Dr. DENKE, Zsolt managing directorDr. DENKE, Zsolt managing directorBudapesti Közlekedési SzövetségBudapesti Közlekedési Szövetség
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 20101022
Administrative structure of HungaryAdministrative structure of Hungary (1) (1)
Source: http://commons.wikimedia.org/wiki/File:Hungary_administration_map.png
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 20101033
• National level: central government, etc.National level: central government, etc.
• Second level: 19 counties, 1 capital Second level: 19 counties, 1 capital city city (all belongs to 7 statistical regions)(all belongs to 7 statistical regions)
• ((Third level: 174 micro-regionThird level: 174 micro-regions)s)
• Local level: Local level: ~~3200 municipalities3200 municipalities
Administrative structure of HungaryAdministrative structure of Hungary (2) (2)
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 20101044
Territory of BKSZTerritory of BKSZ
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 20101055
Administrative structure and datas Administrative structure and datas of of the the BKSZ areaBKSZ area
• Budapest Budapest + + 191922 settlements settlements– Area: 7,600 kmArea: 7,600 km2 2 ; population:; population: 3.2 million3.2 million
• Budapest: 23 district muniBudapest: 23 district munic.c. & 1 capital & 1 capital munimunic.c.– Area: 525 kmArea: 525 km2 2 ; population:; population: 1.7 million1.7 million
• Mainly Pest county (not all settl.)Mainly Pest county (not all settl.); ; partly partly neighbouring countiesneighbouring counties
• Micro-regions: all 15 in Pest County, 13 in Micro-regions: all 15 in Pest County, 13 in other neighbouring countiesother neighbouring counties
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 201010
Pest County and BKSZ servicing territory
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 20101077
Network statisticsNetwork statistics
• Heavy rail Heavy rail ((11 lines11 lines) ) length: 924 km / 119 km (BP)length: 924 km / 119 km (BP)• Heavy rail stations: 378 / 41 (BP)Heavy rail stations: 378 / 41 (BP)• Local rail (hév) length: 98 km / 38 kmLocal rail (hév) length: 98 km / 38 km• Local rail (hév) stations: 71 / 39 (BP) Local rail (hév) stations: 71 / 39 (BP) • Regional bus line length (Volán): 2.434 km / 175 Regional bus line length (Volán): 2.434 km / 175
km (BP)km (BP)• Regional bus stops: 4.216 / 131(BP)Regional bus stops: 4.216 / 131(BP)• Budapest local network: 1.150 km / stops: Budapest local network: 1.150 km / stops: 2250 2250
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 201010
Organisation of different modes of transport
• PT modes
• Motorised road traffic modes
• Soft transport modes
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 201010
Stakeholders in PT service
• Competent authorities (political level)
• Organisers (administrative level)
• Service providers (operator level)
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 201010
Competent authorities
• Local transport: municipalities (mandatory)
–In Budapest: Budapest capital municipal assembly (obligatory)
• Interurban transport (inc. regional transport): transport minister (MoT)
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 201010
Organisers• BKSZ (in BKSZ Area)
– Owned by State, Budapest Munic., Pest County– Main Tasks (temporarly):
• Loss compensation calculation of Budapest Pass • Harmonisation of local and regional timetable (preparation)• Infrastructure develop preparation • Integrated travel inform development
• RKI (in Central Hungarian Region)– Owned by MoT (State)– Task: regional bus and rail timetable preparation
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 201010
Service providers
• Budapest local operator: BKV (municipality owned)
• Regional Bus operator: VOLÁNBUSZ, other Volán Co.s (state owned)
• Railway operator: MÁV-START (state owned railway)
• Private bus operators: subcontractors of VOLÁNBUSZ
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 201010
Characteristic of PT service
• Market type, contractual relationship
• Service contract – Network, timetable– Level of service– Fares, discount (fare subsidy)– Cost subsidy
13
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 201010
PT PT service service contractscontracts (1) (1)
• Budapest, BKV: 8 years from 2004Budapest, BKV: 8 years from 2004
• Regional: Regional: – bus operators: 8 years from 2004 extended in bus operators: 8 years from 2004 extended in
2009 +4 years2009 +4 years– Rail operator: 3 years from 2009Rail operator: 3 years from 2009
• BKSZ contract on special fare: 5 years BKSZ contract on special fare: 5 years from 2005from 2005
1414
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 201010
PT PT service service contractscontracts (2) (2)• Network, timetable & level of service
• BP: BKV prepares, Muni Assembly decides• Regio: RKI/RKSZ (BKSZ) and operator prepare, MoT
decides
• Fares• BP: BKV prepares, Muni Assembly decides• Regio: MoT prepares + decides
• Fare discounts, fare subsidy• Parliament, Centr Gov, MoT, BP (BKSZ)
• Cost subsidy: comp. auth
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 201010
Contribution of PT financing by different authorities
BKV MÁV-ST VOLÁN
Fare box revenue
Fare subsidies
Cost subsidies
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 201010
Tools and measures to achieve sustainable mobility
• Elaboration integrated passenger information system
EMTA General Meeting, EMTA General Meeting, BudapestBudapest
15-1615-16 April 20 April 2010101818
Thank you for your Thank you for your attention!attention!
http://www.bksz.huhttp://www.bksz.hu
[email protected]@bksz.hu