    MINISTRY OF TRANSPORT AND COMMUNICATIONSDirectorate General of Roads and Land Transport

    Construction of Batinah Expressway Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 atBatinah Expressway

    Part B: Design and Construction of Interchange Nos. 4, 4A

    & 5 on Batinah Highway

    TENDER DOCUMENT

    VOLUME 3 of 4

    BILL OF QUANTITIES

  • 8/11/2019 electrical infrastructure

    3/200

    Construct ion of Batinah Expressway Package 7Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah ExpresswayPart B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah

    Highway

    TENDER DOCUMENTS

    INDEX

    Volume 1 of 4: Prime DocumentPart 1 TechnicalPart 2 Financial (To be returned in the envelope with theTender)

    Volume 2 of 4: Special Specification

    Volume 3 of 4: Bill of Quantities (To be returned in the envelope with theTender)

    Book 1 of 3Volume 4 of 4: Tender Drawings Part A

    Book 2 of 3

    Part B Book 3 of 3

  • 8/11/2019 electrical infrastructure

    4/200

    BILL OF QUANTITIES

    TABLE OF CONTENT

    Preamble to Bill of Quantities 1 -1

    Bill DESCRIPTION PAGESNo.1 Preliminaries 1/1 to 1/7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway

    2 Earthworks 2/1 to 2/6

    3 Granular Sub Base, Aggregate Base Course and 3/1

    Stabilized Base Courses

    4 Bituminous Pavement 4/1

    5 Concrete and Concrete Structures 5/1 to 5/13

    6 Incidental Construction 6/1 to 6/16

    7 Road Lighting and Electrical Installation 7/1 to 7/10

    9 Utilities 9/1 to 9/28

    11 Day works 11/1 to 11/13

    Grand Summary - 1 GS-1

    Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway

    2a Earthworks 2a/1 to 2a/6

    3a Granular Sub Base, Aggregate Base Course and 3a/1

    Stabilized Base Courses

    4a Bituminous Pavement 4a/3

    5a Concrete and Concrete Structures 5a/1 to 5a/13

    6a Incidental Construction 6a/1 to 6a/18

    7a Road Lighting and Electrical Installation 7a/1 to 7a/17

    9a Utilities 9a/1 to 9a/23

    10a Provisional Sum 10a/1

  • 8/11/2019 electrical infrastructure

    5/200

    Construction of Batinah Expressway Package 7Preamble to The Bill of Quantities

    Add the following to the 20.1.2 Quantities

    f) Amendment shall not be made to these Bills of Quantities without the authority, inwriting, of the Tender Board during the tender stage.

    g) The Contractor is to ensure that identical items occurring in separate bills are not pricedat different rates unless this is the Contractors deliberate intention.

    h) The prices and rates entered by the Contractor against items in the Bills of Quantitiesshall apply throughout the duration of the Contract to the execution of these items inany location and, except where otherwise provided for, to any additional work ordered

    by the Engineer and/or the Employer.

    i) A price or rate is to be entered against each item in the Bills of Quantities and the Daywork Schedules and any item left unpriced will be deemed to be included for elsewherein the Bills of Quantities for the Day work Schedules and hence the rate for that item willbe taken as NIL.

    j) According to the General Conditions of Contract the Engineer may, if in his opinion it is

    necessary or desirable, order in writing that any additional or substituted work shall beexecuted on a day work basis. The Contractor shall be paid for such work at the ratesentered by him in this list. The rates entered herein shall include and be consideredcompensation for the costs incurred for organization of work, overheads, profits, taxes,royalties, fees, payment to third parties for land or the use of land, or for damage toproperty, incidentals, haulage, tools and all other costs necessary for the performanceof the work on a day work basis.

    k) Rates quoted under Day Works Schedule would not be used for evaluating cost of any

    item of works not listed in the BOQ. The price payable for any new item of work

    instructed to be executed shall be reasonable and appropriate and shall be calculated

    on the following lines as may be applicable:

    (a) Price of comparable item in the Contract

    (b) Price quoted for similar works on other contracts

    (c) Price based upon Rate Analysis utilizing actual cost of materials, labour and

    equipment plus the profit margin

    (d) Based upon quotation from qualified sub-contractors in case the work is of such a

    nature that a sub-contractor has to be engaged plus the tendered margin.

    (e) Based upon rates approved for nominated sub-contractor plus the tendered margin

    Rates quoted under Day Works Schedule is meant to be utilized for executing anactivity of incidental nature and which is not susceptible to measurement Amount

  • 8/11/2019 electrical infrastructure

    6/200

    1/1 .

    Construction of Batinah Expressway - Package 7

    Page No.

    BILL OF QUANTITIES

    PRELIMINARIES (For Part A+ Part B) Bill No. 1

    (in figures) (in words) R.O. Bzs.

    1 PRELIMINARIES

    CONDITIONS OF CONTRACT

    The Contractor is deemed to have carefully studied

    and understood and taken into account the provisions

    and requirements of the General and Particular

    Conditions of Contract. The rates and prices stated in

    the Bill of Quantities shall include for all costs of

    com liance with the Conditions exce t for the costs

    Item No. Item Description UnitEstimated

    Quantity

    Unit Rate (Rial Omani) Amount

    of the items given in this Section 1 and for which a

    separate amount is stated herein.

    1 General

    1.3 Project Site

    1.3.5(i)a Soil Investigation and report LS

    1.3.5(i)b Confirmatory boreholes at location of Pier & Abutment nr. 12

    foundation of bridge, for a minimum depth of 20m or

    as directed by the Engineer

    Carried to Summary

  • 8/11/2019 electrical infrastructure

    7/200

    1/2 .

    Construction of Batinah Expressway - Package 7

    Page No.

    BILL OF QUANTITIES

    PRELIMINARIES (For Part A+ Part B) Bill No. 1

    (in figures) (in words) R.O. Bzs.Item No. Item Description Unit

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    1 PRELIMINARIES (Continued)

    1.4 Contractor's Site Facili ties

    1.4.3(i) Mobilization and demobilization of Contractor's site LS

    facilities

    1.4.3(ii) Maintenance of Contractor's site facilities month 30

    1.5 En ineer's Facilities

    1.5.13(i)a Provision of Engineer's Office as per Special month 33

    Specifications (1 unit x 33 months) type-1

    (RE + QS + AA)

    1.5.13(i)b Provision of Engineer's Office as per Special month 30

    Specifications (1 unit x 30 months) type-2

    1.5.13(ii)a Maintenance of Engineer's Office as per Special month 33

    Specifications (1 unit x 33 months) type-1

    1.5.13(ii)b Maintenance of Engineer's Office as per month 30

    Special Specifications (1 unit x 30 months) type-2

    Carried to Summary

  • 8/11/2019 electrical infrastructure

    8/200

    1/3 .

    Construction of Batinah Expressway - Package 7

    Page No.

    BILL OF QUANTITIES

    PRELIMINARIES (For Part A+ Part B) Bill No. 1

    (in figures) (in words) R.O. Bzs.Item No. Item Description Unit

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    1 PRELIMINARIES (Continued)

    1.5 Engineer's Facili ties (Continued)

    1.5.13(iii)a Provision of Surveying equipments for the Engineer month 30

    as per Specifications

    1.5.13(iii)b Provision of One 3D Laser Scanner Surveying Device month 30

    for Client including training

    1.5.13(iv) Maintenance of Surveying equipments for the Engineer month 30

    1.5.13(v)a Provision of Engineer's Accommodation as per month 33

    Special Specifications (1 unit x 33 months) type-1 (RE)

    1.5.13(v)b Provision of Engineer's Accommodation as per month 66

    Special Specifications (2 unit x 33 months) type-2 (QS)

    1.5.13(v)c Provision of Engineer's Accommodation as per month 120

    Special Specifications (4 unit x 30 months) type-2

    (CE, ME & UE,)

    1.5.13(v)d Provision of Engineer's Accommodation as per month 300

    Special Specifications (10 unit x 30 months) type-3

    (SI, MI, LS & AA)Carried to Summary

  • 8/11/2019 electrical infrastructure

    9/200

    1/4 .

    Construction of Batinah Expressway - Package 7

    Page No.

    BILL OF QUANTITIES

    PRELIMINARIES (For Part A+ Part B) Bill No. 1

    (in figures) (in words) R.O. Bzs.Item No. Item Description Unit

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    1 PRELIMINARIES (Continued)

    1.5 Engineer's Facili ties (Continued)

    1.5.13(v)e Provision of Engineer's Accommodation as per month 33

    Special Specifications (1 unit x 33 months) type-4

    1.5.13(vi)a Maintenance of Engineer's Accommodation as per month 33

    Special Specifications (1 unit x 33 months) type-1

    1.5.13(vi)b Maintenance of Engineer's Accommodation as per month 66

    Special Specifications (2 unit x 33 months) type-2

    1.5.13(vi)c Maintenance of Engineer's Accommodation as per month 120

    Special Specifications (4 unit x 30 months) type-2

    1.5.13(vi)d Maintenance of Engineer's Accommodation as per month 300

    Special Specifications (10 unit x 30 months) type-3

    1.5.13(vi)e Maintenance of Engineer's Accommodation as per month 33

    Special Specifications (1 unit x 33 months) type-4

    1.5.13(vii) Provision of Site Laboratory as detailed in the month 30

    Specifications

    Carried to Summary

  • 8/11/2019 electrical infrastructure

    10/200

    1/5 .

    Construction of Batinah Expressway - Package 7

    Page No.

    BILL OF QUANTITIES

    PRELIMINARIES (For Part A+ Part B) Bill No. 1

    (in figures) (in words) R.O. Bzs.Item No. Item Description Unit

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    1 PRELIMINARIES (Continued)

    1.5 Engineer's Facili ties (Continued)

    1.5.13(viii) Maintenance of Site Laboratory month 30

    1.7 Control of Traffic and Access

    1.7.6(i)a Maintenance and Protection of Traffic month 30

    1.10 Management Procedures

    1.10.6(i) Provision of 5 sets of photographs (294X210mm) month 30

    1.10.6(ii) Provision of two sets of Video recordings as month 30

    specified

    1.11 Submittals

    1.11.8(i) Provision of As-built drawings, record drawings, record LS

    specifications and miscellaneous records as specified

    Carried to Summary

  • 8/11/2019 electrical infrastructure

    11/200

    1/6 .

    Construction of Batinah Expressway - Package 7

    Page No.

    BILL OF QUANTITIES

    PRELIMINARIES (For Part A+ Part B) Bill No. 1

    (in figures) (in words) R.O. Bzs.Item No. Item Description Unit

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    1 PRELIMINARIES (Continued)

    1.14 Contractor's Temporary Works and Services

    1.14.8(i) Provision, erection, relocation, maintenance and nr. 2

    removal of project signboards (Alluminium)

    1.15 Commemorative Plaque and Opening

    Ceremon

    1.15.4(i) Supply and erection of commemorative plaque nr. 1

    1.15.4(ii) Opening ceremony including all facilities LS

    Carried to Summary

  • 8/11/2019 electrical infrastructure

    12/200

    1/7 .

    Construction of Batinah Expressway - Package 7

    Page No.

    BILL OF QUANTITIES

    PRELIMINARIES (For Part A+ Part B) Bill No. 1

    (in figures) (in words) R.O. Bzs.Item No. Item Description Unit

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    SUMMARY

    Page 1/1

    Page 1/2

    Page 1/3

    Page 1/4

    Page 1/5

    Page 1/6

    Carried to General Summary

  • 8/11/2019 electrical infrastructure

    13/200

    BILL OF QUANTITIES

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway

  • 8/11/2019 electrical infrastructure

    14/200

    2/1 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    EARTHWORKS Bill No. 2

    (in figures) (in words) R.O. Bzs.

    2 EARTHWORKS

    2.1 Clearing and Grubbing

    2.1.5(i) Clear site of all trees less than 300mm ,shrubs, sq.m. 1,050,000

    vegetation including roots as necessary to

    commence work

    2.1.5(ii)a Removal and delivery of trees of 300mm trunk nr. 50

    diameter or reater

    Item No.Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    2.1.5(ii)b Removal and disposal of trees of 300mm trunk nr. 50

    diameter or greater

    2.2 Removal of Structures and Obstructions

    2.2.5(i) Removal of existing building, single-storey area nr. 1

    500sq.m.

    2.2.5(ii) Removal of reinforced concrete (for box culverts) cu.m. 200

    2.2.5(iii) Removal of mass concrete (200mm thick) cu.m. 150

    Carried to Summary

  • 8/11/2019 electrical infrastructure

    15/200

    2/2 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    EARTHWORKS Bill No. 2

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    2 EARTHWORKS (Continued)

    2.2 Removal of Structures and Obstructions

    (Continued)

    2.2.5(v) Removal of Concrete Curbs lin.m. 1,000

    2.2.5(vi) Removal of interlocking tiles in sidewalks and median sq.m. 500

    2.2.5(vii) Removal of pipe culvert (900mm diameter) lin.m. 50

    2.2.5(viii) Removal and disposal of bituminous pavement cu.m. 18,500

    200mm max. thickness in carriageways and paved

    areas

    2.2.5(x) Removal of steel safety barrier including posts and lin.m. 1,500

    foundation

    2.2.5(xi) Removal of concrete barrier lin.m. 200

    Carried to Summary

  • 8/11/2019 electrical infrastructure

    16/200

    2/3 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    EARTHWORKS Bill No. 2

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    2 EARTHWORKS (Continued)

    2.2 Removal of Structures and Obstructions

    (Continued)

    2.2.5(xii) Removal of sign boards (single post) nr. 20

    2.2.5(xviii)a Removal of Mortared Riprap cu.m. 250

    2.2.5(xviii)b Removal of Gabion Boxes cu.m. 200

    2.2.5(xix) Removal and disposal of Existing Fence with gate lin.m. 50

    (up to 2m high)

    2.2.5(xx) Removal and disposal of Existing Masonry Wall cu.m. 50(Block Type, up to 2m high)

    2.2.5(xxvi)a Removal and delivery for re-use by others of Street nr. 10

    Light Pole, to the MRMWR stores or as directed

    by Engineer

    Carried to Summary

  • 8/11/2019 electrical infrastructure

    17/200

    2/4 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    EARTHWORKS Bill No. 2

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    2 EARTHWORKS (Continued)

    2.2 Removal of Structures and Obstructions

    (Continued)

    2.2.5(xxvi)b Removal and delivery for re-use by others of Flag Pole, nr. 10

    to the MRMWR stores or as directed by Engineer

    2.3 Roadway Excavation

    2.3.6(i) Unclassified excavation to Embankment & Dyke cu.m. 208,600

    2.3.6(iii) Unclassified Excavation under water cu.m. 1,000

    2.3.6(v) Leveling and Grading for Wadi Training Works cu.m. 329,800

    Carried to Summary

  • 8/11/2019 electrical infrastructure

    18/200

    2/5 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    EARTHWORKS Bill No. 2

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    2 EARTHWORKS (Continued)

    2.4 Borrow Materials

    2.4.6(i)a Borrow excavation to embankment & Dykes cu.m. 3,254,000

    2.6 Sub-grade Construction

    2.6.6 i Sub rade re aration in cut s .m. 352,580

    2.7 Excavation and Backfilling for st ructures

    2.7.6(i) Unclassified structural excavation cu.m. 9,305

    (depth 0m to 2.0m)

    2.7.6(ii) Unclassified structural excavation cu.m. 6,240

    (depth >2.0m to

  • 8/11/2019 electrical infrastructure

    19/200

    2/6 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    EARTHWORKS Bill No. 2

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    SUMMARY

    Page 2/1

    Page 2/2

    Page 2/3

    Page 2/4

    Page 2/5

    Carried to Grand Summary - 1

  • 8/11/2019 electrical infrastructure

    20/200

    3/1 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    GRANULAR SUB-BASE, AGREGATE BASE COURSE, AND STABILISED BASE COURSES Bill No. 3

    (in figures) (in words) R.O. Bzs.

    3 GRANULAR SUB-BASE, AGREGATE BASE

    COURSE AND STABILISED BASE COURSES

    3.2 Granular Sub-Base Course

    3.2.6(ii) Granular Sub-Base Course (Class B) cu.m. 546,400

    3.3 Aggregate Base Course

    3.3.6 i Crushed A re ate Base Course Class A cu.m. 268,800

    Item No.Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    Carried to Grand Summary - 1

  • 8/11/2019 electrical infrastructure

    21/200

    4/1 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    BITUMINOUS PAVEMENT Bill No. 4

    (in figures) (in words) R.O. Bzs.

    4 BITUMINOUS PAVEMENT

    4.2 Bituminous Materials for Prime Coat

    and Tack Coats

    4.2.8(i) Bituminous Prime Coat kg. 1,185,400

    4.2.8(ii) Bituminous Tack Coat kg. 882,200

    4.4 Bituminous Base Course

    Item No.Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    4.4.14(i) Bituminous Base Course cu.m. 120,500

    4.5 Bituminous Binder and Wearing Courses

    4.5.14(i) Bituminous Wearing Course cu.m. 59,650

    4.9 Pavement Repairs and Reinstatement

    4.9.10(i) Surface milling (up to 50mm thick) sq.m. 5,000

    4.12 Surface Ride ability Measurement

    4.12.10(i) International roughness index (IRI) for Asphalt lin.m. 235,000

    pavement

    Carried to Grand Summary - 1

  • 8/11/2019 electrical infrastructure

    22/200

    5/1 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    5 CONCRETE AND CONCRETE STRUCTURES

    5.1 Concrete Materials and Mixes

    5.1.7(i)a Unreinforced Concrete Class 16/20 for Bridges, cu.m. 3,195

    Retaining walls, Overpasses, Box Culverts and Drains

    5.1.7(i)b Reinforced Concrete Class 30/20 MS7 for rectangular cu.m. 1,500

    closed drains

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    . . c oncre e ass . n e n orce oncre e cu.m. ,Box Culvert including headwalls, wing walls, apron slabs

    and cut-off walls

    5.1.7(i)d Post-tensioned Concrete, Class 50/20 MS7 in Cast cu.m. 1,890

    in-situ Post-tensioned Box Girders including Integral

    Abutment, Hanging Back wall etc.for 12.26m deck width

    (For Interchange Bridge )

    5.1.7(i)e Reinforced Concrete, Class 45/20 MS7 in Bridge cu.m. 851

    abutment, abutment cap and its foundation, Wing wall

    etc. (For Interchange Bridge )

    5.1.7(i)f Concrete Class 45/20 MS7 in Pile Caps & Footings cu.m. 252

    (For Interchange Bridge)

    Carried to Collection Page - 1

  • 8/11/2019 electrical infrastructure

    23/200

    5/2 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    5 CONCRETE AND CONCRETE STRUCTURES

    (Continued)

    5.1 Concrete Materials and Mixes (Continued)

    5.1.7(i)g Concrete Class 45/20 MS7 in Pier Columns & cu.m. 120

    Pier Caps (For Interchange Bridge)

    5.1.7(i)h Concrete Class 40/20 MS7 in Approach Slabs including cu.m. 95

    all items as indicated on drawings

    (For Interchange Bridge)

    5.1.7(i)i GRP Cladding to cover space between superstructure sq.m. 11

    and Pier column (color to match with Pier)

    5.2 Reinforcing Steel

    5.2.6(ii)a High tensile steel bar reinforcement, Grade 500, Type 2, t. 798

    of any diameter for Interchange bridges

    5.2.6(ii)b High tensile steel bar reinforcement of any diameter for t. 3,980

    Retaining wall, Box culverts, Underpass and Drains

    5.2.6(iii) Fabric wire mesh reinforcement of any size t. 5

    Carried to Collection Page - 1

  • 8/11/2019 electrical infrastructure

    24/200

    5/3 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    5 CONCRETE AND CONCRETE STRUCTURES

    (Continued)

    5.4 Prestressed Concrete Structures

    5.4.6(i) Prestressing Cables - 0.6" Diameter Strands Grade 270 t. 95

    5.10 Waterproof ing for Structures

    5.10.6(i) Bitumen Water Proofing Paint for surfaces in contact sq.m. 35,500

    w t eart n u verts an oncrete ra ns

    5.10.6(ii) Waterproofing Membrane including Protection board sq.m. 914

    for Bridge Abutments, Pier and Pier Footing, Hanging

    Back Wall etc.

    5.10.7.7(i) Waterproofing for Bridge Decks sq.m. 2,069

    (isocyanite amine based)

    5.12 Load Testing of Bridges

    5.12.7(i)a Bridge Loading Test - Testing by Static Load nr. 2

    5.12.7(i)b Bridge Loading Test - Testing by Moving Load nr. 2

    Carried to Collection Page - 1

  • 8/11/2019 electrical infrastructure

    25/200

    5/4 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    6 STRUCTURAL STEEL AND OTHER METALWORK

    6.6(i) Metal Access door for box girder bridges nr. 8

    Carried to Collection Page - 1

  • 8/11/2019 electrical infrastructure

    26/200

    5/5 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    8 DRAINAGE

    8.1 Pipe Culverts

    8.1.6(ii) Reinforced Precast Concrete Pipe Culvert lin.m. 200

    (diameter 1000mm)

    8.2 Storm Sewers

    8.2.6(i)a Storm Sewer, HDPE Pipe (diameter 300mm) lin.m. 50

    8.2.6(i)b Storm Sewer, HDPE Pipe (diameter 400mm) lin.m. 200

    8.2.6(i)c Storm Sewer, HDPE Pipe (diameter 500mm) lin.m. 50

    8.2.6(i)d Storm Sewer, HDPE Pipe (diameter 600mm) lin.m. 6,000

    8.2.6(i)e Storm Sewer, HDPE Pipe (diameter 900mm) lin.m. 50

    8.2.6(i)f Storm Sewer, HDPE Pipe (diameter 1000mm) lin.m. 50

    Carried to Collection Page - 1

  • 8/11/2019 electrical infrastructure

    27/200

    5/6 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    8 DRAINAGE (Continued)

    8.2 Storm Sewers (Continued)

    8.2.6(i)g Storm Sewer, RC Pipe (diameter 300mm) lin.m. 50

    8.2.6(i)h Storm Sewer, RC Pipe (diameter 400mm) lin.m. 50

    . . orm ewer, pe ame er mm n.m.

    8.2.6(i)j Storm Sewer, RC Pipe (diameter 600mm) lin.m. 50

    8.2.6(i)k Storm Sewer, RC Pipe (diameter 900mm) lin.m. 50

    8.2.6(i)l Storm Sewer, RC Pipe (diameter 1000mm) lin.m. 450

    8.3 Manholes Inlets and Chambers

    8.3.6(ii)a Grated Inlet (600mm x 600mm) with DI grating and nr. 20

    Locked frame

    Carried to Collection Page - 1

  • 8/11/2019 electrical infrastructure

    28/200

    5/7 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    8 DRAINAGE (Continued)

    8.3 Manholes Inlets and Chambers (Continued)

    8.3.6(ii)b Grated Inlet (1000mm x 1000mm) with DI grating and nr. 198

    Locked frame

    8.3.6(ii)c DI grating (1000mm x 1000mm) and Locked frame at nr. 32

    Culvert for Median Drainage as shown on Dwg.

    (on the top of box culvert)

    8.3.6(iii) Curb Inlet (600mm x 600mm) as shown on Dwg. nr. 84

    8.4 Drainage of Structures

    8.4.6(ii)a Drainage pipe, 100mm uPVC in structure lin.m. 350

    8.4.6(ii)b Drainage pipe, 200mm uPVC in structure lin.m. 200

    8.4.6(ii)c 150 mm Dia. uPVC perforated pipe wrapped in lin.m. 300

    Geotextile

    8.4.6(iii) Permeable backing including Geotextile Membrane cu.m. 11,500

    8.4.6(iv) Granular backfill cu.m. 3,560

    Carried to Collection Page - 1

  • 8/11/2019 electrical infrastructure

    29/200

    5/8 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    10 PILING

    10.1 Piling General

    10.1.6(i) Setting up at each 750mm diameter pile location nr. 90

    10.1.6(ii)a Piling - Cast in place, 750mm diameter for Pier lin.m. 504

    Foundation including reinforcement in piles (Boring piles)

    . . ng - as n p ace, mm ame er or n egra n.m. ,

    Abutment or Abutment Foundation including

    reinforcement in piles (Boring piles)

    10.2 Pile Testing

    10.2.6(i) Static Load Testing of 750mm diameter expendable nr. 2

    piles (including all materials)

    10.2.6(ii) Static Load Testing of 750mm diameter working piles nr. 2

    10.2.6(iii) Non-destructive Integrity Test as per the Specifications. nr. 90

    Carried to Collection Page - 1

  • 8/11/2019 electrical infrastructure

    30/200

    5/9 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    11 BRIDGE ACCESSORIES

    11.3 Bearings General

    11.3.6(i)a Pot Bearing, (V= 16,000kN - 18,000kN & nr. 2

    H =2,000kN - 4,000kN) , Fixed type including supply &

    installation

    11.3.6(i)b Pot Bearing, (V= 14,000kN - 16,000kN & nr. 2

    H =2,000kN - 4,000kN), Guided type including supply &

    ns a a on

    11.3.6(i)c Pot Bearing, (V= 4,000kN - 6,500kN & nr. 4

    H =500kN - 1,500kN), Guided type including supply &

    installation

    11.3.6(i)d Pot Bearing, (V= 2,000kN - 4,000kN), nr. 4

    Free type including supply & installation

    11.3.6(i)e Pot Bearing, (V= 4,000kN - 6,000kN ), nr. 4

    Free type including supply & installation

    Carried to Collection Page - 2

  • 8/11/2019 electrical infrastructure

    31/200

    5/10 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    11 BRIDGE ACCESSORIES (Continued)

    11.4 Bridge Expansion Joint

    11.4.6(vii) Provide Strip Seal Type Expansion Joint lin.m. 30

    (Max. Opening = 60mm & Max. Closing = 30mm)

    11.6 Bridge Parapets and Railings

    11.6.6(i) Concrete Barrier for Bridge Parapet as shown on Dwg. lin.m. 410

    Carried to Collection Page - 2

  • 8/11/2019 electrical infrastructure

    32/200

    5/11 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    COLLECTION PAGE - 1

    Page 5/1

    Page 5/2

    Page 5/3

    Page 5/4

    Page 5/5

    Page 5/6

    Page 5/7

    Page 5/8

    Carried to Summary

    C i f B i h E P k 7

  • 8/11/2019 electrical infrastructure

    33/200

    5/12 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    COLLECTION PAGE - 2

    Page 5/9

    Page 5/10

    Carried to Summary

    C t ti f B ti h E P k 7

  • 8/11/2019 electrical infrastructure

    34/200

    5/13 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    CONCRETE AND CONCRETE STRUCTURES Bill No. 5

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) Amount

    Item No. Item Description UnitEstimated

    Quantity

    SUMMARY

    COLLECTION PAGE 1 - 5/11

    COLLECTION PAGE 2 - 5/12

    Carried to Grand Summary - 1

    Construction of Batinah Expressway Package 7

  • 8/11/2019 electrical infrastructure

    35/200

    6/1 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.

    9 SLOPE PROTECTION AND STABILIZATION

    9.1 Riprap

    9.1.6(i) Loose Stone Riprap (Class B) of varying thickness cu.m. 2,000

    for Dyke and slope protection as shown in the Dwg.

    9.1.6(ii)a Mortared Stone Riprap (Class A, Varying Thickness) cu.m. 220,000

    for Slope Protection and Floodways including Stubs

    as per dwg.

    Item No.Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    9.1.6(ii)b Mortared Stone Riprap (Class A) for Culvert inlet cu.m. 11,000

    & outlet

    9.1.6(ii)c Mortared Stone Riprap (Class A) for Dyke as shown cu.m. 550

    on dwg.

    9.1.6(iv) Geotextile Fabric Filter sq.m. 2,250

    9.2 Gabions

    9.2.6(i) Gabion lining of varying thickness for wadi bed, slope cu.m. 42,000

    protection, culvert inlet, outlet protection and

    Floodways as per Dwg.

    Carried to Collection Page - 1

    Construction of Batinah Expressway - Package 7

  • 8/11/2019 electrical infrastructure

    36/200

    6/2 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    9 SLOPE PROTECTION AND STABILIZATION

    (Continued)

    9.9 Ditch Lining

    9.9.6(i)a Concrete Ditch Lining (100mm Thick) with wire mesh sq.m. 200

    (10mm dia @200mm c/c both ways)

    9.9.6(i)b Reinforced Concrete Chute 100mm thick with wire mesh lin.m. 200

    (10mm dia @150mm c/c both ways) as per Dwg.

    9.9.6(ii) Grouted Stone Ditch lining (200mm thick) sq.m. 10,620

    9.12 Mechanically Stabilized Earth Retaining Walls

    9.12.7(i) Mechanically Stabilized Earth Retaining Walls sq.m. 1,200

    (MSERWs)

    9.12.7(ii) Standard Coping for MSERWs lin.m. 80

    9.12.7(iii) Concrete Barrier Parapet on MSERWs lin.m. 100

    Carried to Collection Page - 1

    Construction of Batinah Expressway - Package 7

  • 8/11/2019 electrical infrastructure

    37/200

    6/3 .

    Construction of Batinah Expressway Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    12 SIDEWALKS, PAVED AREAS AND CURBS

    12.1 Sidewalks, Paved areas and Curbs

    12.1.7(ii)a Paving, concrete interlocking blocks 60mm thick sq.m. 35,200

    for side walks and median

    12.1.7(ii)b Paving, concrete interlocking blocks 80mm thick sq.m. 1,000

    for Car parking

    12.1.7(v)a Precast Non-Mountable Concrete Curb Type ''A'' lin.m. 18,500

    12.1.7(v)b Precast Mountable curb Type ''B'' lin.m. 1,200

    12.1.7(v)c Precast flush curb Type ''D'' lin.m. 1,500

    12.1.7(v)d Precast concrete edge curb Type ''E'' lin.m. 15,500

    Carried to Collection Page - 1

    Construction of Batinah Expressway - Package 7

  • 8/11/2019 electrical infrastructure

    38/200

    6/4 .

    Construction of Batinah Expressway Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) Amount

    Item Description Unit

    13 SAFETY BARRIERS AND FENCES

    13.1 Roadside Barriers

    13.1.7(i) W-Beam Guardrail (Strong post) including lin.m. 131,700

    W150 x 13.5 Steel post, reflectors, accessories

    and foundations

    13.1.7(iii)a End anchorage for approach including post, reflectors, nr. 52

    accessories and foundations

    13.1.7(iii)b End anchorage for approach nr. 12

    (Guard Rail-Concrete Barrier transition)

    13.1.7(iii)c W-Beam Guardrail connection with Concrete barrier nr. 12

    as indicated in the Drawing

    13.1.7(iii)d W-Beam Guardrail Terminal section for Departure end nr. 52

    including post, reflectors, accessories and foundations

    13.1.7(vii)a Precast Concrete barrier, Single face as shown lin.m. 4,500

    in the Dwg.

    13.1.7(vii)b Heavy Duty Concrete barrier, Single face as shown lin.m. 180

    in the Dwg.

    Carried to Collection Page - 1

    Construction of Batinah Expressway - Package 7

  • 8/11/2019 electrical infrastructure

    39/200

    6/5 .

    p y g

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    13 SAFETY BARRIERS AND FENCES (Cont inued)

    13.1 Roadside Barriers (Continued)

    13.1.7(ix) Concrete barrier, transition section lin.m. 600

    13.1.7(x) Impact attenuator, Quad Beam type, with expandable nr. 2

    modules/cartridges, including new foundation, slab

    with reflective studs and connection to the concrete

    13.4 Delineators

    13.4.6(i)a Floodway markers, painted white & red as shown on nr. 25

    Dwg. Including anchor bolt

    13.4.6(i)b Floodway water depth guage as shown on Dwg. nr. 8

    Including anchor bolt

    Carried to Collection Page - 1

    Construction of Batinah Expressway - Package 7

  • 8/11/2019 electrical infrastructure

    40/200

    6/6 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    14 TRAFFIC SIGNS AND ROAD MARKINGS

    14.1 Traffic Signs

    14.1.7(i)a Highway sign, Triangular Side (750mm) nr. 15

    14.1.7(i)b Highway sign, Triangular Side (900mm) nr. 33

    . . c g way s gn, r angu ar e mm nr.

    14.1.7(i)d Highway sign, Triangular Side (1500mm) nr. 2

    14.1.7(ii)a Highway sign, Circular (Diameter 750mm) nr. 47

    14.1.7(ii)b Highway sign, Circular (Diameter 900mm) nr. 10

    14.1.7(ii)c Highway sign, Circular (Diameter 1200mm) nr. 2

    Carried to Collection Page - 1

    Construction of Batinah Expressway - Package 7

  • 8/11/2019 electrical infrastructure

    41/200

    6/7 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    14 TRAFFIC SIGNS AND ROAD MARKINGS

    (Continued)

    14.1 Traffic Signs (Continued)

    14.1.7(iii)a Chevron Signs, rectangular [2100 mm x 600 mm] sq.m. 10

    14.1.7(iii)b Chevron Signs, rectangular [2400 mm x 600 mm] sq.m. 10

    14.1.7(iii)c Chevron Signs, rectangular [380 mm x 600 mm] sq.m. 50

    14.1.7(iii)d Highway Signs, rectangular [750x1400] sq.m. 10

    14.1.7(iii)e Highway Signs, rectangular [600x800] sq.m. 5

    14.1.7(iii)f Supplementary plate, rectangular [1200 mm x 700 mm] sq.m. 5

    14.1.7(iii)g Supplementary plate, rectangular [1500 mm x 700 mm] sq.m. 5

    Carried to Collection Page - 1

    6/8

    Construction of Batinah Expressway - Package 7

  • 8/11/2019 electrical infrastructure

    42/200

    6/8 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    14 TRAFFIC SIGNS AND ROAD MARKINGS

    (Continued)

    14.1 Traffic Signs (Continued)

    14.1.7(iii)h Rectangular or Polygonal Sign Face (Area 1-2 sq m) sq.m. 20

    14.1.7(iii)i Rectangular or Polygonal Sign Face (Area 2-4 sq m) sq.m. 40

    14.1.7(iii)j Rectangular Sign Face (Area 4-6 sq m) sq.m. 50

    Carried to Collection Page - 1

    6/9

    Construction of Batinah Expressway - Package 7

    P t A Li k R d 2 4 4A d I t h N 2 t B ti h E P N

  • 8/11/2019 electrical infrastructure

    43/200

    6/9 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    14 TRAFFIC SIGNS AND ROAD MARKINGS

    (Continued)

    14.1 Traffic Signs (Continued)

    14.1.7(iv) Octagonal Road signs (Height 900mm) nr. 8

    14.1.7(v)a Sign post support assembly G.I pipe 100mm Dia. nr. 121

    Including foundation and painting of post

    14.1.7(v)b Multi-post Sign Support Assembly, Type PI posts, nr. 22

    complete including foundation, painting

    (black and white) etc.

    14.1.7(v)c Multi-post Sign Support Assembly, Type PII posts, nr. 4

    complete including foundation, painting

    (black and white) etc.

    14.1.7(v)d Multi-post Sign Support Assembly, Type PIII posts, nr. 8

    complete including foundation, painting

    (black and white) etc.

    14.1.7(v)e Multi-post Sign Support Assembly, Type PIV posts, nr. 4

    complete including foundation, painting

    (black and white) etc.

    Carried to Collection Page - 2

    6/10

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2 4 4A and Interchange No 2 at Batinah Expressway Page No

  • 8/11/2019 electrical infrastructure

    44/200

    6/10 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    14 TRAFFIC SIGNS AND ROAD MARKINGS

    (Continued)

    14.2 Road Markings

    14.2.6(i)a Traffic Lines, Type L1/2(120) White sq.m. 5,500

    (Mechanical application)

    14.2.6(i)b Traffic Lines, Type L1/3(120) White sq.m. 300

    (Mechanical application)

    14.2.6(i)c Traffic Lines, Type L2A(120) White sq.m. 900

    (Mechanical application)

    14.2.6(i)d Traffic Lines, Type L2/1(120) White sq.m. 4,000

    (Mechanical application)

    14.2.6(i)e Traffic Lines, Type L2/2(120) White sq.m. 600

    (Mechanical application)

    14.2.6(i)f Traffic Lines, Type L4/1(150) Yellow sq.m. 100

    (Mechanical application)

    14.2.6(i)g Traffic Lines, Type L4/2(120) Yellow sq.m. 28,500

    (Mechanical application)

    Carried to Collection Page - 2

    6/11

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2 4 4A and Interchange No 2 at Batinah Expressway Page No

  • 8/11/2019 electrical infrastructure

    45/200

    6/11 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    14 TRAFFIC SIGNS AND ROAD MARKINGS

    (Continued)

    14.2 Road Markings (Continued)

    14.2.6(i)h Traffic Lines, Type L5/1(150) White sq.m. 50

    (Mechanical application)

    14.2.6(i)i Traffic Lines, Type L5/2(120) White sq.m. 900

    (Mechanical application)

    14.2.6(i)j Traffic Lines, Type L7(400) White sq.m. 50

    (Mechanical application)

    14.2.6(i)k Traffic Lines, Type L8(200) White sq.m. 300

    (Mechanical application)

    14.2.6(iii)a Special Marking , Pedestrian Crossing sq.m. 1,200

    14.2.6(iii)b Special Marking , Chevrons Marking S9 sq.m. 2,200

    14.2.6(iii)c Special Marking , Lane Selection Arrow White (S3/1) sq.m. 120

    Carried to Collection Page - 2

    6/12 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2 4 4A and Interchange No 2 at Batinah Expressway Page No

  • 8/11/2019 electrical infrastructure

    46/200

    6/12 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    14 TRAFFIC SIGNS AND ROAD MARKINGS

    (Continued)

    14.2 Road Markings (Continued)

    14.2.6(iii)d Special Marking , Lane Selection Arrow White (S4/1) sq.m. 120

    14.2.6(iii)e Special Marking , Lane Selection Arrow White (S5/1) sq.m. 120

    14.2.6(iii)f Special Marking , Lane Selection Arrow White (S7/1) sq.m. 120

    14.2.6(iii)g Special Marking , Lane Selection Arrow White (S8/1) sq.m. 120

    14.2.6(iv) Curb painting sq.m. 11,010

    Carried to Collection Page - 2

    6/13 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2 4 4A and Interchange No 2 at Batinah Expressway Page No

  • 8/11/2019 electrical infrastructure

    47/200

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    14 TRAFFIC SIGNS AND ROAD MARKINGS

    (Continued)

    14.3 Road Studs

    14.3.6(i)a Reflecting Road Studs (Double face, Red color) nr. 1,200

    14.3.6(i)b Reflecting Road Studs (Single face, Red color) nr. 7,800

    14.3.6(i)c Reflecting Road Studs (Single face, White color) nr. 3,800

    14.3.6(iii) Provide removable bollards in the median opening nr. 30

    and one fixed bollard at each ends as shown in

    the Dwg. for R.O.P. including chain and lock

    Carried to Collection Page - 2

    6/14 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

  • 8/11/2019 electrical infrastructure

    48/200

    , , g p y g

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    COLLECTION PAGE - 1

    Page 6/1

    Page 6/2

    Page 6/3

    Page 6/4

    Page 6/5

    Page 6/6

    Page 6/7

    Page 6/8

    Carried to Summary

    6/15 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

  • 8/11/2019 electrical infrastructure

    49/200

    g p y g

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    COLLECTION PAGE - 2

    Page 6/9

    Page 6/10

    Page 6/11

    Page 6/12

    Page 6/13

    Carried to Summary

    6/16 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

  • 8/11/2019 electrical infrastructure

    50/200

    BILL OF QUANTITIES

    INCIDENTAL CONSTRUCTION Bill No. 6

    (in figures) (in words) R.O. Bzs.Item No.

    Estimated

    Quantity

    Unit Rate (Rial Omani) AmountItem Description Unit

    SUMMARY

    COLLECTION PAGE 1 - 6/14

    COLLECTION PAGE 2 - 6/15

    Carried to Grand Summary - 1

    7/1 .

    Construct ion of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

  • 8/11/2019 electrical infrastructure

    51/200

    BILL OF QUANTITIES

    ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

    (in figures) (in words) R.O. Bzs.

    15 ROAD LIGHTING AND ELECTRICAL

    INSTALLATION

    15.1 General

    15.1.20(i) Power Supply connection to the feeder pillar nr. 53

    15.1.20(ii) Spare Parts (5%) as per the approved list LS

    Unit Rate (Rial Omani) AmountItem No. Item Description Unit

    Estimated

    Quantity

    15.3 Package Sub-stations

    15.3.6(i)a Supply and installation of Electrical Sub-station with nr. 1

    1Nr RMU,1Nr 500 KVA Transformer and 800 A feeder

    pillar, including building, cable terminations, testing,

    commissioning and all civil works and other

    accessories necessary to complete the system

    functional

    15.3.6(i)b Supply and installation of Electrical Sub-station with nr. 1

    1Nr RMU, 1Nr OLU, 1Nr 500 KVA Transformer and

    800 A feeder pillar, including building, cable

    terminations, testing, commissioning and all civil works

    and other accessories necessary to complete the

    system functional

    Carried to Summary

    7/2 .

    Construct ion of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

  • 8/11/2019 electrical infrastructure

    52/200

    BILL OF QUANTITIES

    ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) AmountItem No. Item Description Unit

    Estimated

    Quantity

    15 ROAD LIGHTING AND ELECTRICAL

    INSTALLATION (Continued)

    15.5 33kV and 11kV Pole Mounted TransformerSub-stations

    15.5.6(ii)a Supply and installation of 11kV pole mounted nr. 12

    transformer sub-station, 100KVA with 1 way LV panel

    including H-pole transformer mounting structure,

    earthin , connections and other accessories

    necessary to complete the system functional

    15.5.6(ii)b Supply and installation of 11kV pole mounted nr. 1

    transformer sub-station, 100KVA with 2 way LV panel

    including H-pole transformer mounting structure,

    earthing, connections and other accessories

    necessary to complete the system functional

    15.5.6(ii)c Supply and installation of 11kV pole mounted nr. 1

    transformer sub-station, 200KVA with 2 way LV panel

    including H-pole transformer mounting structure,

    earthing, connections and other accessories

    necessary to complete the system functional

    Carried to Summary

    7/3 .

    Construct ion of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

  • 8/11/2019 electrical infrastructure

    53/200

    BILL OF QUANTITIES

    ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) AmountItem No. Item Description Unit

    Estimated

    Quantity

    15 ROAD LIGHTING AND ELECTRICAL

    INSTALLATION (Continued)

    15.5 33kV and 11kV Pole Mounted TransformerSub-Stations (Continued)

    15.5.6(ii)d Supply and installation of 11kV pole mounted nr. 1

    transformer sub-station, 200KVA with 1 way LV panel

    including H-pole transformer mounting structure,

    earthin , connections and other accessories

    necessary to complete the system functional

    15.6 Feeder Pillars

    15.6.6(i)a Supply and install Mini Feeder Pillars, 400 A, 4way nr. 2

    15.6.6(i)b Supply and install Street Lighting Feeder Pillars, 100 A nr. 51

    Carried to Summary

    7/4 .

    Construct ion of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

  • 8/11/2019 electrical infrastructure

    54/200

    BILL OF QUANTITIES

    ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) AmountItem No. Item Description Unit

    Estimated

    Quantity

    15 ROAD LIGHTING AND ELECTRICAL

    INSTALLATION (Continued)

    15.7 Electrical Cables

    Supply 4-Core cabling, copper conductor,

    XLPE insulated, Steel Wire armoured,

    PVC sheathed, 600/1000V rating, as fo llows:

    15.7.6 i a Nominal Conductor Area 25mm2 lin.m. 84,000

    15.7.6(i)b Nominal Conductor Area 95mm2 lin.m. 4,500

    15.7.6(i)c Nominal Conductor Area 120mm2 lin.m. 2,500

    15.7.6(i)d Nominal Conductor Area 240mm2 lin.m. 1,000

    15.7.6(ii)a Termination on 25mm2 cabling nr. 115

    Carried to Summary

    7/5 .

    Construct ion of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

  • 8/11/2019 electrical infrastructure

    55/200

    BILL OF QUANTITIES

    ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) AmountItem No. Item Description Unit

    Estimated

    Quantity

    15 ROAD LIGHTING AND ELECTRICAL

    INSTALLATION (Continued)

    15.7 Electrical Cables (Continued)

    15.7.6(ii)b Termination on 95mm2 cabling nr. 30

    15.7.6(ii)c Termination on 120mm2 cabling nr. 150

    15.7.6(ii)d Termination on 240mm2 cabling nr. 10

    15.8 Road Light ing Masts, Columns and Luminaries

    15.8.6(i) Supply, install and commission Galvanized steel nr. 20

    lighting column polygon (Mid hinged Type) 25m high

    mast with 4 x 600 Watt HPSV luminaries fixed on

    bracket complete with fused cut out, control gear,

    wiring, connection etc

    Carried to Summary

    7/6 .

    Construct ion of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

  • 8/11/2019 electrical infrastructure

    56/200

    BILL OF QUANTITIES

    ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) AmountItem No. Item Description Unit

    Estimated

    Quantity

    15 ROAD LIGHTING AND ELECTRICAL

    INSTALLATION (Continued)

    15.8 Road Light ing Masts, Columns and Luminaries(Continued)

    15.8.6(ii)a Supply, install and commission Galvanized steel nr. 1,354

    lighting column polygon (Mid hinged Type) 14m high

    pole/column with 1 x 400 Watt HPSV luminaries

    fixed on bracket com lete with fused cut out,

    control gear, wiring, connection etc

    15.8.6(ii)b Supply, install and commission Galvanized steel nr. 676

    lighting column polygon (Mid hinged Type) 14m high

    pole/column with 2 x 400 Watt HPSV luminaries on

    bracket complete with fused cut out, control gear,

    wiring, connection etc

    15.8.6(iii) Column / high mast testing LS

    Carried to Summary

    7/7 .

    Construct ion of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

  • 8/11/2019 electrical infrastructure

    57/200

    BILL OF QUANTITIES

    ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) AmountItem No. Item Description Unit

    Estimated

    Quantity

    15 ROAD LIGHTING AND ELECTRICAL

    INSTALLATION (Continued)

    15.10 Under Bridge Light ing

    15.10.6(i) Under bridge surface mounted lighting including nr. 32

    Conduits, Cables, 150W High Pressure Sodium

    Lanterns, Junction Boxes, including Supply,

    Installation, Testing and Putting into service complete

    15.15 Earth ing

    15.15.7(i) Supply and install Twin rod earthing installation at nr. 53

    street lighting feeder pillars

    15.15.7(ii) Supply and install Single rod earthing installation nr. 150

    at the end of street lighting circuits

    15.17 Civil Works for Electri cal Installations

    15.17.6(vi)a Supply and install Pre-cast concrete foundation for nr. 2

    mini feeder pillars as per Dwg. including Bolts and

    any other accessories required for installation.

    Carried to Summary

    7/8 .

    Construct ion of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

  • 8/11/2019 electrical infrastructure

    58/200

    ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) AmountItem No. Item Description Unit

    Estimated

    Quantity

    15 ROAD LIGHTING AND ELECTRICAL

    INSTALLATION (Continued)

    15.17 Civil Works for Electri cal Installations(Continued)

    15.17.6(vi)b Supply and install Pre-cast concrete foundation for nr. 51

    street lighting feeder pillars as per Dwg. including

    Bolts and any other accessories required for

    installation.

    15.17.6(vii)a Trench for low voltage cable for one cable lin.m. 84,000

    15.17.6(vii)b Trench for low voltage cable for two cable lin.m. 4,500

    15.17.6(vii)c Trench for low voltage cable for three cable lin.m. 3,500

    15.17.6(ix) Supply and install Precast Concrete Foundation for nr. 2,030

    columns 14m high pole/column as per Dwg. including

    Base plate, Bolts, Hexagonal nuts, washers,

    uPVC ducts and any other accessories required

    for installation

    Carried to Summary

    7/9 .

    Construct ion of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

  • 8/11/2019 electrical infrastructure

    59/200

    ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) AmountItem No. Item Description Unit

    Estimated

    Quantity

    15 ROAD LIGHTING AND ELECTRICAL

    INSTALLATION (Continued)

    15.17 Civil Works for Electrical Installations(Continued)

    15.17.6(x) Supply and install Precast Concrete Foundation for nr. 20

    25m high mast as per Dwg. including Base plate,

    Bolts, Hexagonal nuts, washers, uPVC ducts and

    an other accessories re uired for installation

    Road Crossing Ducts

    15.17.6(xii)a 2Way 100 mm Upvc duct for street lighting with lin.m. 2,250

    concrete encasement

    15.17.6(xii)b 2Way 150 mm Upvc duct for 11kv cables for street lin.m. 1,600

    lighting with concrete encasement

    15.17.6(xii)c 4Way 100 mm Upvc duct for street lighting with lin.m. 1,600

    concrete encasement

    15.17.6(xii)d 6Way 150 mm Upvc duct for street lighting with lin.m. 500

    concrete encasement

    Carried to Summary

    7/10 .

    Construct ion of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

  • 8/11/2019 electrical infrastructure

    60/200

    ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

    (in figures) (in words) R.O. Bzs.

    Unit Rate (Rial Omani) AmountItem No. Item Description Unit

    Estimated

    Quantity

    SUMMARY

    Page 7/1

    Page 7/2

    Page 7/3

    Page 7/4

    Page 7/5

    Page 7/6

    Page 7/7

    Page 7/8

    Page 7/9

    Carried to Grand Summary - 1

    9/1 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill N 9

  • 8/11/2019 electrical infrastructure

    61/200

    UTILITIES Bill No. 9

    (in figures) (in words) R.O. Bzs.

    18 UTILITIES

    18.1 Locating and Protecting Existing Utilit ies

    Water Utility

    18.1.6(i)a Concrete protection slab for existing water lines/ducts lin.m. 100

    300 mm dia (Class 25/20)

    Gas Line Utility

    ''

    Unit Rate (Rial Omani) AmountItem No. Item Description Unit EstimatedQuantity

    . . . .

    excavation, backfilling, concreting (Class 35/20),reinforcement etc as per drawings but excluding any

    roadway related items over the culvert, as per OGC

    specification and requirements

    18.1.6(i)c Utility culvert for protection of 16'' Gas line including lin.m. 145

    excavation, backfilling, concreting (Class 35/20),

    reinforcement etc as per drawings but excluding any

    roadway related items over the culvert, as per OGCspecification and requirements

    Carried to Collection Page - 1

    9/2 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No 9

  • 8/11/2019 electrical infrastructure

    62/200

    UTILITIES Bill No. 9

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.1 Locating and Protecting Exist ing Utili ties (Continued)

    Oil Line Utility

    18.1.6(i)d Utility culvert for protection for 24'' oil line including lin.m. 75

    excavation, backfilling, concreting (Class 35/20),

    reinforcement etc as per drawings but excluding

    embankment for roadway over the culvert as per

    ORPC (Oman Refineries & Petroleum Chemicals)

    Electrical Utility

    18.1.6(i)e Supply and Install proposed 2way 200mm dia Upvc lin.m. 110

    and 2way 50mm Split duct to protect the existing

    underground 33kv electrical cables complete with

    concrete protection (class 25/20) including excavation,

    backfilling, compaction, end caps, draw ropes and

    duct markers etc. at locations shown in the drawingsor as directed by the Engineer

    Carried to Collection Page - 1

    9/3 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No 9

  • 8/11/2019 electrical infrastructure

    63/200

    UTILITIES Bill No. 9

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.1 Locating and Protecting Exist ing Utili ties (Continued)

    18.1.6(i)f Supply and Install proposed 2way 150mm and 2way lin.m. 50

    50mm dia uPVC Split duct to protect the existing

    underground 11kv electrical cables complete with

    concrete protection (class 25/20) including excavation,

    backfilling, compaction, end caps, draw ropes and

    duct markers etc. at locations shown in the drawings

    or as directed by the Engineer

    Telephone Utili ty

    18.1.6(i)g Supply and install 4way 100mm dia Upvc Split duct lin.m. 60

    to protect existing Omantel / Nawras / MOD cables

    complete with concrete protection (class 25/20)

    including excavation, backfilling, duct marker and

    compaction etc. at locations shown in the drawings

    or as directed by the Engineer as per Omantel /

    Nawras / MOD Standards and Specifications

    Carried to Collection Page - 1

    9/4 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No 9

  • 8/11/2019 electrical infrastructure

    64/200

    UTILITIES Bill No. 9

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.1 Locating and Protecting Exist ing Utili ties (Continued)

    18.1.6(i)h Supply and install 2way 100mm dia and 2way 100mm lin.m. 50

    dia Upvc Split duct to protect existing Omantel /

    Nawras / MOD cables complete with concrete protection

    (class 25/20) including excavation, backfilling, duct

    marker and compaction etc. at locations shown in the

    drawings or as directed by the Engineer as per Omantel/

    Nawras / MOD Standards and Specifications

    18.2 Removing and Disposing or RelocatingExisting Utilities

    Electrical Utility

    18.2.6(i)a Carefully disconnect and remove existing LV overhead lin.m. 1,040

    electrical Cable any size including poles stay

    insulators and any other accessories existing wires,

    and dispose of same to the locations as directedby the Engineer

    18.2.6(i)b Carefully disconnect and remove existing LV lin.m. 1,300

    underground electrical cables and any other

    accessories existing and dispose of same to the

    locations as directed by the Engineer

    Carried to Collection Page - 1

    9/5 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    65/200

    UTILITIES Bill No. 9

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    18.2.6(i)c Carefully disconnect and remove existing 11KV lin.m. 11,100

    overhead electrical conductors including poles stay

    wires, insulators and any other accessories existing

    and dispose of same to the locations as directed

    by the Engineer

    . . . .

    underground electrical cables and any otheraccessories existing and dispose of same to the

    locations as directed by the Engineer

    18.2.6(i)e Carefully disconnect and remove existing 33KV lin.m. 1,520

    overhead electrical conductors including poles stay

    wires, insulators and any other accessories existing

    and dispose of same to the locations as directed

    by the Engineer

    18.2.6(i)f Carefully disconnect and remove existing 33KV lin.m. 220

    underground electrical cables and any other

    accessories existing and dispose of same to the

    locations as directed by the Engineer

    Carried to Collection Page - 1

    9/6 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    66/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    18.2.6(i)g Carefully disconnect and remove existing 132KV lin.m. 800

    overhead electrical conductors, Double Circuit

    (6 conductor together) including insulatorsand other

    accessories existing and dispose of same to the

    locations as directed by the Engineer (Quantity

    measured as Route length).

    18.2.6(i)h Carefully disconnect and remove existing 132KV nr. 3electricity pylons including foundation, excavation,

    backfilling and any other accessories existing and

    dispose of same (except foundation) to the locations

    as directed by the Engineer

    18.2.6(i)i Carefully disconnect and remove existing 220KV lin.m. 1,500

    overhead electrical conductors, Double Circuit

    (6 conductor together) including insulatorsand otheraccessories existing and dispose of same to the

    locations asdirected by the Engineer (Quantity

    measured as Route length).

    Carried to Collection Page - 1

    9/7 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    67/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    18.2.6(i)j Carefully disconnect and remove existing 220KV nr. 2electricity pylons including foundation, excavation,

    backfilling and any other accessories existing and

    dispose of same (except foundation) to the locations

    as directed by the Engineer

    18.2.6(i)k Locate excavate down to and remove the existing lin.m. 300

    110mm diameter AC/DI pipe including but not limited

    to valve chambers, Fire hydrants and all other

    accessories complete and dispose of same to the

    locations as directed by the Engineer including

    excavation, backfill, disposal, disconnection ,etc

    18.2.6(i)l Locate excavate down to and remove the existing lin.m. 300800mm diameter CS pipe including but not limited

    to valve chambers, Fire hydrants and all other

    accessories complete and dispose of same to the

    locations as directed by the Engineer including

    excavation, backfill, disposal, disconnection ,etc

    Carried to Collection Page - 1

    9/8 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    68/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    Telephone Utili ty

    18.2.6(i)m Locate, excavate down, disconnect and remove lin.m. 600

    existing telephone cables and ducts, chambers and

    dispose of same (except chambers) to the locations

    as directed by the Engineer including excavation,

    , .

    For Electrical: All LV, 11KV/33KV Electrical

    Relocation work inc luding materials shall be as

    per MEDC/Mazoon/Majan Electricity Distribution

    Company Standards and Specifications.

    18.2.6(ii)a Carefully disconnect and Relocate existing 11KV nr. 2

    substation with 500KVA TX+ 1 No. and 800 A Feeder

    pillar locations as directed by the Engineer includingfoundation, jointing, excavation & connecting to the

    existing supply, testing, commissioning, all civil works

    and other accessories necessary to complete the

    system functional

    Carried to Collection Page - 1

    9/9 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    69/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    18.2.6(ii)b Carefully disconnect and Relocate existing 11KV nr. 1substation with 500KVA TX+ 1 No. RMU+1 No. OLU

    and 1000 A Feeder pillar locations as directed by

    the Engineer including foundation, jointing, excavation

    & connecting to the existing supply, testing,

    commissioning, all civil works and other accessories

    18.2.6(ii)c Remove and Relocate Underground MRM&WR Borewell nr. 2

    with existing equipment complete with new structure,

    pipe work, all electro mechanical work and necessary

    work to complete system to make functional

    18.2.6(ii)d Remove and Relocate Rain Water Monitoring Station nr. 1

    (MRM&WR) existing equipment complete with new

    structure, pipe work, all electro mechanical work andnecessary work to complete system to make functional

    Carried to Collection Page - 2

    9/10 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    70/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    Provide and install new utilities

    18.2.6(iii)a Supply and installation of overhead LV electrical lin.m. 1,650

    Cable including poles, stay wires, insulators,

    jumpers, stringing, jointing, excavation & backfilling

    of poles, connecting to the existing supply, testing,

    , ,

    necessary labor, operation, materials, accessories,earthing.

    18.2.6(iii)b Supply and installation of underground proposed LV lin.m. 1,095

    cable (4C x 240 Sq.mm) complete including excavation,

    backfilling, cable covering tiles, warning tapes, joints,

    connecting to the existing supply, testing,

    commissioning, carting spoil to tips as directed, all

    necessary labor, operation, materials and any otheraccessories including earthing, etc

    Carried to Collection Page - 2

    9/11 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    71/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    18.2.6(iii)c Supply and installation of overhead 11 KV electrical lin.m. 5,500conductors (3 conductors together) for Street Lighting

    complete including poles, stay wires, insulators, AB

    switches, lightning arrestors, jumpers, stringing,

    jointing, excavation & backfilling of poles, connecting

    to the existing supply, testing, commissioning,

    , ,

    operation, materials, accessories, earthing and anyspecial protection to the poles (Wadi Area).

    (Quantity measured as Route length).

    18.2.6(iii)d Supply and installation of underground proposed lin.m. 1,000

    11KV Electrical cable for Street Lighting complete

    including excavation, backfilling, cable covering tiles,

    warning tapes, route markers, joints, connecting to

    the existing supply, testing, commissioning, cartingspoil to tips as directed, all necessary labor,

    operation, materials and any other accessories

    including earthing, etc.

    Carried to Collection Page - 2

    9/12 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    72/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    18.2.6(iii)e Supply and installation of overhead 11 KV electrical lin.m. 7,350conductors (3 conductors together) complete

    including poles, stay wires, insulators, AB

    switches, lightning arrestors, jumpers, stringing,

    jointing, excavation & backfilling of poles, connecting

    to the existing supply, testing, commissioning,

    , ,

    operation, materials, accessories, earthing and anyspecial protection to the poles (Wadi Area).

    (Quantity measured as Route length).

    18.2.6(iii)f Supply and installation of underground proposed lin.m. 5,220

    11KV Electrical cable complete including

    excavation, backfilling, cable covering tiles,

    warning tapes, route markers, joints, connecting to

    the existing supply, testing, commissioning, cartingspoil to tips as directed, all necessary labor,

    operation, materials and any other accessories

    including earthing, etc.

    Carried to Collection Page - 2

    9/13 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    73/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    18.2.6(iii)g Supply and installation of underground proposed lin.m. 2,00033KV Electrical cable complete including excavation,

    backfilling, cable covering tiles, warning tapes, joints,

    connecting to the existing supply, testing,

    commissioning, carting spoil to tips as directed, all

    necessary labor, operation, materials and any other

    , .

    18.2.6(iii)h Supply and installation of proposed overhead 132KV lin.m. 900

    Electrical AAAC Twin YEW Conductors, Double

    Circuit (6 conductor together) including insulators,

    warning lights, ground wire, connecting to the existing

    supply, testing, commissioning, carting spoil to tips

    as directed, all necessary labor, operation, materials

    and any other accessories including earthing, etc.

    complete as per OETC Standards & Specifications(Quantity measured as Route length).

    18.2.6(iii)i Design, Supply, Install, Testing and Commissioning nr. 2

    132KV electricity pylons (Tension Type) including

    concrete foundations, all other accessories, fittings,

    design calculations and shop drawings etc. complete

    as per OETC Standards & Specifications

    Carried to Collection Page - 2

    9/14 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    74/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    18.2.6(iii)j Design, Supply, Install, Testing and Commissioning nr. 2132KV electricity pylons (Suspension Type) including

    concrete foundations, all other accessories, fittings,

    design calculations and shop drawings etc. complete

    as per OETC Standards & Specifications

    . . . . ,

    Electrical AAAC Twin YEW Conductors, Double

    Circuit (6 conductor together) including insulators,

    warning lights, ground wire, connecting to the existing

    supply, testing, commissioning, carting spoil to tips

    as directed, all necessary labor, operation, materials

    and any other accessories including earthing, etc.

    complete as per OETC Standards & Specifications

    (Quantity measured as Route length).

    Carried to Collection Page - 2

    9/15 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    75/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    18.2.6(iii)l Supply and installation of underground proposed lin.m. 300220KV Electrical cables (Double Circuit, 12nr. Single

    core cable) complete including

    excavation, backfilling, cable covering tiles,

    warning tapes, joints, connecting to the existing

    supply, testing, commissioning, carting spoil to tips

    , , ,

    and any other accessories including earthing, etc.

    18.2.6(iii)m Design, Supply, Install, Testing and Commissioning nr. 1

    220KV electricity pylons (Tension Type) including

    concrete foundations, all other accessories, fittings,

    design calculations and shop drawings etc. complete

    as per OETC Standards & Specifications

    18.2.6(iii)n Design, Supply, Install, Testing and Commissioning nr. 1

    220KV electricity pylons (Suspension Type) including

    concrete foundations, all other accessories, fittings,

    design calculations and shop drawings etc. complete

    as per OETC Standards & Specifications

    Carried to Collection Page - 2

    9/16 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    76/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated

    Quantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    Supply & Installation of New Water Lines: TheNew Pipe lines installed to replace affected pipe

    lines should have all the fittings, accessories,

    Valves (Gate valves, Drain valves, Air Valves, etc),

    Fire Hydrants, any other specials and related

    Chambers complete necessary to reinstate the

    on the Drawings

    18.2.6(iii)o Supply and install 110mm HDPE Water pipes (PN16) lin.m. 500

    complete with all the specials, fittings, and chambers

    including but not limited to tees, bends, shut off valves,

    air valves, washout valves, Fire hydrants, thrust blocks

    etc and also excavation, backfilling, warning tape,

    bedding and surrounding, jointing to existing water pipe

    and jointing material, Flushing, Disinfecting, pressuretesting and any other items necessary to complete

    the work

    Carried to Collection Page - 2

    9/17 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    77/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit EstimatedQuantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    18.2.6(iii)p Supply and install 800mm CS Water pipes lin.m. 300complete with all the specials, fittings, and chambers

    including but not limited to tees, bends, shut off valves,

    air valves, washout valves, Fire hydrants, thrust blocks

    etc and also excavation, backfilling, warning tape,

    bedding and surrounding, jointing to existing water pipe

    , , ,

    testing and any other items necessary to complete

    the work

    18.2.6(iii)q Supply and install 4Way uPVC duct for telephone lin.m. 50

    cables, including but not limited to excavation,

    backfilling, warning tape, bedding and surrounding,

    jointing and jointing material, manholes, handholes,

    junction boxes and any other items necessary to

    complete the work

    18.2.6(iii)r Supply and install 2Way uPVC duct for telephone lin.m. 420

    cables, including but not limited to excavation,

    backfilling, warning tape, bedding and surrounding,

    jointing and jointing material, manholes, handholes,

    junction boxes and any other items necessary to

    complete the work

    Carried to Collection Page - 3

    9/18 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    78/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit EstimatedQuantity

    18 UTILITIES (Continued)

    18.2 Removing and Disposing or Relocating

    Existing Utilities (Continued)

    18.2.6(iii)s Supply and install 1Way uPVC duct for telephone lin.m. 50cables, including but not limited to excavation,

    backfilling, warning tape, bedding and surrounding,

    jointing and jointing material, manholes, handholes,

    junction boxes and any other items necessary to

    complete the work

    18.2.6(iii)t Supply, install and laying EEF 100x0.65 telephone lin.m. 210

    cable including jointing, jointing material and any

    other items necessary to complete and commission

    the work

    18.2.6(iii)u Supply, install and laying EEF 200x0.65 telephone lin.m. 210

    cable including jointing, jointing material and any

    other items necessary to complete and commission

    the work

    Carried to Collection Page - 3

    9/19 .

    Construction of Batinah Expressway - Package 7

    Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.

    BILL OF QUANTITIES

    UTILITIES Bill No. 9

  • 8/11/2019 electrical infrastructure

    79/200

    (in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit EstimatedQuantity

    18 UTILITIES (Continued)

    18.3 Service / Future Utilit y Road Crossing Ducts

    18.3.6(i)a Supply and Install proposed 9way 200mm and 2way lin.m. 150

    100mm dia uPVC duct for 132kv electrical cables withconcrete protection (class 25/20), laid and jointed in

    trenches beneath carriageway including excavation,

    backfilling, compaction, end caps, draw ropes and

    duct markers etc. complete at locations shown in

    the drawings or as directed by the Engineer

    18.3.6(i)b Supply and Install proposed 9way 200mm and 2way lin.m. 150

    100mm dia uPVC duct for 220kv electrical cables with

    concrete protection (class 25/20), laid and jointed in

    trenches beneath carriageway including excavation,

    backfilling, compaction, end caps, draw ropes and

    duct markers etc. complete at locations shown in

    the drawings or as directed by the Engineer

    18.3.6(i)c Supply and Install proposed 2way 100mm dia lin.m. 200uPVC duct for electrical cables with concrete

    surround (class 25/20), laid and jointed in trenches

    beneath carriageway including excavation, backfilling,

    compaction, end caps, draw ropes and duct markers

    etc. complete at locations shown in the drawi