Energy Efficiency Financing Policy:
South Africa’s Standard Offer Scheme
Country Energy Policies
7 December 2011
Doc Id
Research has been undertaken into the market
potential for energy savings per technology
Technology Resid Comm Indus Total
Efficient Lighting 939 115 116 1,170
Solar Water Heating 3,713 3,713
Domestic Cooking Conversion
2,144 2,144
Infra red heating 766 766
Heat Pumps 960 224 569 1,753
Showerheads & Restrictors
240 160 400
Load Management 9 200 209
Heating, Ventilation & (HVAC)
14 70 84
Agricultural Initiatives 144 144
Efficient Compressed Air 1,255 1,255
Motor Efficiency 408 408
Variable Speed Drivers 417 417
Fan / Pumps 530 530
TOTAL 8,762 666 3,565 12,933
• The market’s total potential is the
estimated maximum amount of
demand savings that can be
achieved in each technology
class.
• The market potential was
estimated in a recent research
study conducted by EEDSM.
• In setting targets, the market
penetration in any of the
technology classes did not exceed
50% of the research finding’s
maximum market potential.
• The above conservative target
settings approach allows for
market estimation accuracy,
customer own projects and supply
chain constraints.
Doc Id L
ast M
od
ified
20
11
/09
/19
15
:47
:29
So
uth
Afric
a S
tan
da
rd T
ime
P
rinte
d 2
01
1/0
9/0
7 1
7:3
4:3
5
NERSA has granted Eskom funding to pursue these
market opportunities
• As part of the MYPD2, NERSA approved a total of R 5,445m for Energy Efficiency and
DSM. “These funds will be applied for project implementation and administrative costs
for DSM, energy efficiency and demand-reduction programmes, including a portion of the
solar water heating (SWH) initiated by the Department of Energy (DoE).”
Demand Savings (MW)
Current
Year
FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Total
Eskom EEDSM 301 313 459 502 656 2231
MYPD2 NERSA Approved 289 301 447 1037
IRP2 252 242 315 501 656 1966
Demand Savings (MW) Claimed Since Inception Of IDM Programme
4
90 72
270
650
917
372 357
0
200
400
600
800
1000
FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011
Dem
an
d S
avin
gs (
MW
)
Other CFL's
Demand Savings = 355 MW
5
Lets change this picture….
35
70
0
50
100
150
200
250Re
side
ntia
l
Ind
ust
rial
Red
istr
ibu
tor
Agr
icu
ltu
re
Co
mm
erc
ial
Group1
2010/2011
204
113
334 2
De
man
d S
avin
gs (
MW
)
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
1.22.8 3.5 3.9 4.4 4.5 5.3 5.3 5.3 5.3
8.7 9.0
32.0
Fun
din
g R
mill
/MW
Funding Of Technologies – R mill/MW
6
CFL = Best
“bang for buck”
but opportunity
exhausted over
47 million bulbs
installed
New
technologies
more expensive
SWH is
expensive
Down lighters
next “big”
opportunity
Doc Id
The IDM energy savings target for 2011/12 could power a city for a year
Source: Annual electricity consumption/sales as reported in the State of Cities 2006, City Energy Support Unit, Sustainable Energy Africa, 2006
1,280 G i g a w a t t h o u r s
Mangaung (1,397 GWh consumed during 2006)
Buffalo City (1,305 GWh consumed during 2006)
either of
Sol Plaatjie (514 GWh consumed during 2006)
or
for 2½ years
for ~1 year
Doc Id
Current Funding Mechanisms and Inititatives
ESCo Process
Rebates Mass Roll-
out Standard Offer
Standard
Product
Performance
Contracting
Size Projects >
1MW
Individual
Products
Large Scale Roll-
outs 50kW<Project<5MW Projects <100kW
Substantially larger
than ESCo process
>5MW
Eskom
Payment
Value
Based on
individual
project
calculation
Value per
product based
on savings
potential
In line with
MYPD
benchmarks,
with discretion
Standard value per
kWh saved per
technology. Focus on
daytime hrs 6am –
10pm weekdays.
Standard value
per item
calculated based
on savings
potential
Competitive bidding
process. Contract
over 3 yrs.
Funding
Customer and
Eskom (up to
NERSA
benchmark)
Customer and
Eskom (up to
NERSA
benchmark)
Eskom or DoE
Market price per
technology (up to 85%
of NERSA
benchmark)
Market price per
technology (up to
NERSA
benchmark)
Customer and
Eskom (up to
NERSA
benchmark)
Payment Progress
payments to
ESCo’s
Rebate claimed
by consumer
Progress
payments
70% on
implementation, 10%
pa based on M&V
100% on
installation, based
on M&V
Progress payments
with retainer at a
rate of 55c/kWh
peak hrs.
Investment
Decision
Individual IC
approval
Once-off IC
approval per
technology
Individual IC
approval
Bulk IC approval per
technology
Bulk IC approval
per technology
Bulk approval of
individual projects
Procurement
Decision
Price
evaluation
based on
submitted
approval
Rebate
administration
outsourced
Individual tender
processes
Streamline individual
project approvals
Possibly no
requirements if
outsourced
Streamline
individual project
approvals
Possibly no
requirements if
outsourced
RFI
Tender
Cumulative Progress on Registration Of Standard Offer Projects - As at end October 2011
9
47
1114
24
3538
0
14
28
42
56
70
0
10
20
30
40
50A
pr
Ma
y
Jun
Jul
Aug
Sep
Oct
Dem
an
d (
MW
) &
En
erg
y (
GW
h)
Savin
gs
No
. o
f p
roje
cts
FY 2012
FY 2012 = 38 projects registered with a demand savings = 12.8MWSince inception (July 2010) - 52 projects registered with a demand savings of 16.4MW
No. Of Projects Demand Savings (MW) Energy Savings (GWh)
Cumulative Progress on Registration Of Standard Product Projects - As at end October 2011
10
516
38
68
132
229
328
0
10
20
30
40
50
0
90
180
270
360
450A
pr
Ma
y
Jun
Jul
Aug
Sep
Oct
Dem
an
d (
MW
) &
En
erg
y (
GW
h)
Savin
gs
No
. o
f p
roje
cts
FY 2012
FY 2012 - 328 projects registered with a demand savings = 9.4MWSince inception (Jan 2011) - 362 projects registered with a demand savings of 11.7MW
No. Of Projects Demand Savings (MW) Energy Savings (GWh)
Doc Id
Standard Products
We started with lighting
Extension of standard product offer to include:
Air
conditioners Solar water
heaters
Heat
pumps
Shower
heads
Performance Contracting
For Industrial and large
commercial customers For projects that save
more than 5MW
Pays 55c/kWh during
‘peak’ (06:00 – 22:00)
Pays 10c/kWh off
peak and weekends
Published rate and invitation to tender
Contracts to value of R 750m awarded
Breakdown Of ESCOs In Industrial Sector
• Numerous ESCOs participate in the IDM programme
• To date the top 5 ESCOs have delivered 72% of the demand savings achieved
0 50 100 150 200 250
Others
ESCo 10
ESCo 9
ESCo 8
ESCo 7
ESCo 6
ESCo 5
ESCo 4
ESCo 3
ESCo 2
ESCo 1
97
7
7
10
13
15
21
29
36
67
225
Demand Savings (MW)
Breakdown Of ESCOs In Commercial Sector
• Many smaller ESCOs (44) participate in the IDM programme in the Commercial
Sector
• To date the top 5 ESCOs have delivered 61% of the demand savings achieved
0 5 10 15 20 25 30
Others
ESCo 10
ESCo 9
ESCo 8
ESCo 7
ESCo 6
ESCo 5
ESCo 4
ESCo 3
ESCo 2
ESCo 1
21
3
3
3
3
4
4
5
7
15
27
Demand Savings (MW)
34 ESCOs
Doc Id
15
Thank you