engineer genral con.co. (egco) eng.abdel moety amer & co
DESCRIPTION
ENGINEER GENRAL CON.CO. (EGCO) ENG.ABDEL MOETY AMER & CO. Web site : www.egcoegypt.com Email : egco @ egcoegypt.com. More than twenty years of experience. ENGINEER GENERAL CON.CO.(EGCO). ENGINEER GENERAL CON.CO.(EGCO) :. ENG.ABDEL MOUTY AMER. - PowerPoint PPT PresentationTRANSCRIPT
ENGINEER GENRAL CON.CO. (EGCO)ENG.ABDEL MOETY AMER & CO.
Web site : www.egcoegypt.comEmail : egco @ egcoegypt.com
More than twenty years of experience
ENG.ABDEL MOUTY AMER.
ENGINEER GENERAL CON.CO.(EGCO):
EGCO, OUR COMPANY, HAS BEEN ESTABLISHED IN 1985, BY A VERY HIGH QUALIFIED GROUP OF CIVIL, MECHANICAL, ELECTRICAL AND ARCHITECTURAL ENGINEERS.
WE HAVE A VERY GOOD EXPERIENCE OVER 20 YEARS IN THE CONSTRUCTION OF PROJECTS FOR WATER SUPPLY AND WASTE WATER FACILITIES.
WE ARE WORKING HARD TO KEEP A GREAT COORDINATION BETWEEN OUR PROFESSIONAL EMPLOYEES AND THE MANAGEMENT OF OUR DEPARTMENTS,
MAINTAINING THE HIGHTEST STANDARD OF QUALITY.SO WE INVITE YOU TO TAKE A LOOK AT OUR BROCHURE, WISHING ALL PROGRESS
AND SUCCESS FOR EGCO.COMMITMENT TO QUALITY, SERVICE, FUNCTION AND VALUE REMAINS AT THE HEART
OF EVERYTHING WE DO.ENG.ABDEL MO ُُُُETY AMER
CHAIRMAN OF THE BOARD
CHAIRMAN AND MANAGINGDIRECTOR
CHAIRMAN AND MANAGINGDIRECTOR
PUBLICRELATION
PUBLICRELATION LEGAL
AFFAIRS
LEGALAFFAIRS EXECUTIVE
SECRETARY
EXECUTIVE
SECRETARY
GENERAL PROJECTS MANAGER
GENERAL PROJECTS MANAGER
SECRETERIASECRETERIALL
SECRETERIASECRETERIALL
ADMINISTRATIVE
MANAGER
ADMINISTRATIVE
MANAGER
ITMANAGER
ITMANAGERTECHNICA
LMANAGER
TECHNICAL
MANAGER
EXECUTIVEEXECUTIVEMANAGER
EXECUTIVEEXECUTIVEMANAGER
FINANCIALMANAGER
FINANCIALMANAGER
QUALITY CON-TROL
MANAGER
QUALITY CON-TROL
MANAGER
INTERNAL PREVIEW
INTERNAL PREVIEW
DOCUMENTATIONCONTROL
DOCUMENTATIONCONTROL
QUALITY CONTROL
QUALITY CONTROL
STORES ACCOUNTS
STORES ACCOUNTS
AUDITING TENDERS
RESEARCH
AUDITING TENDERS
RESEARCH
CASHIERCASHIER
SUB-CONTRACTORS
CASHADVANCE
SUB-CONTRACTORS
CASHADVANCE
CONTRACTS,OFFERS &
PROJECTS COSTS
CONTRACTS,OFFERS &
PROJECTS COSTS
GENERALLEDGER
GENERALLEDGER
BANKS &INVESTMENT
S
BANKS &INVESTMENT
S
HUMAN RESOURCES
AND TRAINING
HUMAN RESOURCES
AND TRAINING
PURCHASINGPURCHASING
STORAGESTORAGE
MECHANICAL EQUIPEMENTS MANAGERS
MECHANICAL EQUIPEMENTS MANAGERS
SITE ENGINEERMANAGERS
SITE ENGINEERMANAGERS
PLANNING PLANNING
CONTRACTSTENDERS
RESEARCH
CONTRACTSTENDERS
RESEARCH
INFORMATIONSTATICS
INFORMATIONSTATICS
EXECUTIVE WORKS
PREVIEW
EXECUTIVE WORKS
PREVIEW
Sr.Quality ( Item )Quantity
1Excavator ( Komatsu ) PC 200/22
2Excavator ( Komatsu ) PC 200/32
3Excavator ( Komatsu ) PC 120/55
4Excavator ( Komatsu ) PC 120/62
5Loader ( Komatsu ) WA 3502
6Loader ( Komatsu ) W 602
7Loader ( Komatsu ) WA 401
8Crane FMC ( 18 Ton )2
9Moving mixer 1m 34
10Well point system with accessories32
11Jet pump 4 inch6
12Deep well pump (Ferbank ) 30 H.P 100 m3/h with accessories20
13Generator ( Komatsu ) 230 K.V.A4
14Generator ( Helwan ) 60 K.V.A3
15Distribution panels for operation pumps3
16Air compressor( Atlas )3
Sr.Quality ( Item )Quantity
17Concrete Vibrator ( Honda5 ) 5.5 H.P8
18Submersible pump (Tesromi ) 220 Volt13
19Dewatering pump ( kobbota )6
20Truck ( 3 Ton )6
21Water truck6
22Diesel truck3
23Welding Machine Doeits 400 Amb3
24Mercedes Car ML 3201
25Peugeot car GLX 4051
26Mitsubishi Lancer1
27Mitsubishi truck car ( 5 Ton )1
28Pick up Chevrolet car8
29Dogan car SLX 16001
30Shaheen car 14001
31Computer Network 1
32Personal Computer22
33Printer8
NONAMEPOSITION
YEARS OF
EXPERI-ENCE
QUALIFICATION
YEARS WITH THE FIRM
1Abdel Moety Mohamed Amer
Chairman of the board.36B.Sc. of Mechanical Eng. Cairo Univ. 1968
19 Years
2Ahmed El Sayed AmerGeneral Executive Manager
19B.Sc. of Science, 198516 Years
3Abdel Moneim ZayedTechnical Dept. Manager29B.Sc. of Mechanical Eng. 19756 Years
4Mohsen El ShabrawiProject Manager21B.Sc. of Civil Eng. 19833 Years
5Helal Aziz SharobimMaintenance Engineer27B.Sc. of Mechanical Eng. 19776 Years
6Mostapha EL TabeiChemical Engineer26B.Sc. of chemical Eng. 19788 Years
7Ahmed Sabry Nour-Eldeen
Project Manager21B.Sc. of Civil Eng. 19836 Years
8Ahmed Mohamed ElbiehSite Engineer16B.Sc. of Civil Eng. 19871 Year
9Baher Mikhaeil Shenouda
Site Engineer15B.Sc. of Civil Eng. 19884 Years
10Fathy Elsaid AlmoursySite Engineer6B.Sc. of civil Eng. 19974 months
11Mohamed Bayomi Ramadan
Computer Engineer9B.Sc. of Science Technology 1995 3 Years
12Ahmed Adel MahmoudTechnical Dept. Engineer1B.Sc. of civil Eng. 200318
months
13Sameh Nabil Abdel HadiSite Engineer3B.Sc. of civil Eng. 20006 months
NONAMEPOSITION
YEARS OF
EXPERI-ENCE
QUALIFICATIONYEARS WITH
THE FIRM
14Hassan Moh. Mohei El DinAccountant16Faculty of Commerce 198510 Years
15Mohamed OmarFinancial Manager26Faculty of Commerce 197510 Years
16Ali Abdel Al SalehFinancial & Admin.10Faculty of Commerce 907 Years
17Ibrahim Abdel HalimAccountant10Faculty of Commerce 914 Years
18Magdy Abou El MagdAccountant9Faculty of Commerce 19921 months
19Mohamed Seliman EliwaAccountant4Faculty of Commerce 19854 Years
20Onsi Anwar AliPersonnel20Technical Commercial High School 1881
5 Years
21Safwat Abdel naieem Financial & Admin.9Technical Commercial High School 1881
7 Years
22Osama Anwar AliAdmin. Manager20Faculty of Commerce 198520
23Hisham Abdel moniem
HelalAccountant1Faculty of Commerce 20031
24Amal Abdel MegeedAccountant4Faculty of Commerce 20001
25Heba Ali MouradSpecial Secretary4Faculty of Agriculture 20001
26Ebtihal Gamal EldeenGeneral Secretary10Faculty of Law 19932
27Yasmien Saleh MahmoudReceptionist2Faculty of Law 20021
NONAMEPOSITIONYEARS OF EXPERI-ENCE
QUALIFICATIONYEARS
WITH THE FIRM
28Fouad Nabil SobhySurveyor8Industrial High School 19933 Years
29Ezzat Khalaf Hassan Surveyor5High School for Area measurements 19964 Years
30Ahmed Abdel HafizSurveyor4Technical Industrial high school 1997 4 Years
31Mohamed Roshdy Ahmed Surveyor4High School for Area measurements 19974 Years
32Taha Bassiouny MohamedSurveyor4Technical Industrial high school 1997 4 Years
33Moustafa A. Fatah El
WakeelTechnical Supervisor13Technical Industrial high school 19887 Years
34Hazem Abdalla El MougiTechnical Supervisor13Technical high School 19883 Years
35Ibrahim El Sayed BayoumyTechnical Supervisor12Technical Industrial high school 19895 Years
36Mohamed El SherbiniTechnical Supervisor9Technical Industrial High School 19927 Years
37Ramadan ShaabanTechnical Supervisor10Technical Industrial high school 19917 Years
38Maged Abdel MoneimTechnical Supervisor7Technical Industrial high school 945 Years
39Mohsen Aboul LeilTechnical Supervisor18Agriculture Science high school 19944 months
40Nabil Aboul LeilStore Keeper15Technical Commercial high school 19866 Years
41Mohamed Badr El Din Purchasing Representative12Technical Commercial high school 19895 Years
42Mohamed Ibrahim MoustafaStore Keeper14Agriculture Science high school 19875 Years
43Ali El Sayed AliStore Keeper14Agriculture Science high school 1987 5 Years
44Aref Sabry SharafStore Keeper8Faculty of letter 19934 Years
NONAMEPOSITIONYEARS OF
EXPERI-ENCE
QUALIFICATIONYEARS
WITH THE FIRM
45Wael Ahmed El SheikhPlumber9Technical Industrial high school 19924 Years
46Attia Mansour AhmedPlumber6Carpentry high school 19967 Years
47Essam Abdel MoetyPlumber9Technical commercial high school 936 Years
48Abdel Nasser Abdel
KhalekPlumber--5 Years
49Amgad El ShahatPlumber--4 Years
50Mosaad Sallamcarpenter9Preparatory School 19924 Years
51Gamal HusseinElectrician21Industrial High School 19807 Years
52Wagih MansourElectrician16Industrial High School 19855 Years
53Hesham TahaElectrician14Technical Industrial High School 19875 Years
54Hassan Abdel AzimElectrician-Industrial High School 1979 5 Years
55Khaled Galal El DinElectrician4Technical Industrial High School 19973 Years
56Alaa Abdel GawaadTechnician--5 Years
57Mohamed MekkiMechanic--1 Year
58Atif Abdel HamidMechanic--9 Years
59Mahmoud Hafez MahmoudMechanic--6 Years
60Emad El Sayed AttiaMechanic-Primary school 19825 Years
NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER
MILLION
11985- 1986
POTABLE WATER PIPES AT: MEET MAZAH & MEET ALI VILLAGES
DAKAHLIA GOVERNORATE-
EGYPT.
SUPPLY AND INSTALL OF ASBESTOS CEMENT PIPES LINE, DIAMETERS 150 MM &
200 MM INCLUDING VALVES, SPECIAL PIECES, VALVES CHAMBERS AND HOUSE
CONNECTIONS.
MINISTRY OF RECONSTRUCTION AND HOUSING AT DAKAHLIA GOVERNORATE.
1.5
21985-1986
SEWAGE DRAINAGE NETWORK AT 10TH OF
RAMADAN AREA - GAMASSA CITY.
DAKAHLIA GOVERNORATE-
EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM
175 MM UP TO 600 MM INCLUDING THE INSTALLATION OF SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON
WELL-POINT SYSTEM DEWATERING.
MINISTRY OF RECONSTRUCTION AND HOUSING AT DAKAHLIA GOVERNORATE.
2.0
31985-1986
SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND
ELECTRICAL EQUIPMENTS AT THE
10TH OF RAMADAN AREA - GAMASSA CITY
. DAKAHLIA GOVERNORATE –
EGYPT.
SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION WORKS, PLAIN & REINFORCED CONCRETE
WORKS, PUMPS-ROOM, BUILDINGS AND FINISHINGS.
PLUS OF SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL
EQUIPMENTS, BASED ON WELL–POINT SYSTEM DEWATERING.
MINISTRY OF RECONSTRUCTION AND HOUSING AT DAKAHLIA GOVERNORATE.
2.0
NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER
MILLION
41986-1987
POTABLE WATER PIPES LINE AT NEW EZBET EL SAIIDIA
VILLAGE.DAKAHLIA
GOVERNORATE.EGYPT.
SUPPLY AND INSTALL OF ASBESTOS CEMENT PIPES LINE, DIAMETERS 150
MM & 200 MM INCLUDING VALVES, SPECIAL PIECES, VALVES CHAMBERS
AND HOUSE CONNECTIONS.
MINISTRY OF RECONSTRUCTI
ON AND HOUSING AT
DAKAHLIA GOVERNORATE
.
1.5
51986-1987
SEWAGE DRAINAGE NETWORK AT 5TH
AREA – GAMASSA TOURIST AREA.
DAKAHLIA GOVERNORATE-
EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS,
DIAMETERS FROM 175 MM UP TO 450 MM INCLUDING THE INSTALLATION OF
SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON
WELL-POINT SYSTEM DEWATERING.
MINISTRY OF RECONSTRUCTI
ON AND HOUSING AT
DAKAHLIA GOVERNORATE
.
1.5
61986- 1987
SEWAGE PUMPING STATION AND
SUPPLY OF MECHANICAL AND
ELECTRICAL EQUIPMENTS AT 5TH AREA - GAMASSA CITY. DAKAHLIA GOVERNORATE-
EGYPT.
SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION WORKS, FOUNDATIONS,
PLAIN & REINFORCED CONCRETE BUILDINGS, ISOLATIONS, FINISHINGS
AND OUTSIDE FENCE.PLUS OF SUPPLY AND ERECTION OF
MECHANICAL AND ELECTRICAL EQUIPMENTS FOR THE STATION, BASED ON WELL-POINT SYSTEM DEWATERING.
MINISTRY OF RECONSTRUCTI
ON AND HOUSING AT
DAKAHLIA GOVERNORATE
.
1.5
NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER
MILLION
71986-1987
SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND
ELECTRICAL EQUIPMENTS AT 2ND
AREA -GAMASSA CITYDAKAHLIA
GOVERNORATE-EGYPT.
SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATION INCLUDING EXCAVATION
WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE BUILDINGS,
ISOLATIONS, FINISHINGS AND OUTSIDE FENCE.
PLUS OF SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL
EQUIPMENTS FOR THE STATION, BASED ON WELL-POINT SYSTEM DEWATERING.
MINISTRY OF RECONSTRUCTION AND HOUSING AT DAKAHLIA GOVERNORATE.
1.5
81987-1988
SEWAGE DRAINAGE NETWORK AND
DEWATERING FOR INDUSTRIAL AREA AT NEW DAMIETTA CITY.
DAMIETTA GOVERNORATE-
EGYPT.
SUPPLY AND INSTALL OF GRP, PVC AND PRE-STRESS PIPES, DIAMETERS FROM 200
MM UP TO 1000 MM INCLUDING SUPPLY AND INSTALL OF SQUARE AND CIRCULAR
CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM DEWATERING.
ARAB CONTRACTOR-
TANTA BRANCH.AUTHORITY OF
RECONSTRUCTION OF NEW
DAMIETTA CITY.
5.5
91988
POTABLE WATER PIPES LINE DIAMETER 1000
MM AND DEWATERING AT NEW DAMIETTA
CITY.DAMIETTA
GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF PRE-STRESS CONCRETE PIPES, DIAMETER 1000 MM.
PLUS OF SUPPLY AND INSTALL OF VALVES CHAMBERS AND SPECIAL PIECES, BASED ON
WELL-POINT SYSTEM DEWATERING.
ARAB CONTRACTOR-
TANTA BRANCH.AUTHORITY OF
RECONSTRUCTION OF NEW
DAMIETTA CITY.
4.5
NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER
MILLION
101989-1990
SEWAGE DRAINAGE NETWORK AND
DEWATERING AT DELENGATE CITY
(PART 1).EL BEHERA
GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM
200 MM UP TO 500 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR CONCRETE MANHOLES BASED ON WELL-POINT SYSTEM
DEWATERING.
ARAB CONTRACTORS- ALEX BRANCH.
FOR THE (NOPWASD).
3.0
111990-1991
SEWAGE DRAINAGE NETWORK AND
DEWATERING AT DELENGATE CITY
(PART 2).EL BEHERA
GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM
200 MM UP TO 500 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM
DEWATERING.
ARAB CONTRACTORS – ALEX BRANCH.
FOR THE (NOPWASD).
3.5
121991-1992
SEWAGE DRAINAGE NETWORK AND
DEWATERING AT KHANKA CITY.
GREAT CAIRO-EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM
200 MM UP TO 600 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM
DEWATERING.
ARAB CONTRACTORS – ALEX BRANCH.
FOR THE (NOPWASD).
2.0
NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER
MILLION
131992-1993
SEWAGE DRAINAGE NETWORK AND
DEWATERING AT DAMANHOUR CITY
(PART 1).EL BEHERA
GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM
200 MM UP TO 750 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM
DEWATERING.
ARAB CONTRACTORS- ALEX BRANCH.
FOR THE (NOPWASD).
3.0
141992-1993
SEWAGE DRAINAGE NETWORK AND
DEWATERING AT DAMANHOUR CITY
(PART 2).EL BEHERA
GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM
200 MM UP TO 750 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR CONCRETE MANHOLES, BASED ON WELL-POINT SYSTEM
DEWATERING.
ARAB CONTRACTORS – ALEX BRANCH.
FOR THE (NOPWASD).
3,0
151992- 1994
GRAVITY PIPES LINEDIAMETER 1400 MM
AND DEWATERING AT DAMIETTA
GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 1400 MM TO JOIN THE PARTIAL
STATION AND THE MAIN STATION.PLUS OF SUPPLY AND INSTALL OF VALVES
CHAMBERS INCLUDING THE SPECIAL PIECES, BASED ON THE WELL- POINT
SYSTEM DEWATERING.
ARAB CONTRACTORS – ALEX BRANCH.
FOR THE (NOPWASD).
8.5
NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER
MILLION
161992-1993
FORCE MAIN PIPES LINE FOR THE SEWAGE
DRAINAGE AND DEWATERING AT
RASSEL BAR. DAMIETTA
GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF DUCTILE CAST-IRON PIPES LINE, DIAMETER 900 MM.
PLUS OF SUPPLY AND INSTALL OF VALVES CHAMBERS, SPECIAL PIECES, BASED ON
WELL-POINT SYSTEM DEWATERING.
ARAB CONTRACTORS- TANTA BRANCH.
FOR THE (NOPWASD).
9,00
171995-1997
SEWAGE DRAINAGE NETWORK AND
DEWATERING AT EZBET EL BORG CITY.
DAMIETTA GOVERNORATE-
EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM
175 MM UP TO 750 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE
AND CIRCULAR PLAIN CONCRETE MANHOLES, BASED ON WELL -POINT
SYSTEM DEWATERING.
ARAB CONTRACTORS- TANTA BRANCH.
FOR THE (NOPWASD).
9.0
181995-1997
SEWAGE DRAINAGE NETWORK, FORCE
MAIN PIPELINES AND DEWATERING AT
HORANI CITY.DAMIETTA
GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH RIGID JOINTS, DIAMETERS FROM
175 MM UP TO 600 MM FOR THE SEWAGE DRAINAGE NETWORK.
PLUS OF SUPPLY SQUARE AND CIRCULAR PLAIN CONCRETE MANHOLES, FLEXIBLE
CAST IRON FORCE MAIN PIPES LINE DIAMETERS FROM 150 MM UP TO 200 MM,
VALVES CHAMBERS AND ITS SPECIAL PARTS.
EL NASR COMPANY FOR BUILDINGS AND
CONSTRUCTIONS.FOR THE
(NOPWASD).
13.0
NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER
MILLION
191996
SEWAGE PUMPING STATIONS AT HORANI CITY (1, 2). DAMIETTA
GOVERNORATE-EGYPT.
SUPPLY AND CONSTRUCTION OF SEWAGE PUMPING STATIONS INCLUDING
EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED CONCRETE WORKS, WELLS, BUILDINGS, FINISHING AND OUTSIDE FENCE.
EL NASR COMPANY FOR BUILDINGS AND
CONSTRUCTIONS.FOR THE
(NOPWASD).
3.0
201997
SUPPLY AND ERECTION FOR MECHANICAL AND
ELECTRICAL EQUIPMENTS FOR SEWAGE PUMPING
STATIONS AT HORANI CITY.
DAMIETTA GOVERNORATE-EGYPT.
SUPPLY AND ERECTION OF MECHANICAL AND ELECTRICAL EQUIPMENTS INCLUDING
PUMPS, DISTRIBUTION BOARDS, GENERATOR UNITS, VALVES & SPECIAL
PIECES IN VALVES CHAMBERS.
EL NASR COMPANY FOR BUILDINGS AND
CONSTRUCTIONS.FOR THE
(NOPWASD).
3.0
211997-2001
GRAVITY PIPE NETWORKS AND DEWATERING AT
BALTIME CITY. KAFREL SHEIKH GOVERNORATE
EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS
FROM 175 MM UP TO 750 MM.PLUS OF SUPPLY AND INSTALL OF SQUARE & CIRCULAR CONCRETE MANHOLES, BASED
ON WELL-POINT & DEEP-WELL SYSTEMS DEWATERING.
INDUSTRIAL & ENGINEERING
PROJECTS COMPANY.FOR THE
(NOPWASD)
42.0
NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER
MILLION
221998-2001
SEWAGE PUMPING STATIONS (1,2) AT
BALTIME CITY. KAFREL SHEIKH GOVERNORATE
EGYPT.
SUPPLY AND CONSTRUCTION OF ENGINEERING WORKS FOR PUMPING
STATIONS INCLUDING EXCAVATION WORKS, FOUNDATIONS, PLAIN & REINFORCED
CONCRETE WORKS, WELL WORKS, BUILDINGS, FINISHING AND OUTSIDE FENCE.
INDUSTRIAL & ENGINEERING
PROJECTS COMPANY.FOR THE
(NOPWASD).
6.0
231999-2000
PILES FOR CROSSING CANAL OF MAHMOUDIA
AT ABOU HOMOSS-ZAWYETTE GHAZAL.
EL BEHERA GOVERNORATE-
EGYPT.
SUPPLY AND CONSTRUCTION OF 16 M LENGTH OF PILES FROM IRON PIPES,
DIAMETER 600 MM.PLUS OF CONSTRUCTION OF REINFORCED
CONCRETE COLUMNS AND RETAINING WALLS OF AN IRON BRIDGE TO SUPPORT
FLEXIBLE CAST IRON PIPES.
INDUSTRIAL & ENGINEERING
PROJECTS COMPANY.FOR THE
(NOPWASD).
3.0
241999-2001
SEWAGE DRAINAGE NETWORK AND
DEWATERING AT EL MAASARA & HELWAN.
CAIRO GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS
FROM 200 MM UP TO 500 MM.PLUS OF CONSTRUCTION OF SQUARE &
CIRCULAR CONCRETE MANHOLES, BASED ON DEEP- WELL SYSTEM DEWATERING.
ARAB CONTRACTORS –
HELWAN BRANCH.
GREAT CAIRO RECONSTRUCTIO
N AUTHORITY
9.0
NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER
MILLION
251999-2000
POTABLE WATER PIPES LINE AT EAST
KANTARA CITY-EGYPT.
SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 500MM.
PLUS OF CONSTRUCTION OF CONCRETE CHAMBERS, SPECIAL PIECES, UNDER
CROSSING ABOVE CANALS AND DRAINAGES.
ENGINEERING INDUSTRIAL PROJECTS COMPANY.
SOUTH SINAI RECONSTRUCTIO
N AUTHORITY.
20.0
261999-2002
SEWAGE DRAINAGE NETWORK AND
SEWAGE PUMPING STATIONS AT
BATANOUN CITY.MOUNIFIA
GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS
FROM 200 MM UP TO 750 MM INCLUDING THE SUPPLY AND INSTALL OF SQUARE AND
CIRCULAR CONCRETE MANHOLES.PLUS OF CONSTRUCTION OF SEWAGE
PUMPING STATIONS INCLUDING THE CIVIL WORKS, BASED ON THE DEEP WELL SYSTEM
DEWATERING.
ENGINEERING AND INDUSTRIAL
PROJECTS COMPANY.FOR THE
(NOPWASD).
10.0
272001-2002
IRRIGATION PIPE LINES AT AHMED DAWOUD CANAL – DEWIDAR
AREA.NORTH SINAI
GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 700 MM, 1200MM, 1400MM,
1600MM, 1800 MM AT DIFFERENT DEPTHS UP TO 8M.
ENGINEERING & INDUSTRIAL PROJECTS COMPANY.
NORTH SINAI IRRIGATION AUTHORITY.
2,00
NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER
MILLION
282002-2004
FORCE MAIN PIPELINE FOR SEWAGE
DRAINAGE STATIONS AT BALTIME.
KAFREL SHEIKH GOVERNORATE
EGYPT.
SUPPLY AND INSTALL OF GRP PIPES, DIAMETER 600MM INCLUDING THE
CONSTRUCTION OF VALVES CHAMBERS, THE SPECIAL PIECES, UNDER CROSSINGS,
ABOVE CANALS AND DRAINAGES.
ENGINEERING & INDUSTRIAL PROJECTS COMPANY.FOR THE
(NOPWASD).
12,00
292002-2003
DEVELOPMENT OF IRRIGATION LINES AT EL HAMAMI CANAL-
ABOU HOMOSS.BEHIRA
GOVERNORATE-EGYPT.
SUPPLY AND INSTALL OF PLASTIC PIPES, DIAMETERS FROM 315MM UP TO 500 MM
INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS AND THE SPECIAL PIECES.
ENGINEERING & INDUSTRIAL PROJECTS COMPANY.
BEHIRA GOVERNORATE
IRRIGATION AUTHORITY.
6,00
302002-2003
DEVELOPMENT OF IRRIGATION AT
KHAWALID CANAL-SIDI SALEM.
KAFREL SHEIKH GOVERNORATE-
EGYPT.
SUPPLY AND INSTALL OF PLASTIC PIPES, DIAMETERS FROM 315 MM UP TO 500 MM
INCLUDING THE CONSTRUCTION OF VALVES CHAMBERS AND SPECIAL PIECES.
ENGINEERING & INDUSTRIAL PROJECTS COMPANY.
KAFREL SHEIKH GOVERNORATE.
13,00
NOPERIODNAME & LOCATIONDESCRIPTION OF PROJECTOWNERCOST PER
MILLION
312003-2006
GRAVITY PIPE NETWORKS, SEWAGE PUMPING STATIONS, DEWATERING AND
FORCE MAIN PIPELINE FOR SEWAGE DRAINAGE
STATIONS AT TABLOUHA VILLAGE.
MENOFYA GOVERNORATE
EGYPT.
SUPPLY AND INSTALL OF VITRIFIED CLAY PIPES WITH FLEXIBLE JOINTS, DIAMETERS
FROM 175 MM UP TO 800 MM INCLUDING THE SUPPLY AND INSTALL OF SQUARE AND
CIRCULAR CONCRETE MANHOLES.PLUS OF CONSTRUCTION OF SEWAGE
PUMPING STATIONS INCLUDING THE CIVIL WORKS, BASED ON THE DEEP WELL
SYSTEM DEWATERING.PLUS SUPPLY AND INSTALL FORCE MAIN OF PIPE LINES, INCLUDING THE CONSTRUCTION
OF VALVES CHAMBERS, THE SPECIAL PIECES, UNDER CROSSINGS AND OVER
CROSSINGS.
EL NASR COMPANY FOR BUILDINGS AND
CONSTRUCTIONS.
FOR THE (NOPWASD).
12,00
Construction of sewage drainage network at the
5th area, Gamassa Touristic city, to protect the city from pollution as well as encouraging resorting and tourism.
SEWAGE DRAINAGE NETWORKS AT 5TH AREA AT GAMASSA TOURIST CITY, DAKAHLIA GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES :
Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 450 mm, length of 8000 m and depths up to 6,50 m.
Supply and installation of 320 square & circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.
The construction was based on the well-point system dewatering according to the high water level at this area.
MAIN CONTRACTOR :
Engineer General Con. Co.
OWNER :
Authority of Reconstruction and
Housing at El Dakahlia Governorate.
COST:1.5 Million EGP.
Construction of sewage drainage network for the industrial area at Damietta city to complete the existing drainage project at the city.
SEWAGE DRAINAGE NETWORK AT THE INDUSTRIAL CITY , NEW DAMIETTA CITY
PROJECT DESCRIPTION:
EGCO SERVICES : Supply and installation of GRP & PVC pipes, diameters from 175 mm up to 600 mm , length of
10000 m and depths up to 8,50 m.
Supply and installation of 400 square and circular plain concrete manholes, internal diameters from 1,20 m up to 1,50 m and depths up to 8,50 m.
The construction was based on the well-point system dewatering according to the high water level at this area.
MAIN CONTRACTOR :
Arab contractors – Tanta branch
OWNER :
National Organization for Potable Water and
Sanitary Drainage.
COST:5.5 Million EGP.
CONSTRUCTION OF A POTABLE WATER PIPES LINE NETWORK, DIAMETER OF 1000 MM, FOR THE NEW DAMIETTA CITY, TO COMPLETE THE EXISTING SERVICES AT THE CITY.
WATER PIPELINES AT NEW DAMIETTA CITY,DAMIETTA GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES :
Supply and installation of pre-stress reinforced concrete pipes, diameter of 1000 mm and length of 1200 m including bends and plugs, etc.
Supply and installation of sluice, wash and air valves chambers including special pieces, valves and dismantling pieces.
MAIN CONTRACTOR :
Arab contractors – Tanta branch
OWNER :
National Organization for Potable Water and Sanitary Drainage
COST:
4.5 Million EGP.
The construction was based on the well-point system dewatering according to the high water level at this area.
CONSTRUCTION OF SEWAGE DRAINAGE NETWORK AT EL DELENGAT CITY TO COMPLETE THE EXISTING NETWORK AT EL BEHIRA GOVERNORATE.
SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL DELENGAT CITY,EL BEHIRA,(PART ONE)
PROJECT DESCRIPTION:
EGCO SERVICES : Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to
375 mm, length of 8500 m and depths up to 6,50 m.
Supply and installation of 340 square and circular plain concrete manholes, internal diameters from 1,20 m up to 1,50 m and depths up to 6,50 m.
The construction was based on the well-point system dewatering according to the high water level at this area.
MAIN CONTRACTOR :Arab contractors – Alex branch.
OWNER :
National Organization for Potable Water and Sanitary Drainage
COST:
3 million EGP
CONSTRUCTION OF THE SECOND PART OFSEWAGE DRAINAGE NETWORK AT EL DELENGAT CITYTO COMPLETE THE EXISTING NETWORK AT EL BEHIRAGOVERNORATE
SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL DELENGAT CITY, EL BEHIRA, (PART TWO)
PROJECT DESCRIPTION:
EGCO SERVICES:
Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 375 mm, length of 8500 m and depths up to 4.50 m.
Supply and installation of 320 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 4,50 m.
The construction was based on the well-point system dewatering.
MAIN CONTRACTOR :
Arab contractors – Alex branch
OWNER :
National Organization for Potable Water and Sanitary Drainage.
3.5 million EGP.
COST:
Construction of sewage drainage network at El Khanka City to complete the existing network at Great Cairo.
SEWAGE DRAINAGE NETWORK AND DEWATERIND AT EL KHANKA CITY, GREAT CAIRO.
PROJECT DESCRIPTION:
EGCO SERVICES : Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to
600 mm, length of 1200 m and depths up to 6,50 m.
Supply and installation of 48 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.
The construction was based on the well-point system dewatering according to the high water level at this area.
MAIN CONTRACTOR :
Arab contractors – Nasr City branch.
OWNER :
National Organization for Potable Water and
Sanitary Drainage.
COST:2.0 million EGP.
This project was constructed to join the partial stations with the main station by gravity pipes line, diameter of 1400 mm.
GRAVITY PIPELINES NETWORK, 1400 MM DIAMETER, AND DEWATERING AT RAS EL BAR, DAMIETTA GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES : Supply and installation of GRP pipes, diameter of 1400 mm, to join the partial stations with the
main station.
Supply and installation of slow down and sluice valves chambers including the special pieces, valves and paddle pieces.
The construction was based on the well-point system dewatering according to the high water level at this area.
MAIN CONTRACTOR :Arab contractors – Tanta branch.
OWNER :National Organization for Potable Water and Sanitary Drainage.
COST:8.5 million EGP.
CONSTRUCTION OF GRAVITY PIPELINES, DIAMETER OF 900 MM, AT RAS EL BAR CITY, TO TRANSPORT SEWAGE TO THE TREATMENT STATION AND TO COMPLETE THE EXISTING SEWAGE DRAINAGE NETWORK AT THE CITY.
SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES : Supply and installation of ductile cast iron pipes, diameter of 900 mm, depths from 2,50 m up
to 3,5 m and length of 9000 m.
Supply and installation of sluice, wash and air valves chambers including the special pieces, valves, paddle and dismantling pieces.
The construction was based on the well-point system dewatering according to the high water level at this area.
MAIN CONTRACTOR :
Arab contractors – Tanta branch.
OWNER :
National Organization for Potable Water and Sanitary Drainage
COST:9 million EGP.
Construction of the first part of gravity Pipes line at Ezbet El Borg according
To the need of a sewage drainagenetwork at this area .
GRAVITY PIPELINES AND DEWATERING AT EZBET EL BORG CITY, DAMIETTA GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES:
Supply and installation of vitrified clay pipes with rigid joints, diameter from 175 mm up to 750 mm, length of 6000 m and depths up to 6,50 m.
Supply and installation of 400 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.
The construction was based on the well-point system dewatering according to the high water level at this area.
MAIN CONTRACTOR :
Arab contractors – Tanta branch.
OWNER :
National Organization for Potable Water and
Sanitary Drainage.
COST:
9.0 million EGP.
Construction of force mainpipelines, from GRP pipes,
diameter of 600 mm and lengthof 14000 m, to transport the sewagefrom the sewage drainage stations.
Including the construction of valveschambers, special pieces, valvesand dismantling pieces.
POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT THE EAST EL TAFREAA AREA.
PROJECT DESCRIPTION:
EGCO SERVICES: Supply and installation of force main pipelines from GRP pipes,
diameter of 600 mm and length of 14000 m including excavation works, installation, test, washing, cleaning and transportation
Supply and installation of sluice, wash and air valves chambers valves including the special pieces, valves, dismantling and wall paddle pieces.
The construction was based on the well-point system dewatering for levels up to 3.50 m and on the deep-well system dewatering for levels more than 3.50 m.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company
OWNER :
National Organization for Potable Water and Sanitary Drainage
12 million EGP
COST:
Construction of sewage drainage network at Batanoun, Menoufia Governorate according to the Government’s policy concerning supplying all villages and cities at Cairo by the Gravity pipes networks.
SEWAGE DRAINAGE NETWORK AND SEWAGE PUMPING STATIONS AT EL BATANOUN CITY.
PROJECT DESCRIPTION:
EGCO SERVICES :
Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 8000 m and depths up to 8.50 m.
Supply and installation of 320 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 and depths up to 8.50 m.
Supply and construction of 4 sewage pumping stations including wells works, diameters from 3 m up to 8 m, plus of construction of extension buildings as workshops, generator room, storage, administration building and outside fences.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company.
OWNER :
National Organization for Potable Water and Sanitary Drainage.
COST:
6 million EGP.
The construction was based on the deep-well system dewatering according to the high water level at this area.
Construction of sewage drainageNetwork At El Maasara and Helwanareas to complete the existing networkat the Great Cairo.
SEWAGE DRAINAGE NETWORK AND DEWATERING AT EL MAASARA AND HELWAN.
PROJECT DESCRIPTION:
EGCO SERVICES:
Supply and installation of vitrified clay pipes with flexible joints, diameters from 200 mm up to 550 mm, length of 6500 m and depths up to 6,50 m.
Supply and installation of 260 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m
The construction was based on the deep-well system dewatering according to the high water level at this area.
MAIN CONTRACTOR :
Arab contractors – Helwan branch.
OWNER :National Organization for Potable Water and
Sanitary Drainage.
COST:
9.0 million EGP.
COST:
Construction of 2 sewage pumping stations to transport sewage to the treatment station to complete the existing network project at Balteem.
SEWAGE DRAINAGE NETWORK AT 10TH OF RAMADAN AREA, GAMASSA CITY, DAKAHLIA GOVERNORATE
PROJECT DESCRIPTION:
EGCO SERVICES :
Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, length of 1200 m and depths up to 6,50 m.
Supply and installation of 320 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.
The construction was based on the well-point system dewatering according to the high water level at this area.
MAIN CONTRACTOR :
Engineer General Con. Co
OWNER :
Authority of Reconstruction and Housing at El Dakahlia Governorate
COST:2.0 million EGB.
Construction of sewage drainage network at Gamassa, Dakahlia Governorate to complete the network of the city.
SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL AND ELECTRICAL EQUIPMENTS AT THE 5 TH AREA AT GAMSSA CITY, DAKAHLIA GOVERNORATE
PROJECT DESCRIPTION:
EGCO SERVICES : Supply and installation of a well for the pumping station, internal diameter of 3 m including
the reinforced concrete works and the penetration until the well settles at the required level.
Construction of the extension buildings as the workshop, the generator building, storage, security room and outside fences.
Supply and erection of mechanical and electrical equipments including submersible pumps, generator unit, distribution boards, transformers, valves, special parts, dismantling pieces and the installation at the valves chambers.
MAIN CONTRACTOR :
Engineer General Con. Co.
OWNER :Authority of Reconstruction and Housing at El Dakahlia Governorate
COST:
1.5 Million EGP
Construction of a sewage pumping station and supply of mechanical & electricalequipments at the 2nd area to complete the sewage drainage network at Gamassa city.
SEWAGE PUMPING STATION AND SUPPLY OF MECHANICAL & ELECTRICAL EQIPMENTS AT THE 2ND AREA, GAMASSA CITY, DAKAHLIA GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES :
Supply and installation of a well for the pumping station, internal diameter of 4 m, including the reinforced concrete works and the penetration until the well settles at the required level.
Construction of administrative units at the station as the workshop, the generator building, storage, security room and outside fences.
Supply and erection of mechanical & electrical equipments including submersible pumps, generator unit, distribution boards, transformers, valves, special pieces, dismantling pieces and the installationation at the valves chambers
MAIN CONTRACTOR :
Engineer General Con. Co.
OWNER :
Authority of Reconstruction and
Housing at El Dakahlia Governorate..
COST:
2.0 million EGP
Construction of a sewage drainage Network at Damanhour (Part one)
to complete the existing networkat middle Delta.
SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY, EL BEHIRA, (PART ONE)
PROJECT DESCRIPTION:
EGCO SERVICES: Supply and installation of
vitrified clay pipes with rigid joints, diameters from 175 mm up to 750 mm, length of 10500 m and depths up to 8,50 m.
Supply and installation of 420 square and circular plain concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m.
The construction was based on the well-point system dewatering according to the high water level at this area
MAIN CONTRACTOR :
Arab contractors – Alex branch
OWNER :
National Organization for Potable Water and Sanitary Drainage. .
COST:
3.0 million EGP
construction of the second part of sewage drainage network at Damanhour City to complete the existing network project at El Behira Governorate.
SEWAGE DRAINAGE NETWORK AND DEWATERING AT DAMANHOUR CITY, EL BEHIRA, (PART TWO).
PROJECT DESCRIPTION:
EGCO SERVICES : Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to
750 mm, length of 4800 m and depths up to 8,50 m.
Supply and installation of 190 square and circular plain concrete manholes, internal diameters of 1,20 mm and depths up to 8,50 m.
The construction was based on the well-point system dewatering according to the high water level at this area.
MAIN CONTRACTOR :
Arab contractors – Alex branch
OWNER :
National Organization for Potable Water and Sanitary Drainage.
COST:3.0 million EGP
Construction of 2 sewage pumping stations to transport sewage to the treatment station to complete the existing network project at Bal teem.
SEWAGE PUMPING STATIONS (1,2) AT BALTEEM, KAFR EL SHEIKH GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES :
Supply and Construction of concrete wells, diameters of 12 m including the penetration for wells settlement at the required level.
Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room and the outside fences.
The construction was based on the well-point system dewatering according to the high water level at this area.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company
OWNER :
National Organization for Potable Water and Sanitary Drainage
COST:6.0 million EGP.
Construction of the sewage pumping stations (1,2) and supply of mechanical & electrical equipments, to complete the sewage drainage network project at El Horaniy city.
Sewage pumping stations (1,2) at El Horaniy city, Damietta Governorate
PROJECT DESCRIPTION:
EGCO SERVICES :
Supply and Construction of reinforced concrete wells and the penetration until the wells settles at the required level.
Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room, the administration building and the outside fences.
MAIN CONTRACTOR :
El Nasr Company for Buildings and constructions.
OWNER :
National Organization for Potable Water and Sanitary Drainage.
COST:
3.0 million EGP.
Supply and erection of electrical and mechanical equipments at the stations including submersible pumps, generator unit, distribution board, transformers and special pieces, valves, dismantling pieces at the valves chambers
Construction of irrigation lines for the agriculture areas at north Sinai in accordance with the development scheme of this area.
AHMED DAOUD CANAL IRRIGATION PIPELINES AT EL DOWAIDAR AREA, NORTH SINAI.
PROJECT DESCRIPTION:
EGCO SERVICES :
Supply and installation of GRP pipes, diameters of 700 mm, 1200 mm and 1400 mm, depths from 4 m up to 7 m and length of 12000 m.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company.
OWNER :
North Sinai Reconstruction
Authority.
COST:
2 million EGP.
Construction of a potable waterPipelines from El kantara East atEastEl Tafreaa Area to complete the
needs and the services at this area .
POTABLE WATER SUPPLY PIPE LINE, DIAMETER OF 500 MM, AT THE EAST EL TAFREAA AREA.
PROJECT DESCRIPTION:
EGCO SERVICES:
Supply and installation of GRP pipes, diameter of 500 mm, depths from 2,50 m up to 3,50 m and length of 25000 m.
Supply and installation of 65 sluice, wash and air valves chambers including special pieces, valves and dismantling pieces.
Supply and construction of under crossing roads and over crossing canals, using excavation for the roads and piles for the canals.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company.
OWNER :
North Sinai Reconstruction Authority.
15 million EGP
COST:
In view of the need of "Abou Homuos city" for potable water supply, especially the east area of El Mahmoudia canal, it was necessary to construct an over crossing for ductile cast iron pipes, diameter of 600 mm.
PILES FOR OVER CROSSING CANAL AT EL MAHMOUDIA, ABOU HOMOUS AND ZAWIAT GHAZAL, EL BEHIRA GOVERNORATE..
PROJECT DESCRIPTION:
EGCO SERVICES : Supply and installation of 64 reinforced piles, diameter of 600 mm, length of 16 m including
tests of loading and pouring of the reinforced concrete into the piles.
Supply and construction of walls and reinforced concrete piles heads to hold the steel bridge.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company
OWNER :
National Organization for Potable Water and
Sanitary Drainage..
COST:3 million EGP
Construction of a sewage drainage network at Balteem city to complete services at all villages and cities in Egypt.
GRAVITY PIPELINES NETWORK AND DEWATERING AT BALTEEM CITY, KAFR EL SHEIKH GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES:
Supply and installation of vitrified clay pipes with flexible joints, diameters from 175 mm up to 750 mm, depths up to 8,50 m and length of 30000 m.
Supply and installation of 1200 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m. 4
The construction was based on the well-point system dewatering for depths up to 3,50 m and on the deep well system dewatering for depths more than 3,50 m.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company
OWNER :
National Organization for Potable Water and
Sanitary Drainage.
COST:
42.0 million EGP.
Demolition and reconstruction of water supply networks which facing the execution of the network project.
Construction of a sewage drainage network at El Horani city, DamiettaGovernorate, according to the Government policy to complete the construction of all
sewage drainage networks at all villages and cities in Egypt
Sewage Drainage network, force main pipelines and Dewaterimg at El Horani city, Damietta Governorate..
PROJECT DESCRIPTION:
EGCO SERVICES:
Supply and installation of vitrified clay pipes with rigid joints, diameters from 175 mm up to 600 mm, depths up to 6,50 m and length of 12500 m.
Supply and installation of 500 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 6,50 m.
Supply and installation of ductile cast iron pipes, diameters of 150 mm & 200 mm and length of 6000 m including valves chambers, special pieces, valves and dismantling pieces.
MAIN CONTRACTOR :El Nasr for buildings and Constructions.
OWNER :National Organization for
Potable Water and Sanitary Drainage.
COST:13.0 million EGP.
Supply and construction of under crossing roads and over crossing canals including isolated iron pipes, diameters of 200 mm & 150 mm and the chambers on the crossing sides.
Supply and modification of Potable water network at Meetmazah and Meetali villages .
WATER PIPELINES AT MEETMAZAH AND MEETALI VILLAGES, DAKAHLIA GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES:
Supply and installation of potable water network from Asbestos pipes, diameters of 150 mm & 200 mm and lenglh of 18000 m.
Supply and installation of valve diameters of 150 mm & 200 mm including special pieces of bends, tees and reducers, etc, along the network.
Joining the housing connections with the main network.
MAIN CONTRACTOR :
Engineer General Con. Co.
OWNER :
Authority of Reconstruction and Housing at El Dakahlia Governorate.
1.5 Million EGP.
COST:
Modification of the existing potable water network at El Saiidia village, Dakahlia Governorate .
POTABLE WATER PIPELINES AT NEW SAIIDIA VILLAGE, DAKAHLIA GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES:
Supply and installation of potable water network from Asbestos pipes, diameters of 150 mm and 200 mm and length of 6500 m.
Supply and installation of valves, diameters of 150 mm & 200 mm including bends, tees and reducers, Etc.
Supply and installation of potable water pipes for the house connections.
MAIN CONTRACTOR :
Engineer General Con. Co.
OWNER :
Authority of Reconstruction and Housing at El Dakahlia Governorate.
2.0 Million EGP.
COST:
Construction of irrigation pipeline system at EL Hamami canal, Abou Homos, to save the waste water resulting from the use of old-fashioned irrigation system .
DEVELOPING OF THE IRRIGATION PROJECT AT EL HAMAMI CANAL, ABOU HOMOUS, EL BEHIRA GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES:
Construction of irrigation pipeline system at EL Hamami canal, Abou Homos, to save the waste water resulting from the use of old-fashioned irrigation system.
Supply and installation of 240 valves chambers including valves, diameter of 250 mm.
Supply and construction of 38 irrigation stations, wells for pulling, places for the pumps and horizontal containers including excavation works and reinforced & plain concrete foundations, walls and ceilings.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company.
OWNER :
Irrigation development Authority at the Ministry of the General affairs.
6 million EGP
COST:
Construction of irrigation pipeline system at El Khawaled canal, Sedy Salem, to save the waste water resulting from the use of old-fashioned irrigation system
DEVELOPMENT OF IRRIGATION PROJECT AT EL KHAWALED CANAL, SEDY SALEM, KAFR EL SHIEKH GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES:
Supply and installation of plastic pipes, diameters of 315 mm, 355 mm, 400mm & 500 mm and length of 49000 m including excavation works, installationations and tests.
Supply and installation of 680 valves chambers including valves, diameter of 250 mm.
Supply and construction of 78 irrigation stations, wells for pulling, places for the pumps and horizontal containers including excavation works, reinforced & plain concrete foundations, walls and ceilings.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company.
OWNER :
Irrigation development Authority at the Ministry of General affairs.
13.0 million EGP
COST:
Construction of a sewage drainage network at Tablouha city to complete services at all villages and cities in Egypt.
CONSTRUCTION OF GRAVITY PIPES NETWORK FOR TABLOUHA CITY WITH THE WELL POINT IN KAFR EL SHEIKH
PROJECT DESCRIPTION:
EGCO SERVICES : Supply and installation of vitrified clay pipes with flexible joints, diameters from 175 mm up to
750 mm, depths up to 8,50 m and length of 30000 m.
Supply and installation of 1200 square and circular concrete manholes, internal diameters of 1,20 m & 1,50 m and depths up to 8,50 m.
The construction was based on the well-point system dewatering for depths up to 3,50 m and on the deep well system dewatering for depths more than 3,50 m.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company
OWNER :
National Organization for Potable Water and Sanitary Drainage.
COST:
30 million EGP.
Demolition and reconstruction of water supply networks which facing the execution of the network project.
Construction of 2 sewage pumping stations totransport sewage to the treatment station to complete the existing network project at Tablouha.
SEWAGE PUMPING STATIONS (1,2) AT TABLOHA, KAFR EL SHEIKH GOVERNORATE.
PROJECT DESCRIPTION:
EGCO SERVICES :
Supply and Construction of concrete wells, diameters of 12 m including the penetration for wells settlement at the required level.
Supply and construction of the extension buildings as the working building, generator building, storage, workshop, security room and the outside fences.
MAIN CONTRACTOR :
Industrial and Engineering Projects Company.
OWNER :
National Organization for Potable Water and Sanitary Drainage.
COST:
4 million EGP
The construction was based on the well-point system dewatering according to the high water level at this area.
Supply and install upvc water pipes with diameter 355 mm of working pressure 10 ,16 bar length of 15 km including Wash, Air chambers and Tunnels . In addition to supply and build reinforced concrete ground tanks capacity of 4000 m3 within the factory and another 750 m3 capacity in pumping stations.In addition to the ordinary work including excavation , PC , RC ,and finishing the work and including the supply and install of Pumps ,generators, cranes, chlorination systems, water hammer systems , the earthing and fire alarm systems Inside Pumping stations.In addition to the supply and installation of internal water networks of diameters 160 mm , 110 mm and 63 mm for all the buildings inside the factory and connecting the ground tank to cement product water tanks and build Pump chambers for water transfer from the ground tank to the internal water networks.
Arabian Cement Project Water Transmission Pipe Line ( Kattamia - Ein ELsokhna road).
PROJECT DESCRIPTION:
EGCO SERVICES : Supply and install upvc water pipes with diameter 355 mm length of 15 km including Wash , air chambers and Tunnels ( Kattamia
– Ein El El sokhna road ) the Arab cement company – ( quarries road) .
Supply and install RC ground tank with capacity of 4000 m3 including all concrete works . inlet and outlet chambers and their Pipe works .
Supply and install all the ordinary works for the Pumping stations including ground tanks with capacity of 750 m3, Pumps chambers , Cranes , Gates , Garde room , Fence , and Generating chambers .
MAIN CONTRACTOR :
Engineer General Contracting Company
OWNER :
Arabian Cement Company
COST: 20 million EGP.
Consultant :
Arab Consulting Engineers – Reliance Heavy Industries
Supply and install the Mechanical and Electrical equipments for Pumping stations including Pumps , Generators , Cranes , Panel boards , Cables , Earthing systems , Water hummer systems , Fire alarm and Control system .
Supply and install PVC pipes for the internal water pipe network with diameters of (160,110,63 )mm with length of 2500 m including Chambers , Valves and Internal connections .