environmental impact and community relationships

Upload: inlanderweb

Post on 04-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Environmental Impact and Community Relationships

    1/8

    92d Air Refueling Wing

    Environmental Impact &

    Community RelationshipsMr. Jeff Johnson

    Deputy, 92 Mission Support GroupDirector, FAFB Encroachment Management Team

  • 7/29/2019 Environmental Impact and Community Relationships

    2/8

    2

    Environmental Impact &Community Relationships

    Fairchild AFB has positive working relationship withplanning elements of:

    Spokane County

    City of Spokane

    City of Airway Heights

    Spokane International Airport (SIA)

    2009 Joint Land Use Study

    Cooperation balanced zoning heights adjacent to basebetween Fairchild mission and community dev.

    Base involvement in SIA proposed second runway

    USAF Cooperating Agency participation with Spokane

    Tribe Casino Environmental Impact Statement

  • 7/29/2019 Environmental Impact and Community Relationships

    3/8

    3

    Fairchild AFB/SpokaneInternational Class C Airspace

    Surface to and including

    6400 MSL within a 5 NMradius

    3700 MSL up to andincluding 6400 MSLwithin a 10 NM radius

    Excludes SpokaneInternational AirportClass C Airspace

    Spokane Approach iscontrolling agency forboth Class C Airspaces

    Fairchild Towermaintains control over itsairspace

  • 7/29/2019 Environmental Impact and Community Relationships

    4/8

    4

    Fairchild Tower & Spokane Tower Airspace

    .9 NM

    NM

    5 NM Radius

    4500Surface

    3500SurfaceSKA

    GEG

    Fairchild aircraftmust turn north(over the proposedsite) to avoidSpokaneInternational

    Airportapproaches

    Note: Runway 23 is the designated calm wind Runway (

  • 7/29/2019 Environmental Impact and Community Relationships

    5/8

    LOCAL

    VFR Pattern(3,000 MSL)

    (539 above R/W)

    Radar Pattern(4,000 MSL)

    (1,539 above R/W)

    VFR Pattern(3,700 MSL)

    (1,239 above R/W)

    Circling

    Approach(3,020 MSL)

    (558 above R/W)

    Radar Pattern(5,000 MSL)

    (2,539 above R/W)

    VFR Pattern(3,700 MSL)

    (1,239 above R/W)

  • 7/29/2019 Environmental Impact and Community Relationships

    6/8

    6

    Spokane Tribe Casino

  • 7/29/2019 Environmental Impact and Community Relationships

    7/87

    Spokane Tribe Economic Project(STEP)

    AF Position = Neutral AF Concerns vetted through EIS Process

    Aircraft flights below 1000 ft over the Project Site Noise Complaints

    Light Pollution from the Site (Pilots Night Vision) Proximity to FAFB Aircraft Traffic Patterns

    Under the VFR Final Turn to Rwy 23 (600-650 AGL)

    Under Ground Track for Departures for Rwy 05 (700-850 AGL)

    Under the Circling Approach Track for Rwy 23 (558 AGL) Large Concentration of People in Proposed Buildings Potential for Aircraft Crash/Mishap

  • 7/29/2019 Environmental Impact and Community Relationships

    8/88

    Questions & Discussion