Oct 3, 2007 1 Encounters With Risk PPP (Perception,Policy and Practice) During a Career in Operations Research Stephen Pollock University of Michigan

Upload: juan

Post on 04-Feb-2016

33 views

Category:

Documents


0 download

DESCRIPTION

Encounters With Risk PPP (Perception,Policy and Practice) During a Career in Operations Research. Stephen Pollock University of Michigan. A PERSONAL VIEW OF RISK PPP. MY EXPERIENCES WITH RISK PPP WHILE DOING O.R. CLEARLY A BIASED PERSPECTIVE - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

1

Encounters With Risk PPP(Perception,Policy and Practice)

During a Career in Operations Research

Stephen PollockUniversity of Michigan

Page 2: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

2

A PERSONAL VIEW OF RISK PPP

• MY EXPERIENCES WITH RISK PPP WHILE DOING O.R.

• CLEARLY A BIASED PERSPECTIVE

• A NUMBER OF ANECDOTAL EXAMPLES THAT MIGHT SERVE TO FORESHADOW OR TIE TOGETHER THE DIVERSE ISSUES OF THIS WORKSHOP

Page 3: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

3

O.R./I.E/ ENGINEERING?

• OPERATIONAL PROBLEM SOLVING• MOSTLY MATHEMATICAL MODELS• ALSO A WAY OF THINKING:

– WATER GLASS– GUILLOTINE– FORK

• UNCERTAINTY ALWAYS PRESENT

Page 4: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

4

TYPICAL DECISION ANALYSTS VIEW

d4

d3

d1

d2

DECISION

CONSEQUENCE x2

CONSEQUENCE x1

CONSEQUENCE x3

CONSEQUENCE x4

p1

1-p1

1- p2

p2

CHANCE

Page 5: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

5

MORE GENERIC VIEW

CONSEQUENCE x

d

DECISION

f(x|d)

CHANCE

Page 6: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

6

MORE GENERAL VIEW

*”UNCERTAINTY”

f(x|d)d

DECISION CHANCE*

f(y|d’,x)d’(d,x)

DECISION CHANCE

CONSEQUENCE (X,Y)

Page 7: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

7

WHERE DOES RISK POLICY AND PERCEPTION FIT THIS SCHEMA?

d

DECISION

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

Page 8: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

8

WHERE DOES RISK POLICY AND PERCEPTION FIT THIS SCHEMA?

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

RISK

Page 9: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

9

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

RISK HAS TWO NECESSARY ASPECTS:• UNCERTAINTY -- WHAT WILL HAPPEN?• CONSEQUENCES -- WHY DOES ONE CARE?

CONFOUNDING THESE ARE

• CONCEPTION (WHAT ONE THINKS THE “RISK” ASPECTS ARE)• PERCEPTION (HOW ONE “SEES” THE RISK ASPECTS)• CODIFICATION (HOW ONE “TALKS” ABOUT -- OR SHOULD TALK ABOUT -- RISK ASPECTS)

RISK

Page 10: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

10

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

THE POLICY COMPONENT (DECISION/MITIGATION) -- WHAT SHOULD ONE DO?

THIS ALSO INVOLVES A MIXTURE OF• CONCEPTION (WHERE DO POSSIBLE DECISIONS/OPTIONS/POLICIES COME FROM?)• PERCEPTION (HOW ONE “SEES” OPTIONS)• CODIFICATION (HOW TO DESCRIBE OPTIONS)

Page 11: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

11

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

FINALLY (AND PERHAPS MOST IMPORTANT):

PRACTICE (WHAT ACTUALLY GETS DONE)

??

Page 12: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

12

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

RISK

TO THE “PERSON IN THE STREET”, ARE THE FOLLOWING “RISKY”?

•BUNGEE JUMPING•NOT BUCKLING UP•BUCKLING UP•PICKING UP A $20 BILL FROM THE STREET•INOCULATING A CHILD AGAINST MEASLES•NOT INOCULATING A CHILD AGAINST MEASLES•LIVING

“EVERYDAY” ANSWERS SHOW ALL SORTS OF COGNITIVE BIASES, BUT NEGATIVE FRAMING SEEMS TO BE PERVASIVE

Page 13: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

13

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

SOME “EVERYDAY”* CONCEPTION, PERCEPTION, AND CODIFICATION OF RISK:

*NY TIMES, NEW YORKER, NPR, ETC.

RISK

Page 14: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

14

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

“EVERYDAY” CONCEPTION, PERCEPTION AND CODIFICATION OF RISK

Souffle (NPR 7/23)

David Denby’s review of “A Fine Romance”: (referring to romantic film comedies)

“ …with a married couple, romance is like “…a duel with slingshots at close quarters –- exciting but a little risky” (New Yorker 7/23)

RISK

Page 15: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

15

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

“EVERYDAY” CONCEPTION, PERCEPTION AND CODIFICATION OF RISK

“The Black Swan” popular book dealing with “The role of the unexpected” in financial trading (NYT B.R. 7/29)

”What is “unexpected”? {13 craps in a row}{this particular person dies within the next five years}{this levee fails}{a levee fails}

RISK

Page 16: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

16

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

“EVERYDAY” CONCEPTION, PERCEPTION AND CODIFICATION OF RISK

Louis Menan’s review of Caplan’s “The Myth of the Rational Voter: Why Democracies Choose Bad Politics” (New Yorker 7/19)

“You can’t use futures markets for assessing probabilities like you can for guessing the number of jellybeans in a bowl, or odds in sports gambling.”

RISK

Page 17: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

17

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

“EVERYDAY” CONCEPTION, PERCEPTION AND CODIFICATION OF RISK

Louis Menan’s (continued): “People exaggerate the risk of loss; they like the status quo and tend to regard it as a norm; they overreact to sensational but unrepresentative information (shark attack phenomenon) … Most people, even if you explained …the economically rational choice … would be reluctant to make it, because … in particular, they want to protect themselves from the downside of change. They would rather feel good about themselves than to maximize ... profit.”

RISK

Page 18: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

18

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

“EVERYDAY” CONCEPTION, PERCEPTION AND CODIFICATION OF RISK

Levitt and Dubner’s article “The Jane Fonda Effect”

“... in 1916 … the legendary economist Frank Knight made a distinction between two key factors in decision making: risk and uncertainty. The cardinal difference, he declared, is that risk — however great — can be measured, whereas uncertainty cannot.” (NYT Magazine 9/16)

RISK

Page 19: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

19

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

“EVERYDAY” CONCEPTION, PERCEPTION AND CODIFICATION OF RISK

Levitt and Dubner’s* article “The Jane Fonda Effect”

“… Has fear of a [nuclear] meltdown subsided, or has it merely been replaced by the fear of global warming? …. in 1916 … the legendary economist Frank Knight made a distinction between two key factors in decision making: risk and uncertainty. The cardinal difference, he declared, is that risk — however great — can be measured, whereas uncertainty cannot.” (NYT Magazine 9/16)

* Authors of “Freakonomics”

RISK

Page 20: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

20

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

“EVERYDAY” CONCEPTION, PERCEPTION AND CODIFICATION OF RISK AND POLICY

HELMET WEARING BY NHL PLAYERS (1979-80 SEASON REQUIREMENT)

RISK

Page 21: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

21

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY

HOW MUCH TIME TO CARRY A GARBAGE CAN FROM A BACK YARD TO THE CURB?

WHICH CUTTER HEADS WERE THE DEFECTIVE ONES?

WILL A SUB PASS BY DURING AN ASWEX?

Page 22: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

22

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY

ELLSBERG PARADOX

BAG A HAS 500 RED BALLS AND 500 GREEN BALLSBAG B HAS 1000 RED AND GREEN BALLSYOU CHOSE A BAG, DRAW A BALL AND WIN $100 IF IT IS RED.WHICH BAG DO YOU PREFER?

MOST PEOPLE PREFER A

Page 23: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

23

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY

ELLSBERG PARADOX DEMONSTRATES MANY PEOPLE’S PREFERENCE FOR “CRISP” PROBABILITIES VS. “AMBIGUOUS” ONES

Page 24: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

24

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY

ELLSBERG PARADOX -- PREFERENCE FOR “CRISP” PROBABILITIES VS. “AMBIGUOUS” ONES

BAG A HAS 450 RED BALLS AND 550 GREEN BALLSBAG B HAS 1000 RED AND GREEN BALLSYOU CHOSE A BAG, DRAW A BALL AND WIN $100 IF

IT IS RED.NOW WHICH BAG DO YOU PREFER?

Page 25: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

25

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY

ELLSBERG PARADOX -- PREFERENCE (?) FOR “CRISP” PROBABILITIES VS. “AMBIGUOUS” ONES

BAG A HAS 200 RED BALLS AND 800 GREEN BALLSBAG B HAS 1000 RED AND GREEN BALLSYOU CHOSE A BAG, DRAW A BALL AND WIN $100 IF

IT IS RED.NOW WHICH BAG DO YOU PREFER?

Page 26: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

26

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY

“CRISP” VS. “AMBIGUOUS” PROBABILITIES

•TEST OF CONCEPT OF TOTAL RE-DESIGN OF A GLOBAL LOGISTIC CHAIN VIA M.C. SIMULATION

•USED PREVIOUS YEAR’S DEMAND DISTRIBUTION FOR TO PROVE OUT RE-DESIGN CONCEPT

•MASSIVE CORPORATE PRESSURE AGAINST USING DISTRIBUTION OVER SIMULATION MODEL’S PARAMETERS -- SINCE “WE WON’T KNOW WHAT THEY MIGHT BE”

Page 27: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

27

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY“CRISP” VS. “AMBIGUOUS” PROBABILITIES

•ORDER SIZE FOR CRITICAL MATERIAL BASED ON PROJECTED PRODUCT SALES AND MATERIAL PRICE•SALES BASED UPON “TARGETS”•MATERIAL PRICE BASED ON SPECIALIST’S FORECASTS•MASSIVE CORPORATE PRESSURE AGAINST USING DISTRIBUTION OVER EITHER SALES OR PRICES “THESE ARE EXPERTS, THEY SHOULD KNOW THE

ANSWER”

Page 28: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

28

v ($)

Probability {loss > v}

“mean” prob.

5%

95%

uncertainty in

Probabilityuncertainty in Loss

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTYAMBIGUITY EXPRESSED AS PROBABILITY DISTRIBUTIONS OVER PROBABILITIES (REF: H. KUNREUTHER)

Page 29: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

29

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY

WHAT IF ADVERSARIES CHOOSE THE PROBABILITIES?

Page 30: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

30

ADVERSARIAL RISK ANALYSISFOOTBALL ANALOGY [OFFENSE’S VIEW]

d

OFFENSE PLAYER PERSONNEL

f(x|d)

DEFENSIVE ALIGNMENT

d’(x)

AUDIBLE PLAY CALL

f(y|x,d’(x))

PLAY OUTCOME (y)

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

Page 31: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

31

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF POLICY

WHAT IF THE DECISION MAKER CHOOSES THE PROBABILITIES?

CONSIDER THE MATHEMATICAL PROGRAMMING PROBLEM:

min f(x) s.t. g(x, z) ≥ 0

Page 32: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

32

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF POLICY

“CHANCE CONSTRAINED PROGRAMMING”

min f(x) s.t. Prob. { g(x, Z) ≥ 0 } ≥ p

WHERE Z IS NOW A RANDOM VARIABLE

Page 33: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

33

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

EXAMPLE: DETERMINE d = BANK’S CASH RESERVESBANK WANTS TO MINIMIZE dREGULATORS REQUIRE SMALL PROBABILITY OF RUNNING OUT OF CASH; Z = DEMAND FOR CASH (A R.V.)

min d s.t. Prob. { Z ≥ d } ≥ .90

x = 2M

.10

z

p(z)

Page 34: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

34

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

HOW ABOUT A RANDOMIZED POLICY?

min x s.t. Prob. {x ≥ Z} ≥ .90

z

Prob. = .2 .8

x = 2.1Mx = .6M

Prob. { x > Z} = .2(.55) +.8(.99) = .901 (OK)E(X) = .2(.6M) + .8(2.1M) = 1.93 ( better than 2)BUT -- WOULD THE REGULATORS APPROVE??

.01.55

Page 35: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

35

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF POLICY

•CAMSHAFT HARDENING•SEWAGE TREATMENT IN ***•1979 NHL HELMET REGULATION (REVISITED)

Page 36: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

36

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY

A US FEDERAL DEPARTMENT REPORT USES, WITH LITTLE DIFFERENTIATION:

PROBABILITYLIKELIHOODCHANCEFREQUENCYRELATIVE PROBABILITYSTOCHASTIC PROBABILITY

Page 37: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

37

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY

A US FEDERAL DEPARTMENT, IN A PRA REPORT, USES, AS SYNONYMS:

MEANAVERAGE

Page 38: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

38

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY

ANOTHER US FEDERAL DEPARTMENT USES, AS SYNONYMS:

DISTRIBUTION FUNCTIONDENSITY FUNCTIONPROBABILITY FUNCTIONPROBABILITY DISTRIBUTIONDISTRIBUTION

Page 39: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

39

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF RISK (computation)

FEDERAL DEPARTMENT REPORT:

RISK = "the probability or frequency of an event multiplied by the consequences of the event”

RISK

Page 40: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

40

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

CONCEPTION, PERCEPTION AND CODIFICATION OF RISKSociety for Risk Analysis (SRA) Glossary (http://sra.org/resources_glossary.php)

RISK = “The potential for unwanted, adverse

consequences to human life, health, property, or the

environment;

BUT THEN SRA GOES ON TO SAY:

“estimation of risk is usually based on the expected value of the conditional probability of the event occurring times the consequence of the event given that it has occurred."

RISK

Page 41: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

41

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

CODIFICATION OF RISK IN A FORTHCOMING PROPOSED LEXICON

RISK = The potential for unwanted, adverse consequences. It is important to distinguish between the term "risk,” which involves uncertainties, consequences and conditioning statements, and "expected risk" [q.v.] which combines these factors using a linear additive operation.

PROBABILITY = One of a set of numerical values between 0 and 1 assigned to a collection of random events (which are subsets of a sample space) in such a way that the assigned numbers obey axioms [ …]

RISK

Page 42: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

42

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

MORE CODIFICATION FROM THE PROPOSED LEXICON

CONSEQUENCE (OUTCOME) = A description of a scenario, in terms of measurable factors, that a decision-maker may consider when assessing preferences over different scenarios; these factors are often random variables.

EXPECTED RISK = A summary measure of risk for an event, scenario, etc., as expressed by the expected value of any one of the measurable consequences associated with the risk.

Page 43: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

43

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

CODIFICATION OF UNCERTAINTY IN A FORTHCOMING PROPOSED LEXICON

•ALEATORY PROBABILITY = A measure of the uncertainty of an unknown event whose occurrence is governed by some random physical phenomena that are either: a) predictable, in principle, with sufficient information (e.g., tossing a die); or b) phenomena which are essentially unpredictable (radioactive decay).•EPISTEMIC PROBABILITY = A representation of uncertainty about propositions due to incomplete knowledge. Such propositions may be about either past or future events.

RISK

Page 44: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

44

(ANECDOTE) “NEWSVENDOR” STADIUM HOTDOG DEMAND

NORMAL SEASON

CONTENDER

Page 45: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

45

(ANECDOTE) “NEWSVENDOR” STADIUM HOTDOGS

NORMAL SEASON PROBABILITY = ?

CONTENDER PROB = 1-?

Page 46: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

46

(ANECDOTE) “NEWSVENDOR” STADIUM HOTDOGS

OVERALL SALES

Page 47: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

47

(ANECDOTE) “NEWSVENDOR” STADIUM HOTDOGS

NORMAL SEASON, CONTENDER PROBABILITIESOR CONDITIONAL DEMAND DISTRIBUTIONS?

WHICH PROBS ARE ALEATORYWHICH ARE EPISTEMIC?

Page 48: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

48

(ANECDOTE) “NEWSVENDOR” STADIUM HOTDOGS

DIFFERENCE BETWEEN IGNORANCE AND APATHY?

Page 49: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

49

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF CONSEQUENCES

WE’RE REALLY TALKING ABOUT APPROPRIATE PERFORMANCE MEASURES

THIS IS DIFFICULT ENOUGH TO DO IN DETERMINISTIC O.R. -- THE UNCERTAINTY ASPECT ONLY MAKES THINGS MORE “INTERESTING”

Page 50: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

50

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF CONSEQUENCES

SUBMARINE SEARCH:MINIMIZE EXPECTED TIME TO DETECT ?MAXIMIZE PROB. {DETECT TIME ≤

Tcritical} ?

Page 51: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

51

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF CONSEQUENCES

ALLOCATION OF POLICE PATROLS:MINIMIZE EXPECTED TIME TO RESPOND ?MINIMIZE VARIANCE OF RESPONSE TIME ?

Page 52: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

52

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF CONSEQUENCES

QUALITY CONTROL AND 6-SIGMA“TAGUCHI” LOSS FUNCTIONESSENTIALLY QUADRATIC:DECISION IS d, RANDOM VARIABLE IS X

LOSS = CONST. (d - x)2

Page 53: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

53

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF CONSEQUENCES

“TAGUCHI” LOSS FUNCTION C(d - x)2

x

d

Page 54: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

54

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF CONSEQUENCES

WITH “TAGUCHI” LOSS FUNCTIONBEST DECISION IS d* = E(X)WHICH RESULTS INMINIMUM EXPECTED LOSS = CONST•VAR(X)MINIMUM EXPECTED RISK = CONST•S.D.(X) = CONST•SIGMA

Page 55: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

55

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF CONSEQUENCES

MORE REALISTIC MANUFACTURING LOSS FUNCTION

x

d

Page 56: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

56

INTENSITY MODULATED RADIATION TREATMENT (IMRT)

critical (healthy) tissue

tumorradiation beam

Page 57: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

57

PAROTID

GLAND

TUMOR

SPINAL CORD

typical 2-D slice of 3-D imagetypical 2-D slice of 3-D image

Page 58: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

58

THE FUNDAMENTAL PROBLEM IN IMRT

DETERMINE THE NUMBER, ANGLES AND INTENSITIES OF THE BEAMLETS SO THAT

a) THE TUMOR RECEIVES A SUFFICIENT DOSE, BUT b) CRITICAL TISSUES (E.G. NORMAL ORGANS) ARE

SPARED HIGH DOSES

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

Page 59: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

59

CONFLICTING CONSEQUENCES• want to have:

– at least a “critical dose” of radiation absorbed by the tumor “target”

– as little radiation as possible absorbed by healthy tissue

• this is a mathematical programming problem, right?

min (radiation to healthy tissue)s.t. (radiation to tumor) critical dose

ormax (radiation to tumor)s.t. (radiation to healthy tissue) damaging dose

Page 60: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

60

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

GRAPHICAL REPRESENTATION OF CONSEQUENCES: DOSE-VOLUME HISTOGRAM (“DVH”)

Page 61: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

61

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

ADD UNCERTAINTY TO DVH

Page 62: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

62

v ($)

Probability {loss > v}

“mean” prob.

5%

95%

uncertainty in

Probabilityuncertainty in Loss

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

NOTE SIMILARITY TO KUNREUTHER’S REPRESENTATION

Page 63: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

63

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

REMEMBER PRACTICE? (WHAT ACTUALLY GETS DONE)

Page 64: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

64

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

PRACTICE

REMOVING SKUS FROM EOQ POLICIESFACULTY RETIREMENT OPTIONSCLASS ACTION SINKING FUNDSIMULATED ANNEALING AND IMRT“X BAR” CONTROL CHART DESIGN

PRACTICE

Page 65: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

65

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

HERE IS A FINAL CHALLENGE:

DURING THIS WORKSHOP, TRY TO DISCOVER IMPLIED RESOLUTIONS (USUALLY VIA ASSUMPTIONS) TO THE INHERENTLY PROBLEMATIC NATURE OF RISK Conception, Perception, Policy, and Practce

PRACTICE

Page 66: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

66

CLICK TO HEAR NEXT SPEAKER

Page 67: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

67

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

PRACTICE (UNLIKELY DERIVATIVES)From the New York Times, 2/23/89 -- p. 1(!):“The underlying rate of inflation is accelerating”If X(t) = PRICE INDEX, then

INFLATION = X(t)RATE of INFLATION = X(t)“ ... is accelerating” ==> [X(t) > 0 ==> X(t) >0

From the NYT 2/4/02“The increase in Chip Speed is Accelerating …”[work it out …]

Page 68: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

68

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(EVERYDAY) CONCEPTION, PERCEPTION AND CODIFICATION OF UNCERTAINTY“CRISP” VS. “AMBIGUOUS” PROBABILITIES

Building a prison in Berlin NH would produce a revenue increase of $264,000/year (NYT 9/2)

Page 69: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

69

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

INTERESTING CONTRAST IN USAGE INTELLIGENCE COMMUNITY

“ANALYSIS”: GATHER INFORMATION ABOUT OPPONENT’S INTENTIONS AND CAPABILITIES, “ASSESSMENT”: USE THIS INFORMATION TO PRESENT A STATEMENT OF THE CURRENT SITUATION

RISK AND DECISION COMMUNITY

“ASSESSMENT”: OBTAIN INFORMATION ABOUT UNCERTAINTY OF EVENTS (AND ALSO CONSEQUENCE)“ANALYSIS”: USE THIS INFORMATION AND COMBINE IT IN SUCH A WAY THAT ONE CAN MAKE BETTER DECISIONS

Page 70: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

70

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF POLICY

“MORAL HAZARD”?: SEEDING HURRICANES

•CONSEQUENCES = WIND SPEED•SPEED NOW IS 70 MPH•WITH NO SEEDING, FORECAST: 140 MPH AT LANDFALL•WITH SEEDING, FORECAST: 100 MPH AT LANDFALL•DECISION IS TO SEED ==> WIND IS 90 MPH AT LANDFALL•SEEDING “CLEARLY” INCREASED THE SPEED, SO SUE THE GOVERNMENT

Page 71: Encounters With Risk PPP (Perception,Policy and Practice)   During a Career in Operations Research

Oct 3, 2007

71

d

POLICY

f(x|d)

UNCERTAINTY

X

CONSEQUENCE

(ANECDOTAL) CONCEPTION, PERCEPTION AND CODIFICATION OF POLICY

“MORAL HAZARD”

•DECISION MAKER DOES NOT SUFFER CONSEQUENCES•HURRICANE INSURANCE•SUB-PRIME LENDING INSTITUTIONS•“DONORCYCLES”