employee general information

37
Quest.doc 1 March 2019 The numbers at the end of each line/area in parenthesis preceded by either an "A" or an "N", indicate the alpha or numeric character space allowed in that field. Do not exceed the limits of our database. Employee General Information Firm Sequence Number (if unknown, leave blank)____________________________ (A8) Firm Name __________________________________________________________ (A120) Employee Sequence Number (if unknown, leave blank)_________________________(A8) Employee Name __ ____________________________________________________ (A30) Last First Middle Personnel Number____________ (N15) (Sequential order of employees being entered beginning with 01, 02, 03, etc or any number you assign.) Employee Branch Number _______________ (N2) (Enter 00 if the employee works in the main office. Enter 01, 02, etc., indicating the branch office number where the employee works.) Employee Expertise (Engineer, Surveyor, Planner, Architect, Landscape Architect, Technician or Scientist) ___________________________________________________ (A20) Employee Certification Information Use the space you need to provide us with the information needed to meet the minimum academic or professional requirement for all categories that the employee is requesting. 1. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.) Training Type __________________________________________________ (A2) (Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.) Training Date ____________________________________ (A8) Year Month Day Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for Type code and description.) Issue Date ________________________________ (A8) Month Day Year Expiration Date ____________________________ (A8) Year Month Day

Upload: others

Post on 28-Feb-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Employee General Information

Quest.doc

1 March 2019

The numbers at the end of each line/area in parenthesis preceded by either an "A" or an "N", indicate the

alpha or numeric character space allowed in that field. Do not exceed the limits of our database.

Employee General Information

Firm Sequence Number (if unknown, leave blank)____________________________ (A8)

Firm Name __________________________________________________________ (A120)

Employee Sequence Number (if unknown, leave blank)_________________________(A8)

Employee Name __ ____________________________________________________ (A30)

Last First Middle

Personnel Number____________ (N15) (Sequential order of employees being entered beginning with 01, 02, 03, etc or any number you assign.)

Employee Branch Number _______________ (N2) (Enter 00 if the employee works in the main office. Enter 01, 02, etc., indicating the branch office number

where the employee works.)

Employee Expertise (Engineer, Surveyor, Planner, Architect, Landscape Architect, Technician or

Scientist) ___________________________________________________ (A20)

Employee Certification Information

Use the space you need to provide us with the information needed to meet the minimum

academic or professional requirement for all categories that the employee is requesting.

1. Degree Type _____________________________________ (A10)

(Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Year Month Day

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description.)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Year Month Day

Page 2: Employee General Information

Emp-Quest-2019.doc

2 March 2019

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

2. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

3. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Page 3: Employee General Information

Emp-Quest-2019.doc

3 March 2019

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

4. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

5. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Month Day Year

Page 4: Employee General Information

Emp-Quest-2019.doc

4 March 2019

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

6. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

7. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Page 5: Employee General Information

Emp-Quest-2019.doc

5 March 2019

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

8. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

9. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Page 6: Employee General Information

Emp-Quest-2019.doc

6 March 2019

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

10. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

11. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Page 7: Employee General Information

Emp-Quest-2019.doc

7 March 2019

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

12. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

Page 8: Employee General Information

Emp-Quest-2019.doc

8 March 2019

13. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

14. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________(A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Page 9: Employee General Information

Emp-Quest-2019.doc

9 March 2019

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

15. Degree Type _____________________________________ (A10) (Type of degree, if any, held by this individual.)

Training Type __________________________________________________ (A2)

(Type of training or license, if any, in their field of study i.e. Biology/P.E, RPLS.)

Training Date ____________________________________ (A8) Month Day Year

Personnel and/or Laboratory Certification Type ____________________________ (A6) (Reference Attachment C, Personnel Certification Type Codes or Laboratory Certification Type Codes for

Type code and description or, 112000 for Surveyor, 1000000 for P.E..)

Issue Date ________________________________ (A8) Month Day Year

Expiration Date ____________________________ (A8) Month Day Year

Certification Number _______________________________________________ (A20) (The number assigned to the certificate or License.)

Issuing Agency ___________________________________________ (A30)

(The name of the agency/board that issued the degree/certificate/license, such as University of Texas/State of

Texas/ State of OK /AIA/TNRC/Wetland Training Institute/TBPLS etc.)

Employee Category of Work Information

Select From the Precertification Work Categories listed on Attachment B

Reference Attachment B - Precertification Requirements by Category - for Category Numbers.

Enter leading "0's" before each single digit category number, for example, Category 1.1.1 would

be entered as 01.01.01. All Categories listed here must also be listed under your projects.

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Page 10: Employee General Information

Emp-Quest-2019.doc

10 March 2019

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Page 11: Employee General Information

Emp-Quest-2019.doc

11 March 2019

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Category ________________________ (N6) Category________________________ (N6)

Project Information

* = required fields

* please user 4 digits when entering year fields

* Please use current date for (Date completed), if on-going project

Note: We do not want a description of a project. We need to see the actual work that you

performed on the project that demonstrates to us how you meet the minimum requirement for any

category you want. In other words, how did you get from point a to point c? What was the

actual work?

Project 1

*Project Name _____________________________________________________ (A60)

*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)

Page 12: Employee General Information

Emp-Quest-2019.doc

12 March 2019

*Date Began __________________________________ (A8) Month Date Year

* Date Completed ______________________________ (A8) Month Date Year

*Enter A General Description of the Work Done on this Project. You may abbreviate as

long as we can tell what you are trying to say:

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

Contract Number: ____________________ (A15)

Project Manager Name: __________________________________________ (A30) Last First Middle

Client Name: _____________________________________________ (A30)

Client Phone Number: ________________________ (A10)

Client contact Name:_____________________________________________ (A30)

**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or

Special Characters are NOT allowed

Estimated Construction Cost: ____________________ (N12)

Estimated Project Fees: _________________________________ (N12)

Select Up to 10 Categories of Work That Pertain To This Project

You May Describe The Actual Work Completed For Each Category, But It Is Not Required.

***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System

1. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

Page 13: Employee General Information

Emp-Quest-2019.doc

13 March 2019

_________________________________________________________________ (A60)

2. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

3. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

4. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

5. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

6. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

7. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

8. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

Page 14: Employee General Information

Emp-Quest-2019.doc

14 March 2019

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

9. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

10. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

Project 2

*Project Name _____________________________________________________ (A60)

*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)

*Date Began __________________________________ (A8) Month Date Year

* Date Completed ______________________________ (A8) Month Date Year

*Enter A General Description of the Work Done on this Project. You may abbreviate as

long as we can tell what you are trying to say:

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

Contract Number: ____________________ (A15)

Page 15: Employee General Information

Emp-Quest-2019.doc

15 March 2019

Project Manager Name: __________________________________________ (A30)

Last First Middle

Client Name: _____________________________________________ (A30)

Client Phone Number: ________________________ (A10)

Client contact Name:_____________________________________________ (A30)

**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or

Special Characters are NOT allowed

Estimated Construction Cost: ____________________ (N12)

Estimated Project Fees: _________________________________ (N12)

Select Up to 10 Categories of Work That Pertain To This Project

You May Describe The Actual Work Completed For Each Category, But It Is Not Required.

***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System

1. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

2. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

3. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

4. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

Page 16: Employee General Information

Emp-Quest-2019.doc

16 March 2019

_________________________________________________________________ (A60)

5. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

6. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

7. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

8. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

9. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

10. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

Project 3

Page 17: Employee General Information

Emp-Quest-2019.doc

17 March 2019

*Project Name _____________________________________________________ (A60)

*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)

*Date Began __________________________________ (A8) Month Date Year

* Date Completed ______________________________ (A8) Month Date Year

*Enter A General Description of the Work Done on this Project. You may abbreviate as

long as we can tell what you are trying to say:

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

Contract Number: ____________________ (A15)

Project Manager Name: __________________________________________ (A30) Last First Middle

Client Name: _____________________________________________ (A30)

Client Phone Number: ________________________ (A10)

Client contact Name:_____________________________________________ (A30)

**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or

Special Characters are NOT allowed

Estimated Construction Cost: ____________________ (N12)

Estimated Project Fees: _________________________________ (N12)

Select Up to 10 Categories of Work That Pertain To This Project

You May Describe The Actual Work Completed For Each Category, But It Is Not Required.

***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System

Page 18: Employee General Information

Emp-Quest-2019.doc

18 March 2019

1. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

2.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

3.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

4.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

5.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

6.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

7.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

Page 19: Employee General Information

Emp-Quest-2019.doc

19 March 2019

8.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

9.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

10. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

Project 4

*Project Name _____________________________________________________ (A60)

*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)

*Date Began __________________________________ (A8) Month Date Year

* Date Completed ______________________________ (A8) Month Date Year

*Enter A General Description of the Work Done on this Project. You may abbreviate as

long as we can tell what you are trying to say:

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

Page 20: Employee General Information

Emp-Quest-2019.doc

20 March 2019

Contract Number: ____________________ (A15)

Project Manager Name: __________________________________________ (A30) Last First Middle

Client Name: _____________________________________________ (A30)

Client Phone Number: ________________________ (A10)

Client contact Name:_____________________________________________ (A30)

**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or

Special Characters are NOT allowed

Estimated Construction Cost: ____________________ (N12)

Estimated Project Fees: _________________________________ (N12)

Select Up to 10 Categories of Work That Pertain To This Project

You May Describe The Actual Work Completed For Each Category, But It Is Not Required.

***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System

1. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

2. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

3. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

4. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

Page 21: Employee General Information

Emp-Quest-2019.doc

21 March 2019

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

5. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

6. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

7. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

8. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

9. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

10. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

Page 22: Employee General Information

Emp-Quest-2019.doc

22 March 2019

Project 5

*Project Name _____________________________________________________ (A60)

*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)

*Date Began __________________________________ (A8) Month Date Year

* Date Completed ______________________________ (A8) Month Date Year

*Enter A General Description of the Work Done on this Project. You may abbreviate as

long as we can tell what you are trying to say:

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

Contract Number: ____________________ (A15)

Project Manager Name: __________________________________________ (A30) Last First Middle

Client Name: _____________________________________________ (A30)

Client Phone Number: ________________________ (A10)

Client contact Name:_____________________________________________ (A30)

**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or

Special Characters are NOT allowed

Estimated Construction Cost: ____________________ (N12)

Estimated Project Fees: _________________________________ (N12)

Select Up to 10 Categories of Work That Pertain To This Project

Page 23: Employee General Information

Emp-Quest-2019.doc

23 March 2019

You May Describe The Actual Work Completed For Each Category, But It Is Not Required.

***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System

1. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

2.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

3.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

4.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

5.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

6.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

7.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

Page 24: Employee General Information

Emp-Quest-2019.doc

24 March 2019

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

8.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

9.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

10. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

Project 6

*Project Name _____________________________________________________ (A60)

*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)

*Date Began __________________________________ (A8) Month Date Year

* Date Completed ______________________________ (A8) Month Date Year

*Enter A General Description of the Work Done on this Project. You may abbreviate as

long as we can tell what you are trying to say:

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

Page 25: Employee General Information

Emp-Quest-2019.doc

25 March 2019

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

Contract Number: ____________________ (A15)

Project Manager Name: __________________________________________ (A30) Last First Middle

Client Name: _____________________________________________ (A30)

Client Phone Number: ________________________ (A10)

Client contact Name:_____________________________________________ (A30)

**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or

Special Characters are NOT allowed

Estimated Construction Cost: ____________________ (N12)

Estimated Project Fees: _________________________________ (N12)

Select Up to 10 Categories of Work That Pertain To This Project

You May Describe The Actual Work Completed For Each Category, But It Is Not Required.

***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System

1. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

2.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

3.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

Page 26: Employee General Information

Emp-Quest-2019.doc

26 March 2019

_________________________________________________________________ (A60)

4.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

5.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

6.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

7.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

8.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

9.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

10. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

Page 27: Employee General Information

Emp-Quest-2019.doc

27 March 2019

_________________________________________________________________ (A60)

Project 7

*Project Name _____________________________________________________ (A60)

*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)

*Date Began __________________________________ (A8) Month Date Year

* Date Completed ______________________________ (A8) Month Date Year

*Enter A General Description of the Work Done on this Project. You may abbreviate as

long as we can tell what you are trying to say:

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

Contract Number: ____________________ (A15)

Project Manager Name: __________________________________________ (A30) Last First Middle

Client Name: _____________________________________________ (A30)

Client Phone Number: ________________________ (A10)

Client contact Name:_____________________________________________ (A30)

**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or

Special Characters are NOT allowed

Estimated Construction Cost: ____________________ (N12)

Estimated Project Fees: _________________________________ (N12)

Page 28: Employee General Information

Emp-Quest-2019.doc

28 March 2019

Select Up to 10 Categories of Work That Pertain To This Project

You May Describe The Actual Work Completed For Each Category, But It Is Not Required.

***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System

1. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

2.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

3.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

4.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

5.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

6.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

Page 29: Employee General Information

Emp-Quest-2019.doc

29 March 2019

7.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

8.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

9.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

10. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

Project 8

*Project Name _____________________________________________________ (A60)

*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)

*Date Began __________________________________ (A8) Month Date Year

* Date Completed ______________________________ (A8) Month Date Year

*Enter A General Description of the Work Done on this Project. You may abbreviate as

long as we can tell what you are trying to say:

___________________________________________________________________ (A60)

Page 30: Employee General Information

Emp-Quest-2019.doc

30 March 2019

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

Contract Number: ____________________ (A15)

Project Manager Name: __________________________________________ (A30) Last First Middle

Client Name: _____________________________________________ (A30)

Client Phone Number: ________________________ (A10)

Client contact Name:_____________________________________________ (A30)

**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or

Special Characters are NOT allowed

Estimated Construction Cost: ____________________ (N12)

Estimated Project Fees: _________________________________ (N12)

Select Up to 10 Categories of Work That Pertain To This Project

You May Describe The Actual Work Completed For Each Category, But It Is Not Required.

***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System

1. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

2.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

3.Select A Category of Work: ________________ (A8)

Page 31: Employee General Information

Emp-Quest-2019.doc

31 March 2019

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

4.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

5.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

6.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

7.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

8.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

9.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

Page 32: Employee General Information

Emp-Quest-2019.doc

32 March 2019

10. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

Project 9

*Project Name _____________________________________________________ (A60)

*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)

*Date Began __________________________________ (A8) Month Date Year

* Date Completed ______________________________ (A8) Month Date Year

*Enter A General Description of the Work Done on this Project. You may abbreviate as

long as we can tell what you are trying to say:

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

Contract Number: ____________________ (A15)

Project Manager Name: __________________________________________ (A30) Last First Middle

Client Name: _____________________________________________ (A30)

Client Phone Number: ________________________ (A10)

Client contact Name:_____________________________________________ (A30)

**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or

Special Characters are NOT allowed

Page 33: Employee General Information

Emp-Quest-2019.doc

33 March 2019

Estimated Construction Cost: ____________________ (N12)

Estimated Project Fees: _________________________________ (N12)

Select Up to 10 Categories of Work That Pertain To This Project

You May Describe The Actual Work Completed For Each Category, But It Is Not Required.

***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System

1. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

2. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

3. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

4. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

5. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

6. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

Page 34: Employee General Information

Emp-Quest-2019.doc

34 March 2019

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

7. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

8. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

9. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

10. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

Project 10

*Project Name _____________________________________________________ (A60)

*Location __________________________________________________ (A30) (Highway/road or bridge name or the City/County/State, or physical address.)

*Date Began __________________________________ (A8) Month Date Year

* Date Completed ______________________________ (A8) Month Date Year

*Enter A General Description of the Work Done on this Project. You may abbreviate as

Page 35: Employee General Information

Emp-Quest-2019.doc

35 March 2019

long as we can tell what you are trying to say:

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

___________________________________________________________________ (A60)

Contract Number: ____________________ (A15)

Project Manager Name: __________________________________________ (A30) Last First Middle

Client Name: _____________________________________________ (A30)

Client Phone Number: ________________________ (A10)

Client contact Name:_____________________________________________ (A30)

**Enter Construction Cost and Project Fees in Whole Dollars – Decimals, Commas and/or

Special Characters are NOT allowed

Estimated Construction Cost: ____________________ (N12)

Estimated Project Fees: _________________________________ (N12)

Select Up to 10 Categories of Work That Pertain To This Project

You May Describe The Actual Work Completed For Each Category, But It Is Not Required.

***Caution, Only 120 Characters, (2 Lines), Will be Stored in the System

1. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

2.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

Page 36: Employee General Information

Emp-Quest-2019.doc

36 March 2019

_________________________________________________________________ (A60)

3.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

4.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

5.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

6.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

7.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

8.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

9.Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

Page 37: Employee General Information

Emp-Quest-2019.doc

37 March 2019

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)

10. Select A Category of Work: ________________ (A8)

Description of Work Completed in This Category (Up to 2 Lines/Optional):

_________________________________________________________________ (A60)

_________________________________________________________________ (A60)