00 l,

t<lJ n\ r.J . 1\!1 iiffi\' IJ1U?I', \fl~f.lOliJ, 'i:J>'ll,.)f!,;; 13\f> <l>'?,!c,_w;, l).U,.t](:i, :?I'' 4!)0,'j, :i \iOm• .,.~,:,,,; o;;O,~;uo!O~. oo.n ,:,,~':,6'1,1 f.!.6, 0-11,tit.J •> - n:aicb, "'· , l8~ "10, 09~! P.l':'l')OO. r,JCII EI DTr.!!,

- ~1-e_-_m:ill: '.Y.mktilltl.f:ll'..1$l ll!.~ ----- - ---·---- ----'1 ir.P ~ ;, ·1<1 u,., ne.1c; I!~!~ (~fi,•n olJtlli>"U')

c; ~le), ~:;i)-::; l(J

*-.1!> _-'1,,:, ;

~r.o,-:., t0.,.J, • .,

iJo: .12Cl•O l'L•RQIBO. , t\)(1.):0,0 '!\). ~ 'f.\H~O ,1 11,CO fl r.t.ul)I. \?1~g ai:0 , I.Y(' C)'1tf' i~ ':X:l"ocO

;;i,~ ,1'., ili(b ~~"~ o&l>C;S u~i:;,51, <?.>:I!! ~- t?oa. ,r,i:: 1,otA, 1i>• '.," (1?' '1:•>J lll.,.,,Jiu o'I: <'<>o), .,.,~,u,, •"!!· e0~1tl,il.U

1. ~B. .! tt(I • ;~,,-r,;,,,"~~ ... '~ •iz t i}~~t.111 ~~16 ~~'·"'' =»o.ct\)t FJ7'.:]~i~~"1' tp:-nr _1-J ~;S )~ lb&:Uv

(~ aa!1tn \.fu1:.w ~,~tt~ ch~:nr."'~.u 6"1 tb°'"~t.\10 \j)i-!i.u~"',: 1J n,~ l!E,;- ':l., ;;:no .e•ar-1uc.tt:o, tU=cl'1o>~t11.lu. ~ , m>r,,s 8'"'.b~mn ,Qa!,O ~ o ~cr,1,11 • ~Jo . t ' t.!: a, o l.J.

rCrn:i tthi~ido., • t ) 19t;~ ~ Olf~~ .r,;, • •~'!J~U.1,tJ ..., ,)1;i63, ,t,11d1J,1lrlt1D. 41 ~!1!:, mrl.scJ-!} IVfl~lfl~ 1:UUJ~\i

ffdl./Oif/1> ~"' '-41 , ;;"5:ll,! +1111,.."1~ 1~ [~ ,:,. m!j1 ;JI'~..;' ~ol\°'3, ;;i..,t,,p,e, :,I!), Jl.;;"'Ol>'<W l<,l o, Dw,sl ~ ~(.'j • 0?.0

<no. > <!1r,f ,y,~1<><J.1Jo, c,c,,~1;,1!.ff ..,<»•\I. r,i«;:,u;.m;o i<>iotJ~, i ,..,. 11 .,~. mi,~rro. ti13.ti,..,. :sl,1<. ~,r,, 1a1. n~ ><~r.,o, ,. 1fo113 i!>"'¾1l'1., w<>~ » c,4· .I) IT<><l'J<t\J s,,:•~vctS,., a.,od;u ? ,,; .-,.:,\,( t>tJ ,~I ~11·t ~•,~,. 11G U~FY.J.L1 Q:t !l1 •0i~ 1,,.8,l\,i.J1,h. ~.,..~e:ill , ~,. :l"-, U'1ili~rS f 1'1~,r; {J°1C:.. ~,r.•c "111.t'~. ilt~.i. ~OD0:34. 7 ) l!t!! H.J1,1~-,-! -'D,0wt, J?O ~:l~"Ctt:m. lltih:liJ'PkS :jo IEll?!, 8) il.?o~i c~~fG:.tl F.1f~?Jt-(1 ma D-t01';jL11.11>0. 1)."A:J ~ i;tl)Uo

(qn'n.r;, '6>':"" •.'J ~ o<luc) , .&>i'!cl\Jft)n1J0 a;'?!, t,) d~,0~6 61CT1Joci.'\JQ. ??r:; ,n (l~o 11\~tUu ~'\·o~t>!>). ~'tr.i:r1 itlo ~ - 10) ~l ,S.'1 ~HJ' uA rp~cc::UJo. ;,\)'2ilf:'H:l~, c1r111td,o}. ,l'~\~· t i.~oo).' 1)74(.W,,C,tl~c, 1!~.

111 ,ru•r-:-Jf>OI.' u fl a u,,iVcl. Ub .;,H ,.~~~ ~!.'\f) upiul'l10J. ~ED l~C t'lve>), r,zcJi1tfitl~b ~~· l et <-JOt~f~~-8 ~~ , 1:ottl.•:;1JI" 111 , •n·. i,)wolt«> S>Cl~,,ctllo. "!! ;l;o . n. , llan•,s .,.,J!b, ,.,e,i.; tGnO, 1.1 n:ol>""1Ll0 • , <m o,,.,_

t? ~~!~-~,- ~~\ll nl01J! t:,j, t;>~t,.t oi~~tu, ~v~». e,~~a:baw t~<!Sl.1 c::~..\Cl~I-=~~ ~ t.;o~ c.~~~ ~l: a><>4 ·' ,i~f .. ~ ~. 10•1,.tl >'.,.,,.,.;;, 1'I ~- \;folll l~O(ld~ ... ;;'lb~ l!>l~'TI'? ""'00 r>~II ~1C)lit°u.m>

"<',u-.ic-;,~~J'~ .t ;fuOt:11.\> t?IO ~,tc ,Dt(\ a~ ::flll'!>C".J~ ij~~!ol ~~ T,)Ol.\~~ri- t;3u-n·,111'1c-lSJ ~ ·)n ~Q,.<,~{ :;':\ 1h--:5!&> m "'' ;n~JS, .-, \)lh'!'~ ~- . -;(\r:: ai' -

' ( ~r.n.J<ion ~~c~ j

r..,1;c1 .t:1~·,. '!Jc,..

,;Jo-: ; 1.t~ .... ~· ,:: 1 !'.

~1u\S] ij_,}r!li,if a-•"'""'~\j r:tc;c:'lJol:flh111 ~o<U:>, o iict.1..J !El'llUll":4: 1:t""'""e.,. ,J)t!l '!l.h~'l1Jc1. ~~ ---·~~~-·--~---- -~9............----:,!_. ..... ., ..... _..__- . ....... ~,... ..

.-::, ·-·-....-

Page 238: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

--------·;uNPM Tlr~ts or IN~~~;A1<1-1,-,~A:T''_A_M -1VIAllCI· 25, ;•(Ill) ' · 1 ,,

-------------

. ··r . EM\(llllOIIMEtlTI\L p ll"U::A nm,

,.., P•. c.or Jenc,s \,vlt 1 th'!' ' :Ell\ NotlncaUc-n "lo.S.0.15:13, d'!lta•:t 1•\th S~PI• o ,ll~r1 2.llrlf) nru l I t, tu.1ll ._. , ,~'f91 :t ,11,.,r, 1d1T or11s ~nd he' ci .,, ,1rrtt I tuit cl lln11(Hl f. U"\•t f\/llnt•t•y ol e,-v1r,,hrno1 i t (t. For-101, Guvtt."' n t7n1 c f lnd1-. 1 ind.; r E11viron...,~ ,t ,=i: 1 >I Oont ~ :\, '1 lllll, lhn, I\ P l:,nllullon l';1)t 1lrc •I Bq1ud, ,._. -n,y IB,j\ UI •' ).t, 11:111 ::. 1::-ornn.11tri1.1cin ll•l\11 10~1,,, 4 'q 1 llll!ll\ln,;; up cif n,iw 2.W:11 J'IVA ! ; Lfb11oi~md l!laiolr lo l\rc IL•Jrhl'la11 i,(tn1, Hlth

::;'.~~;g. ~:; !~:~'::, ~~8

:~;

1~,~-~o=~·:: :;,t;r/11 ;~'"~u~;:~';,,:~!~~"Aet~~:';1~::~:~::::~ :~pi~~~ '~.:.1~~~~::~

I!=- a= 'foll!:,w:1: Frn r,> M.,,, 1, 1.rhtl!lo G · ,;;-9,ll ":"O r ·pf\ ( Qf ) !1111~ \llo r •u.ana.u• I' 1 ,00,Q(L.0 ·1·c,.n~(urHJT.'flw·~· Slllc ·9l '-:'3,::Z(•tl ·rpA. (:~,) r=a.- :1 Chro1i1~ Q!.130 •UN r'l-" f\ , r'ho lol •I pruJc11.rl oQ" c,r llle p lnr')I hi R:t1 . oe ,"11 ! Zr-on11 n

Ei<i •llrH• Ft~.73 , Iii Cm ~11 ,• :, f:.>!pan•lon ,.,.,_,,, 12 1,0 Ot0r--nt 1 nt"llJ h 11 p r1 po• ti , bt• tml.,b1''PJh'1 ~ 'n ., .. ,. .. -.:I lrlg •.Jrlll ord)· lo,:-pit d •t APIIC Plol 'sla :J<:f3, <3rc;,wth •::en~"r (1Pd11 ;lrlal Esle\e-; Uot;blll (\• 1 r.. fW l. t fz 1n-~u~r-n m Cll!1 de.I, r ndhro Pr.e.dn9h.

?,.-!; .. J0 ;t. c..1.uf:!O'.-ls'u .. v f \$ ,nf:lnUnt \41 b"tow:

I Ml ... Btirry All :,yoo l.1rnl'r.i ~. API IGl r··1ot N<l,ll '3 D, - -

,_ •:l.-owlh C0nti!'."r (lndL1ti\ll;1l E .:9,tn l~ ) Cl-:>bb l ll ("·: !: Nanu~ B ,- ch~r: >f; nf the ,:1\11>, VJ::.len:gg.iram C tat,1 lot. An1J r n f'niild . tJ -. :_

Frolsct () fiC'.'l 1 153 13 66 ;\. P i m,,., " l o . QE:(;l, JA! ,!T•IO• l •I. J!~-moi ll , Y1orlte(QJt,nny111 •Uoys.1r,

-; L,~~,3tj;;:;; 1f t11( F;;:;iject- ·,;i:~~68, <c,rowth Cer·tar (lnd~•s1,1iiie~i,;;i; ,j~-- -l~cbbill (V) ,1. (hll) , Vlt:l i21n!•i;1a rm11 [)j;_,1r;i,t,

_____ _ _____ .~-.Jl11 a P 1 de•1h, Jr"JI 1

1:, 11, No. ,33f;_l:_!~ ___ _

r l:;rna o! :he ' ;lh·Jriz.qd ~ 01,,011 le Im ( )11t:1cted ~ ritl I mldr 351'1 1. l'I onn \\I J,

I >ale, ·1 i111e :i /tirue of I ·'utilh: Hi,an1 I I

I

.;31 I M. Sl'lnlvas,o ll'1j t , p...,..,lrlen'I;. 1 A/1,'s. B 3r,y Alloyg Umlle,d, 3rcl Flc,oc, r , F'rap,.\hi

R,,yol <\parlments . L,allia H,,nplt i, I lana, · VI al<.hapatn,,m - 5;;101t()(:I , Pl 1011e No. 0,39·1 :i: ti1'1 1Jt)O, ·1~1.1·11138'/79. fl.,.,.,,,, ""'' Its :!}L"",. <'JloYE · !n __________ _ Rs.85.16 C1 ·or,Ja (l\fl,er E,q:,nn,clon). ____ _

6x9 l',1VA Electric An; Fur•13.ce~ f::r r::-:::rro Al'o· •_lnit {AfterE:t:1:.ans,I~-------- _ '. ___ _ [J,.,te: '.<!3/04/~·)1l< (Thun,ciay); Tim•, 11:QO/ .r,1, VF:,nll9 : Near to Iha existing pre111is.e3 ,:-,f 1\11/ i

nf~rry J\lloys L imlted, AF IIC, Pio!. Nu. 358 ~ ,rc.iwtl, Ce:nloar Bobbi11 (\/f ,3'. (M ), Vizianapc;:irarn '. [)le 1:1·lct.

_____ __ ___ . A11d'1 r<1 P A'ld ~~IJI • ______ ' _ -~·-- -· 7 .,,a,., or a, al'a'"lllitv · Exr cullvo Sumrn;n.i & REIA Report/ '·"1 h ennnum, :,hm along wm, !'!".Jft corl!!! •·1'1k:h

,re. ·~qp~ op~n !",:,f pl I le· ::>rn·.:.·9 ,:,f th~ LJislri: C.ollectar. Vizi:ar ::iqa,am.

2 Jm· :e ,;.f lh'? <:.h1!:.1 x3r ullve O fleer :i,:illl? Pe1ri!: hed, Vi.~ iam-,gara111 , J om~;e •:-f lh':' C:ier;!:'1 11 M;1nager, District lndus1rl:1s Cenh--:r, Vlzinnaga!.am. ,t om-~e :,f lh? J ,1e,n·.) ~r S-·J.crclaT)·, A.F. Pnllulion.~6nlrcl lloa,d, nea, r.~un R.i::•!? 110(:1 ·ital. Pu~I, in

Heinl Cen'•?L Ch:1: m1pv2irl StP~et, l':uslurlbalp9l, Vljaynwa•ja - 520 010. 5 Off ,.e <tf lh :1 .'olnt, h;e' E1wlro11ment.eil Eng•ne~r. APP ;B. Zonal Olt!ce, Vud.:1 L:1: :11;t,

Ma ·l;,l ,.,va•llnra. '' ,H, ".I RTA < Jfflc<', Vi!lakl mfalnartt - 0300'13. e Ole• II" 1-ilcEF :;: '~- Heglona1 orn, ,, (Soul~ E:aslern Zone), Isl & .".nd Floor, Hl::l'C C/ull<liu i

No J•I, Calh•:-dr~.-i:' ~arc.en H'Ja I, Nl n:J':llnb.;iJ;,~ am, Chennel - 000 0 ~4. 7 orr•,;e of Hin 'Jls-!r r I I tP.venua I HfiCE!, Vlzlanag.1ram Dl~:l1ict .. e orr: ;e or U,n -1.evroi u;1. ntvlslon 11 OFir.-:1 1 Parva hiµurmr. Vl~lenagar;: 1m Dlslri:J ~1 Qf(i,:.e of th•:" rah::; lda1, Bobblli (Vill:-19~ r., Mar rJal), \/izian?.grrarn eislrk:.~. 11 ,. G•ar11 Pal':: 1a!H: l )Int e, M8tl~v::1h.1:;~ (V), Bobbl1i M<111C,al, Vi;-:i.ena·1ararn Oistric1

. G1rnn Pm·,,~ !ar?' )!fi1.:e, M . ~oorJ~11;11a5a ~V). Bobl)ili rv1a11t.fa1I, Viz:i: rnagaram Dii lril;L ·\ '.. r:ific9 (JF 111,~ Ea --i :mmenlal E ngln?et . P1sP, PnllulttJrt Conllol Bt.111111, R ,o,:;tll_'.'r'II CHh::13,

p1 ·.,1 Ma.11, Isl. I''• ,or, Shive]i ·~oloe1y, P1ecies:, ~l~gur, VlzlanuuTiro,n - 1,:i, , Q1J·1 , s, ,00n1ll ::,ns. '11?·.r,.-:-::- • crnrn9nt~ e11d 0\1luction-s c1r lhe pul:-lic c.1n an•1l.-c·:1rnenl::'"!I i:iSL"1 :i 1f :-frly 01, !111~ :1b:i·,'E' p, ~,;(, ':I:~ in"11r.,c:1 ~· c<"' L,ef,::,rP. :~0/0" ;m·tn. ,,11 lhH n~1,;;:,ne; c:\n ~ls11 make .,..,,rill: n s1.:•;1gss1 :11'3 lo r·,e w jc,:r slp'l~·j •)r'ic~r f u,'3 ,,.ndl ,·a P• mlesh Pcllullon C:.·~ntro~ B~;in_! on or b~rcr'·~ ~.6 10•1/2.C l:: . t"-11 lr·~1 pr- -~IJ• s -~ ;!fl~,~,.., r:·~? ' ~:p 9. te lri tl1:'! pul:1',: hr?e1ln~1 on ll1e ::ate a11d ,,er:ue specirled :·~t1\le:_. 3i:;

••I• · 1,11oz.,0111r., ENV1f·IONl,1EN f'AL t:I-IGIIH' EH A .? . Pnlh.1llon.Co1Hwl Eloud

A"!J'C'""1"1 r)ffl(:~: \11,•I J.,IIP!JHill l

- ·---1Jlji!li1fftJ"--

l/\J~·~~ EN RONMEN L E~JGINEEI~

.'\.P.PO LUTIOM C NTf~OL 1:'lOARD PEG!C'~·-?Al O?:"~CE ....... . ,,

Page 239: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

P1i11l wind:iv1

I

,, P .il:1

lic l-lec.1ri,·1~1 __ C?f_M/'.; __ ~~rry_8ll,)ys .. ltd.

": n 'Eel···,[email protected]

IC vz, '1@ycd1oc,.(O.il1

~:hr., lay, :23 /,prif, .Zo:L':J, J. :E ;•::U ,\M iST

I ' • I I

This is H 'Aa<Jhub"b" (ICnvlmi_1_h;,,111 Volynte•.-J ••n~;,,g SUl!por\ le_tte, to you rega1ding Public heari10g of IA/, 'II I ~,;Jor:, u .I. ,i I ' '

I:, ,rq!, ir 'IJ you E ir.

'' -. h 1h11I ,11.111 tRI EHl-\:3) 1~1/ 1313 1;:ou7

·: .! :· I

I 1

I , I

.;· 'I' I

;1 ·, L.. i,,·,· '!.) M'.i lktty Alloyes Ltd dc,c. ' ,.:~ r \ } ). <!/\JC I _' .( • .i.1• I .,•<, '

1

I \ 1

,, . , I .. -i.... \ ·v·

; \-',, r )\\} ..

./ ~­\ \

.

".\ .f'' \,

, . . ,. ·r 'I: ;; ., ' ·:

. · I, ' 1: : !'

i I

:i· ' I I I

,I I

I

! j:

,; '1: j ;

_I ,:

' .

,i

' ' 1

' I I '

I ' I I ' I

I I I ) I I

I i . ! ' I

I . ' I I I; I I I I I

,· 1 I, 1 I

i !I ! '

ti I

'I I I I I I

. l I

ii I! I

i! 1 I I

I ' I

I ' . It

' I !1 i ,.

I I I

I I •• • 1

Page 240: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

!\1WI:. ·· ., rn 1:i:::i

Hurat Enuinann101ut Educa'ttinn ;nntl trl1(]aHJt J\mn n~1Hf:;~~ Soriety

Regd No· 17(12/2007

---· .. ~ .... L. Plec1<.e 11 \izc •A aste v,ater 10 pl~ntat ,Jn, ,prinkli11g on roads. It contr,Jls D11sc Pollution v,he I yostr vel· i,:!Ei,.

t , ans1; or1 ,:im,~.

•· '<ou · t~ l(l.,g(:13''~) pl l,1t-lt\n11 Im Gt t!,: 11 h~lt is good, it is<:!'( U norms, bL,t: I am •·~questing '· 1 in(1·eas~ ,f ,,ny 1:os!;ihl~.

L. 'iOL t;ikt• ,111 l'.l•~ pl1<1tlt11J,1 te> ne_cr llla1~es, road sic!,•, ii is •1sef\llto ~.ave 1:11vlrcnrnent. Pl 111t f1uitb.Hi11g rncl r·wd ,:i11c1· v, ll 1f· t ·e,•i.

~'- FIE-2s~ gi• •! erwJloyment opporlunil.i: s. to loca l p~op'e first. And co:1duct skilled program~ 1 ·,r local ye uth lil.E, !Tl. l)iplorna. 1 he•1 ,viii gE!t_;of: npportunilies other inclu:;trie·,. also

H•. Cii11e (lll~l i·.:~I F..cilitl~, to n'car •1illag::·-, Cunduct Medical Camps Re@ularlv.

,_-;ive drin',:ing ,• ;,te.1 facilit1, t:, r.,,ar .,, lag·~s.

l: Give goc, echr• ,,t.io,1 to n1;;1r villag,, 1 111,Jren.

:, .. ·r he pi oj, ct wil: rnntd\Jut,~ acldition.;I re1-enue to th·: litate Ill Central Govt.

J.I, For using of CS l, bu,Jget please for·n 1 CD-ordination committee with vlllagE: people, Govt:., iff.ic;als ancl co1111:ar,·1 i:,eople. ar,cl find ne,:,!ssary wor!,.s fo, v:l\;1ges ncq ta-·!=t ,Jrlente,1 wocks .

.,, 11 re,:oir,111, 11di11€ ,1utuirities of polluli' n f.'.Jntrol p,in1il ~,f MOEF 8, CC for gr,nt p2nnissic,n t" the abo~e P1op,:,nenr.

h, nkin 5 '.'Ciel.

u,rs fail hhdl,,

, I. i~larlhuhab11 i •re;id,~nt (1:EEHLIS. ~ural Env;rorw,enl i:cu:atlon and H1!alth J\waren ~~s Snci,ty)

I

) t:opy t,, HO \/iii,111;iga,,,m, 1WPCB.

:l c:,Jpy t,} Prn.,ii:t l1,c1po11er,t 1\1/s Oe·ry ,.\I or Ltd. ,) 1:opy t,~ p,·o,!:ct C•>nsu!tant.

~· '. iiJ ~ I · / ,1'~ ;1•1 r,. ·;11sh e111 ,1b,>cl, I ly,lt1r_ab:1d-!' ·1, 020. . E.1 ·1,;111: n1d,Jl11,han111m111t!l,1@gm.;11l.com, 1;; iha,78@\Jlnarl ,;urr c,,11 : 9t1fl01i1 rnirr

ENVI ONMENT L ENGINEG~ A.P. POLLUTION co~JTROL SOARD

REGIONAL OPf!CE '1121ANAGARAM

\ "l,

Page 241: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

r,:.

r

i) rw r: ' rRl{;:.

ii .. :.;.;,; -

lf' :,antl ltir vh·un ~1ont IEdur:atiton ;ind l·itmltf:1 l t1i\f1Binnu1s:s Socinty

RHgd. M J: rl02/2CQ?

·11 ;: :, \/11··.Df·J~,lffHJ'L EIJGIIF=:F:, ,· i i c 11n,ir:1c11 flegicnc;l o 'fice,

eoblJili, L' are: 26.0,1. 2018,

·. i i 0•w, !il1-111 Dist i\FPC'!.

'1tSF:, iFlS!R.

5.!lQ :- lte~ ;~, or pul: lie t, ~. iring t>f M,'., 13erry Alloye •; Ltd. pro;,osed to e,qund their prn\llli:t~ Fmance r:ap.i<itv ~' 9 ['!'\'ti, Ferm l\ll t1 n,iar,~rn 4-lll!iO M 111,~. Si1i1 o rv anganese c 2400 MTPA "110 Acres wl th 20 Crams, lvlan power of 100 at Fl·)i: 1•1,.· ,HiB, /\P ill.: Grow r. h Ce, ler (IE) £11 ,\Jlilll , Vll l:rJ! & Mandal) Vhianagaram(tiist) AP.

: I \ 1,,.:1t1ubabu Enviror-ment 1/m lenl:e1!r (REEH A,;, Hural Environment Education and H•Blth Aware,ws; Society) F/0 of fl, cl2r 0 ·.Ho:i, r·./lost He'.:pe::tfull~ 3L IM,it Tl,at: ·

111 this reg,,r d a; a Em ircr,ment 1/oluntee.r I 'am ,5i.1ing few su;:gestions to the pror:onenl So Please 1:1rw ~ Cc ·-side· ':he Belo•.'J (( it·.t:- '

,,.11 ''11vi1'ci11rnenta 1ist s are opposing the inclu;trle:s but i am sL1p·porting H,e industries why because, In ·:t11! tim,! of 1,1 :I-, n1,1der,ce our .:o,Jntry pop1.1lation i.; 30 crc:res but now it i 1crec1sed to 120 cror~s, ev,~ry year 50 lal:hi, Graduates are

~c111i--ir fo1 ~rnp lo·1rn1:nt but Gover ,men•: givin ~ employment 10 011:y 5 lakh! people•, othE:IS ar~ getting Ji:b opportunities in I-' il'.?I: • sectcv sow ~ mu ;t wel·:iJrnr· to the ind1;5trh:!'.

•"ll_c·• ~ di~ C'Jllt!lg a!Jm I: poll:.1tior ... pc llutior ... b11t main pol!ut~oll of our c:ountryi, Ul1CTTI~~yrnel\1T t I 11~ 111i,5t d, r (Je.ro'i:Js ~1-,--I • f-, 11 -'-~1 11:---

'I. ,_he Pro,Jone t of M/$ E env •illoys •_td 1:rc-posed tc Exp;ind Their Products as rnent•oned ,;bo·:1:-.

2 The E111lron nent :,xis rlt,,r-t of thi,; pnject stud\' area cover d 10 k.m radiu~ aro1:ncl the ,:roposecl Pro_iect aL~3,

they studier:' loca':iom of ail ambir,nt q11ality, noLe le~els reo:01 ded, water samples collecteJ, soil sample; al;,J rnllech~th,.,~cll-are-·n rnnns ur-cPCT.TnistS:Sa":fsfa~:!Oi\1:- -

J The co1s.1lt,•rit please :ak? t·-ealth ;tali';; of village people tn J.O •-;m radius around s must .. wl v t.e,:ause ii: i, VE ry t1seful •n Fut, ire.

,t Please take ;~rop p1 o,foction details fr( m near Agrlcult.ure lands also.

'i . For operntic'l of ti-,e pr ojEct Nater req .1irnment is 120KLD It is I a king from groun:l water, Ir. ,;um mer i.eason chancE to d,:wn foll v.t,,ter l~·,el so pie, ,e arrange rain water harvesting system .

.. i1 i-7--4'.J!-iN t,lus,1eer~!Jad, -lyd,rabarH,On IJW. · ::. r11,1il: rnallhL·har1u·11aridlc1(0g1 mil.com, [email protected]

Cnll: 9!~01lflH6fi'

' . -..

Page 242: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

·1:f'\jl \:i j .,~ · ; q ii lll Cll I, l \· f'- f l r, I f1' "1·:'t i ' ,, Il: , -- .I 1 1. , : I • .:J ;l ll ,.\ I . 11... ¥ ,: I! I \, ,e, ' ' ; i1 B \

' . 1~ \i Jii:1\!\'t}n lt$:E; .:1\0[:iH: t\~

Heqc.. No: I 70:U201)7

l ~ ! ' ii w 1>f p JI. it I . , r 118 of M/ :; fl~rry Alloy,u. Ltd , pi-upo~ed to e~:q,1, n;t tht Jo· pm ducts Fur;~m-l'! Capndt\'

I ;<',nfdfl•'.~!IJ.1 J~'G°ll1

~i; J1, :!'!co_,~ illt):l,~I e~:1~~10 . ~pp. in 10 A_r.r.e'.l Wit!, JO - ·nit!;!:, Man powe1· o[ iOO f ,i.

,.· Vi;: i\: 'I! .,, ,, ,·,11 ,, t,~11l:11 \1E) \ obmh (\ 1l1q: ;· ,_ ru,arn1.11J 'fm,:m,·~r:i1·2m{l:·\~i:) A.F. (' I ~1-- 1 il1 s' • ) :J_ () t ir,n;~\

nv'! •: ,ni t)f!i it Vou en'·-~ r (Hl:t.11/\S. ,::, 1ml l :nviro ·in,e:1nt E(:ucati(,n , !nd lkc.l, , hf\, v :H\)!H!SS Soch':ty) r.;n of :,,. ) ·cd ;,., ;: jiP_; >:(: fu'iv '.:, !\i ,. !ii I in,:

1 .; j:·c r 1 · 1c1, i 1\i:;t ; ;ir, 1 1) :ipo;.iri1: tht in Ju~1:rie5 h111: I ~1111 sup1:-,)rti111~ th{ indui,fri :,; why h, •:al s ~ .. n the tiiT•c of 'I'- , 1, : 11-:: ,,_; UJi.il\1 :' \Y.·1:,ui:.1\1,m 1: ~it cr,}r1!5 but 1101N it incr::a:,!:d lo l.2ll crcn ·,, (:ve1-)· )':?,11 ~;o iakhs G1adu,:tc :, >i: ; :r.:! h:1pk- r-·,,, 1!· b .1t :-, ,:11,rl : 1,m,'.1 t giving ~m1:loynie11t to i:,nly !, i;;:ld1!, p,zo~IE, ,:,tiifc'.ri, :rel el"':•n[i job {1pr,ortu 1,, :;•·. i, ,

:_,1 : :r_:c IJ '.' l I(:') 11<;\ w1•\( ()rn1: tci ! I(! ncl'-.151 Pe:,.

I I i : '.~' .· l !: \ ! ;! ~ \ .

' I iw l 1vi1 ( 11m ~n · c:n11!;'.l 'tc11 ,. ol th !;; roj, •:I ~.tudy ,)I c:a i:n,mrd 10 k.r1 .1diw, ,11 ,; 11m' ·:It:~ prc,pcr.,Ecl Pro·ec 1 ,1n!;1, :: :s:-( , ·1 ,,._ l : I i ,c ~ti!·,1 1·; of ai ,lmbient q11;i\J:·y

I r,o\s,~ I =Vt!l:i n!rnrdrnl , w 1t:-=: san ,pies col1ected, !.Oil sarn k:; Jb-:.1

; ,I ·, ul: t1·:;: -1 .: II 11 ·~ 011 n, ,. 1w. ol Cl'U~. I his ls 5;•tlsC1cl:;1ry.

I.

' ·

f!w t r,, 1!' ;1H ple,1:;,~ 1:1hE 1~·2llh ~,l.11.e: ; :: \· \tillage !J!:'•)plc II H krn rndi ,,. cl ' oun :: is 1rl\ff., why be(:-111 :, 1:. it i:, 'ff::.,'/

.::r:l, hr ,,, ,: c.

. ill r, 81i1 \r',n of tlic !ll'r.•j~H t 'Uilte1· rt!(lUiri;:ri1enl i$ '.i.20\<L. _. ll i:; ts1k.in1~ frnrn gro1 ,. ·,d ,-,aV·r, in sunHncr ~e;i:;cJ11

: 1r. i r ~ to , iuv,n ; all \'V ;,11 e1· I< ve i so plea~t! ar rr:1n1~e rc1i11 w,.1\ e::r 1i .1rve:,Li11g i\':,.U::rn.

/ .. 1-7-•\~151 •, fvhnh• er;,bac.l, Hydt"ab3d-50) Q;'.(' . : :rni-1 111: ll1:_,1 1;1rn mun1:ll::1@Jm:'·l.c•Jrn. rF. ehm,[email protected] ~;fill : ')'.}()I ' 6°1'.l 3'.'i?

IROM~~r-G-IN-1,E--~-R-­LLUilON CONTROL dO.I\RD

,~1-:, ... 1r-i1')r,.\ !Y,~,..r··!CE ,-,t:v \..,.., ...... \/l Z\ ,:\N N.'?!/:... Rf, 1'-1~

Page 243: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

. . ' ,-'I .

: .(), f[;

~ ;J ;,,

.. ; '. li . : '.! . ~ i t. !• \ .Jl ' ,. E~r,1 irurnnL ~«rt f 1h.i:~a'lti1\1.11n

;.. 1 · rd 1th J\ ·,;1v iJff u 11, rn;3 1'.i .. »'Pl ~; *-~ ·it \r I

Ref~d. No: 1702/2007

'• ": .:::.::i:; uU\o: 1~ -. va-;t(? w2.t2r 1, i>lanti.lt on, !.,prinkling 011 roads. It controls 1)11:;t Pollution when your vehicf ~~. ,.\ j -:~:-, orl ) rp ~ .

· ; ,111 · 1l:iqL(3 : ',\: plan~.itk>i' fc,r c;re·m lw!t is good, ii. is CPCI~ norms,. bu;: I ;m1 ,, !r1m~ ,l:inti to incn:,;iw if ;1n;

p·i:·. '.,I\ F.

,; \' •) ., 1 k<: , ·' '(: r ui;: pian!.,1\:iQ11 t·:i nec1r rillc;;e~, roo1d s\rll~, ii: b 1Jsctul to ~a\' ·. ' erwir( nment. Plant fruil baring a11cl 11 :: ii· n,: 1 ,11-c t1 E.H'.i .

P1·~.-i:,, i;:h·i: •.:,, ,pl•)'fl 110111. or l ·c,rtuniti,~~ t:i local peoph,· firsl. Ard conduct skilled p1 og··,;111, for local voulh lil,e \Tl, JJ i ~,k11 1c1 ·ii ...... v,1;il :,t~: t ,1:1b c· ,pc,rtuni .ILs ,:,q 10 1 indusll le~ also

i ,1, rhr: p )jW ~ w( I cw trih1, te ,vldl tiona re,1rn1,1e to the ~.1:a, e &. c, !11tral <:,o,d

i •, . l • )!' 1 1: nc.. c I c: H i>u:lgd pk.:. si? forn1 ~ Cll· urclinntion , 0111rnil:tP-? with "lli -1t;e pi~c 1::ie, r :i )V':. official!> -md c c!llp,Hw

fl' :r 11 1 , , ,1 • fi1 •d ')E·1;w:,'.;,:ry ,, ·cir i<s f11r vill ,111c~; notta,g,it orient { d works.

-\ M~cH1,.iJ:, ;t,11

\'r ~; d ,· 11 . (r,::.U-tr•'.:i, 1,t:rni ':.w\; 1nnent t:du:.1tion and Health ,O..wari~nes!'t '.:ic :•:letyi

1J C11 r y t • f (l vj ,,j ()IHIL;<ll"~I\ \ I, -\n ' :B: 1 i !\'\: ~· 1: --,; ·c ,n ,;I' I-' -c·1 •oiwr,:: YI/ , ~erry /.\I oy:. i.td. l l Cq : t 1 ! ·0\·~ ). l•m :u!t:inl. . ·

ti ·1-· 1 .ii.'3 3/! r~l ;n \le.nrst>:c d . H:1der-1bc·d-50C _02J. f ,,1,il : niw 1ht.'ll H1u1na11(\lafQ~\ ml3i1.ccm, re, ~tia,.'78@grnaiLccrn , .elf: :!9PU ~i~?.cs r

:~h ONMIC¼.= I\P.POLLUTION CONTt~OL 80J\HD

RESIONAl OPRCE Vl2JANAGARAM

Page 244: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

l C

' .

' ( ,(

-- . -- ----- . -------· - ----

~2\ ·. I

": . . ,,.·

(),, ' ·'( '

·; · j

-~ ---· · &;i . , ,··JA.11;·'.;:.

C' - ) \ ··i -,'..,; \/, .• ~ rJ . -

\'' q

,;•_ ,; u ,,)

----··- · ·--·--- ·- -----· ··------ --·· - -· · ~-

C' (t")O ·1 !I LlJ'l: 7.1.,>)t.l \i

1.•1 .. ..._

s;1 6 ! ,· •.,) £ (1 ) ,:! , ... ' I ~ '· ·· It~·

-P.di ·1,::

1 \ \.l, •. '"', · ")_ t ,:· 1:.7

'--. .

Page 245: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

Gandhi (\' .- ,'.iG,~ lllfiryu/ogu1n-~C!l ; 1i-• Nalgond,1 7E.',7i'Hh !r= :, , T~/. . . 11•1c 1.•1f11. , :• ,.s•su:;u "'·; ;, l:·M1J1/ :ri1 •nro·~s ,tr /1, 1f' ,-~1ai•.,:c r;

wwlv-r;an1ef ;,, -

··--- ___ .. , __ _ ·~:_e·~1~·.1u •If\ r,1LP(

_....,. • • -- '-..-. ~ _... . ,.,,.rrr , ,. • -

' \ 1) . . l: ci I,. , ... ' ,11· . V ~ I ~ ' • •'

I 'l· f' '; ~ l 1

1S ·b .

,.f-l-~T1} () ,,n. j (::- C?...f:- ..

I,) f. f-...... (t. • ·-

' .f ,.:L•ll'J t) ,,,,,·rJ 1;· •• ,\i). 1"V11-k[~~ t~ trr1.v·h 1 -fon,1.r1J y·c,lv.n{-(,,,-._

··Jl, L 'n q) o 1~ ·I i: o" ~:t~ h HJ w •r/U;,f c><n ./-Ii <- 11-. v-'h·"" m, _;.,4 t'l')/1_~

r ..-·· - ·

f'1"-'ce. '[" ' D "· . ., 1/ co .. r

.I

I ··- I ci.,,,. ,? ot o / 'f·\r j

1),,,,,, 1 f•I'''·"'- 1::- . AC I ;..,,'h'</ '·•l 1.i., (;w,-0,1/ '!3 v,' l";rd . +t~J c( '"1-ff t: )'( '(;~'~; ~r f ~ { . {.1,1~·l1f;1:9

1' ;::_ c. l(.•(•,} . ,.;_·,_)\• vlus ,

u . ) .

?vt L

,, J./1. f ·-· l,O'/:},~~, • I

(: ·n v r,o(rn:,'t .{~---

l·\H . I" )·'f_() {;-fl).J> ft:·t'J

( i:, nt' i• '~1 .,+-( or,;,il :~J

•JI v·( :

f) · · ·t,1, 1-,'c,n , 1_) \I ':" / ·---·

/:: :,HJ E>tv·,),,,,.,,.,,....,(- r1>~·"1Jffl.•,I e ~.1'>4 L~ co•,, . ..\ucb-

: J <•"'--\'~, -"lV\,j ,'.'Jf'" c ,mp~'.] 1"-"* h) h,, ,a!j,c. cc/ ;,;bl,~ L

Page 246: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

• , 1; Nr,. ·1 ·'3/:,!'~ ·1 ~\

Sl\l\lKA);11~~'" . l i~HX~: D~ fEILOPMENl' SOC. ft:TV

i ~, Ash Jk Na gar, rt\lH'(Al AGUD.I\, NAI..GONDJ\ Telanga11a Stute-50(;207 .lN DIA.

,--: -·--- - -- ___ _ ____ __ '~-mail:sankalparcls@)gmail ('Om .~ ,,i~iclm11: ··--- ---·----···------·-# · · ·· iC,Jll\ln(AllJi\!-\1 ' -----·----- ----- -- ·---

-1 r. '

- ~- 'I(_ 1(_: ·_). i ; r. ',, I , I / 1. I ,V1'i·,,l.'t)'.(,V1,

(l. :::,1-r / ~· + =s, \..vb , hJ l t ttrrri~.'.~I • I:,( p-1VJ10 f c,/ m {_r rJ l r~J A· U.121 J

I , . • 1 r ' . I# (. ,, C.·1 'lA c.., /l,,:11 '' '} O·' ·rtJr (D ~vtAi~~ J IJtY~ {-li""J 1'1-, ·' - t,, y . f)' I t111 J1

/J f)I .f '11:-n t J 11 l .,J-

;./1 I?.,,.· 1J11bb 1n r l \'lil~·,,,· rJ rnwr1."W i \r,i . .r~'ru~rw,n 1. 011ti

.c 1,· \ \ :i, ,.. ;· I / ..JJ\ r: I' ) - ~~er/ ~ r" ..Jb { r C H,i.!\(l-~'1 ~ll [) (- ell; l () 11/ .Lf, I e . ,...T cv,n 'i

7 • · -'

}-· . -:hn,l\,ICcirl',"ci' ,· 1) -".?o'r·ld:""f C\J l"l'\ .\;-11.--0/r~t,b-- v' O (;_,,qJ;t~·- J7,'11,Q.. JT ~/Ci .• vv'

+ \ ,_ f "'ii"") ,~ c nTI/ ,,, j h.a ,1 ,v,,&ty on i le ""' , : "~·~· ,t- .~,,,,/ ,Dnro lou•wl !\· c h , ; c 1, • i -n • / b : J'> 71""'" f!J v 11,l,i) , - 1<1_ c ~ <W<. , f ,, / ')' '', 1?1'16 Jl , •.. ,.J '-l - ;·,, ·t\., V fl. Ly - So , It/ c ,ti ,c f 1Afi ( •·rd 'j .J-n -H l I •~f "''/ •+J ·J>t<'>" f uI~:;J 1/n,'. l- -

' I J \ • ' ' • I { I _/ L "{ '... .. JI-. I •'vf' l-•-'Y'L ,::v_t, iCI l~uY,\l"(J~, (0111,/tiwy ,·~ '·1.n ·V/J"')

0

l':1tvl.f'_,',j1/'" f<'OJ,il'<P. . __ .,,.

-Jli,. I O I 1,-+:a1 I IT) ~ ' f-~c envh-o \.,,,,A- . ('0'1'f""'._) , ,fc,,,,,fi:::,• --6 0 ov f rJ,,~·

( \' 1·· I 1 'H,) C\'"',1.,n·,J . ,.Pko"'l~' . Ccrt1'-~h.,,t,'.: · ... hry 'Ml ·inqrfo.1-f..cl. '~/o1--;(? · ~ ; ·\!I \~l_(.\,L(i/-''l'l,(,1,f ur u'

r.-

~_,_,.

1

.

1

~;\,: ·1

1· ,· L i,,1'1·,0 ,~a'l,L ],~/,<_.JtbLC- ,:=- (,;,: . r(tJ1 .. ill At.~Jd jC ' ' : l I y ( (1 •t7l I' 0 lJ·1, V.)i l'1 V 'I . , ..

( I ,C.#

. \+_rn '·-,\ ~.: -1- I,, \ ~ f( · ,.,. 1 e,rrni h.1 . <"'(''ll. -H-u. • ~ I ·'-JIJ •

, p .. N'-o /,i, if ,,,.d-- • (.' r' . \/ 1 i LepJ . l:sw·r.. -t: 7:

~" t~ ... 1 -~\.Nr! 11,½~:~1 v- I 1.'lt.s,1

· ~JbvY/ J ,,-/,,v$1;- JJ~J \ ... ~ - _. '

.-r:::== _4., ------- -- - ·-:-:,.

,ef<-~ :~ (N~~1A~\9-91--·

~- ~ .. r(?. :.J· t p~ ,2.vt-J .?-e,v--Yu·t·"'(J- Stu1

f':.·j ,;: I O,\ i~w ~ ~ \.., ....... ., . ,,• n ~ cu'"• :0-1,0

fl P f l,,, .... ,r,,.,l - l- : -j ·, ,_,L.;J I"' -~- . ?~;.:;;;·;(·t;\:,.:~.:;:,>~,;(:

\ J \ Zl:\i, li\() :\·,::~ ,·ili·d

Page 247: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

/ ,. \ '~-'\

(:l·I E~YIU ;H , Cel l: 7

c87066362 ~ ~tURAL DEVEL. . C/052-C)[·, £2 "},.) ENT 'SOCI . ...'.)_J

W

. R~9d. l'lo, 2:t/2n-n7 " ETY

- 1, '

. i \( j,-L

(\ i: 1.: ··,·.u.(

j .-\ i'_ . '- ._

Ti'-\ ,· . · ·L.

C \ :• . ,_-; t·-'

(':, ·-~

'· 1 11

'1-1 ,-1-~. (

acap· ·II (V) ,i..,. '· Y , D,u naracherla (M) N 1 , ' d goncla District.

,,

' r, / ,,., I . ( (,,, 11 • ~L-

.. I

. -n·· i' ' l • ~ . 1 , J!

._, ,· ,_ ! ' 1';_( \ ' ,.,,\) '}1. \ -~~ .

(l ! !{f'I • • ', " 0 . . , · ,-·\I -~- ~ '~ (/ I, I\

,::~·.-~ 1_, 1.\~.-·...... ._-> r,

a•_- , < t~· ~ I ,,., •. • r; •\I!{--, I ·q

I, . \•'· , . , . ' .

--~ -------~----~--~--- -

,. (t.: [),].; I

(: • ,.:. , 1 I. ,c •· ) • ,. _ - !J.1 r 'fr. · , ,. I\ (1 ,<-- '. • ,;;-....t: (/ , ., ... .,;

1,

!~(· ,'() {), · tj l L,<'1'' _(./\!}"- ';·<-· ...

n Lr-,-- ':l-oL ( : .

c11-'. o\-·i1.;·ve.-k)

n,:.: () i IL "'i J ()3,nfl"' +,,aid , <(-v IJ;lt 'j)s, Vo< fr If'-- ' ':P- If-, 11-;p6 \ ' . . '

(N• "·' ,\u. : ,t- h, , II;· (.6< r, p J • "'u D er"' q· I r_,Uc,.':r . '., rnn1. "'''"t [)" I li'.i s J ',

Page 248: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

7 ·r, '.:;ur·JKESUlJ-\ (Vll.LL\CiE 8t. POST}, YERRf\GUNTU'.\ l'v1f.\NDAL,

Y.S.fL DISTRICT KA/PA, . .

""'' CORRESl'ONDEl'H RE!ilDENCE ADDRESS . HMO: 5--6-:};29/1,

SWAPNA MAOHAVI ARACADE

VAIDEHINAGJ\.R, VAN,I\STt--1/I.LWU RAM,

H,~rw.c~HEDDY DIST HYl::i ·'i00070

C:Ell. NO : ~1491883019

HEC NO: BC10I', 1\/ NO: 0 i/1011

.. F_;

<, ~ - ,.

• I

"

I • • ; l

-~: : ~; -,,

', -· ·;_~ J -·

(

,.

·-,

' . J

r. · ' '

") ' ,·) l ... · < .. ·. \ ,·:1

I _..,._ . -

:!·. C, ~-- ~~~·-:r '~~ -.... ~·

' ...... ( ~: .;\ ._ •. J__ '.~: i..J

<.~---·'L'

( \ . ' ..... \

"" · I ·£, .. ? ):/t2 /.. <.,\ '\' ~ ,I ,-

I

L ..- r~, - ...

,;::: • ...._·) ,- ·,--) .l. • ?... • • '\ "1"""~' '/ , ::I .,, , , ··, ··- , _,_ ,- ~ \.) "'-~ • .:l.. _Q_. ,, ·c·-....

• , __ _, • ' • ( 1

Page 249: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

{ 'h 1.)869•1-<.' 5 J c~ ·2 ~< c :er : 99494 47::'7').

S Gt«::: l J.\ tL. V(> 1.nu1 !M'T,Alft''f (}RC-iJ.!~INI IS,1l\rf I iCl·N I

1 .l.l-· .. l\L- 11:-. . .ula. R. 1\t,I/\t~lN,1-\PET- :i081 l . Dis1: l'-al,:;,:,ndn. ( . .'l.,.P . 1

(:;<)vt:. Re;~J. _t'1o. __ 3 57S/9'S.

• I "' J

'. ,(,,' '11 ( '1 ,1

. ~.

c, · ,• c:. <. 1111..- '..'•

\ -( • .' ) I<'._

;: !, : ) -:;?, I,.~:, .;::,

.-r-/ , ::-c~---:,;:; ,. 7 '\ ('~-.J r.. ~ ~-tC:i r;:,£ ~~ -~ C> ·)'

\

<l. ~ \ ' { ' · 1;.~..:s., , .. - 11. · -- ~C- ::-.-, ;~ ·'.:~ CT:::_:,•="\; -:- --...5,_: ~~) 1~~-t; .> r:~ ,.2J1;:;,u·:.::... ~t:.::::- 1 '\ _ ,

~~-, ~ : ,1;0._)-0.-:·) 1·t:k~ :~,s- Y~1 u ~ -~- . .st .. >', -:::-• -~~~~

Ov~ ~

~·-.~n /\.?. POLL T:CN Ol'H.-.OL 8 0 ,\RD

REGIONA' ...,p:;ic~ l:ZJANJ!.GARAM

~ ~' l ~~;~ ~~:,6

•:~: i~

Page 250: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

!lit t~ "

W• ~,· ·.') 1!1 ,· •.• ~11 _' ,'M· ,<~ • . -,

IL J·,;.~,,,.1,t.,,,. , .. · · ····' · \ ,1,·ri '''c::· S!OB· T

·, ' '1 C·

\\ ( ' . ,.

"'--~· 1 ; i \~ '-, J I . I . ' , .• .,.... " ,. ( \ ~

f •,r1,fe . -> ... I / .~--u I O 21 '2o/8 .,-

\

'b •

( .• C ( '\ ---

GI / 1ut·f,-,,,..../'(7 ,(. ;-,, (:I I • , I P\J ';J ~ .n A L.

,. ' I

,-,_<<::'\.·) l, ,,,,., . /_Jr (\ ,\ \> ~:-· ,:::i,<') (-10,~·q .·~_:,11_);P,1 ·.~.:.,:v" ,:~_'L_-,..C.. __ 0 ,,~o,,o •.I~-) ··v £7_. ·C·· r_,:;. '.I'-'- , Lr'•:;t_Tf..,1 <--.. ,U 0. w _,v • _ ,:_r _ - ~ .{<J' -IC:.._,_ , ~ r ~ . '--'

'

• (I i .· /J ,-r-··. • C .-~L~ .

(

c 1,--'t~J T , ,. "'\. ' (,".J 1;, rµ , (_; (P- v'· )7i); 31'.? .~· , c ~·-: ce, . .:xx.v o.... ,... ; -' (_.,-

i' ,' (,\ ,!;l..,- I . (:_ ••

. 'J. -.

I • .- )

··1 r '· . l C

I ( • ~

I JZ)

I. · I

ll..'

I/ ..

/

t _(,)

) ~~) _.,

\ ~ ~0 El I IRO.,_ i ~ ;:;: rl, :... 2:·iGiNi::.[:H '

A..P.P LLU I lON CONTROL BOARD REGIONAL OFPtCE

Vl~::'.IANAGARAM

r, -:::- -~ v, ... , r-' .I::,.

Page 251: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

' r_>

.P -P{ 11..LU • , ' -R~io+l office. Vir.lan::i,garal\'I

't For t~ P,-opose.d Eicpcmsion of I

• Grow"-h Center,B06BILl-~3!5 Ve.nue; tlear tt

M/5 B

·~ -~ -·

.

• t ----- ~ -

Page 252: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

(~)

_BERft Y ' ( f

J-iL L

Page 253: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 254: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

'J

----

---

Page 255: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 256: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

,.

J

Page 257: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

E,, ,, .. : , , "" u,L,.l itbrc j: 1,,,,.,.;,1i ~ . .,. ·ti"'· -'r~1'1>><,J e JC ,,o,v:v, . .,

t "b (;'""a Al L ~', ~.:,1,LL , iM I\ t , Pl.I:- r,I,, JH .

c;"·,,Ak. (e,;,L_,.., / ·.E~n~~~~-GI) ,:~f (1-1) /_; Virv) J;,L ··' A,, .. .JJ'-,~'---

r, c,&,,;i~ i1"", Pt:iltt-,\~0 1~ . cu=- i°1 · oo "1 n~.i~v to ·tk....,

~ io :.: ~I I ~"'('f._,<'11.\.V:,C- ~l, 1)

I 1.

( -

I I l

I . '

I t I I ! •.

i ' ! ! ' I ! I , ~ I

Page 258: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period
Page 259: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

-1,

' I j '-( J ·' ') ,~_ ........... .,

~ ·. - ,.. . ·,--. J ~ ' (..> ) (- r i~.) P,) --- , .. ., P, ,_ - \J ·- "'t. ~ t:J.,·· <~) . ' .

~ (".L \

' . - .__, ·-r- -'- - _,-.· ~ ,..._ c::,. j(,,., l)-'J, %· '·c_· -·: c .. I"-- I ·1..- I., • L, .. ,

· -IT-•• ·cko~!.1?J-.f~l-- -

/\.J ;:JQ.--·~--{ ~>. ff JL/ '

I.

I

~--j

-g\'\_I)~, .. ,,b_jq__.

1----1\ 'i - J\,.\.._,,. "-L ,~,--,~·-A

' I I

i . 1 I I

'J,

( . . , l

I : . I I ,: I (

)

Page 260: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

. _. ~~ --tJ ,1

~~+--_ __,__·-_-_ . ._,,,_1.rr >86 f J ~ .,,. ~ It ~

I

Page 261: Environmental Impact Assessmentenvironmentclearance.nic.in/writereaddata/EIA/06062018K3FK8HUO... · DECLARATION OF CONSULTANT ... EIA Coordinator Mr. Vipin Kumar Signature Date Period

I , ,

... }) .

c·_ .h

I. l

I

·!, ·I

j I

I . I

.l/ ' 1

l l I

. j. '

i '1 .:

I l 'I , . ,r 1 I I I J '

r' ,I. '. I II ,'. f, . ; \

I ': il ii! ~I , I . 1 :li. I lf

I I I ! cl I

' I I ' : ~ l j > Ii l 1 ! t I • ~ f. . !.

II II I ' I I I i 11 I : I t1 l· i I ',11 i ;.

I' ,II I ! 1 l i ! 1 1 ' 11 ! ; I i · I ,II, ,., I I l, l 11, l I ! 1•

·l ,:! r ; t I , :1, : 1 : ' h , .

I Ii : I ' . I I •

: 1 l I ,

I • I '., ' I I . .

I I I I H . ' ' :; I i:

' f_ ,•, I ij

I :; ? :;

Ii ·ii. q:

. . :11 ' I - I: .. 11 I

I ' . .

1 I \

' ! ! • f • j I

I

j'

,,

.. If· " t I I·, I

I.

I I I