Page 1: ENERGY STORAGE CHALLENGES · • Siting and sizing energy storage • Partial vs complete mitigation economics • Simultaneous charging and discharging • Market re-dispatch timing

Confidential & Proprietary | Copyright © 2018 Slide 1

D O E E l e c t r i c i t y A d v i s o r y C o m m i t t e e ( E A C )

R a t e - T a r i f f - M a r k e t D e s i g n P a n e l

F e b r u a r y 2 0 , 2 0 1 8

ENERGY STORAGE CHALLENGES

Page 2: ENERGY STORAGE CHALLENGES · • Siting and sizing energy storage • Partial vs complete mitigation economics • Simultaneous charging and discharging • Market re-dispatch timing

Confidential & Proprietary | Copyright © 2018 Slide 2

Energy Storage is Building Momentum

Energy Storage has Moved beyond DoE-driven Pilots!

Page 3: ENERGY STORAGE CHALLENGES · • Siting and sizing energy storage • Partial vs complete mitigation economics • Simultaneous charging and discharging • Market re-dispatch timing

Confidential & Proprietary | Copyright © 2018 Slide 3

Conventional

Technologies

Energy Storage

Competitiveness of Energy Storage Systems

Planning Criteria – (NWA, Duration)?(NERC, RTOs)

Accessible Wholesale Services?Valuing Unique Services (e.g., Resiliency)?

(RTOs, States, FERC)

Modularity & Phased PlanningHow to Value reducing Rate Payer Risk?

(State Commissions)

Performance Guarantees?(RTOs, Utilities)

Page 4: ENERGY STORAGE CHALLENGES · • Siting and sizing energy storage • Partial vs complete mitigation economics • Simultaneous charging and discharging • Market re-dispatch timing

Confidential & Proprietary | Copyright © 2018 Slide 4

Regional Congestion Relief (PJM)

Right Sizing

Motivation

• Regional congestion costs the markets hundreds of millions of dollars per year

• Permitting and building new transmission can be lengthy and expensive

• Line capacity is not modular, and relieving moderate congestion may not be economical

Planning Considerations

• Congestion usually occurs after contingencies (N-1 or N-1-1)

• Siting and sizing energy storage

• Partial vs complete mitigation economics

• Simultaneous charging and discharging

• Market re-dispatch timing

Case Study in PJM Region

• 230-kV congestion in PJM 2016 long-term market efficiency window

• Partial mitigation had B/C ratios ranging from 3 to 5 using 4-hour batteries

Siting and Sizing of Storage to Resolve multiple N-1 Congestions

What Storage Capacity (Hours) is Acceptable? 30min or 4 hours?Significant Cost Impact!Need Planning Criteria for NWA

Page 5: ENERGY STORAGE CHALLENGES · • Siting and sizing energy storage • Partial vs complete mitigation economics • Simultaneous charging and discharging • Market re-dispatch timing

Confidential & Proprietary | Copyright © 2018 Slide 5

Asset Management

Usage Profile – Cost Uncertainty

Uncertainty in Usage Profile is Costly to Rate Payers:

• Contracting and Performance Guarantees• Warranty Cost• Capacity Fading • Asset Management Strategy and Cost

Cycles per Day?Depth of Discharge?Speed of Charge/Discharge?

Replacement

Augmentation

O&M

Rate Payer Cost

Page 6: ENERGY STORAGE CHALLENGES · • Siting and sizing energy storage • Partial vs complete mitigation economics • Simultaneous charging and discharging • Market re-dispatch timing

Confidential & Proprietary | Copyright © 2018 Slide 6

Accessibility of Storage to Wholesale Markets & Valuation of Unique Services

Value Stacking

Application Access to Wholesale Market Services?

• By Location: C-D-T-G

• By Time: Day Ahead, Real Time, ..

• Application: Reliability, Efficiency, Policy, ..

• Which Market Services?

Valuing System Resiliency:

• Black Start

• Islanding and Microgrids

• Enable Clean Energy Future

Clarity of Market Rules Important to Financial Viability

Wholesale Market Services

Page 7: ENERGY STORAGE CHALLENGES · • Siting and sizing energy storage • Partial vs complete mitigation economics • Simultaneous charging and discharging • Market re-dispatch timing

Confidential & Proprietary | Copyright © 2018 Slide 7

Phased Implementation Reduces Rate Payer Risk

Flexibility Valuation

Storage Modularity Allows Phased Implementation:

• As more information is available, storage size and asset management can be adjusted.

• Reduced risk to rate payers of stranded or under utilized assets.

150.00

200.00

250.00

300.00

350.00

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

20

51

20

53

20

55

20

57

20

59

20

61

20

63

20

65

Load Profiles

Storage to Conventional Solution Cost Ratio

How is the Storage Flexibility Valued?

Page 8: ENERGY STORAGE CHALLENGES · • Siting and sizing energy storage • Partial vs complete mitigation economics • Simultaneous charging and discharging • Market re-dispatch timing

Confidential & Proprietary | Copyright © 2018 Slide 8

Conclusions

Storage is not a traditional asset:

• Not familiar to system planners

• Offer both Similar and Unique attributes as Conventional Assets

Enablers to Economic Viability of Storage:

• Clarity in Planning Criteria impacts size and cost

• Uncertainty in Usage Profile impacts performance guarantees and cost certainty

• Access to markets and valuation of unique services crucial to business case

• Asset flexibility and rate payer risk reduction is not recognized or compensated yet

Page 9: ENERGY STORAGE CHALLENGES · • Siting and sizing energy storage • Partial vs complete mitigation economics • Simultaneous charging and discharging • Market re-dispatch timing

Confidential & Proprietary | Copyright © 2018 Slide 9

(919) 334-3000

quanta-technology.com

[email protected]

Facebook.com/quanta-technology-LLC

@QuantaTech

Linkedin.com/company/quanta-technology

Quanta Technology, LLC4020 Westchase Boulevard, Suite 300

Raleigh, NC 27607

Thank you!

Hisham Othman

[email protected]