engineering projects (india) limitedengineeringprojects.com/tender/uploadfiles/6849... · 2020. 2....

29
Page 1 of 29 DLI/CON/EMM/001 04.02.2020 FOR DISCIPLINE NAMELY: ELECTRICAL & MECHANICAL WORKS E/M(a) Heating, Ventilation & Air Conditioning (HVAC) Systems. E/M(b) Dust Extraction & Suppression ( DE) Systems. E/M(c) Fire Fighting System. E/M(d) Instrumentation, Fire Alarm, CCTV, PA, EPBAX, Access Control, Networking Systems, Building Automation & Building Management Systems (BMS) etc. E/M(e) Building Electrics/ Illumination / Low Tension Electrical Works (LT). E/M(f) Electrical Equipment / Transformers / Generators / High Tension Electrical Works (HT) . E/M (g) Plant & Equipment Erection (P & E) works. E/M (h) Lift, Escalator etc. (LIFTS). E/M (i) Security Surveillance System. LAST DATE OF ONLINE SUBMISSION: 25/02/2020 UPTO 05.00PM LAST DATE OF SUBMISSION OF OFFLINE DOCUMENTS AFTER ONLINE SUBMISSION: 27/02/2020 UPTO 01.00PM APPLICATIONS OPENING DATE: 27/02/2020 AT 02.00PM ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) CORE 3, SCOPE COMPLEX, 7 LODHI ROAD, NEW DELHI 110003

Upload: others

Post on 16-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 1 of 29

DLI/CON/EMM/001 04.02.2020

FOR DISCIPLINE NAMELY:

ELECTRICAL & MECHANICAL WORKS

E/M(a) Heating, Ventilation & Air Conditioning

(HVAC) Systems.

E/M(b) Dust Extraction & Suppression ( DE) Systems.

E/M(c) Fire Fighting System.

E/M(d) Instrumentation, Fire Alarm, CCTV, PA,

EPBAX, Access Control, Networking Systems,

Building Automation & Building Management

Systems (BMS) etc.

E/M(e) Building Electrics/ Illumination / Low Tension

Electrical Works (LT).

E/M(f) Electrical Equipment / Transformers /

Generators / High Tension Electrical Works (HT) .

E/M (g) Plant & Equipment Erection (P & E) works.

E/M (h) Lift, Escalator etc. (LIFTS).

E/M (i) Security Surveillance System.

LAST DATE OF ONLINE SUBMISSION: 25/02/2020 UPTO 05.00PM

LAST DATE OF SUBMISSION OF OFFLINE DOCUMENTS AFTER

ONLINE SUBMISSION: 27/02/2020 UPTO 01.00PM

APPLICATIONS OPENING DATE: 27/02/2020 AT 02.00PM

ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA ENTERPRISE)

CORE 3, SCOPE COMPLEX, 7 LODHI ROAD, NEW DELHI – 110003

Page 2: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 2 of 29

EMPANELMENT OF CONTRACTORS

(2020-2022)

I N D E X

SECTION PAGE Nos.

DETAILED NOTICE FOR EMPANELMENT Section-1 3-6

INFORMATION & INSTRUCTIONS FOR

APPLICANTS Section-2 7-17

PRE-QUALIFICATION INFORMATION &

APPLICATION FORMS (FORMS A TO I) &

LETTER OF TRANSMITTAL

Section-3 18-29

Page 3: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 3 of 29

Page 4: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 4 of 29

ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA ENTERPRISE)

CORE 3, SCOPE COMPLEX, 7 LODHI ROAD, NEW DELHI – 110003

NIT NO: DLI/CON/ EMM/ 001 DATE: 04.02.2020

NOTICE FOR INVITING APPLICATIONS FOR

EMPANELMENT OF CONTRACTORS (2020-2022)

1. ENGINEERING PROJECTS (INDIA) Ltd. invites online application from reputed,

experienced and Indian registered contractors / firms for „Empanelment of Contractors‟ on

“All India Basis” for the following discipline & categories.

DISCIPLINE: ELECTRICAL & MECHANICAL WORKS CATEGORIES MONETARY LIMITS

i) E/M(a): Heating, Ventilation &

Air Conditioning (HVAC)

Systems.

ii) E/M(b): Dust Extraction &

Suppression ( DE) Systems.

iii) E/M(c): Fire Fighting (FF)

System.

iv) E/M(d): Instrumentation, Fire

Alarm, CCTV, PA, EPBAX,

Access Control, Networking

Systems, Building Automation &

Building Management Systems

(BMS) etc.

v) E/M(e): Building Electrics/

Illumination / Low Tension

Electrical Works (LT).

vi) E/M(f): Electrical Equipment /

Transformers / Generators / High

Tension Electrical Works (HT) .

vii) E/M(g): Plant & Equipment

Erection (P & E) works.

viii) E/M(h): Lift, Escalator etc.

(LIFTS).

ix) E/M(i): Security Surveillance

System.

Group -U ` 250 Crores up to ` 400 Crores

Group –U1 ` 100 Crores up to ` 250 Crores

Group –U2 ` 50 Crores up to ` 100 Crores

Group –U3 ` 20 Crores up to ` 50 Crores

Group -A ` 10 Crores up to ` 20 crores

Group -B ` 5 Crores up to ` 10 crores

Group -C ` 2 Crores up to ` 5 Crores

Group -D ` 0 Crores up to ` 2 Crores

The contractors should meet the minimum qualifying criteria as mentioned in this

notice for Empanelment for the respective discipline & categories under different

monetary Limits for getting empanelled.

Page 5: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 5 of 29

2. The detailed notice is available for download and submit only on MSTC portal

http://www.mstcecommerce.com/eprochome/EPIL and available for reference on the

websites of EPI: www.enginneringprojects.com & CPP Portal: www.eprocure.gov.in. The

contractors should bid considering their eligibility & apply for the specific discipline &

category of works only. Contractors who want to apply for more than one Category

should do so through separate application including applicable Registration fee.

3. Application complete in all respects to be submitted online in respect of respective category

and limit and offline documents must reach Executive Director (Contracts & Engineering),

Engineering Projects (India) Limited., Scope Complex core 3, 7 Lodhi Road, New Delhi -

110003 along-with non-refundable Registration fees of Rs.15,340/-(Rupees Fifteen

Thousand Three Hundred Forty only) (The Registration fee is inclusive of GST @ 18%)

payable in the form of Demand Draft / Pay Order in favor of “ENGINEERING PROJECTS

(INDIA) LIMITED” payable at New Delhi.

4. MSME bidders also have to pay Registration fees of Rs.15,340/- .However after

empanelment waiver of tender fees and EMD is applicable for MSME bidders in respective

tenders.

5. In order to participate, the bidder should have Digital Signature Certificate (DSC) from one

of the authorized Certifying Authorities.

6. Interested bidders have to necessarily register themselves on the portal

http://www.mstcecommerce.com/eprochome/EPIL through M/s MSTC Ltd., Kolkata to

participate in the empanelment. It shall be the sole responsibility of the interested bidders to

get themselves registered at the aforesaid portal for which they are required to contact M/s

MSTC Ltd. at following address to complete the registration formalities:

M/s MSTC Ltd.,

Registered office at 225-C, Acharya Jagdish Chandra Bose Road,

Kolkata – 700020

Phone Number: 03322901004, 01123212357, 01123215163, 01123217850

Email: - [email protected]

They may obtain further information regarding this notice from the office of Executive

Director (Contracts & engineering) at the address given in this notice from 10:00 hours to

17:00 hours on all working days till the last date of online submission of Documents or e-

mail at [email protected].

7. For proper uploading of the on the portal namely

http://www.mstcecommerce.com/eprochome/EPIL (hereinafter referred to as the „portal‟),

it shall be the sole responsibility of the bidders to apprise themselves adequately regarding

all the relevant procedures and provisions as detailed at the portal as well as by contacting

M/s MSTC Ltd. directly, as and when required, for which contact details are mentioned

above. The EPI in no case shall be responsible for any issues related to timely or properly

uploading/submission of the bid in accordance with the relevant provisions of Section

Instruction to Bidders of the Bidding Documents. No Joint venture or Consortium of firms

shall be allowed and the contractors should meet the above criteria by themselves.

Page 6: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 6 of 29

8. The desired contractors should apply online on the prescribed documents as per this notice

of empanelment document along-with documentary evidence for the following:

a) Audited Balance Sheet and statement of profit & loss & CA certificate including

net worth for the last three financial years i.e. 2016-17, 2017-18 & 2018-19.

b) Work Completion Certificates from Clients / Owners along with LOI/Work order.

c) Plant & Machinery holding,

d) Manpower details.

e) Details of pending litigation etc. on company letter head.

f) Evidence of being profit making organization (Should not have incurred loss for more

than one years during last three years).

g) EPF Regn. No

h) PAN No.

i) GST Reg. No.

j) Bank Solvency Certificate issued by Bank of specified amount as per table issued not

before September 2019.

k) Certificate of Incorporation in India and Memorandum & Article of

Association/Partnership deed.

l) All duly filled annexure of this Empanelment Notice.

9. Last date of submission of online application is 25.02.2020 up to 05:00 pm on MSTC

Portal.

10.0 Last date of submission of Hard copy of documents as listed below: 27.02.2020 upto

01.00PM to the office of Executive Director (Contracts & Engineering) address as

mentioned in this notice. If the below documents are not received in time then online

application shall not be opened and EPI shall not be responsible for any delay in respect of

submission of the empanelment application.

a) Registration fee Original DD of Rs.15,340/-(The Registration fee is inclusive of

GST @ 18%)

b) Power of Attorney duly attested by notary public.

c) Affidavit Form I.

Note: Envelope should be superscribed with category and monetary Limit applied for.

11.0 The short-listing of Empanelled contractors shall be valid for TWO YEARS from the

date of empanelment. However, EPI reserves the right to curtail or extend this period at

its sole discretion.

Corrigendum / addendums, if any to this empanelment notice shall be posted on EPI‟s

website, CPP Portal, MSTC portal.

Executive Director (Contracts & Engineering) ENGINEERING PROJECTS INDIA LTD

CORE-3, SCOPE COMPLEX,

7 LODHI ROAD, NEW DELHI 110003

Page 7: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 7 of 29

Page 8: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 8 of 29

ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA ENTERPRISE)

CORE 3, SCOPE COMPLEX, 7 LODHI ROAD, NEW DELHI – 110003

INFORMATION & INSTRUCTIONS FOR

APPLICANTS

1. INTRODUCTION

ENGINEERING PROJECTS (INDIA) Ltd. invites online application from reputed,

experienced and Indian registered contractors / firms for „Empanelment of Contractors‟

on “All India Basis” for the following discipline & categories.

DISCIPLINE: ELECTRICAL & MECHANICAL WORKS

CATEGORIES MONETARY LIMITS

i) E/M(a): Heating, Ventilation &

Air Conditioning (HVAC)

Systems.

ii) E/M(b): Dust Extraction &

Suppression ( DE) Systems.

iii) E/M(c): Fire Fighting (FF)

System.

iv) E/M(d): Instrumentation, Fire

Alarm, CCTV, PA, EPBAX,

Access Control, Networking

Systems, Building Automation &

Building Management Systems

(BMS) etc.

v) E/M(e): Building Electrics/

Illumination / Low Tension

Electrical Works (LT).

vi) E/M(f): Electrical Equipment /

Transformers / Generators / High

Tension Electrical Works (HT) .

vii) E/M(g): Plant & Equipment

Erection (P & E) works.

viii) E/M(h): Lift, Escalator etc.

(LIFTS).

ix) E/M(i): Security Surveillance

System.

Group -U ` 250 Crores up to ` 400 Crores

Group –U1 ` 100 Crores up to ` 250 Crores

Group –U2 ` 50 Crores up to ` 100 Crores

Group –U3 ` 20 Crores up to ` 50 Crores

Group -A ` 10 Crores up to ` 20 crores

Group -B ` 5 Crores up to ` 10 crores

Group -C ` 2 Crores up to ` 5 Crores

Group -D ` 0 Crores up to ` 2 Crores

A. EPI seeks to empanel contractors in various Classes in different Categories mentioned

in above notice. EPI intends to have a ready list of suitable and competent contractors

for EPIL works so as to minimize requirement of verification of credentials of

contractors at the time of individual tenders. Any Indian Individual, Sole

Page 9: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 9 of 29

Proprietorship Firm, Partnership Firm, Limited Liability Partnership, Public Limited

Company or a Private Limited Company may apply for empanelment as a contractor

in EPIL under these Rules provided the eligibility criteria and other conditions are

satisfied. The empanelled contractors have to abide by all the rules made herein and

as amended from time to time.

B. The empanelment of a contractor in EPIL shall entitle him to be considered for

participation in tenders subject to the conditions laid down in each individual Notice

Inviting Tender. The empanelled contractor shall be required to submit all documents

as per respective NIT norms both online & offline as specified (Including EMD, Bank

Solvency/Experience certificate/Work completion/Financials). It shall not confer any

right on the empanelled contractor either to be necessarily qualify in the tender

process or qualify for award of work in respect individual tender.

C. EPI intends to call open tenders from empanelled contractors in eligible category and

monetary limit as well as to other eligible un-empanelled contractors meeting the laid

down criteria of particular NIT. The empanelled contractor in particular category and

monetary limit shall have right to bid for all open tenders issued by EPI subject to

fulfilling qualification criteria thereof.

D. The short-list of Empanelled contractors shall be valid for TWO YEARS from the

date of empanelment. However, EPI reserves the right to curtail or extend this period

at its sole discretion.

E. EPI intends to update this empanelment in every six months. The contractors

desirous of empanelment in higher category and monetary limits shall need to apply

based on their latest credentials.

2. DEFINITIONS

In this document the following works and expressions have the meaning hereby assigned

to them:

2.1 “EMPLOYER” OR “EPI”: Means Engineering Projects (India) Limited.

2.2 “APPLICANT” Means the individual, proprietary firm, firm in partnership, limited

company, private or public or corporation.

2.3 “YEAR” means “Financial Year” unless stated otherwise.

3. METHOD OF APPLICATION 3.1 If the applicant is an individual, the application shall be signed by him above his full

typewritten name and current address.

3.2 If the applicant is a proprietary firm, the application shall be signed by the proprietor

above his full typewritten name and the full name of his firm with its current address.

The proprietor shall submit an affidavit that the applicant is sole proprietor of the firm

duly attested by notary public.

Page 10: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 10 of 29

3.3 If the applicant is a firm in partnership, the application shall be signed by all the

partners of the firm above their full typewritten names and current addresses or

alternatively by a partner holding power of attorney for the firm. In the latter case a

certified copy of the power of attorney should accompany the application. In both

cases a certified copy of the partnership deed and current address of all the partners of

the firm should accompany the application.

3.4 If the applicant is a limited company or a corporation, the application shall be signed

by a duly authorized person holding power of attorney for signing the application

accompanied by a copy of the power of attorney. The applicant should also furnish a

copy of the Memorandum of Articles of Association duly attested by a Public Notary.

3.5 Only the applications received online, will be evaluated on the basis of information

and documents provided by the applicant. In case the applicant is not found suitable

for the Group, his application shall be considered for the empanelment in lower

monetary group (if available). In case the applicant is found suitable for lower

monetary group, he shall be qualified for lower group.

3.6 Under no circumstances the Registration fees can be adjusted against the pending

dues of Contractors working with EPI and the Registration fee is required to be

submitted in the form as mentioned in Notice for Empanelment.

3.7 MSME bidders also have to pay Registration fees of Rs.15340/- .However after

empanelment waiver of tender fees and EMD is applicable for MSME bidders in

respective tenders.

3.8 The contractor empanelled for Empanelment in higher Group (monetary limit) can

also participate for tenders of lower Groups (monetary limits) for the same Discipline

and Category.

3.9 The Empanelled contractors shall be required to submit EMD & Tender Fees and

documents as specified in specific tender, separate details of which shall be stipulated

in Tender Documents. MSME empanelled contractors will be exempted from tender

fees and EMD in respected tenders invited by EPI.

3.10 EPI reserves the right to call open tenders in which contractors are empanelled. For

such tenders, the Empanelled contractors under this process meeting the stipulated

criteria of tender can also participate.

3.11 The Open tender to be invited by EPI from the Empanelled & Open eligible

contractors and shall be available on www.epi.gov.in , www.eprocure.gov.in and

http://www.mstcecommerce.com/eprochome/EPIL .

3.12 The Empanelled contractors are advised to check the details from EPI‟s Website,

CPP Portal, MSTC Portal regularly and no claim of Empanelled contractors shall be

entertained whatsoever, due to non receipt of information about the tender of EPI.

3.13 All information called for in the enclosed forms should be furnished against the

relevant columns. If for any reason, information is furnished on a separate sheet,

this fact should be mentioned against the relevant column. Even if no information is

Page 11: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 11 of 29

to be provided in a column, a „NIL‟ or „NO SUCH CASE‟ entry should be made in

that column. If any particulars / query is not applicable in case of the applicant, it

should be stated as “not applicable”. The applicants are cautioned that not giving

complete information called for in the application forms or not giving it in clear

terms or making any change in the prescribed forms or deliberately suppressing the

information may result in the applicant being rejected. Applications made by

telegram or telex, E-mail, and those received late or without Registration fees will

not be entertained.

3.14 The application should be type-written. The applicant should sign and stamp each

page of the application.

3.15 Overwriting should be avoided. Correction, if any, should be made by neatly

crossing out, initialing, dating and rewriting. Pages of the pre-qualification

documents are numbered. Additional sheets, if any, added by the contractor, should

also be numbered by him. They should be submitted as a package with signed letter

of transmittal.

3.16 References, information and certificates from the respective clients certifying

suitability, technical know how or capability of the applicant should be signed by an

officer not below the rank of Executive Engineer or equivalent.

3.17 The applicant may furnish any additional information which he thinks is necessary

to establish his capabilities to successfully complete the works. The applicants are

however, advised not to furnish superfluous information. No information shall be

entertained after submission of pre-qualification documents unless it is called for by

the EPI.

3.18 Any information furnished by the applicant found to be incorrect either immediately

or at a later date, would render him liable to be debarred from pre-qualification /

tendering / taking up of work in EPI. If such applicant happens to be pre-qualified/

enlisted contractor in more than one Group/ Category his name shall be removed

from all the Groups/ Categories of the pre-qualified list of contractors.

3.19 Prospective applicants may request clarification on the empanelment notice within

seven days prior to the last date of submission of online submission of application

as mentioned in this Notice. No request for clarification will be considered after that

date.

3.20 Empanelment letters will be sent to only those successful applicants who meet the

qualifying criteria.

4. MINIMUM QUALIFICATION CRITERIA:

The contractors should meet the following minimum qualifying criteria for different

monetary groups limits for getting pre-qualified for Empanelment:

Page 12: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 12 of 29

4.1 Electrical & Mechanical works:

i) E/M(a): Heating, Ventilation & Air Conditioning ( HVAC) Systems.

ii) E/M(b): Dust Extraction & Suppression ( DE) Systems.

iii) E/M(c): Fire Fighting (FF) System.

iv) E/M(d): Instrumentation, Fire Alarm, CCTV, PA, EPBAX, Access Control,

Networking Systems, Building Automation & Building Management Systems (BMS)

etc.

v) E/M (e): Building Electrics/ Illumination / Low Tension Electrical Works (LT).

vi) E/M(f): Electrical Equipment / Transformers / Generators / High Tension Electrical

Works (HT) .

vii) E/M (g): Plant & Equipment Erection (P & E) works.

viii) E/M (h): Lift, Escalator etc. (LIFTS).

ix) E/M(i): Security Surveillance System.

(Figures are in Rs. Crores)

Group Pre-

qualification

limit(Works

Cost

between)

in Crores

Average

Annual

Turnover

during last 3

years ending

31.03.2019

Past experience in completed

similar works during last 7 years

ending on 31.01.2020

(To fulfill either of three options)

Latest

Bank

Solvency

(Not

Before

September

2019)

Single

Work

Two

Works

each at

Least

Three

works

each at

least

U 250-400 200 320 240 160 160

U1 100-250 125 200 150 100 100

U2 50-100 50 80 60 40 40

U3 20-50 25 40 30 20 20

A 10-20 10 16 12 8 8

B 5-10 5 8 6 4 4

C 2-5 2.50 4 3 2 2

D 0-2 1 1.60 1.20 0.80 0.80

Page 13: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 13 of 29

4.2 The definition of similar works for different categories of works is

as under: DISCIPLINE: ELECTRICAL & MECHANICAL WORKS

CATEGORY DEFINITION OF SIMILAR WORKS

E/M(a): Heating, Ventilation & Air

conditioning ( HVAC) Systems.

Supply, installation, testing & commissioning of

Heating, Ventilation & Air conditioning (HVAC)

Systems comprising of Air Handling units,

chillers etc.

E/M(b): Dust Extraction & suppression

( DE) Systems.

Supply, installation, testing & commissioning of

Dust Extraction & suppression (DE) Systems

comprising of Dust collector, ducting work ,fan

etc.

E/M(c): Fire Fighting (FF) System.

Supply, installation, testing & commissioning of

Fire Fighting systems comprising of fire pumps,

Jockey pumps & piping etc.

E/M(d): Instrumentation, Fire Alarm,

CCTV, PA, EPBAX, Access Control,

Networking System, Building Automation

& Building management systems ( BMS)

etc.

Supply, installation, testing & commissioning of

Instrumentation/ Fire Alarm/CCTV /PA /EPBAX

/ Access Control/ Networking System/ Building

Automation/ Building management systems

( BMS) etc. for Buildings/ Industrial plants.

E/M(e): Building Electrics/ Illumination /

Low Tension Electrical Works (LT).

Supply, installation, testing & commissioning of

Internal Electrification, External Cabling,

External Illumination, Low tension electrical

415V Panels, DG Set etc.

E/M(f): Electrical Equipment /

Transformers / Generators / High Tension

Electrical Works (HT) .

Supply, installation, testing &

commissioning(SITC)/Installation, testing &

commissioning (ITC) of electrical equipments

/Transformers/ Generators/ 33KV/11KV sub

stations/ HT/LT electrical works etc.

E/M (g): Plant & Equipment Erection (P

& E) works.

Installation, testing & commissioning of Rotating

machines such as Pumps/ Compressors/Agitators/

Crushers/ Hydro Cyclones etc./ Material handling

machines such as Conveyors /Cranes /Wagon-

Tipplers/ Stacker- Reclaimers/ Silos etc.

E/M (h) :Lift, Escalator etc. (LIFTS) Supply, installation, testing & commissioning of

lifts, escalators, walkalators etc.

E/M(i):Security Surveillance System.

Supply, installation, testing & commissioning of

Security Surveillance System comprising of

Perimeter intrusion detection system with smart

fencing solutions supported by software‟s etc.

Page 14: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 14 of 29

4.3.1 No Joint venture or Consortium of firms shall be allowed and the contractors should

meet the above criteria by themselves.

4.3.2 The value of free issue materials (if any) shall be taken while evaluating completion

cost of project. The value of such materials incorporated in the project should be

certified by the chartered accountant/owner.

4.3.3 For evaluation purpose, the completion cost of works mentioned in the Completion

Certificate shall be enhanced by 7% per annum till the end of month prior to date of

this Notice.

4.3.4 The completion certificates issued by Government Organizations / Semi Government

Organizations / State Government/ Public Works Department / Central Government /

Public Sector Undertakings / Autonomous Bodies / Municipal Bodies / Public

Limited Companies listed on BSE / NSE and private party shall be accepted for

assessing the eligibility of the tenderer. However, the certificates issued by Public

Limited Company & Private Party must also be supported by work order & TDS

certificates.TDS certificates for full contract value as mentioned in the work

order/Completion Certificate must match failing which the same shall not be

considered.

4.3.5 The gross annual turnover should be certified by the Chartered Accountant. Year in

which no turnover is shown would also be considered for working out the average.

4.3.6 The applicant should own sufficient construction equipment for the proper and timely

execution of the work. The applicant should submit details of same with

empanelment Application.

4.3.7 The applicant should have sufficient number of Technical and Administrative

employees for the proper execution of the contract. The applicant should submit

details of same with this empanelment application.

4.4 EVALUATION CRITERIA FOR EMPANELMENT:

4.4.4 For the purpose of pre-qualification, applicants will be evaluated on the basis of

minimum stipulated financial and past experience criteria. The details of plant &

machinery holding, manpower employed, pending litigations shall also be evaluated

for pre-qualification of the firms.

4.4.5 Even though an applicant may satisfy the above requirements, he would be liable to

disqualification if he has:

a) Record of poor performance such as abandoning work, not properly completing the

contract, delay in completion of works, or financial failures / weaknesses etc.

b) Made misleading or false representation or deliberately suppressed the information in

the forms, statements and enclosures required in the Empanelment documents.

4.5 FINANCIAL INFORMATION

Applicant should furnish the following financial information:

Page 15: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 15 of 29

4.5.1 Annual financial statement for the last three years This should be supported by

audited balance sheets and profit and loss accounts (with all schedules attached)

along-with details required for assessing the net worth duly certified by a Chartered

Accountant, as submitted by the applicant to the Income Tax Department.

4.5.2 Bank Solvency Certificate issued by Bank of specified amount as per table issued not

before September 2019.

4.5.3 Name & Address of the bankers.

4.6 EXPERIENCE IN WORKS HIGHLIGHTING EXPERIENCE IN

SIMILAR WORKS

4.6.1 List of all similar works successfully completed during the last seven years.

4.6.2 List of the projects under execution or awarded.

4.6.3 Particulars of completed works and performance of the applicant duly authenticated /

certified by an officer not below the rank of Executive Engineer or equivalent should

be furnished separately for each work completed or in progress ( preferably in Form

“F” or as per Performa of concerned Clients covering the required information as

asked for in Form 'F'). The work completion/ experience certificates issued by other

than Govt. Deptt./PSU shall be supported by the copies of the TDS certificates issued

by the owner of the project of completion value.

4.6.4 The value of executed works shall be brought to the current level by enhancing the

actual value of work done at simple rate of 7% per annum, calculated from the date of

completion to last date of receipt of application for pre qualification.

4.6.5 Construction/Development of „Own Real Estate‟ by developers shall not be accepted

as eligible project to meet the qualifying requirement of past experience as

construction contractor.

4.7 AVAILABILITY OF EQUIPMENT RESOURCE Applicant should own sufficient Plants & Machinery to complete the works of

stipulated category and monitoring group the details to be furnished in FORM - H.

4.8 MANPOWER: Applicant should have sufficient manpower to complete the works

of stipulated category and monitoring group for which the contractor has applied.

Details with qualification to be submitted.

4.9 ORGANIZATION INFORMATION Applicant is required to submit the following information in respect of his

organization.

4.9.1 Name & Postal Address, including Telephone and Telex, Fax numbers, E-Mail

address etc.

4.9.2 Copies of original documents defining the legal status, place of Registration and

principal places of business.

Page 16: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 16 of 29

4.9.3 Name of Directors and Officers concerned with the work, with designation of

individuals authorized to act for the organization.

4.9.4 Information on any litigation in which the applicant was involved during the last five

years, including any current litigation.

4.9.5 Authorization for EPI to seek detailed references.

4.10 LETTER OF TRANSMITTAL

4.10.1 The applicant should submit the letter of transmittal attached with pre- qualification

documents (SECTION-3) duly signed by him.

4.10.2 Any effort on the part of the applicant or his agent to exercise influence or to

pressurize the employer would result in rejection of his application. Canvassing of

any kind is prohibited.

5. FINAL DECISION MAKING AUTHORITY

EPI reserve the right to modify the eligibility criteria, to decide on cut off date of

implementation, to accept or reject any application, to annul the Empanelment, to

reject all applications or accept new applications at any time, without assigning any

reason or incurring any liability to the applicants.

6. EMPANELMENT LETTERS: LETTERS will be issued to qualified parties in

respective category and limits with a validity of two years from date of empanelment.

7. CANCELLATION OF Empanelment

7.1 The Empanelment of contractor shall be cancelled by EPI in case of their poor

performance, abandoning of the allotted work, and abnormal delay in completion of

work, bankruptcy/declared insolvent and for activities detrimental to the interest of

EPI and debarred/blacklisted by any organization during the tenure of empanelment.

The decision of EPI in this regard shall be final and binding on the contractor.

7.2 The pre-qualified contractor / firm shall not effect any change in the constitution of

the firm without the prior approval of EPI. Such proposal, if any shall be submitted in

advance furnishing full details of the proposed change along with all supporting

documents. Any change in the constitution of the firm /company without the prior

approval of EPI will render the contractor/ firm liable for removal from the approved

list of contractors. The discretion to allow/disallow the proposed change shall vest

solely with EPI. In case, the original partners/ constitution change by more than 50%

either due to substitution or due to retirement or death the enlistment of the firm/

contractor by that name shall be cancelled.

7.3 In case of change of name of the pre-qualified firm/contractor without change of

constitution/partners the same shall be intimated along with proof of such change to

EPI immediately but in no case later than 30 days from the date of such change

occurs failing which the empanelment of the firm/ contractor by that name shall be

cancelled.

Page 17: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 17 of 29

8. SUBMITTALS:

Empanelment Documents should be submitted online in prescribed manner.

Empanelment Applications are liable to be discarded if the applications are not

submitted in the prescribed manner.

8.1 Order in which the online documents to be uploaded is as under:

1 Letter of Transmittal as per Section -3 , enclosing Copy of

Demand Draft

2 Application for prequalification of contractor ( Form „A‟)

Annexure –I

3 Structure and Organization (Form „B‟ ) Annexure –II

4 Financial information ( Form „C‟ ) Annexure –III

5 Details of similar works completed during the last 7 years (

Form 'D' )

Annexure -IV

6 Project under execution or awarded (Form „E‟ ) Annexure -V

7 Completion Certificates Annexure -VI

8 Performance report ( Form 'F')

Annexure -VII

9 Undertaking ( Form 'G') Annexure -VIII

10 Plant & Machineries ( Form 'H') Annexure -IX

11 Affidavit ( Form-'I' ) Annexure-X

12 Man Power details Annexure -XI

13 Pending Litigation etc on company letter head. Annexure -XII

14 EPF registration no. copy Annexure -XIII

15 PAN copy Annexure -XIV

16 GST registration copy Annexure-XV

17 Certificate of incorporation copy Annexure -XVI

18 Power of attorney duly attested notary copy Annexure -XVII

19 Memorandum & Articles of Association copy Annexure -XVIII

20 Document in support of Applicant legal status Annexure -XIX

21 Any other documents Annexure -XX

Note: Above Annexures to be uploaded with documentary evidence.

8.2 List of hard copy of Documents to be submitted to be submitted in physical form at

the address given NIT on or before last date and time of offline submission of

documents. If the below documents are not received in time then online application

shall not be opened and EPI shall not be responsible for any delay in respect of

submission of the empanelment application.

Envelope should be superscribed with category and monetary Limit applied for

1 Registration fee Original DD of Rs.15,340/-(The Registration

fee is inclusive of GST @ 18%)

2 Power of Attorney duly attested by notary public.

3 Affidavit Form I.

Page 18: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 18 of 29

Page 19: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 19 of 29

APPLICATION FOR EMPANELMENT OF CONTRACTORS FOR

ELECTRICAL & MECHANICAL WORKS.

FORM „A‟ NAME OF APPLICANT

DISCIPLINE: ______________________________

MONETARY GROUP & CATEGORY IN WHICH : MONETARY GROUP_______________

APPLICANT IS INTERESTED

FOR PRE-QUALIFICATION : CATEGORY ________________

(To be selected from table given in Section 1

Detailed NIT) e.g. If an applicant is interested for Empanelment in

Discipline Electrical & Mechanical Works, Category E/M(a) ,

Monetary Group -C : Rs.02.00 Crores up to Rs.05.00 Crores

it is to be written as :

DISCIPLINE Civil Works

GROUP /

Monetary Limit

Group -C : Rs.02.00 Crores up to Rs.5.00 Crores

CATEGORY E/M (a) Heating, Ventilation & Air Conditioning (HVAC)

Systems.

The requisite Registration fees of Rs. 15, 340/-(Rupees fifteen Thousand Three Hundred

Forty only) (The Registration fee is inclusive of GST @ 18%) are herewith submitted in

Demand Draft / Pay Order No. __________ dated __________.

[SIGNATURE OF APPLICANT]

Page 20: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 20 of 29

FORM „B‟

STRUCTURE AND ORGANIZATION

1. Name and address of applicant.

2a. Telephone No. / Fax No. / Telex No.

2b. Working E – Mail ID

3. Legal status of the applicant (attach copies

of original documents defining the legal

status)

(a)

(b) (c)

(d)

The applicant is:

An Individual

A Proprietary Firm

A Firm in Partnership

A limited Company ( Private or Public) or

Organization

4 Particulars of Registration with various

Government bodies/ Organization. (attach

attested photocopy)

5. Name of Directors/ Partners with their

addresses, Telephone numbers, Fax, Email.

6. Designation of individuals authorized to

act for the Organization.

7. Was the applicant ever required to suspend

any construction for a period of more than

six months continuously after

commencement of the construction? If so,

give the name of the project & reasons of

suspension of work.

Page 21: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 21 of 29

8. Has the applicant or any constituent partner

in case of partnership firm, ever abandoned

the awarded work before its completion? If

so, give name of the project and reasons for

abandonment.

9. Has the applicant, or any constituent

partner in case of partnership firm ever

been debarred / black listed for tendering in

any organization at any time? If so, give

details.

10. Has the applicant or any constituent partner

in case of partnership firm, ever been

convicted by a court of law? If so, give

details.

11. Other details:

a) EPF No.

b) PAN No.

c) GST Regn No

(Copies to be enclosed)

12. Any other information considered

necessary but not included above.

Seal of the Applicant Signature of Applicant

Note: a) In "other details" if any of the registration/clearance is not applicable

/exempted/not available with applicant the applicant shall submit an

affidavit/undertaking stating that the same will be submitted before

participating in tender/award of work.

Page 22: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 22 of 29

FORM „C‟

FINANCIAL INFORMATION

I. Financial Analysis: Details to be furnished duly supported by figures in Audited

Balance Sheet / Profit & Loss Account for the last three years duly certified by

the Chartered Accountant, as submitted by the applicant to the Income Tax

Department (copies to be attached)

2016- 2017 2017-2018 2018-2019 Average annual

turnover.

A b C (a + b + c)/3

(i) Gross Annual

turnover on

construction

works.

(ii) Profit / Loss

(iii) Net Worth (Paid

up capital + Free

reserves but

excluding surplus

on revaluation of

assets, etc as

defined under

Company‟s

Act,2013)

(iv) Latest Bank

Solvency

II. The Solvency certificate from Banker not issued before September 2019.

SIGNATURE OF CHARTED SEAL AND SIGNATURE

ACCOUNTANT WITH SEAL OF APPLICANT

Page 23: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 23 of 29

FORM „D‟

DETAILS OF ALL OF SIMILAR

WORKS COMPLETED DURING THE LAST SEVEN YEARS

1 Sr. No.

2 Name of Work / Project & Location

3 Owner or Organization

4 Value of work in lakhs at completion.

5 Date of commencement as per contract

6 Stipulated date of completion

7 Actual date of completion

8 Litigation/ Arbitration pending /in

progress with details.

9 Name and address / telephone number

of officer to whom reference maybe

made.

10 Remarks

Signature of Applicant

Page 24: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 24 of 29

FORM „E‟

PROJECT UNDER EXECUTION OR AWARDED

S. No. Particulars Particulars

Name of work / Project &

Location

Owner or organization

Value of work in lakhs

Date of commencement as per

contract

Stipulated date of completion

Up to date percentage of progress

of work

Slow progress if any, & reasons

thereof

Name & Address/ Telephone No.

of officer to whom reference may

be made.

Remarks

Signature of Applicant

Page 25: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 25 of 29

FORM „F‟

PERFORMANCE REPORT IN RESPECT OF M/S. _____________________

1. Name of Work / Project &

Location

2. Agreement Amount

3. Estimated Cost

4. Tendered Amount

4 a Completed cost of work

5. Date of Start.

6. Date of completion.

(i) Stipulated date of completion.

(ii) Actual date of completion/ likely

date of completion

7. Amount of compensation levied

for delayed completion, if any.

8. Performance report

(a) Quality of work. Very

Good

Good Fair Poor

(b) Resourcefulness Very

Good

Good Fair Poor

(c ) Financial soundness Very

Good

Good Fair Poor

(d) Technical Proficiency Very

Good

Good Fair Poor

(e) General Behavior Very

Good

Good Fair Poor

Note:

1. The performance report is to be submitted separately for each work mentioned In

Form „D‟ & „E‟. This report should be signed by the authority of owner not less

than the rank of Executive Engineer or equivalent.

2. The performance report is to be submitted separately for each work

executed/under execution for EPI duly signed by Regional Head/ED/GGM.

3. The performance report preferably be submitted in the above Performa. In case,

different Performa is used the applicant shall ensure that the report/ certificate

shall contain the above information.

Page 26: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 26 of 29

FORM „G‟

UNDERTAKING

(TO BE SUBMITTED ON FIRM/COMPANY'S LETTER HEAD)

I..................., the proprietor/ Authorized signatory Of M/s...................

having its Regd./ Head office at ..................... do hereby confirm/ declare

that M/s.................. or its directors / partner has never executed* /

executing* construction work with EPI.

Signature of Applicant with seal

* tick which ever is applicable

Page 27: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 27 of 29

FORM „H‟

DETAILS OF PLANT & MACHINERIES

AVAILABLE WITH APPLICANT

Sr

No.

Name of Equipment Make/model/

Capacity

Quantity Condition

Signature of Applicant

Page 28: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 28 of 29

FORM „I‟

AFFIDAVIT (TO BE SUBMITTED ON NON-JUDICIAL STAMP PAPER OF MINIMUM RS.10/-DULY

CERTIFIED BY NOTARY PUBLIC)

Affidavit of Mr.………………………………….S/o……………………… R/o …………………………………….

I, the deponent above named do hereby solemnly affirm and declare a under:

1 That I am the Proprietor/ Authorized signatory of M/s…………………………. having

its Head Office/ Regd. Office at……………………………………………………

2 That the information/ documents/ Experience certificates submitted by

M/s………………………. along with this „Application for Empanelment of contractors

(2020-2022) ‟ to EPI Ltd. are genuine and true and nothing has been concealed.

3 I shall have no objection in case EPI verifies them from issuing

authority(ies).I shall also have no objection in providing the original copy of the

document(s), in case EPI demand so for verification.

4 I hereby confirm that in case, any document, information &/Or certificate

submitted by me found to be incorrect/false/fabricated, EPI at its discretion may

disqualify/ reject my application for pre qualification out rightly and also debar

me/M/s………………… from participating in any future tenders/ PQ.

DEPONENT

I,…………………………………., the Proprietor/ Authorized signatory of

M/s…………………………., do hereby confirm that the contents of the above Affidavit

are true to my knowledge and nothing has been concealed there from and that no

part of it is false.

Verified at ……………. this……. day of ……………...

DEPONENT

Page 29: ENGINEERING PROJECTS (INDIA) LIMITEDengineeringprojects.com/Tender/UploadFiles/6849... · 2020. 2. 4. · Page 8 of 29 ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA

Page 29 of 29

LETTER OF TRANSMITTAL

[ON THE LETTER HEAD OF APPLICANT] From:

To

Executive Director (Contracts & Engineering)

ENGINEERING PROJECTS (INDIA) LIMITED

Core 3, Scope Complex, 7 Lodhi Road,

NEW DELHI – 110 003

E Mail:[email protected]

SUB: EMPANELMENT OF CONTRACTORS FOR ELECTRICAL &

MECHANICAL WORKS (2020-2022). Sir,

Having examined the details given in Notice for Empanelment and Application

documents for the above work, we hereby submit our qualification and relevant

documents.

1 We hereby certify that all the statements made and information supplied in the

enclosed forms „A‟ to „I‟ and accompanying statements are true and correct.

2 We have furnished all information and details necessary for pre-qualification and

have no further pertinent information to supply.

3 We have submitted the requisite banker‟s certificate/ performance reports and

authorize the ENGINEERING PROJECTS (INDIA) LIMITED or their representatives to

approach individuals, employers, firms and corporations to verify our submittals,

competency and general reputation.

4 We hereby confirm that we have read and understood all the stipulations given in

this prequalification documents and the decision of EPI with regard to our

prequalification shall be final and binding on us.

5 We have submitted the following certificates in support of our meeting the

minimum qualifying criteria of completed work(s) specified in Section 2 for having

successfully completed the following works:

NAME OF WORK CERTIFICATE FROM

1.

2.

3.

Enclosures:

Date of Submission:

(Seal of Applicant) (Signature of Applicant)