SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES INSPECTION & TEST PLAN FOR ELECTRICALJob No. : 99012 Doc No. : INSP 99012 999 Page : 1/23 Rev. 4

8700 0004

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR ELECTRICAL

4 3 2 1 0 REV.

07/01/01 21/12/00 20/12/99 17/11/99 30/09/99 DATE

ISSUE OF APPROVED FINAL DOCUMENT ISSUE OF APPROVED FINAL DOCUMENT APPROVED FOR CONSTRUCTION APPROVED FOR CONSTRUCTION ISSUED FOR APPROVAL DESCRIPTION

M. G. KIM M. G. KIM M. G. KIM M. G. KIM M. G. KIM BY

S. Y. KIM S. Y. KIM S. Y. KIM S. Y. KIM S. Y. KIM REVIEWED

S. K. AN S. K. AN Y. H. KIM Y. H. KIM Y. H. KIM APPROVED

TOTAL SOUTH PARSSOUTH PARS FIELD DEVELOPMENT (PHASE TWO & THREE)

DOCUMENT TITLE

INSPECTION & TEST PLAN FOR ELECTRICALINSP 99012 999 8700 0004 DOCUMENT No. 4 REV IAFD STATUS NONE SCALE 2 CLASS 1/23 PAGE

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES INSPECTION & TEST PLAN FOR ELECTRICALJob No. : 99012 Doc No. : INSP 99012 999 Page : 2/23 Rev. 4

8700 0004

TABULATION OF REVISED PAGESPAGE

Rev.1

Rev.2 X X X

Rev.3 X X X X X X X X X X X X X X X X X X X X X

Rev.4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

X X

X X

X X X X X X X

X X

X

Rev.1 45 46 47 X 48 X 49 X 50 X 51 X 52 X 53 X 54 X 55 X 56 X 57 X 58 X 59 X 60 X 61 X 62 X 63 X 64 X 65 X 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIESPAGE

Rev.2 X X X X X

Rev.3

Rev.4

INSPECTION & TEST PLAN FOR ELECTRICAL

Job No. : 99012 Doc No. : INSP 99012 999

Page : 3/23 Rev. 4

8700 0004

CONTENTSA. EARTHING AND LIGHTNING INSTALLATION ---------------------------------------B. CABLE LADDER INSTALLATION --------------------------------------------------------C. CABLE INSTALLATION ---------------------------------------------------------------------D. EQUIPMENT INSTALLATION -------------------------------------------------------------E. LIGHTING AND SMALL POWER INSTALLATION ----------------------------------F. HEAT TRACING INSTALLATION --------------------------------------------------------G. CATHODIC PROTECTION INSTALLATION ------------------------------------------H. TELECOMMUNICATION INSTALLATION --------------------------------------------PAGE 4 PAGE 6 PAGE 8 PAGE 11 PAGE 18 PAGE 20 PAGE 22 PAGE 23

NOTE : COMPANY reserves the right to increase surveillance from SW to W and from W to H depending on results of site surveillance activities. COMPANY shall be notified of inspection points by CONTRACTOR at least 3 days in Advance of the Activity

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

:

DESCRIPTION OF WORK : Earthing and Lightning Installation

4 4 OF 23 REMARK

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY

A 1

EARTHING AND LIGHTNING INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Damage Review the Test Report Earthing Installation Cable Type/Size Location & Routing Bolts and Nuts Tighting Compression Type Connection RP 5561V 999 1620 001 Related DWG SP-COM-511 Related STD : IEC 364 CPX26 W W W W SW SW SW SW SW SW SW SW PP 99012 999 0001 550 RP 5561V 999 1630 029 QP 550 002 SW SW R SW SW R

1.1 1.2

1.3 2 2.1 2.2 2.3 2.4

LEGEND :

R : Review

SW : Spot Witness

W : Witness H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

:

DESCRIPTION OF WORK : Earthing and Lightning Installation

4 5 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

3

Test Continuity Test Earthing Resistance Test RP 5561V 999 1620 001 TPX26 W H SW W SW W

3.1 3.2

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

:

DESCRIPTION OF WORK : Cable Ladder Installation

4 6 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

B 1

CABLE LADDER INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Damage & Sharp Edge Review the Related Document Cable Ladder Installation Related DWG Proper Type / Size Cable Ladder Location / Routing Cable Ladder Damage, Sharp Edge, Burr RP 5561V 999 1630 007 RP 5561V 999 1620 001 W W W SW SW SW SW W SW CPX30 PP 99012 999 0001 550 Related DWG QP 550 002 SW SW R -

1.1 1.2 1.3 2 2.1 2.1 2.3 LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

:

DESCRIPTION OF WORK : Cable Ladder Installation

4 7 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

Support(Type/Size/Welding/Anchoring ) Coating(touch up paint) on cut end & damage Portions Earthing / Bonding Final Inspection 2.4 2.5 2.6 2.7 LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

W W W W

SW SW SW W

W W SW W

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

:

DESCRIPTION OF WORK : Cable Installation

4 8 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

C 1 1.1 1.2 1.3 2 2.1 2.2 2.3 2.4

CABLE INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Cable Damage Review the Related Test Record Cable Installation Cable Type / Size / Routing Cable Arrangement Cable Damage Cable Pulling Tension RP 5561V 999 1630 008 Related DWG RP 5561V 999 1630 007 CPX08 (HV cable) CPX09(LV power/control) W W W SW SW SW SW SW SW SW SW SW PP 99012 999 0001 550 RP 5561V 999 1630 029 QP 550 002 SW SW R SW -

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

:

DESCRIPTION OF WORK : Cable Installation

4 9 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

2.5

Cable Installation(In Cable Trenches) - Cable Trenches Preparation - Cable Segregation - Sand Bedding and Depth Cable Termination Crimping Lug or Plug Size / Bolting Cable Bending Radius Gland , Fitting ID Marker & Wire ID Marker Cable Splicing( If required )

RP 5561V 999 1630 029 W W W CPX08 (HV cable) CPX09(LV power/control) W SW SW W W SW

W W W W H

SW SW SW SW W

SW SW SW SW W

3 3.1 3.2 3.3 3.4 3.5

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

:

DESCRIPTION OF WORK : Cable Installation

4 10 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

4 4.1

Cable Test SP-COM-511 Above 1000V Cable - Continuity Test - Insulation Resistance Test - High-Voltage Test Up to 1000 V Cable - Continuity Test - Insulation Resistance Test TPX09 W H W W W W RP 5561V 999 1630 029 TPX08 H H H W H H W W H

4.2 L