ELVIS - substation maintenance
Hannu Hätönen
![Page 2: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/2.jpg)
SAP Work Manager Mobile
Oracle Primavera Project Portfolio &
Management
Primavera adapter
Maximo Spatial
IBM Maximo Asset Management
ESRI ArcGIS GIS
Electron CAPE Relay simulation
IPS RelexRelay Management
Siemens PSS®ODMS Grid modeling
Siemens PSS®E Grid calculation
OSIsoft PI AF & ProcessBook
Asset health
OSIsoft PI Real-time & data storage
other integrations to Accounting, Metering, Document Management, Business Intelligens, Invoicing, among others
SCADA
ELVIS– THE NEW PLATFORM FOR ASSET AND OPERATION MANAGEMENTIntegrated best-of-breed standard software products
ELVIS
integrations to Accounting, Document Management, Business Intelligens, Invoicing
![Page 3: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/3.jpg)
Anttila substation in Maximo:- 450 operating locations- 1321 operating assets- 496 active preventive maintenance records- 4587 active measurement points- 1150 historical workorders with 5993 tasks
Anttila substation450 kV HVDC + 400 kV AC + 110 kV AC
![Page 4: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/4.jpg)
![Page 5: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/5.jpg)
5
Outsourced model with digitalization
Work process:
1.Generation
2.Planning
3.Execution
4.Approval
5.Invoicing
![Page 6: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/6.jpg)
Long history of maintenance data
N = 23 955
![Page 7: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/7.jpg)
Long history of maintenance data
![Page 8: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/8.jpg)
Long history of maintenance data
![Page 9: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/9.jpg)
Long history of maintenance data
![Page 10: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/10.jpg)
N = 64 921
200k+ measurement results
![Page 11: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/11.jpg)
Summary
![Page 12: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/12.jpg)
FO AC03AQ0 found 414,3 kV – 117,2 A
[2 open deviations][1 open workorder][Create new deviation][Go to measurements][Cancel]
GPS [OK]Microphone [OK]
Database connection [OK]Camera [OK]
3G
![Page 13: ELVIS substation maintenance Hannu Hätönen](https://reader035.vdocuments.site/reader035/viewer/2022062316/588259311a28abd40e8b53a3/html5/thumbnails/13.jpg)
Fingrid OyjLäkkisepäntie 21FI-00620 HelsinkiP.O.Box 530FI-00101 Helsinki, FinlandTel. +358 30 395 5000Fax +358 30 395 5196
Lisää kuva napsauttamalla kuvaketta
Thank you!
Let's have a digitalized future!