ENV-NCP-TOGETHER PARTNER MEETING

WORK PACKAGE 3

02/03/2010

c Beta Technology

Re-cap of Work Package 3

• The main objective of this WP is to improve the knowledge of NCPs in pre-screening FP7 environment proposals•The aim is to decrease the number of out of scope of the call proposals and to improve the quality of those which are submitted • Areas of the proposal to concentrate on are administrative issues, e.g.

• The forms • Objectives• Deliverables• Management

c Beta Technology

Tasks and Deliverables

• Task 3.1: Preparation of training materials• D3.1: Training material on proposal pre-screening (M24)

• Task 3.2: Developing a tool for pre-screening proposals• D3.2: Pre-screening tool (M12)

• Task 3.3: Feedback of using the pre-screening tool and its updates • D3.3: Questionnaire to evaluate the proposal pre-screening tool

(M12)• D3.4: Report of the evaluation of the pre-screening tool (after

calls 2010-2013)

Aim • A complete set of training materials on proposal pre-screening for

use in the WP1 training courses. Presentations will be produced and will be backed up with exercises to provide practical experiences for the NCPs being trained.

• The following topics will provide the focus for the training:– What makes a good consortium – mandatory requirements

specified in the Work Programme and best practices– A forms – B section– Project finances– EPSS

Task 3.1: Preparation of training materialsD3.1: Training material on proposal pre-screening (M24)

c Beta Technology

Progress so far• A shortened version of the pre-screening tool is being developed• No work has started on the presentations or exercises

Plans for 2010• Complete the shortened version of the pre-screening tool • Recruit NCPs to help with the presentations and exercises. Are there

any volunteers? • Complete the training material and liaise with WP1 to decide upon a

completion deadline (TBC)

Task 3.1: Preparation of training materialsD3.1: Training material on proposal pre-screening (M24)

Task 3.2: Developing a tool for pre-screening proposals

D3.2: Pre-screening tool (M12)Aim• To develop and support NCPs in the activity of pre-screening proposals through a tool for all projects in FP7• Types of projects that the tool should cover includes:

• Collaborative Projects • Network of Excellence• Coordination and Support Actions

• The pre-screening tool will be a handbook that will provide• Comments on the different sections of a proposal• A model response• Checklists that can be used to ensure all aspects of the proposal

have been addressed.

c Beta Technology

Task 3.2: Developing a tool for pre-screening proposals

D3.2: Pre-screening tool (M12)Progress so far• A pre-screening tool has been developed for the following types of proposals

• Collaborative Projects - YES• Network of Excellence - NO• Coordination and Support Actions - YES

Format of the Proposal Pre-screening Tool

The Tool is broken down into sections and includes the following areas:• Formal Guidance• Common Errors• Good Practice• What the Evaluator Looks For• Model Answers, with Good Practice Guidelines• Checklist

c Beta Technology

Pre-screening Proposal Tool - Advice

c Beta Technology

Pre-screening Proposal Tool – Model Answers

Pre-screening Proposal Tool – Examples

c Beta Technology

Task 3.2: Developing a tool for pre-screening proposals

D3.2: Pre-screening tool (M12)Plans for 2010• The tool is in its final draft form but it needs finishing with a front page, etc.• Does a NoE tool need to be developed – no NoE topics in the work programmes• Plan to review the tools in September, ready for 2011 call

Aim• To get a large number of NCPs using and providing feedback on the pre-screening tool and tested by experienced FP7 evaluators.• A questionnaire will be developed that will be sent to all users after a calldeadline. • A report will be generated based upon the questionnaire responses that will contain recommendations for the improvement of the pre-screening tool. The tool will then be updated in line with the report’s recommendations.

c Beta Technology

Task 3.3: Feedback of using the pre-screening tool and its updates D3.3: Questionnaire to evaluate the proposal pre-screening tool (M12)

D3.4: Report of the evaluation of the pre-screening tool (after calls 2010-2013)

c Beta Technology

Task 3.3: Feedback of using the pre-screening tool and its updates D3.3: Questionnaire to evaluate the proposal pre-screening tool (M12)

D3.4: Report of the evaluation of the pre-screening tool (after calls 2010-2013)

Progress so far• An email was sent out twice to the WP3 partners asking for NCP evaluation and comments – only 1 responded!• One UK evaluator is looking at the tools and will provide formal feedback

Plans for 2010• Get more feedback:

• Does anyone know any more evaluators?• WP3 needs your help to achieve the deliverables. Volunteers required

to evaluate the tool• Generate a report but only possible if we get NCPs using the tool

Deliverables Progress

c Beta Technology

D3.1

Training material on proposal pre-screening 24 Not started

D3.2

Pre-screening tool 12 95% complete (NoE?)

D3.3

Questionnaire to evaluate the proposal pre-screening tool

12 Not started. Lack of NCP usage

D3.4

Report of the evaluation of the pre-screening tool

After

calls

Not started due to D3.3

How You Can Help

• I need volunteers to test out the pre-screening tool and provide me with feedback.• Help from any NCP gratefully received• Would anyone like to help develop the proposal pre-screening training materials?

• Please see me in the break or email me by the end of the week if you are interested ([email protected])

c Beta Technology

THANK YOU