Issues and Responses Trail: Gergarub Mine ESIA Page 1
All the issues raised during the public consultation process of the Scoping phase have been collated into the table below. This
includes those raised at the meetings and those submitted to the consultant in writing. The questions asked for clarification
purposes were excluded.
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
Health and Safety
Anton Meintjies
(Tamar Health T/A
RoshCare)
13-11-2013
(via e-mail
and at
focal
meeting)
We provide primary health,
occupational health and
emergency services.
Tamar Health trading as
RoshCare is equipped to deliver
a one-stop health management
service, as mentioned above, to
Environmental and Social Impact Assessment for the Gergarub Mine
ISSUES AND RESPONSES TRAIL
Issues and Responses Trail: Gergarub Mine ESIA Page 2
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
industrial clients in Rosh Pinah.
Tamar Health, through her
medical practitioners, qualified
in various disciplines in medical
services, will be able to add
value at affordable rates to the
clients, to ensure sustainability of
the development.
Lazarus Nangula
(Swapo)
12-11-2013
(Public
meeting in
Rosh Pinah)
Please consider the impact on
the increase of HIV/AIDS as a
result of this project. Contractors
should also be included in HIV
programmes as well as the influx
of workers.
We have an HIV/AIDs policy that
includes both the mine workers
and contractors. This also spills
over into the community. There
will also be a need for a medical
facility at the construction site so
that there is no additional pressure
on the facilities in town.
Johan Kamfer
(Skorpion Mining
Company)
Yes.
Raphta Ortmann
(Company Owner;
!Garid Scrap
Recycling)
12-11-2013
(Public
meeting in
Rosh Pinah)
Will there be any safety issue for
the residents of Tutungeni who
are located closer to the
Gergarub project, should the
preferred mining option be open
Yes.
Issues and Responses Trail: Gergarub Mine ESIA Page 3
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
pit?
Raphta Ortmann
(Company Owner;
!Garid Scrap
Recycling)
12-11-2013
(Public
meeting in
Rosh Pinah)
Noise of machinery and vehicles
can impact the community.
Yes.
Raphta Ortmann
(Company Owner;
!Garid Scrap
Recycling)
12-11-2013
(Public
meeting in
Rosh Pinah)
Consider the issue of dust during
blasting activities.
Yes.
Lazarus Nangula
(Swapo)
12-11-2013
(Public
meeting in
Rosh Pinah)
Who will be responsible in case
of some accidents such as the
loss of a finger? Some people
do not get compensated for
such a loss. Will this new project
allow for compensation for the
disability?
Skorpion has not experienced any
fatality to date. We are registered
with the Workman Compensation
Fund. In the event of an injury,
Social Security pays, but only up
to a certain bracket. We have
engaged with Social Security and
invited them to come to Skorpion
and review this process.
We do not ignore these cases.
We ensure that we look after them
Johan Kamfer
(Skorpion Mining
Company)
Issues and Responses Trail: Gergarub Mine ESIA Page 4
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
and pay medical bills where
possible.
We will continue to comply with
the applicable legislation.
Vegetation
Frank Lohnert
(Namib Botanical
Gardens)
05-11-2013
(via e-mail)
We are interested in sourcing
indigenous, protected plant
material requiring relocation
from your EIA site during
construction, for purpose of
display within the Namib
Botanical Gardens (NBG)
project, and as stock for
propagation. Such plant
specimens would form part of a
dedicated “Sperrgebiet Flora”
themed exhibit, as intended for
the NBG project. Please register
NBG as a prospective partner
and destination site in the
relocation of relevant flora from
sites to be cleared of vegetation.
We would be willing to physically
Issues and Responses Trail: Gergarub Mine ESIA Page 5
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
assist in relocations.
Nick Kotze (Farm
Spitzkop 111)
12-11-2013
(Public
meeting in
Rosh Pinah)
Vegetation is also impacted by
dust. This could be seen during
the period before the road was
tarred.
Noted. Johan Kamfer
(Skorpion Mining
Company)
Yes.
Socio-Economics
Harold Urikeraka
(Operator
Skorpion Zinc)
12-11-2013
(Public
meeting in
Rosh Pinah)
This project should benefit the
region and the town of Rosh
Pinah. What role does the
Namibian government play
ensuring that this will not be
owned by one individual only?
This mine will benefit the
community in terms of direct and
indirect employment, and
economic growth. Development
includes things like for example
roads, clinics, shopping malls.
Taxes and royalties are also paid
to the government which
contributes to the country’s
economy.
Johan Kamfer
(Skorpion Mining
Company)
Stephanus
Iiyambo (Skorpion
12-11-2013
(Public
Approximately 450 job
opportunities will be created.
There will be 450 direct job
opportunities. Should Skorpion
Johan Kamfer
(Skorpion Mining
Yes.
Issues and Responses Trail: Gergarub Mine ESIA Page 6
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
Zinc)
Carlos Kanelorozu
(Cleaner)
Tangi Kafuro
(school learner)
Lazarus Nangula
(Swapo
representative)
Johannes
Swartbooi
(community
member)
Natali Karapo
(community
member)
Meme Maria
(community
member)
meeting in
Rosh Pinah)
14-11-2013
(Focal
group
meeting in
Tutungeni)
21-11-2013
(Authorities
meeting in
Windhoek)
What percentage of it will be
new positions and how many
will be re-employment?
The local people should be
considered for these
positions.
The youth should also benefit
from employment
opportunities.
Women should also be
considered for employment.
We can be trained if we can
just get the opportunity.
Zinc close down, they could be re-
employed at Gergarub. Thus,
instead of retrenching people,
there will first be an opportunity for
re-employing them at Gergarub
and re-training them before
outsiders are sourced. But this has
not yet been finalised.
The socio-economic study will
include consultation with women
in the community. Skorpion is
having the highest level of women
employees in the Namibian
mining industry, but we are still not
happy. We will continue to ensure
that women also benefit in terms
of employment.
Company)
Satish Kumar
(Skorpion Mining
Company)
Issues and Responses Trail: Gergarub Mine ESIA Page 7
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
Ms. D. Dumeru
(Marketing and PR
Manager at the
Namibian
Chamber of
Commerce and
Industry, NCCI)
Ms. D. Dumeru
(Marketing and PR
Manager at the
Namibian
Chamber of
Commerce and
Industry, NCCI)
21-11-2013
(Authorities
meeting in
Windhoek)
There is an existing gap between
the skills available and skills
needed. Consider interventions
on how to address this.
Consider the shortage of skills.
The recruitment strategy that we
usually follow is that recruitment
starts within Rosh Pinah and then
the bigger Karas Region before
moving to the North.
Potential also exists for Skorpion
Zinc to up skill and develop
existing employees and transfer
them to Gergarub. But yes, the
strategy is to source locally first.
Skorpion Zinc has been very
active in developing skills. Many
bursaries are given and young
Johan Kamfer
(Skorpion Mining
Company)
Ms. N. Ndopu
(Corporate
Affairs and
Communications
Manager at
Skorpion Zinc)
Issues and Responses Trail: Gergarub Mine ESIA Page 8
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
apprentices trained. Skorpion Zinc
has its own apprentice program
and also gives job attachment
opportunities to other NIMT
apprentices and students. Training
is happening at NIMT in
Keetmanshoop, Arandis and
Tsumeb. As Skorpion Zinc will be a
shareholder in the new mine these
activities will most likely continue
as the development of skills is
important to Skorpion Zinc.
Another mine will require a lot of
technical skills. Training institutions
like NIMT in Keetmanshoop will
play a major role in providing such
necessary skills. You cannot just
take from the pool without adding
to it.
Skorpion Zinc has a strong
internship program. And
Issues and Responses Trail: Gergarub Mine ESIA Page 9
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
apprentices from vocational
colleges. These people are
sourced not just from
Keetmanshoop but also from
Tsumeb, like our diesel mechanics.
We are open to the entire
country. The Polytechnic and
UNAM are great sources for young
graduates. Before we let them go
we try to keep them in the
company and develop them to a
level that we can keep them here
as long as possible.
Women’s Focal
Group in Tutungeni
14-11-2013
(Focal
meeting in
Rosh Pinah)
There is a need for training and
development of women in Rosh
Pinah in order for them to get the
skills needed to work at the
mines.
Meekness
Shanyinga
12-11-2013
(Public
Namibian contractors should get
preference during the tender
Four out of the six contractor
companies are Namibian. We first
Johan Kamfer
(Skorpion Mining
Yes.
Issues and Responses Trail: Gergarub Mine ESIA Page 10
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
(community
member)
meeting in
Rosh Pinah)
process and not foreigners. The
same goes for qualified artisans.
look at Namibians and when the
suitable candidate or
organizations cannot be sourced
locally, we have to look beyond
the border. Sometimes
companies need financial security
to take on big tenders.
Company)
Miss Hadula
(community
member)
12-11-2013
(Public
meeting in
Rosh Pinah)
Who will be responsible for
recruitment once this project is
implemented? Will Tutungeni
change and how? Will there be
an opportunity for skilled and
unskilled employees?
There are social programmes
assisting the health and education
sectors. A secondary benefit of a
new project will include benefits
to town. The recruitment process
will be advertised.
Johan Kamfer
(Skorpion Mining
Company)
Yes.
Women’s Focal
Group in Tutungeni
14-11-2013
(Focal
meeting in
Rosh Pinah)
An influx of job seekers will
create competition for jobs and
services with those already
seeking for jobs in Rosh Pinah.
Yes.
Mrs. E. Solomons
(Adult Literacy
Promoter)
12-11-2013
(Public
meeting in
The adult literacy education will
have its own building in Rosh
Pinah. Please look into this
No.
Issues and Responses Trail: Gergarub Mine ESIA Page 11
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
Rosh Pinah) matter.
Mufaro Mukwashi
(Safety Coordinator)
12-11-2013
(Public
meeting in
Rosh Pinah)
Should this project not continue,
what impact will it have on the
Skorpion Zinc mine, the town and
community at large?
If it continues, there will be
additional pressure on available
services as more people come to
the area. This project will
contribute to the sustainability of
the town. Better infrastructure will
be provided which can contribute
to it being proclaimed. A socio-
economic specialist study is also
being undertaken to determine
the positive and negative
impacts.
Unfortunately no mine can
continue forever, but we want to
avoid closure to extent possible.
Should Skorpion Zinc mine close,
people will be left unemployed.
Some buildings will also have to
be taken down as part of the
closure plan which includes the
Johan Kamfer
(Skorpion Mining
Company)
Yes.
Issues and Responses Trail: Gergarub Mine ESIA Page 12
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
school, houses, etc. .
If any of the two mines close, the
effects will be detrimental. A third
mine might contribute to
prolonging the life of the town.
Rosh Pinah is depended on the
mines. This project is seen as a life
extension opportunity.
Eva-Lisa Nailenge
(RoshSkor)
12-11-2013
(Public
meeting in
Rosh Pinah)
Rosh Pinah does not have a
traditional town council. Does
this study include ways and
means to address the needs of
those who are not related to the
mine? For example in Tutungeni.
The scope of this project does not
cater specifically for Tutungeni.
The Corporate Social
Responsibility programs of both
mines shows some upliftment or
their involvement in this area.
Gergarub will add to the
sustainability of the town, causing
it to continue to prosper.
Johan Kamfer
(Skorpion Mining
Company)
Andreas
Mwoombola
(Skorpion Zinc)
12-11-2013
(Public
meeting in
Consider the increase in crime
rates increases as job seekers
enter.
This will be taken up with the
regional police. We will set up
centres outside Rosh Pinah where
Johan Kamfer
(Skorpion Mining
Company)
Yes.
Issues and Responses Trail: Gergarub Mine ESIA Page 13
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
Ms. N. Ndopu
(Corporate Affairs
and
Communications
Manager at
Skorpion Zinc)
Rosh Pinah)
21-11-2013
(Authorities
meeting in
Windhoek)
recruitment will be done in order
to limit the number of job seekers
coming to the town.
Lazarus Nangula
(Swapo
representative)
12-11-2013
(Public
meeting in
Rosh Pinah)
All houses are owned by the
mine. Employees should be
given the opportunity to own
their own houses.
Also, the proclamation of the
town will allow people to own
their own houses. The new mine
might contribute to the facilitation
of this process as sustainability is
an issue for its proclamation at this
stage.
Johan Kamfer
(Skorpion Mining
Company)
Yes.
Sergeant Mabuta
(Police)
Mr. Smith (HOD at
Hoeksteen
Combined School)
Sister Musyoka
14-11-2013
(Focal
meetings in
Rosh Pinah)
Available housing in Rosh Pinah is
limited. It is thus difficult to
attract and house new
employees in this service sector.
Yes.
Issues and Responses Trail: Gergarub Mine ESIA Page 14
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
(State Clinic)
Sergeant Mabuta
(Police)
Mr. Smith (HOD at
Hoeksteen
Combined School)
Sister Musyoka
(State Clinic)
Stefan Saayman
(RoshSkor
Manager)
Women’s Focal
Group in Tutungeni
14-11-2013
(Focal
meetings in
Rosh Pinah)
There are more than 80
shebeens in Tutungeni. Alcohol
abuse and related disruptive
behaviour and violence is a
problem.
Stephanus
Iiyambo (Skorpion
Zinc)
Womens’ Focal
Group in Tutungeni
12-11-2013
(Public
meeting in
Rosh Pinah)
14-11-2013
The fact the town is not yet
proclaimed is an issue. There is a
need for a proper open market
area in town where people can
sell their goods. Some
unemployed people trying to sell
We note your concern.
We as the mines do want to see
the town prosper. However,
uncontrolled activities should be
managed by RoshSkor.
Satish Kumar
(Skorpion Mining
Company)
Issues and Responses Trail: Gergarub Mine ESIA Page 15
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
(Focal
meeting in
Rosh Pinah)
their goods have been chased
away in the past. Also, there is
no temporary land where
people can stay.
Andreas
Mwoombola
(Skorpion Zinc)
12-11-2013
(Public
meeting in
Rosh Pinah)
Has provision been made for
people to build businesses in
town?
Noted. There is a need for
industrial sites to be provided.
Johan Kamfer
(Skorpion Mining
Company)
Altus van der Walt
(HOD at
Hoeksteen
Combined School)
14-11-2013
(Focal
meeting in
Rosh Pinah)
The existing school facilities are
under pressure and would not be
able to accommodate any form
of influx.
Sister Musyoka
(State Clinic)
14-11-2013
(Focal
meeting in
Rosh Pinah)
While the state clinic
infrastructure is very good, the
clinic is understaffed and
struggle to cope with the existing
demand. An influx of job seekers
will add to this problem. The
status of the clinic has to be
upgraded to a hospital before
Issues and Responses Trail: Gergarub Mine ESIA Page 16
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
more staff can be employed
and a permanent doctor be
appointed.
Arthur Alcock
(Occupational
Hygienist; Skorpion
Zinc)
Pamela Nkulu
(Community
member)
Lazarus Nangula
(Swapo
representative)
12-11-2013
(Public
meeting in
Rosh Pinah)
Are there plans to further assist
the Hoeksteen School from the
Gergarub mine? We are aware
of your current contributions.
Not everyone can afford the
private school.
Skorpion is involved with this
school through its Corporate
Social Responsibility programmes.
In 2002, Hoeksteen only had 150
children. 10 years later it
increased to 1000 learners. We
will continue to support the
community.
Johan Kamfer
(Skorpion Mining
Company)
No.
Lazarus Nangula
(Swapo)
12-11-2013
(Public
meeting in
Rosh Pinah)
What measures will be taken to
ensure that the contractors are
controlled in terms of firing and
recruitment processes? The
employees and employers
should be protected.
The new company will be guided
by the Labour Law. There are
systems in place to deal with non-
compliance.
Johan Kamfer
(Skorpion Mining
Company)
Issues and Responses Trail: Gergarub Mine ESIA Page 17
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
There should also be fair
economic distribution.
Sometimes, SMEs are appointed
who promise to employ a certain
number of people, but
sometimes fail to do so.
Raphta Ortmann
(Company Owner;
!Garid Scrap
Recycling)
12-11-2013
(Public
meeting in
Rosh Pinah)
Will SME’s and the services they
provide be taken into
consideration when this project is
being implemented?
Yes, if there are SME’s that are
suitably qualified they will be
considered during the tender
process. The mines also strives to
assist the development of SMEs.
Johan Kamfer
(Skorpion Mining
Company)
Satish Kumar
(Skorpion Mining
Company)
Mr. NP du Plessis
(Environmental
Scientist,
NamWater)
12-11-2013
(Public
meeting in
Rosh Pinah)
How will traffic be influenced by
this project?
There could be a maximum
increase of 15 x 32ton-trucks per
day. Potentially they will travel to
Luderitz via the C13 or Walvis Bay.
Lead and Zinc concentrate is
currently exported via Luderitz. If
the Zinc concentrate is to be
refined at Skorpion, the trucks
Mr. J. Kamfer
(Project
Manager,
Skorpion Mining
Company)
Yes.
Issues and Responses Trail: Gergarub Mine ESIA Page 18
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
traveling to Luderitz will reduce to
3 or 4 trucks per day while the
remaining 11 will travel to Skorpion
Zinc via the existing road. No
additional truck traffic should go
into Rosh Pinah town.
Infrastructure and Services
Ms. D. Dumeru
(Marketing and PR
Manager at the
Namibian
Chamber of
Commerce and
Industry, NCCI)
21-11-2013
(Authorities
meeting in
Windhoek)
My question the level of
electricity that NamPower will be
able to supply.
Has NamPower indicated that
they will be able to supply the
mine and the settlement as early
as 2017?
The Obib Substation that was built
for the Skorpion Zinc Project has
the capacity to provide 105 MW
to Skorpion Zinc. During the initial
years of the Skorpion Zinc
operation the Maximum demand
was 96 MW. Over the years many
modifications and optimisation
programs were introduced
leading to a reduction in power
consumption. Currently the
maximum demand for Skorpion
Zinc is maintained at around 82
MW. It can therefore be seen that
Johan Kamfer
(Skorpion Mining
Company)
Issues and Responses Trail: Gergarub Mine ESIA Page 19
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
there is spare capacity. However,
the Skorpion Zinc operation is also
planning upgrades which will
require additional power. These
projects were registered with
NamPower in order for them to
conduct the supply studies taking
all potential projects into
consideration more efficiently.
Should the Kudu project go
ahead it will also align with the
planned Gergarub start-up.
Ms. D. Dumeru
(Marketing and PR
Manager at the
Namibian
Chamber of
Commerce and
Industry, NCCI)
21-11-2013
(Authorities
meeting in
Windhoek)
Kudu is planned to be online
2018 and Gergarub 2017. What
about the electricity cost
escalation before Kudu comes
online?
That is one of main things that is
part of the feasibility study. To
make the project viable they
include the bulk services cost. If
we cannot afford these services
then the entire project will not be
feasible.
Johan Kamfer
(Skorpion Mining
Company)
Mr. NP du Plessis
(Environmental
21-11-2013
(Authorities
The town development – does it
form part of the ESIA?
Yes, it does. Ms. Stephanie van Zyl
will meet with Lithon mining. Many
Johan Kamfer
(Skorpion Mining
Yes.
Issues and Responses Trail: Gergarub Mine ESIA Page 20
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
Scientist,
NamWater)
meeting in
Windhoek)
erven have been marked out
already. All of erven will be
occupied that are already
serviced. Sewage works, roads,
water, power and refuse disposal
will all be part of the ESIA.
Company)
Mr. NP du Plessis
(Environmental
Scientist,
NamWater)
21-11-2013
(Authorities
meeting in
Windhoek)
Waste management is often a
problem and it seems as if it is
not properly managed.
Implement proper waste
management practices.
At this point a good waste
removal system is in place within
Rosh Pinah, but it is worthwhile to
investigate and it is an opportunity
to improve on current waste
management practices.
Johan Kamfer
(Skorpion Mining
Company)
Yes.
Mr. NP du Plessis
(Environmental
Scientist,
NamWater)
21-11-2013
(Authorities
meeting in
Windhoek)
If a bigger water pipeline to Rosh
Pinah is required, what is the next
step?
Yes, we registered the study with
NamWater where we discussed
the water of Rosh Pinah Zinc Mine
with the authorities. The
Namwater study will take into
account all registered projects
when determining what
infrastructure to install. It could
mean one new pipeline or
Johan Kamfer
(Skorpion Mining
Company)
Yes.
Issues and Responses Trail: Gergarub Mine ESIA Page 21
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
another combination of solutions.
If a new pipeline is required it
could be a combined line to meet
all of the requirements of both
Gergarub and Rosh Pinah Zinc so
that resources are not duplicated.
Arthur Alcock
(Occupational
Hygienist; Skorpion
Zinc)
Lazarus Nangula
(Swapo
representative)
Dictor Willem
(community
member)
12-11-2013
(Public
meeting in
Rosh Pinah)
Will additional land and
infrastructure be made available
to address the influx of people
and associated pressure on the
sewerage system and water
supply?
We expect that there will be an
influx of people yes. This will be
included in the specialist studies.
During the construction phase, it is
for example being considered to
have an on-site clinic in order to
alleviate the pressure on the
available services in town.
The two mines involved have
been involved extensively in
contributing to the community.
The mines will continue with their
support to the community. We do
not now have a list of the exact
Johan Kamfer
(Skorpion Mining
Company)
Issues and Responses Trail: Gergarub Mine ESIA Page 22
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
activities or extent where
Gergarub will be involved with.
Stefan Saayman
(RoshSkor
Manager)
13-11-2013
(Focal
meeting in
Rosh Pinah)
The existing road, water,
electricity and sewerage systems
are being utilised at full
capacity. In order to make
provision for the expansion of the
town, these services will have to
be upgraded to meet the new
need.
Geo-hydrology
Frans van Wyk
(Farm
Zebrafontein 87)
12-11-2013
(Public
meeting in
Rosh Pinah)
I farm of the neighbouring farm,
Zebrafontein. How will the
underground water be
influenced?
Before we commissioned these
studies, we approached all the
neighbouring farmers and
obtained water samples from their
boreholes to test the quality of the
water. We have also drilled
boreholes in the project area. We
want to determine where the
water is and also avoid impacting
Johan Kamfer
(Skorpion Mining
Company)
Yes.
Issues and Responses Trail: Gergarub Mine ESIA Page 23
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
it or changing the water quality.
We are drilling extensively to
ensure we understand these
underground structures, including
cracks and can model these
water courses. We will not use
water from boreholes.
Nick Kotze (Farm
Spitzkop 111)
12-11-2013
(Public
meeting in
Rosh Pinah)
The water levels of the
neighbouring farms were
adversely affected, with some
even becoming uneconomical
when the Skorpion Zinc mine
started up due to the large
volumes of water they pumped.
Noted.
Johan Kamfer
(Skorpion Mining
Company)
No.
Dust and tailings facilities
Harold Urikeraka
(Operator
Skorpion Zinc)
12-11-2013
(Public
meeting in
Rosh Pinah)
There are problems with existing
tailings facilities near the town
and consequent infections.
What will be done to ensure that
Gergarub’s tailings facilities will
As part of this study we will look at
dust and visual impacts. The one
site was located directly in the
direction of the wind which would
have resulted in dust being blown
Johan Kamfer
(Skorpion Mining
Company)
Yes.
Issues and Responses Trail: Gergarub Mine ESIA Page 24
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
not add to these problems? to the houses of the communities
in Rosh Pinah. Thus, another site
was chosen.
We will have to answer these
questions in our report. We are
looking at for example cladding
the dam with rocks, keeping it wet
and are also considering the wind
direction.
Mufaro Mukwashi
(Safety
Coordinator)
12-11-2013
(Public
meeting in
Rosh Pinah)
Will there be an increase in the
level of dust already
experienced by the
communities?
One has to manage the dust
problem. We are doing studies to
identify the best mitigation
measures for this problem. The
findings will be included in the
Environmental Management Plan
in the final report.
Johan Kamfer
(Skorpion Mining
Company)
Yes.
Nick Kotze (Farm
Spitzkop 111)
12-11-2013
(Public
meeting in
Rosh Pinah)
No company can really manage
the dust of tailing dams. Look at
the tailings dam of RPZC for
example.
In 1950 the VW was not the best
vehicle, but is today far better.
Similarly technology has changed
and we will consider the best
Johan Kamfer
(Skorpion Mining
Company)
Issues and Responses Trail: Gergarub Mine ESIA Page 25
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
means available to our disposal
with regards to managing dust.
Visual Amenity of the area
Nick Kotze (Farm
Spitzkop 111)
12-11-2013
(Public
meeting in
Rosh Pinah)
Please consider the visual
amenity of the area.
A Visual Impact Assessment will be
undertaken as part of the EIA.
Stephanie van
Zyl (Enviro
Dynamics)
Yes.
Legal Process and Ownership
Ision Izzy (General
Worker)
12-11-2013
(Public
meeting in
Rosh Pinah)
We have learned in the
newspapers that the two mining
giants are fighting over this
Gergarub mine. We are
concerned as a community.
What if they cannot reach a
consensus?
Yes, there are some elements of
dispute which basically pertains to
the interpretation of some clauses
of the agreement. We do not
want to community to suffer due
to these internal issues.
Since both mines expect this
project to be feasible, it was
decided that t he feasibility study
should continue despite of some
of the internal disagreements. We
Satish Kumar
(Skorpion Mining
Company)
Issues and Responses Trail: Gergarub Mine ESIA Page 26
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
also do not want this study to
suffer.
We are working closely with Rosh
Pinah Zinc Corporation (RPZC) to
reach a conclusion and best
possible solution for the Gergarub
project, the community and for
the country.
Harold Urikeraka
(Operator
Skorpion Zinc)
12-11-2013
(Public
meeting in
Rosh Pinah)
The Gergarub deposit was found
on farm Spitzkop of Mr. Kotze.
Where is the intervention of
government to solve issues on his
farm such as the impact on
water? Maybe the government
should buy back the farm from
Mr. Kotze so that the nation can
benefit.
We will discuss and resolve this
issues at a different platform.
There are enough policies and
guidelines within the country’s
legal framework to resolve this
issue.
Satish Kumar
(Skorpion Mining
Company)
Nick Kotze (Farm
Spitzkop 111)
12-11-2013
(Public
meeting in
The ore body belongs to the
government. But I had to
purchase the farm at a price
Noted. Johan Kamfer
(Skorpion Mining
Company)
Issues and Responses Trail: Gergarub Mine ESIA Page 27
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
Rosh Pinah) higher that its worth at the time
of independence. I do have the
surface rights which extends 1 ½
m underground. The minerals
should be extracted and jobs
should be created. But there
has to be negotiations with the
farm owner.
Andrew
Theunissen
(Attorney)
05-11-2013
(via e-mail)
Our client is NP Kotze, the owner
of Farms Spitzkop No. 111 and
Farm Spitzkop Wes No. 128, Karas
Region, on which client believes
that the Gergarub Deposit is
situated. We are pleased to
enquire by what authority your
client is able to engage in this
assessment without our client’s
written consent.
Andrew
Theunissen
(Attorney)
05-11-2013
(via e-mail)
Kindly provide us with a copy of
your brief and of all documents
and information in your
possession regarding the
economical viability of the said
Issues and Responses Trail: Gergarub Mine ESIA Page 28
COMMENTATOR DATE AND
METHOD
COMMENT RESPONSE RESPONDENT DOES THIS FALL
WITHIN THE SCOPE
OF THE EIA
deposit for client to be able to
respond thereto.
The EIA Process
Raphta Ortmann
(Company Owner;
!Garid Scrap
Recycling)
12-11-2013
(Public
meeting in
Rosh Pinah)
Why has the whole community
been invited and not only the
two mines and its workers and
the farm owner?
We want to involve the whole
community with this study.
Remember, the focus of the
meeting is to share project
information and identify areas of
concern to the community at
large, that we have to investigate
further. This meeting is being
recorded and the minutes will be
made public knowledge. We
want to be transparent
thourghout this process.
Johan Kamfer
(Skorpion Mining
Company)
Nick Kotze
(Spitskop 111)
12-11-2013
(Public
meeting in
Rosh Pinah)
Can we please get an extension
on the 7day appeal period? It is
a very short period especially if
you live far away.
This has been established by law.
Your request for extension should
be addressed to the
Environmental Commissioner. We
want to deliver a document that is
Stephanie van
Zyl (Enviro
Dynamics)