english convention programme - biogas-convention.com...panel 2.1 future opportunities for biogas:...
TRANSCRIPT
English convention programme
Latest news and registration:
www.biogas-convention.com
Key topics: » Biomethan » LNG » Best practices in Europe » Best practices worldwide » Innovations
Special workshop » Enzyme to improve the Biogas yield – DEMETER a BBI Ju funded project as best practice
Large biogas exhibition in hall 9
10 – 12 December 2019 Exhibition Center Nuremberg, NCC Mitte
International
excursion
13 December 2019
Supported by
Media partner
HostGerman Biogas AssociationHeadquartersAngerbrunnenstraße 1285356 Freising, GermanyPhone: +49 (0)8161 98 46 - 60Fax: +49 (0)8161 98 46 - 70E-Mail: [email protected]
With more than 4,700 members, the German Biogas Association is the largest German and European body representing the interests of the biogas sector. It represents manufacturers of biogas plants and components, planners as well agricultural and industrial biogas plant owners throughout Germany. The objective of the association’s work is to enlarge the production and use of biogas for the nationwide generati-on of electricity, heat and fuel production, to strengthen the industrial location Germany and to develop an effective climate protection.
Co-organiser DLG Service GmbHEschborner Landstraße 12260489 Frankfurt am Main
Hotel reservationsCongressCheck GmbHBultstraße 7 – 930159 Hanover, GermanyPhone: +49 (0)511 89 88 13 - 0E-Mail: [email protected]: www.biogas-convention.com
www.biogas-convention.com
www.biogas.org
Anzeigenpreisliste Nr. 46gültig ab Folge 1/2017
2 | kurz und gut
Erscheinungsweise: monatlichJahrgang: 46. Jahrgang 2017Verkaufte Auflage: 106.483 Expl. (lt. IVW, 2. Quartal 2016)Erscheinungsort: 48165 MünsterVerlag/Herausgeber: Landwirtschaftsverlag GmbH Hülsebrockstraße 2– 8, 48165 Münster bzw. Postanschrift: 48084 Münster Telefon: 02501/801- 0www.lv.de · E-✉: [email protected]äftsführung: Hermann Bimberg (Sprecher), Werner Gehring
Bereichsleitung Fachmedien: Dr. Peter Wiggers
Chefredaktion: Dr. Ludger Schulze Pals, Berthold Achler Telefon: 0 25 01/8 01- 64 00 www.topagrar.com E-✉: [email protected]:Friedrich DeckertTel. 02501/801- 16 80 E-✉: [email protected]
top agrar ist die Nr. 1 unter den Fach- und Spezialzeitschriften im deutschsprachigen Raum. Das Magazin bietet jeden Monat aktuelle Fach- informationen und praxisgerechte Entscheidungs- hilfen für die landwirtschaftlichen Betriebsleiter und Entscheidungsträger in der grünen Branche.top agrar ist crossmedial sehr stark vernetzt und punktet auf jedem Kommunikationskanal durch fundierte, präzise Fachinformationen mit hohem Nutzwert.top agrar – wir sind für die Bauern da!
Individuelle Angebote1) 12 xSpezialprogramm Rinderhaltung
2) 12 xSpezialprogramm Schweinehaltung
3) 12 xtop agrar Österreich, als Extra im Heft für Abonnenten in Österreich
4) 12 xLANDfreund, als Extra im Heft für Abonnenten in der Schweiz
5) 6 xsüdplus, als Extra im Heft für Bayern und Baden-Württemberg
6) 3 xENERGIEmagazin, als Extra im Heft
Mitglied von Eurofarm Arbeitsgemeinschaft führender europäischer Agrarzeitschriften
Mitglied der Informationsgemeinschaft zur Feststellung der Verbreitung von Werbeträgern e. V.
YouTube
Instagramm
Google+
182.991
21.461
48.911
5.742
5.061
487
19
Social Network top agrar
LANDfreundDAS SCHWEIZER AGRARMAGAZIN Nr. 9 · September 2016
Einkauf Im Team geht’s billiger
WeizenJetzt die beste Sorte wählen
ShredlageIst grobe Maissilage besser?
FachmesseTrade Fair
GeländeübersichtPlan of site
L 4, 5
Karl-Schönleben- Str Karl-Schönleben- Str
Otto-Bärnreuther-Straße
Münchener Straß
e
WestEinfahrt . Access
OstEinfahrt . Access
Betriebs-hof
im Bauunderconstruction
Messepark AusstellerShopExhibitorShop
12
3
4
5
6
789
7A
4A
3A3C
U-Bahn / SubwayMesse
S 9S 11
S 12.0
S 1
S 5/6
S 6/7S 8/9
S 1/2S 4/5
S 7
S 4
S 2/3/4
S 1Mitte
S 3/4
S 10
S 9Mitte
Operation Center
Service-Center Mitte
Rotunde
ServicePartnerCenter
ParkhausParking
Ost
Süd-Ost Sü
VIP Ost 2
VIP Ost 1
Süd-Ost
VIP West/ Mitte
Ost
NCCMitte
NCC West Franken-halle
NCCMitte
NCCMitte
NCC Ost
50 100m0
12
11 10
MitteEingangEntrance
Eingang und ServicebereichEntrance and service
Tagung Convention
Tagung / Convention Fachmesse / Trade Fair
Content Contact, location map ..................................2
Welcoming address .......................................3
Programme overview ....................................4
Trade fair / ticket prices ................................5
Programme details
Tuesday ................................................6
Wednesday ...........................................7
Thursday ..............................................8
Excursion .......................................................8
Information for participants .........................9
Convention prices ........................................10
VenueNCC Mitte, conference area & hall 9 Nuremberg fair ground
Registration CongressCheck Sandra Franke Bultstraße 7 – 9 30159 Hanover, Germany Phone: +49 (0)511 89 88 13 -17 E-Mail: [email protected]
Online registrationwww.biogas-convention.com
Editor
Anja Lobedank, Fachverband Biogas e. V.
Design
bigbenreklamebureau gmbh
DMZ Druckmedienzentrum
2
New pathways into the futureThe issue of climate protection has at last attracted the attention of the German government. Since thousands of school children have taken to the streets every Friday in protest, calling for fast, consistent action to combat global warming, the politicians have been forced to come up with solutions.
It is obvious to everyone that this will only be possible with the help of renewable energies. And that this basi-cally means stepping up the pace of development of such sources. What is lacking is a road map.
The biogas industry is ready to help – in all sectors, right away and 24/7. The great potential and the variety of bio-gas plants for ensuring a climate-friendly energy supply is once again reflected in the programme of this year‘s BIOGAS Convention & Trade Fair.
The German programme includes dedicated panels to key topics like flexibility, biomethane and manure utilisation. Flexibility is a major strength of the biogas industry. We are the only ones who can deliver quickly and reliably – whatever the season, whatever time of day. Biogas can be stored. Either directly at the plant or upgraded into biomethane and stored in the gas grid. There is still huge potential here. Just as in the case of manure utilisation and processing. Only a quarter of the manure produced in barns and stables is digested at biogas plants. Urgent improvement is required. Digestate upgrading is another field that needs to be improved.
The international, English programme offers insights on future opportunities of biomethane innovations, success-ful incentive schemes in other European countries and successful projects in developing markets.
The political situation will no doubt be a focus of dis-cussion at the BIOGAS Convention & Trade Fair. Let us not be discouraged! Biogas remains a crucial part of the energy transition. And there is no doubt that we need this change.
I wish you many interesting discussions, plenty of new insights and, above all, courage and confidence for the tasks that await us!
Best regards,
Horst Seide
Programme – overview Important note: This programme only includes presentations in English. Please find the full programme including the presentations in German on our German website: www.biogas-convention.com
TUESDAY, 10 DECEMBER 2019 BIOGAS Trade Fair 9 am – 6 pm .
Special workshop
10.00 am – 01.00 pmEnzyme to improve the biogas yield –
DEMETER a BBI Ju funded project as best practice
WEDNESDAY, 11 DECEMBER 2019 BIOGAS Trade Fair 9 am – 6 pm .
Panel 2
9.00 am – 10.30 am 2.1 Future opportunities for biogas: Biomethane, Bio-LNG and more
10.30 am – 11.00 am Coffee break
11.00 am – 12.30 pm 2.2 Succesful incentive schemes in Europe
12.30 pm – 01.30 pm Lunch break
01.30 pm – 03.00 pm 2.3 Succesful projects worldwide
04.00 pm – 06.30 pm General assembly German Biogas Association (for members only)
07.00 pm Biogas Convention & Trade Fair evening event, Foyer NCC Mitte, Exhibition Center
THURSDAY, 12 DECEMBER 2019 BIOGAS Trade Fair 9 am – 5 pm .
BIOGAS Expert Forum
11.00 am – 01.00 pm Innovation forum in hall 9, stand B11
FRIDAY, 13 DECEMBER 2019
08.00 am – 05.00 pm Excursion (with simultaneous translation into English)
4
Come and visit the
In hall 9 of the Nuremberg trade fair, you can visit all kinds of compa-nies from the biogas sector from 9.00 am to 6.00 pm (Thursday until 5 pm), which means you as a visitor can meet the entire industry at one trade fair and fully concentrate on your business. Take advantage of this opportunity and get the latest information directly from the exhibitors!
Also in hall 9 you will find our BIOGAS Forum, where selected compa-nies will be presenting their products, services, projects (in German). On Thursday, 12 December we will present four innovations to our international guests (in English).
The German Biogas Association with its „Biogas-Treff“ is also in hall 9. Together with 9 of our members, our joint booth is the center of the hall and meeting point for visitors, companies, members and experts. Here you can meet German Biogas Association employees in person, discuss current and important topics and plan your visit to the BIOGAS Trade Fair 2019. We look forward to seeing you!
If you have any questions regarding the BIOGAS Trade Fair in 2021 or our next industry meeting in 2020 at the EnergyDecentral in Hanover, you can visit the booth of our co-organiser, the DLG and start planning your next presentation as an exhibitor or your future visit.
APROVIS. Better Performance.
EXHAUST TECHNOLOGY: Exhaust Gas Heat Exchangers Heat Recovery Steam Generators Catalytic Converters andSCR (DeNox)-Systems
Silencers
www.aprovis.com
Day ticket 21,00 EUR
Season ticket 40,00 EUR
Day ticket students 5,00 EUR After presentation of id-card and student card
Members German Biogas Association or German Agricultural Society (DLG)
0,00 EUR After presentation of id-card and member card
Voucher Vouchers can be handed in at the exhibition box office
Tickets for the trade fair(only available from the box office)
5
Special Workshop The participation to the DEMETER workshop is free of charge for registered participants since its costs are covered by DEMETER, a BBI-JU funded project (G.A. 720714). The number of participants is limited to 50 attendees. The entrance to the trade fair is included.
10.00 am Enzyme to improve the Biogas yield – DEMETER a BBI Ju funded project as best practice
In the bio-based economy era, the conversion of biomass into energy sources (biofuels, biogas) is an essential step in order to reduce the use of fossils. Enzymes play an indispensable role in this context even if they are not being specifically developed for the biogas production so far; therefore, efficient enzymes enabling the biomass conversion should be developed.
The DEMETER project, among its goals, aims to test a new enzyme product in order to improve the biogas yield; the enzyme has proven to be effective in practice and it can be produced at an industrial scale.
The DEMETER partners will give insights on the industrial and economic feasibility to apply a cost-effective enzyme product in biogas plants as well as on the impact of the developed processes and products on environment and economy.
01.00 pm End of workshop
Tuesday, 10 December 2019
Hall 09Booth B22
GAS ENGINE SPECIALISTS SINCE 1936 PLANNING — CONSTRUCTION — SERVICE
. Combined heat and power plants (CHP) 50 kW to 2.500 kW
. Emergency power systems 50 bis 3.000 kVA
. Uninterruptible power supply (UPS)
. Maintenance, repair and overhaul
. Full service www.HENKELHAUSEN.de
Come and visit the BIOGAS Trade Fair in hall 9!
Tuesday and Wednesday 09.00 am – 06.00 pmThursday 09.00 am – 05.00 pm
6
Wednesday, 11 December 2019 Panel 2
Panel 2.1 Future opportunities for biogas: Biomethane, Bio-LNG and moreModeration: Frank Hofmann, German Biogas Association
09.00 am Biomethane as a fuelAlexey Mozgovoy, German Biogas Association
09.30 am Bio-LNG: technologies and best practices Yannick Rouaud, Air Liquide Advanced Technologies
10.00 am Alternative ways of biogas usageMarcus Friedel, DBI – Gastechnologisches Institut gGmbH
10.30 am Coffee break
Panel 2.2 Successful incentive schemes in EuropeModeration: Harm Grobrügge, German Biogas Association
11.00 am Biomethane as a new driver in the transport sector in ItalyPiero Gattoni, CIB – Consorzio Italiano Biogas
11.30 am Incentive system for biogas in France and resulting developmentMarie Verney, Club Biogaz ATEE
12.00 am Biogas in Serbia – New trends and opportunities in a growing marketDragan Zukic, Serbian Biogas Association
12.30 am Lunch break
Panel 2.3 Successful projects worldwideModeration: Lucius Mayer-Tasch, Deutsche Gesellschaft für Intenationale Zusammenarbeit (GIZ) GmbH
01.30 pm Corporate Driven Projects in the Philippines – Success Factors and ChallengesDitmar Gorges, METPower Venture Partners Holding Inc.
02.00 pm BTS Biogas technology for the anaerobic digestion of maize by-products in ArgentinaRiccardo Gefter, BTS Biogas Srl/GmbH
02.30 pm Biogas in China: how to succeed in one of the biggest economies in the world.Jörg Fischer, EnviTec Biogas AG
03.00 pm End Panel 2
04.00 pm 06.30 pm
General assembly German Biogas Association (for members only)
07.00 pmBiogas Convention & Trade Fair evening event,
Foyer NCC Mitte, Exhibition Center
Besuchen Sie uns an unserem Stand Halle 09, Stand D13!
Emissionsmessungen für Biogasanlagen
7
BIOGAS Expert Forum, hall 9
Innovation Forum
11.00 am Black start of electricity grids through biogas CHP PlantsSebastian Eichhorn, Geisberger Gesellschaft für Energieoptimierung mbH
11.30 am A rising biogas star based on manure and wasteBenjamin Budde, Erich Stallkamp ESTA GmbH
12.00 pm Waste to energy – best practice project Lethbridge Michael Hellenkamp, PlanET Biogastechnik GmbH
12.30 pm New SCR Catalyst Technology by DCLKhalil Saikaly, DCL Europe GmbH
Friday, 13 December 2019Thursday, 12 December 2019Excursion (with simultaneous translation into English)
At every BIOGAS Convention, we organise an excursion to selected bio-gas plants in the area the day after the convention. Please note that you can either book the 3-day package or register separately if you want to be part of the excursion. The number of participants is limited by the number of seats in the buses. Private transport is not permitted. We will be visiting two biogas plants during the tour.
Excursion
08.00 amDeparture at the fair grounds (Signs for the meeting point will be put up during the BIOGAS Convention)
Joint lunch (included)
05.00 pm Expected return to the fair grounds
+49 8503 914 99-0 [email protected] AGROTELGmbH Neuhaus/Innwww.agrotel.euVisit our website!
GasstorageSlurry Cover
8
1 Online registration until Monday, 25 November 2019
f Please register online for the English programme of the BIOGAS Con-
vention & Trade Fair 2019 via the Ticketshop at https://www.biogas-
convention.com/en. Please note that workshops in German can only
be booked via the German Ticketshop. The Ticketshop is open until
Monday, 25 November 2019.
2 On-site registration 10 - 12 December 2019
f It is possible to register on site at the box office of the BIOGAS Conven-
tion & Trade Fair 2019 the entrance to NCC Mitte. The box office opens
at 7.30 am. Tickets to the fair are only available from the box office.
3 Payment
f The option of payment on receipt of invoice is available for online re-
gistration until 25 November 2019. With registration on site at the box
office, payment can be made by credit card, EC card or in cash. The
invoice will be sent to you on request. Please register early so that we
can send you all documents in good time.
4 Important information for booking 2 or 3-day packages
f On Wednesday, 11 December 2019 it is possible to switch to the
German panel taking place in parallel.
f With bookings for Wednesday, 11 December 2019, all participants
will also receive a ticket to the evening event, which will be sent out
separately. Additional registrations for the evening event should be
made in advance via the Ticketshop. Only a limited quota of tickets
will be available at the evening box office.
f The number of participants is limited, with registrations being
processed on a ‘first come, first served’ basis. Once the 2 or 3-day
packages, the evening event or the group excursion are fully
booked, no further participants can be admitted, for safety reasons!
5 Admission to the BIOGAS Convention / Conference pack
f Upon arrival in Nuremberg you will receive your conference documents
and name badge.
f The panel presentations will be made available to participants shortly
before the event and also for downloading in an updated version after
the conference.
6 Cancellation/ Withdrawal
f In the case of cancellation up to 14 days before commencement of
the event, an administrative charge amounting to 10% of the relevant
attendance fee will be applied. With cancellation less than 14 days
before commencement of the event, the full attendance fee will be
charged. Cancellation must be effected in writing. The attendance fee
will also be charged in full in the case of ‘no-show’ on the day of the
event. The detailed terms of cancellation can be found in the General
Terms and Conditions at www.biogas-convention.com/Event info.
f Proof of exceptional circumstances must be provided and cannot be
taken into consideration until after the event. An e-mail to this effect
should be sent to [email protected].
Important information for participants
9
Supplementary Offers (no discounts)
DEMETER Workshop on 11 December 2019 0,00 EUR Free of charge, registration mandatory
Excursion on 13 December 2019 180,00 EURExcursion ticket including bus ride, guided tour, simultaneous translation into English and lunch
Excursion on 13 December 2019 for participants as defined by the DAC list*
90,00 EURExcursion ticket including bus ride, guided tour, simultaneous translation into English and lunch
Evening event on 11 December 2019Online: 45,00 EUR
box office: 50,00 EURA ticket to the evening event with buffet, drinks and music
* the DAC-List can be viewed at our website: www.biogas-convention.com
Please find BIOGAS Trade Faire prices on page 5
Online registration: www.biogas-convention.com Deadline for online registration: 25 November 2019, later only on-site registration.
Prices
Convention Programme item Price in EUR Services included
International participants
2-day package 480,00 EUR2-day package (English programme on 11 December 2019, evening event, biogas forum in hall 9, trade fair tour on 12 December 2019, 3-day ticket to the BIOGAS Trade Fair)
3-day package with excursion
690,00 EUR 3-day package with excursion (English programme on 11 December 2019, evening event, BIOGAS forum in hall 9, trade fair tour on 12 December 2019, excursion at 13 December 2019 and 3-day ticket to the BIOGAS Trade Fair)
International participants as defined by the DAC list*
2-day package 230,00 EUR 2-day package (English programme on 11 December 2019, evening event, biogas forum in hall 9, trade fair tour on 12 December 2019, 3-day ticket to the BIOGAS Trade Fair)
3-day package with excursion
280,00 EUR 3-day package with excursion (English programme on 11 December 2019, evening event, BIOGAS forum in hall 9, trade fair tour on 12 December 2019, excursion at 13 December 2019 and 3-day ticket to the BIOGAS Trade Fair)
10
Everything for you.And your plant.
Planning to sell your biogas plant?Talk to us: [email protected]/biogas
Technical Services
Laboratory Services
Operational Management
Repowering
Project managementApproval planningFlexibilizationExtensionComponents
Over 20 years of experience
Waste digestation plants
Biogas plants
+49 9085 / 96 00 3 - [email protected]
Visit us!In the exhibition hall 9, on the stand A1910th - 12th of December 2019, Nuremberg, exhibition center
www.uts-products.com
UTS Products GmbH · Phone: +49 (0)2923 610940
PSM Submersible Mixer» Reduction of mixing costs by up to 50%» KfW support of up to 40% possible*
*Funding program: KfW energy effi ciency and process heat from renewable energies program (295)
Visit us in hall 9 / booth D34a
Phone: +49 (0)2923 610940
awite_az_en_85x85_BiogasCV2019_200819.indd 2 20.08.19 11:36
Replace your agitator and cut your costs!
| pump | store| agitate | separate MADE IN DINKLAGE
www.stallkamp.de
ONLIN
E SHOP
AFTER REGISTRATIONBEST PRICE
+++ GENUINE & OEM ENGINE PARTS +++
FAST. FAIR. RELIABLE.
ONLIN
E SHOP
AFTER REGISTRATIONBEST PRICE
H09 - B26
MCP directivethe solutionfor continous monitoring!
More information: Hall 9 Booth B64
EMI-LOG
WE WILL BE HAPPY TO ADVISE YOU!Emission Partner GmbH & Co. KGPhone: E-Mail: [email protected] Web: www.emission-partner.de
01.11.2019 13:37 Uhr
Betriebsstunden: 7493 hAusfallstunden: 0 h
NOx: 450 mg/Nm³CO: 100 mg/Nm³