environmental affairs Department: Environmental Affairs REPUBLIC OF SOUTH AFRICA
RISK ASSESSMENT IN TERMS OF REGULATION 8 OF THE WASTE
EXCLUSION REGULATIONS
APPLICANT TC Smelters, a business unit of Samancor Chrome Umited
WASTE STREAM OR PORTION OF A Ferrochrome slag WASTE STREAM
Use as aggregates
BENEFICIAL USEIS Concrete aggregates
-Road base and covering and road stabilisation
Asphaltic concrete and other bituminous mixtures
Construction fill
Concrete products
Page1 of10
Plast er and granite sands
Railro ad ballast
Roofi ng granules
tion media Filb'a
-Pipe filling material
Back:fi lling
I--
Dam construction and stabiUsation material
Con struction of drainage systems ,...--
Hyd roponic filling material
Prod uction of cement
WASTE GENERATING FACILITY
PHYSICAL ADDRESS OF FACILITY Buffi elsfontein Fann 465 JQ, Mooinooi
GPS CO-ORDINATES OF WASTE itude: 25°43'5o.o·s Lat GENERATING FACILITY Lon gitude: 27°36'55.5"E
'---
Page2of10
CONTACT PERSON I ----------------r-----------~--~----------------------~----------------------------~
NAME Heather Booysen
ADDRESS 1st Floor, Block 8, Cullinan Place, Cullinan Close (off Rivonia Road), Morning Side
EMAIL ADDRESS [email protected] -----------------------------------------------
TELEPHONE 0132494407
*DETAILED DESCRIPTION OF WASTE Ferrochrome is an essential ingredient for the production of stainless steel, and is an alloy of iron and GENERATING PROCESS chromium with a chromium content of between 50 and 55 percent. Stainless steel depends on chrome
for its appearance and its resistance to corrosion.
Ferrochrome production is essentially a carbothermic reduction operation taking place at high temperatures. The ore - an oxide of chromium and iron - is reduced by coal and coke to form an ironchromium alloy called ferrochrome. The heat for this reaction comes from the electric arc formed between the tips of the electrodes in the bottom of the furn~ce and the furnace hearth. This arc creates temperatures of about 2 800°C.
Tapping takes place intermittently. When ~nough smelted ferrochrome has accumulated in the hearth of the furnace, the tap hole is drilled open and a stream of molten metal and slag flows down a trough into a chill or ladle. The ferrochrome solidifies in large castings, while the slag is separated and stockpiled for further processing.
The product is crushed and screened to exact customer specifications. Alternatively, the ferrochrome is granulated into a flowing stream of water.
To improve total ferrochrome recovery while maintaining a high-quality product, alloy recovery plants are utilised to recover the ferrochrome from the slag produced during the charge chrome process. The slag, which has a metallic content of approximately 4 percent, is processed through a series of crushers and broken down to minus 15mm material. It then moves through a wet jigging plant where the chrome and slag are separated by means of gravity or magnets. The slag is then stockpiled into various size fractions
L---------------------------'-..:.:-for further use by_ external customers"'-. ___
Page3of10
-PRODUCTION PROCESS FLOW CHART ATTACHED
ves./ NO
IDENTIFICATION OF HAZARDS Not applicable
WASTE CLASSIFICATION HAZARDOUS GENERAL 1--- -
X -• A process flow chart must be attached to the process description
RISK ASSESSEMENT WITHOUT MmGATION
I Activity -
Risk Environmental receptors Impact Assessment of the risk Description
Probability Magnitude Duration Scale Significance
Transporting of Potential for Surrounding environment Deterioration 2 2 1 3 12 -low slag slag to - Air of air quality
become air- - Roads Damage to borne during - Other road users other vehicles transportation
I
Handling of slag 1
Potential for Air Deterioration 2 -
2 1 1 8-low slag to emit of local air dust during the quality loading and offloading of the slag
Page4of10
Activity
Material storage
Material handling and processing
-Material handling and processing of slag
Risk Environmental rec:eptono I Impact Description
Potential for Soil (primary) Slag spillage stockpiled on soil material to enter the Surface water (secondary) surrounding Slag spillage environment in water
causing siltation
Potential for Air Deterioration slag to emit of air quality dust during handling, crushing and screening activities
Potential for Health - skin Potential for skin irritation and abrasion
skin exposure of humans whilst working with slag
Assessment of the risk
Probability
I Magnitude Duration 1 Scale I Slgnificanc;-
3 2 1 1 12-low
2 4 2 1 14-low
4 2 1 1 16-low
Page5of10
Activity 1 Risk Environmental receptors Impact Assessment of the risk Description -
Probability Magnitude Duration Scale Significance
- I
Material handling Potential for Health- eye Potential for 4 2 1 1 16-low and processing of eye contact eye irritation slag exposure of and abrasion
humans whilst working with slag
i----
Material handling Potential for I Health - respiratory Potential for 4 2 1 1 16-low and processing of inhalation of system respiratory slag dust exposure irritation
of humans whilst working with slag
Page8of10
~
Activity Risk Environmental receptors Impact Assessment of the risk Description
Probability Magnitude Duration Scale Significance
f-
Material handling Potential for Health Potential for 2 2 1 1 8-low and processing of ingestion of irritation slag slag dust by
humans whilst working with slag
-Environmental Potential for Soil, surface water. Minor 1 2 1 1 4-low spillage accidental localised silt
release of slag I contamination into the
Visual impacts environment during transport and material
1 handling
Page7of10
The following factors and criteria must be used to assess the impacts of the activities:
Criteria MAGNJTUOE_(~ovedtyl I DURATION
10-Ve!'\1 high 5- Pennanent l lornler than 10 years) 8-H~h
1 4- Lono-term (5 tojQ.yeatS!
6-Moderate 3 - Medium-term 112 months to.~earsl 4-Low I 2- Short-term ro to 12 months! 2-Minor 1 -Immediate
SCALE PROBABIUTY ll.ikeDhoodJ 5--=..Lntemational 5- Definite 4-Nalional 4 - H!ghl~ [ robable
i 3-Regional 3 - Medium l)robabili;y 2-Local 2- Low probabirty 1 - Site ontv 1 -lm~robable 0-None 0-None
Magnitude Magnitude measures the size of the inpact
Duration Duration refers to the lifetime of the impact i.e. how long it will last
Scale The scale rafilrs to the extent of the impact.
Probability The probability refers to the chance of impact to occur. The potential inpact could be most likely to oca.~r, unlikely, etc.
Page8of10
. . .
Assessment of Significance of impact
Significance rating of the potential impacts illustrates the inportance of the inpact itself. The size of area affacted by pollution may be extremely high but the significance of this effect is dependent on the concentration or level of poDution in that area. In order to detennine the significance of inpact, the following method was used:
Significance Points (SP) = (Magnitude + Duration + Scale) x Probabllity
l1le values of SP are then ranged as follows:
rp >80 j lndi::lgh envi_ro_n_me_ nta_ I -,--An- -im-pact--wh- ic-h -= Oe-~ 1 significance whether or not to proceed with the aclivities
regardless of any possible mitigation.
t SP30-60 Indicates moderate An impact or benefit which Is sufficiently Important tO enVironmental significance require management and which could have an
influence on the decision unless it is mltlgatlld. 1
Indicates low environmental Impacts with little real affect and which will not have an significance inftuence on or require modification of the activities.
+ Positive impact I An impact that Is likely to result in positive consequencealeffects
Pagelof10
. . .. J
I
,, r
I, f~, • ~ S b ct C..VJ. hereby declare that I have read the completed the Risk Assessment fonn and· hereby confirm that the information is to the best of my knowledge true and Correct.
Furthermore, I declare that I am fully aware of my responsibilities in terms of the Waste Exclusion Regulations, and that failure to comply with these Regulations may constitute an offence in terms of the National Environmental Management: Waste Act, 2008 (Act 59 of 2008).
. -\ ~ _, 0'( r s '-a ,. L, Applicant (Full names) - 1 ___:0:..........:.-=----_..t:;-'"----""'--'1(}~:.....:'-~-\-. ----
Designation
Signature
Date _ lhi / 0 i _/_l.o l fj Place
IFOROFFIC E USE ONLY
ived Date Rece l a ken Decision T Authorised Not Authorised( provide reasons)
I Reference Number
Pagael'ofe
Procass Row Diagram
~~~~ . . --. .
· FumiJc~: \O~cn, :~oerni dot-<."d or clo~l
Metal • .. ---)· Shwcontalnlns entrapped mel'8l
- . Mr.1;JI , Rewvered Matal
(sd.dor ret'ICI8d m furnace)
l?lclr.ctJon Pbrnr
1
environmental affairs Department: Environmental Affairs REPUBLIC OF SOUTH AFRICA
RISK MANAGEMENT PLAN IN TERMS OF REGULATION 10 OF WASTE EXCLUSION REGULATONS
I APPLICANT I TC Smelters, a business untt of Samancor chrome Limited
~ --------~---- ---4
OURCE(S) OF Ferrochrome smelter producing slag WASTE
----WASTE TO BE BENEFICIATED
BENEFICIAL USEIS
Ferrochrome slag
-1 Use as aggregates
Concrete aggregates I Road base and_c_o_v_e-rin_g_a_n_d road stabilisation
Asphaltic concrete and other bituminous mixtures ------1
Construction fill
Concrete products r- --------------------------~ Plaster and granite sands
Railroad ballast
Roofing granules
Filtration media
Pipe filling material
Backfilling
Dam construction and stabilisation material
Construction of drainage systems -------------------------1
Hydroponic filling material
Page 1 of II
I Production of cement
1 Not hazardous MSDS AlTACHED IF YES NO-/ HAZARDOUS
- - -WASTE TC Smelters, a business unit of Samancor Chrome Limited GENERATING FACILITY
Buffelsfonteln Farm 465 JQ, Mooinooi
I PHYSICAL - --
s
GPSCO· Latitude: 25°43'5o.o·s
ORDINATES OF Longitude: 27~6'55.5"E WASTE GENERATING FACILITY (e.g. 600 29' 30" Latitude; 34° 20' 15H Longitude)
-PostNet Suite 803,
I POSTAL ADDRESS Private Bag X9
Ben more 201 0 -CONTACT PERSON Heather Booysen
-TELEPHONE 0132494407 CELL: NA
- ~
EMAIL [email protected] FAX: -- -
RISK MANAGEMENT PLAN
!Activity Rllk DIICI'Ipllon Adlon(l) ta mlnlmiHI j Rllponelblllty (Who II nlll'llgl thl rllk rllpOIIIIble tD do It)
-Transporting of Potential for slag to Make use of tarpaulin Transporter slag become air-borne over slag during
during transportation transportation if slag has potential to cause
I dust or to be thrown from the vehicle.
I Handling of slag l Potential for slag to Slag is a heavy and Operator
I emit dust during the dense material. The potential to cause dust
Page 2 of I
.
1 loading and -~low. Take
I I offloading of the slag precautions to
minimize dust formation by wetting of the slag when necessary.
-Material storage Potential for The slag is stable in Operator
stockpiled material storage. Slag is usually to enter the consumed in large surrounding volumes for which environment packaging is
impractical. Avoid deposition outside areas of Intended use. Store In demarcated areas. Avoid storage conditions that may generate dust.
Manage stormwater collected in slag stockpile areas.
- --Material handling Potential for slag to Slag Is a heavy and Operator and processing emit dust during dense material. The
handling, crushing potential to cause dust and screening is low. Take activities precautions to
minimize dust
I
formation by wetting of the slag when necessary. I
Material handling Potential for skin Special attention other Operator and processing of exposure of humans than routine personal slag whilst working with hygiene not required.
slag Wash hands with water and soap. Wear the appropriate PPE. Overalls and safety boots; gloves for hands, where applicable.
Material handling Potential for eye Eye protection should Operator and ·processing of contact exposure of be worn were dust i.s a slag humans whilst potential hazard.
I working Safety goggles and
I 1
face shield W the . potential exists for the generation of sharp,
Page 3 of&
j 1 small chips, sharp flakes or excess dust.
--Material handling PQtential for Take precautions to Operator and processing of inhalation of dust minimize dust slag exposure .of humans formation by the
whilst working with wetting of the product slag and use appropriate
personal protective _J equipment to prevent dust inhalation
Material handling Potential for Operator and processing of ingestion of slag slag dust by humans Wash out mouth with
whilst working with water. Wash hands slag and not wearing thoroughly after PPE or washing handling. hands
-- -Environmental Potential for Clean slag spills Transporter and spillage accidental release of Immediately and operator
slag into the remove to suitable environment during storage area. transport and
I material handling
Pege4 Dfll
..
~DECLARATION
I ~· fl. f" '\oa ,.b hereby declare that I have read the completed Risk Management fonn and hereby confinn that the infonnatlon is to the best of my knowledge true and correct.
Furthermore, I declare that I am fully aware of my responsibilities in tenns of the Waste Exclusion Regulations, and that failure to comply with these Regulations may constitute an offence in tenns of the National Environmental Management: Waste Act, 2008 {Act 59 of 2008).
Applicant (Full names) A '1. J 0 ( ~~ k2ac..h Designation --V~C. V tL( f..{ ~ Vl c.t ~ P t"
Signature --4 Date 14 / D f / 2.tJ If Place
L__ _______________________________ ~
FOR OFFICE USE ONLY
Date Received __ ,
Decision Taken Authorised
Reference Number
..__
I ~~horised (provide
1 reason)
-----