V2500 - Fly-on with eng P2T2 Probe Sealant Missing ATA: 73-22 FIN: N/A Ref: 73.22.00001 A/C Type: A319 A320 A321 A/C Serie: Topic: First Issue Date: 16-DEC-2005 Part Number: N/A Last Publication Date: 16-MAY- 2018 Supplier: N/A Linked Articles: Linked Documentation: Old Wise Ref: eng-2253 Engineering Support First Issue Date: 16-DEC-2005 Model: V2500-A1 V2522-A5 V2524-A5 V2527-A5 V2527E-A5 V2527M-A5 V2530-A5 V2533-A5 Last Publication Date: 16-MAY-2018 Manufacturer: INTERN. AERO ENGINES Description A320F V2500 - Fly-on with eng P2T2 Probe Sealant Missing P2T2 probe sealant is missing (at the interface with the intake inner barrel) Solution Sealant application requires 10 hour cure time as per AMM 73-22-11-400-010-A. This may cause AOG situation. As per the AMM, if time is not sufficient to meet cure requirements, it is permitted to postpone the application of the aerodynamic sealant. Aerodynamic sealant must be applied within 14 days (no matter the number of flights). Please contact Airbus Customer Services to request for a chargeable TA to allow for more than 14 days with no sealant installed. Review on-going to add missing sealant around the base of the P2/T2 probe to the allowable damage part of the Structural Repair Manual for a time limited fly-on.

Upload: others

Post on 18-May-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Engineering Support

V2500 - Fly-on with eng P2T2 Probe Sealant Missing

ATA: 73-22 FIN: N/A Ref: 73.22.00001 A/C Type: A319

A320 A321

A/C Serie: Topic: First Issue Date:

16-DEC-2005

Part Number: N/A Last Publication Date:

16-MAY-2018

Supplier: N/A Linked Articles:

Linked Documentation:

Old Wise Ref:eng-2253

Engineering Support

First Issue Date: 16-DEC-2005 Model: V2500-A1

V2522-A5 V2524-A5 V2527-A5 V2527E-A5 V2527M-A5 V2530-A5 V2533-A5

Last Publication Date: 16-MAY-2018

Manufacturer: INTERN. AERO ENGINES

Description

A320F V2500 - Fly-on with eng P2T2 Probe Sealant MissingP2T2 probe sealant is missing (at the interface with the intake inner barrel)

Solution

Sealant application requires 10 hour cure time as per AMM 73-22-11-400-010-A. This may cause AOG situation.

As per the AMM, if time is not sufficient to meet cure requirements, it is permitted to postpone the application of the aerodynamic sealant. Aerodynamic sealant must be applied within 14 days (no matter the number of flights).

Please contact Airbus Customer Services to request for a chargeable TA to allow for more than 14 days with no sealant installed.

Review on-going to add missing sealant around the base of the P2/T2 probe to the allowable damage part of the Structural Repair Manual for a time limited fly-on.

Page 2: Engineering Support

Survey for the Engineering Support section

© Airbus SAS, 2018. All rights reserved. Confidential and proprietary document.The technical information provided in this article is for convenience and information purposes only. It shall in no case replace the official Airbus technical or Flight Operations data which shall remain the sole basis for aircraft maintenance and operation. These recommendations and information do not constitute a contractual commitment, warranty or guarantee whatsoever. They shall not supersede the Airbus technical nor operational documentation; should any deviation appear between this article and the Airbus or airline's official manuals, the operator must ensure to cover it with the appropriate document such as TA, FCD, RDAS. Access to WISE is supplied by Airbus under the express condition that Airbus hereby disclaims any and all liability for the use made by the user of the information contained in WISE. It shall be used for the user's own purposes only and shall not be reproduced or disclosed to any third party without the prior consent of Airbus.