emm overview for world cities...
TRANSCRIPT
EMM Overview for World Cities Initiative
Venue: Birchwood27-31 March 2017
PRESENTATION CONTENT
1. Ekurhuleni Profile
2. Ekurhuleni Regional Position
3. Infrastructure Planning Policy Framework
4. Theory of Change – New Vision
5. Revised MSDF
6. Geographic Priority Areas
7. Example of City’s Initiatives
8. Identified Cooperation Areas
EKURHULENI AT A GLANCE
N12
N17
Kwa-Thema
TsakaneThokoza
Katlehong
Tembisa
Daveyton
Vosloorus
Duduza
Germiston
Boksburg
Benoni
Edenvale
Kempton Park
Sentrarand
Tambo Springs
BrakpanSprings
Nigel
Alberton
Bedfordview
Limpopo
Cullinan
Sandton
Johannesburg
Kempton ParkKrugersdorp
Soweto
Randfontein
Pretoria
Vanderbijlpark
Heidelberg
Sasolburg
Balfour
Vereeniging
Westonaria
Deneysville
Bronkhorstspruit
Delmas
Devon
Ekurhuleni
EKU
RH
ULE
NI R
EGIO
NA
L P
OSI
TIO
N
Aligns to annual budget
process
Built Environment
Performance Plan
Infrastructure Investment
Projects
INFRASTRUCTURE PLANNING POLICY FRAMEWORK
• Permanent urban boundary• Core• Nodes• Corridors• Strategic Land Parcels • Environmental pressure• Agriculture• Densification• Transit oriented development• Improved regional connectivity (road & rail)• Importance of rail • Planning language
REVISED MSDF
• Metropolitan identity
• Urban boundary
• Growth management
• Strategic densification
• Extended zones of opportunity
• Conservation, consolidation
and linkage
BrakpanSprings
Nigel
Alberton
Germiston
Benoni
Edenval
e
Carnival City
Tsakane
Thokoza
Daveyton
Boksburg
Kempton Park
Tambo Springs
Dunnottar
Sentrarand
DELIVERING CITY
(2012- 2020)PRIORITY AREA 1
PRIORITY AREA 2 CAPABLE CITY
(2020- 2030)
PRIORITY AREA 3 SUSTAINABLE
CITY
(2030- 2055)
3 priority areas have been formulated within the CIF and are
attached to a period of implementation as aligned with that of
the EMM Growth and Development Strategy, 2055:
GEOGRAPHIC PRIORITY AREAS
N3
R21
N17
R59
N12
R24
M2
N12
R21
N3
N12
N3
N3
R21
N12
PR
ETO
RIA
EISELEN
TW
ELF
TH
NALA
KIN
GS
WA
Y
SO
NT
ON
GA
MAIN REEF
BIERMAN
SAM MOLELE
HEALD
COMMISSIONER
XH
OSA
HOSPITAL
OLYMPIA
TUGELA
"u"u
"u
"u
"u
%
%
%
%
%
%
%
%%
%%%
%
%%
%
%
%
%• Industrial Townships
• National Highways
• Railway Network
• Township regeneration Projects
• Tembisa
• Tsakane
• Katlehong
• Vosloorus
• Daveyton
• Primary Transport Links (IRPTN Network)
• Secondary Linkages (Local roads/Bus
routes/ Taxi Routes)
• CBD (Aerotropolis Core)
• Urban Hubs
• Secondary Nodes (Economic potential)
• Integration Zone 1 (Tembisa-CBD)
• Integration Zone 2 (Vosloorus-CBD)
• Integration Zone 3 (Katlehong-CBD)
• Integration Zone 4 (Daveyton- CBD)
• Integration 5 (Tsakane-CBD)
Geographic priority area
CATALYTIC RECOMMENDATIONS
No
rth
–So
uth
Co
rrid
or
East West Corridor
• Urban Renewal & Reinventing Cities
• Public Transport & Integrated Transport Systems
• Urban Design & Precinct Plans
• Corridors & Nodal Development
• Growth Management Strategy
• Urban Innovation
• Integrated Infrastructure Master Plan
IDENTIFIED COOPERATION AREAS