electrical drawing - royal university of bhutan · the telephone cable duct must be separated by...

39
ELECTRICAL DRAWING MECHANICAL BLOCK (JIGME NAMGYEL ENGINEERING COLLEGE, DEWATHANG, SAMDRUP JONGKHAR)

Upload: others

Post on 20-Jun-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

ELECTRICAL DRAWING

MECHANICAL BLOCK (JIGME NAMGYEL ENGINEERINGCOLLEGE, DEWATHANG, SAMDRUP JONGKHAR)

Page 2: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SPECIFICATIONS FOR ELECTRICAL WORKS

1) GENERAL SPECIFICATIONS:

DESCRIPTION OF THE GENERAL SPECIFICATIONS

All the light point wiring shall be with 2C 1.5 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25mm recessed HDPE conduit pipe.

1

All the light circuit wiring shall be with 2C 2.5 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25 mm recessed HDPE conduit pipe, unlessotherwise specified in the drawing. (Refer Load Distribution chart for wire sizedetails).

Sl.NO.

All the power point socket outlet shall be located at 0.3 meters from the finishedfloor level.

All the power point wiring shall be with 2C 4 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25 mm recessed HDPE conduit pipe.3

4

2

5

6

The power point socket outlet for kitchen and toilet shall be located at 1.2 metersfrom the finished floor level.

All the wall mounted fixture shall be located at 2.75 meters from the finished floorlevel.All the light switch board shall be located at 1.25 meters from the finished floorlevel, 0.3 meters away from the door and edges of the wall.9

All the non-current carrying conductor should be connected to the common ground.

During execution no phase difference is allowed in the same conduit, refer thedesign drawing.

7

8

10

2) THE FOLLOWING TEST SHOULD SATISFY THE INSTALLATION:

The height of the main control panel board and distribution board shall be 1.5meters from finished floor level or as per the site condition.

11

Earth polarity test1

Earthing test

2

Sl.NO.DESCRIPTION OF THE

TEST

Insulation test

4 Earth continuity test

3

3) SPECIFICATIONS FOR TELEVISION NETWORK:

Test result must not be less than 1mega ohm.

Test result must be within 5-8 ohms.

All switches must be on live conductor.

Low voltage test result should satisfythe installation.

REMARKS OF THE TEST

1

DESCRIPTION OF THE SPECIFICATIONS

The telephone cable duct must be separated by 0.5 meters awayfrom the electrical cable duct and must be in recessed.2

Sl.NO.

The television cable duct shall be with HDPE pipe of 25mm dia inrecessed.

The television coaxial socket outlet shall be located at 0.25 metersfrom the finished floor level.

The televison network wiring shall be with RG6 (solid) 75 ohm microsatcom coaxial cables in HDPE pipe.

4

3

NOTE:

The height of the television divider box shall be located as per thesite conditon, refer design drawing.

All the earth wire shall be 8 & 14SWG copper conductor cable 1.1 KVG for A.Csocket &16A socket respectively, 14SWG copper wire for light points ifnecessary, 8SWG bare copper conductor for SDB earthing.

5

All the A.C power point wiring shall be with 2C 6 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25 mm recessed HDPE conduit pipe.

Refer the " Specification of Electrical Works 2018" approved by BSB (BhutanStandards Bureau), MoWHS & IS standard code of practice for more details.

12

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/01

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: i OF iiDATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 3: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

1.

SYMBOLS.N REMARKS

3.

11.

Light Switch Box.

MDB

Sub-Distribution Box.

SHORTFORM.

PP-N

Telephone Terminal Cabinet.

Data outlet socket numbering.TV-1...

2.

LEGENDS FOR ELECTRICAL WORKS

DESCRIPTION OF SYMBOLS MAKE

4.

5.

6.

7.

8.

9.

10.

S.N

SBSDB

Main Distribution Box, main utilitypower source supply from BPCgrid power.

Television socket numbering.Power Point.

D-1...

READ AS/FULL-FORM

TTC

3.

1.2.

4.

ABBREVIATIONS

6.5.

7.

CEILING FAN (1200MM SWEEP, 1400 RPM)

EXHAUST FAN (80W, 300MM SWEEP, 900 RPM)

Linear DLX 20WLEDSURFACE MOUNTED LED TUBELIGHT 20W

CrownSURFACE MOUNTED (ROUND) LED DOWNLIGHT 12W Note: All the light switches in SBshall be silver aluminum switch.

16A POWER SOCKET (2000W)

TELEPHONE & INTERNET COMBINE SOCKET

12.

Havells orequivalent.

Pluto PanelSURFACE MOUNTED LED PANEL (SQUARE) 34W

IN INTERNET SOCKET

Havells orequivalent.

Havells orequivalent.

Havells orequivalent.

Havells orequivalent.

Havells orequivalent.

16A/32A THREE PHASE POWER SOCKET Havells orequivalent.

Havells orequivalent.

16A, POP-UP TYPE POWER SOCKET (2000W)

16A POWER SOCKET (2000W)Havells orequivalent.

SPLIT TYPE AC

25°C

SPLIT TYPE AIR CONDITIONER (2000W)Havells orequivalent.

Havells orequivalent.

Havells orequivalent.

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/02

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: ii OF iiDATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 4: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

BASEMENT FLOOR PLAN

exit/entry

wc

wc

wc

wc

wc

wc

urinals

washbasin

FILTER

RAMP

UP

ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)

UP

shaft door

STORE

STORE

STORE

STORE

SBs to Light Fittings Conduit Layout Plan

SB-4SB-3SB-2SB-1

SB-2

4SB

-23

SB-2

2

SB-5

SB-6

SB-7

SB-8

SB-9

SB-12

SB-13

SB-14

SB-10

SB-11

SB-1

5SB

-17

SB-1

6

SB-18

SB-20

SB-21

SB-19

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/03

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 01 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 5: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

BASEMENT FLOOR PLAN

exit/entry

wc

wc

wc

wc

wc

wc

urinals

washbasin

FILTER

RAMP

UP

ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)

UP

shaft door

STORE

STORE

STORE

STORE

SBs to Light Fittings Wiring Layout Plan

SB-4SB-3SB-2SB-1

SB-2

4SB

-23

SB-2

2

SB-5

SB-6

SB-7

SB-8

SB-9

SB-12

SB-13

SB-14

SB-10

SB-11

SB-1

5SB

-17

SB-1

6

SB-18

SB-20

SB-21

SB-19

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/04

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 02 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 6: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

BASEMENT FLOOR PLAN

exit/entry

wc

wc

wc

wc

wc

wc

urinals

washbasin

FILTER

RAMP

UP

ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)

UP

shaft door

STORE

STORE

STORE

STORE

SDB to SBs Conduit Layout Plan

SB-4SB-3SB-2SB-1

SB-2

4SB

-23

SB-2

2

SB-5

SB-6

SB-7

SB-8

SB-9

SB-12

SB-13

SB-14

SB-10

SB-11

SB-1

5SB

-17

SB-1

6

SB-18

SB-20

SB-21

SB-19

SDB

-1

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/05

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 03 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 7: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

BASEMENT FLOOR PLAN

exit/entry

STORAGE/SERVICES

FEMALE TOILET

MALE TOILET

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

FILTER

RAMP

UP

ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

UP

shaft door

STORE

STORE

STORE

STORE

SDB to PPs Conduit Layout Plan

PP-1/R

PP-2/R

PP-3/R PP-4/R

PP-5/R

PP-6/R

PP-18/B PP-17/B

PP-16/B PP-15/B

PP-14/B

PP-12/B

PP-11/Y

PP-13/B

PP-10/Y

PP-9/Y

PP-7/Y PP8/Y

SDB

-1

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/06

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 04 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 8: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

BASEMENT FLOOR PLAN

exit/entry

STORAGE/SERVICES

FEMALE TOILET

MALE TOILET

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

FILTER

RAMP

UP

ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

UP

shaft door

STORE

STORE

STORE

STORE

Telephone & Internet Conduit Layout Plan

TTC

D/T-1

D/T-2

D/T-3D/T-4D/T-5

D/T-6

D/T-7

D/T-8D/T-9

D/T-10

D/T-11

D/T-12

D/T-13

D/T-14

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/07

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 05 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 9: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

COMPUTER LAB 1(25 COMPUTERS)

LAB 2LAB 3

LAB 4

LAB 5

LAB 6

LAB 7

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Staircase 2

RAMP

LAB/STORE/CLASS

UP

GROUND FLOOR PLANSBs to Light Fittings Conduit Layout Plan

SB-5

SB-6

SB-1 SB-2

SB-4

SB-A

SB-3

SB-1

SB-3

SB-4

SB-2

SB-6

SB-5

SB-7

SB-8

SB-9

SB-8

SB-7

SB-11

SB-9

SB-10

SB-B

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/08

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 06 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 10: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

COMPUTER LAB 1(25 COMPUTERS)

LAB 2LAB 3

LAB 4

LAB 5

LAB 6

LAB 7

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Staircase 2

RAMP

LAB/STORE/CLASS

UP

GROUND FLOOR PLANSBs to Light Fittings Wiring Layout Plan

SB-5

SB-6

SB-1 SB-2

SB-4

SB-A

SB-3

SB-1

SB-3

SB-4

SB-2

SB-6

SB-5

SB-7

SB-8

SB-9

SB-8

SB-7

SB-11

SB-9

SB-10

SB-B

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/09

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 07 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 11: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

COMPUTER LAB 1(25 COMPUTERS)

LAB 2LAB 3

LAB 4

LAB 5

LAB 6

LAB 7

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Staircase 2

RAMP

LAB/STORE/CLASS

UP

GROUND FLOOR PLAN

SB-5

SB-6

SB-1 SB-2

SB-4

SB-A

SB-3

SB-1

SB-3

SB-4

SB-2

SB-6

SB-5

SB-7

SB-8

SB-9

SB-8

SB-7

SB-11

SB-9

SB-10

SDB to SBs Conduit Layout Plan

SB-B

SDB-2

SDB

-3SD

B-4

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/10

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 08 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 12: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

COMPUTER LAB 1(25 COMPUTERS)

LAB 2LAB 3

LAB 4

LAB 5

LAB 6

LAB 7

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Staircase 2

C O R R I D O R

C O R

R I

D O R

RAMP

LAB/STORE/CLASS

UP

GROUND FLOOR PLANSDB to PPs Conduit Layout Plan

PP-3/R PP-5/R

PP-6/RPP-4/R

PP-12/B

PP-11/B

PP-8/YPP-7/Y

PP-20/B

PP-19/B

PP-21/B

PP-22/Y

PP-2/RPP-1/R

PP-11/YPP-12/R

PP-2/R

PP-1/R

PP-9/YPP-10/Y

PP-7/R

PP-8/Y

PP-14/YPP-13/Y

PP-23/Y

PP-24/B

PP-17/B

PP-16/B

PP-18/B

PP-15/B

SDB-2

SDB

-3SD

B-4

PP-1/R PP-2/R

PP-4/R

PP-5/R PP-3/R

PP-6/Y

PP-9/Y

PP-10/Y

PP-14/B

PP-15/B

PP-13/B

250x200 mmCable Duct

16 A-Pop up Power Socket150x100x5 mmMS Cable Channel

PP-3/RPP-4/RPP-5/RPP-6/R

PP-7/R

PP-8/Y PP-9/Y PP-10/Y PP-11/YPP-12/Y

PP-13/Y

PP-14/YPP-15/YPP-16/BPP-17/BPP-18/R

PP-19/B

PP-20/BPP-21/B PP-22/B PP-23/B PP-24/B

PP-25/Y

PP-26/B

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/11

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 09 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 13: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

COMPUTER LAB 1(25 COMPUTERS)

LAB 2LAB 3

LAB 4

LAB 5

LAB 6

LAB 7

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Staircase 2

C O R R I D O R

C O R

R I

D O R

RAMP

LAB/STORE/CLASS

UP

GROUND FLOOR PLANSDB to ACs Conduit Layout Plan

SDB

-5

SPLIT TYPE AC

25°C

SP

LIT

T

YP

E A

C

25°C

SPLIT TYPE AC

25°C

SPLIT TYPE AC

25°C

SP

LIT

T

YP

E A

C

25°C

SPLIT TYPE AC

25°C

S

P

L

I

T

T

Y

P

E

A

C

2

5

°

C

S

P

L

I

T

T

Y

P

E

A

C

2

5

°

C

SPLIT TYPE AC

25°C

SPLIT TYPE AC

25°C

SPLIT TYPE AC

25°C

SPLIT TYPE AC

25°C

SPLIT TYPE AC

25°C

SPLIT TYPE AC

25°C

SP

LIT

T

YP

E A

C

25°C

SP

LIT

T

YP

E A

C

25°C

AC-1/Y

AC-7/B

AC-8/B

AC-9/B

AC-6/B

AC-2/Y

AC-3/Y AC-4/Y

AC-5/Y

AC-11/R

AC-12/R

AC-13/R

AC-14/R

AC-16/R

AC-10/B

AC-15/R

OU

TDO

OR

UN

IT

OU

TDO

OR

UN

IT

OU

TDO

OR

UN

IT

OU

TDO

OR

UN

IT

OU

TDO

OR

UN

IT

OUTDOORUNIT

OUTDOORUNIT

OUTDOORUNIT

OUTDOORUNIT

OUTDOORUNIT

OU

TDO

OR

UN

IT

OUTDOORUNIT

OUTDOORUNIT

OUTDOOR

UNIT

OUTDOOR

UNIT

OUTDOORUNIT

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/12

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 10 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 14: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

COMPUTER LAB 1(25 COMPUTERS)

LAB 2

LAB 3

LAB 4

LAB 5

LAB 6

LAB 7

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Staircase 2

C O R R I D O R

C O R

R I

D O R

RAMP

LAB/STORE/CLASS

UP

GROUND FLOOR PLANMDB to Three Phase Power Point Conduit Layout Plan

32A/PP(3P)-2

32A/PP(3P)-3

32A/PP(3P)-1

32A/PP(3P)-6

32A/PP(3P)-5

32A/PP(3P)-4

MD

B

From BasementElectrical Room

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/13

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 11 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 15: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

COMPUTER LAB 1(25 COMPUTERS)

LAB 2LAB 3

LAB 4

LAB 5

LAB 6

LAB 7

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice

Lab in-charge'sOffice Lab in-charge's

Office

Staircase 2

C O R R I D O R

C O R

R I

D O R

RAMP

LAB/STORE/CLASS

UP

GROUND FLOOR PLANTelephone & Internet Conduit Layout Plan

D/T-2 D/T-1

D/T-3

D/T-4

D/T-6

D/T-5

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

I

N

I

N

D-1

D-4

D-5

D-6

D-7

D-3

D-2

D-15

D-14

D-12

D-13

D-11

D-10

D-9

D-8

IN

D-20

IN

D-31

IN

D-32

IN

D-33

IN

IN

IN

IN

D-25

D-26

D-38

D-39

250x200 mmCable Duct

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

D-34 D-35 D-36 D-37

D-30 D-29 D-28 D-27

D-21 D-22 D-23 D-24

D-19 D-18 D-17 D-16TTC

150x100x5 mmMS Cable Channel

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/14

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 12 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 16: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

CLASSROOM 4(capacity:40stds)

down

DRAWING HALL(capacity:60stds)

CIRCULATION SPACE

Staircase 2

CLASSROOM 2(capacity:40stds)

CLASSROOM 3(capacity:40stds)

CLASSROOM 5(capacity:40stds)

CLASSROOM 6(capacity:40stds)

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

washbasin

-300mm floor level

DWN

MAIN DOOR

UP

UP

FIRST FLOOR PLANSBs to Light Fittings Conduit Layout Plan

SB-5

SB-4

SB-2

SB-1

SB-1

SB-3

SB-3SB-6

SB-2

SB-4

SB-7

SB-8

SB-9

SB-11

SB-10

SB-15

SB-11

SB-1

4SB

-12

SB-13

SB-9

SB-7

SB-6

SB-5

SB-8SB-1

0

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/15

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 13 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 17: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

CLASSROOM 4(capacity:40stds)

down

DRAWING HALL(capacity:60stds)

CIRCULATION SPACE

Staircase 2

CLASSROOM 2(capacity:40stds)

CLASSROOM 3(capacity:40stds)

CLASSROOM 5(capacity:40stds)

CLASSROOM 6(capacity:40stds)

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

washbasin

-300mm floor level

LANDING

DWN

MAIN DOOR

UP

UP

FIRST FLOOR PLANSBs to Light Fittings Wiring Layout Plan

SB-5

SB-4

SB-2

SB-1

SB-1

SB-3

SB-3SB-6

SB-2

SB-4

SB-7

SB-8

SB-9

SB-11

SB-10

SB-15

SB-11

SB-1

4SB

-12

SB-13

SB-9

SB-7

SB-6

SB-5

SB-8SB-1

0

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/16

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 14 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 18: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

CLASSROOM 4(capacity:40stds)

down

DRAWING HALL(capacity:60stds)

CIRCULATION SPACE

Staircase 2

CLASSROOM 2(capacity:40stds)

CLASSROOM 3(capacity:40stds)

CLASSROOM 5(capacity:40stds)

CLASSROOM 6(capacity:40stds)

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

washbasin

-300mm floor level

DWN

MAIN DOOR

UP

UP

FIRST FLOOR PLANSDB to SBs Conduit Layout Plan

SB-5

SB-4

SB-2

SB-1

SB-1

SB-3

SB-3SB-6

SB-2

SB-4

SB-7

SB-8

SB-9

SB-11

SB-10

SB-15

SB-11

SB-1

4SB

-12

SB-13

SB-9

SB-7

SB-6

SB-5

SB-8SB-1

0

SDB-6

SDB

-7

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/17

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 15 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 19: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

CLASSROOM 4(capacity:40stds)

down

DRAWING HALL(capacity:60stds)

ENTRANCE LOBBY level+150mm

C O R R I D O R

FEMALE TOILET

MALE TOILET

CIRCULATION SPACE

Staircase 2

CLASSROOM 2(capacity:40stds)

CLASSROOM 3(capacity:40stds)

CLASSROOM 5(capacity:40stds)

CLASSROOM 6(capacity:40stds)

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

washbasin

-300mm floor level

LANDING

DWN

MAIN DOOR

UP

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

UP

FIRST FLOOR PLANSDB to PPs Conduit Layout Plan

PP-8/B PP-4/Y PP-4/R PP-3/R

PP-6/Y

PP-1/Y

PP-7/B PP-5/Y PP-3/Y

PP-2/Y

PP-1/R

PP-2/R

PP-10/B PP-9/B

PP-11/R

PP-12/R

PP-14/R

PP-13/R

PP-15/RPP-16/R

PP-5/B

PP-6/B

PP-8/B PP-9/R

PP-12/R

PP-7/B

PP-11/R

PP-10/R

PP-13/R

SDB-6

SDB

-7

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/18

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 16 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 20: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

CLASSROOM 4(capacity:40stds)

down

DRAWING HALL(capacity:60stds)

ENTRANCE LOBBY level+150mm

C O R R I D O R

FEMALE TOILET

MALE TOILET

CIRCULATION SPACE

Staircase 2

CLASSROOM 2(capacity:40stds)CLASSROOM 3

(capacity:40stds)

CLASSROOM 5(capacity:40stds)

CLASSROOM 6(capacity:40stds)

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

washbasin

-300mm floor level

LANDING

FILTER

DWN

MAIN DOOR

UP14

25[4'-

8"]

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

UP

FIRST FLOOR PLANSDB to PPs Conduit Layout Plan

IN

D-9

IN

D-2

IN

D-1

IN

D-8

IN

D-4

IN

D-3IN D-5

IN

D-7

IN

D-6

IN

D-10

IN

D-11

I

N

D-12

I

N

I

N

I

N

D-13

D-14

D-15

IN

D-21

IN

D-19

IN

D-17

IN

D-18

IN D-20

IN D-16

TTC

850

[2'-9"]

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/19

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 17 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 21: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

PANTRYOFFICE

HOD'S OFFICE

CONFERENCE

HALL capa

city:40-45 pp

l

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

washbasin

Staircase 2

ALUMINIUM PARTITION(refer section for heights)

SLIDINGDOOR

SLIDINGDOOR

CUBICLES

CUBICLES

CUBICLES

CABIN

UP

-300mm floor level

-300mm floor level

DWN

SECOND FLOOR PLANSBs to Light Fittings Conduit Layout Plan

SB-10

SB-9

SB-1

SB-2SB-3SB-4

SB-A

SB-5

SB-7

SB-6

SB-8

SB-1

1

SB-9

SB-7

SB-6

SB-5

SB-8

SB-11

SB-1

2SB

-14

SB-1

3

SB-1 SB-2 SB

-3

SB-4

SB-1

0

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/20

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 18 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 22: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

PANTRYOFFICE

HOD'S OFFICE

CONFERENCE

HALL capa

city:40-45 pp

l

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

washbasin

Staircase 2

ALUMINIUM PARTITION(refer section for heights)

SLIDINGDOOR

SLIDINGDOOR

CUBICLES

CUBICLES

CUBICLES

CABIN

UP

-300mm floor level

-300mm floor level

DWN

SECOND FLOOR PLANSBs to Light Fittings Wiring Layout Plan

SB-10

SB-9

SB-1

SB-2SB-3SB-4

SB-A

SB-5

SB-7

SB-6

SB-8

SB-1

1

SB-9

SB-7

SB-6

SB-5

SB-8

SB-11

SB-1

2SB

-14

SB-1

3

SB-1 SB-2 SB

-3

SB-4

SB-1

0

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/21

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 19 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 23: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

PANTRYOFFICE

HOD'S OFFICE

CONFERENCE

HALL capa

city:40-45 pp

l

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

washbasin

Staircase 2

ALUMINIUM PARTITION(refer section for heights)

SLIDINGDOOR

SLIDINGDOOR

CUBICLES

CUBICLES

CUBICLES

CABIN

UP

-300mm floor level

-300mm floor level

DWN

SECOND FLOOR PLAN

SB-9

SB-7

SB-6

SB-5

SB-8

SB-11

SB-1

2SB

-14

SB-1

3

SB-10

SB-9

SB-1

SB-2SB-3SB-4

SB-A

SB-1

SB-2 SB-3

SB-4

SB-5

SB-7

SB-6

SB-8

SB-1

0

SB-1

1

SDB to SBs Conduit Layout Plan

SDB

-8

SDB

-9

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/22

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 20 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 24: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

PANTRY

OFFICE

HOD'S OFFICE

CONFERENCE H

ALL

capacit

y:40-45 pp

l

FEMALE TOILET

MALE TOILET

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

washbasin

Staircase 2

ALUMINIUM PARTITION(refer section for heights)

SLIDINGDOOR

SLIDINGDOOR

CUBICLES

CUBICLES

CUBICLES

CABIN

UP

-300mm floor level

-300mm floor level

DWN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

SECOND FLOOR PLANSDB to PPs Conduit Layout Plan

PP-1/Y

PP-14/Y

PP-13/R

PP-12/R

PP-10/R

PP-11/R

PP-9/R

PP-8/R

PP-6/Y

PP-7/Y

PP-5/Y

PP-4/Y

PP-2/Y

PP-3/Y

PP-15/R

PP-19/BPP-18/B

PP-17/B

PP-16/R

PP-20/B

PP-25/B

PP-22/B

PP-26/B

SDB

-8

PP-24/B

PP-23/B

SDB

-9

PP-21/R

PP-6/

PP-5/Y

PP-3/Y

PP-7/

PP-4/Y

PP-12/

PP-11/

PP-13/

PP-10/

PP-16/

PP-15/

PP-17/

PP-14/

PP-9/

PP-18/

PP-2/Y

PP-1/Y

PP-8/

250x200 mmCable Duct

150x100x5 mmMS Cable Channel

250x200 mmCable Duct

150x100x5 mmMS Cable Channel

150x100x5 mmMS Cable Channel

14285[46'-9"]

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/23

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 21 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 25: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

PANTRY

OFFICE

HOD'S OFFICE

CONFERENCE H

ALL

capacit

y:40-45 pp

l

FEMALE TOILET

MALE TOILET

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

washbasin

Staircase 2

ALUMINIUM PARTITION(refer section for heights)

SLIDINGDOOR

SLIDINGDOOR

CUBICLES

CUBICLES

CUBICLES

FILTER

CABIN

UP

-300mm floor level

-300mm floor level

DWN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

SECOND FLOOR PLANSDB to ACs Conduit Layout Plan

SP

LIT

T

YP

E A

C

25°C

AC-1/

OU

TDO

OR

UN

IT

S

P

L

I

T

T

Y

P

E

A

C

2

5

°

C

S

P

L

I

T

T

Y

P

E

A

C

2

5

°

C

AC-2/

AC-3/

OUTDOOR

UNIT

S

P

L

I

T

T

Y

P

E

A

C

2

5

°

C

AC-4/

OUTDOOR

UNIT

OUTDOOR

UNIT

SDB

-9

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/24

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 22 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 26: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

PANTRY

OFFICE

HOD'S OFFICE

CONFERENCE H

ALL

capacit

y:40-45 pp

l

FEMALE TOILET

MALE TOILET

wc

wc

wc

wc

wc

wc

urinals

washbasin

washbasin

washbasin

Staircase 2

ALUMINIUM PARTITION(refer section for heights)

SLIDINGDOOR

SLIDINGDOOR

CUBICLES

CUBICLES

CUBICLES

FILTER

CABIN

UP

-300mm floor level

-300mm floor level

DWN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

EXHAUSTFAN

SECOND FLOOR PLANTelephone & Internet Conduit Layout Plan

D/T-4

D/T-5

D/T-6

D/T-2

D/T-3

D/T-1

IN

D-1IN

D-13IN

D-10IN

D-9IN

D-6IN

D-5IN

D-2

IN

D-3IN

D-4IN

D-7IN

D-8IN

D-11IN

D-12

TTC

IN

D-18

IN

D-19

IN

D-17

IN

D-16

IN

D-22

IN

D-23

IN

D-21

IN

D-20

I

N

D-14

I

N

D-15

250x200 mmCable Duct

150x100x5 mmMS Cable Channel

250x200 mmCable Duct

150x100x5 mmMS Cable Channel

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/25

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 23 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 27: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SEMINAR HALL

DEPARTMENTAL LIBRARY

LOBBY

UP

SB-2

SB-1

SB-4

SB-3

JAMTHO FLOOR PLANSBs to Light Fittings Conduit Layout Plan

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/26

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 24 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 28: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SEMINAR HALL

DEPARTMENTAL LIBRARY

LOBBY

UP

SB-2

SB-1

SB-4

SB-3

JAMTHO FLOOR PLANSBs to Light Fittings Wiring Layout Plan

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/27

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 25 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 29: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SEMINAR HALL

DEPARTMENTAL LIBRARY

LOBBY

UP

SB-2

SB-1

SB-4

SB-3

JAMTHO FLOOR PLANSDB to SBs Conduit Layout Plan

SDB

-10

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/28

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 26 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 30: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SEMINAR HALL

DEPARTMENTAL LIBRARYLOBBY

UP

PP-6/ PP-5/

PP-7/

PP-8/ PP-9/

PP-4/

PP-1/

PP-2/

PP-3/

SDB

-10

JAMTHO FLOOR PLANSDB to PPs Conduit Layout Plan

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/29

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 27 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 31: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SEMINAR HALL

DEPARTMENTAL LIBRARYLOBBY

UP

SPLIT TYPE AC

25°C

AC-2/

OU

TDO

OR

UN

IT

SPLIT TYPE AC

25°C

AC-1/

OU

TDO

OR

UN

IT

SPLIT TYPE AC

25°C

AC-3/

OU

TDO

OR

UN

IT

SPLIT TYPE AC

25°C

AC-4/

OU

TDO

OR

UN

IT

SDB

-10

JAMTHO FLOOR PLANSDB to ACs Conduit Layout Plan

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/30

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 28 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 32: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SEMINAR HALL

DEPARTMENTAL LIBRARYLOBBY

UP

IN

D-4

IN

D-3

IN D-5

IN

D-1

IN

D-6

IN

D-2

TTC

JAMTHO FLOOR PLANInternet Conduit Layout Plan

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/31

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 29 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 33: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

630A, 415V,70KA, TPN

MCCB.

312C 630 SQ.MM PVC INSULATED, ARMOURED AL.

UG CABLE.

BUSBAR- 4 strips,1350mm bars, 800A

SDB-1

EM

4C, 25 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

AL.

CABLE

.

63A,415V,

TPN MCB.

MDB-DETAILS

SDB-2

4C, 25 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

AL.

CABLE

.

63A,415V,

TPN MCB.

SDB-3

4C, 25 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

AL.

CABLE

.

63A,415V,

TPN MCB.

SDB-4

4C, 16 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

AL.

CABLE

.

40A,415V,

TPN MCB.

SDB-5 SDB-6

4C, 25 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

AL.

CABLE

.

63A,415V,

TPN MCB.

SDB-7 SDB-8

4C, 25 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

AL.

CABLE

.

63A,415V,

TPN MCB.

SDB-9

4C, 25 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

AL.

CABLE

.

63A,415V,

TPN MCB.

SDB-10

4C, 10 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

AL.

CABLE

.

32,415V,

TPN MCB.

4C, 16 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

AL.

CABLE

.

40A,415V,

TPN MCB.

4C, 16 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

AL.

CABLE

.

40A,415V,

TPN MCB.

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/31

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 29 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 34: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SDB-1 DETAILS

4C, 25 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

ALU

MIN

UM

CABLE

.

FROM MAIN DISTRIBUTIONBOARD

16A, SP,B-TYPE MCB

2X4

SQ

MM

PVC

CU

WIR

E

63A, 415V,TPN RCCB.

SDB-2 DETAILS

FROM MAIN DISTRIBUTIONBOARD

63A, 415V,TPN RCCB.

L-1

6A, SP,B-TYPE MCB

2X2

.5 S

Q M

M P

VC

CU W

IRE

L-18 L-2 PP-1 PP-2 PP-3 PP-18

4C, 25 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

ALU

MIN

UM

CABLE

.

SMDB-1 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

12+36, IC+OGRESPECTIVELY

B TYPE, 6A MCB= 18 NosB TYPE, 16A MCB= 18 Nos

SMDB-2 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

12+36, IC+OGRESPECTIVELY

B TYPE, 6A MCB= 08 NosB TYPE, 16A MCB= 24 Nos

8 S

WG

CU E

ARTH

WIR

E

8 S

WG

CU E

ARTH

WIR

E

EARTH LINK EARTH LINK

16A, SP,B-TYPE MCB

2X4

SQ

MM

PVC

CU

WIR

E

L-1

6A, SP,B-TYPE MCB

2X2

.5 S

Q M

M P

VC

CU W

IRE

L-8 L-2 PP-1 PP-2 PP-3 PP-24

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/32

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 30 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 35: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SDB-3 DETAILS

4C

, 2

5 S

Q.M

M P

VC

INSULA

TED

ARM

ORED

ALU

MIN

UM

CABLE

.FROM MAIN DISTRIBUTION

BOARD

16A, SP,B-TYPE MCB

2X4

SQ

MM

PVC C

UW

IRE

63A, 415V,TPN RCCB.

SDB-4 DETAILS

FROM MAIN DISTRIBUTIONBOARD

40A, 415V,TPN RCCB.

PP-5PP-26 PP-4 PP-3 PP-2 PP-1

4C

, 1

6 S

Q.M

M P

VC

INSULA

TED

ARM

ORED

ALU

MIN

UM

CABLE

.

SMDB-3 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

12+36, IC+OGRESPECTIVELY

B TYPE, 16A MCB= 26 Nos

SMDB-4 ACRYLIC DOOR (DOUBLEDOOR),8 WAYS, TPN-DB

8+24, IC+OGRESPECTIVELY

B TYPE, 6A MCB= 09 NosB TYPE, 16A MCB= 15 Nos

8 S

WG

CU E

ARTH

WIR

E

8 S

WG

CU E

ARTH

WIR

E

EARTH LINK EARTH LINK

16A, SP,B-TYPE MCB

2X4

SQ

MM

PVC C

UW

IRE

L-1

6A, SP,B-TYPE MCB

2X2

.5 S

Q M

M P

VC

CU W

IRE

L-9 L-2 PP-1 PP-2 PP-3 PP-15PP-6

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/33

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 31 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 36: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SDB-5 DETAILS

4C, 16 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

ALU

MIN

UM

CABLE

.FROM MAIN DISTRIBUTION

BOARD

40A, 415V,TPN RCCB.

SDB-6 DETAILS

FROM MAIN DISTRIBUTIONBOARD

63A, 415V,TPN RCCB.

4C, 25 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

ALU

MIN

UM

CABLE

.

SMDB-5 ACRYLIC DOOR (DOUBLEDOOR),6 WAYS, TPN-DB

6+18, IC+OGRESPECTIVELY

B TYPE, 16A MCB= 16 Nos

SMDB-6 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

12+36, IC+OGRESPECTIVELY

B TYPE, 6A MCB= 10 NosB TYPE, 16A MCB= 16 Nos

8 S

WG

CU E

ARTH

WIR

E

8 S

WG

CU E

ARTH

WIR

E

EARTH LINK EARTH LINK

16A, SP,B-TYPE MCB

2X4

SQ

MM

PVC

CU

WIR

E

L-1

6A, SP,B-TYPE MCB

2X2

.5 S

Q M

M P

VC

CU W

IRE

L-10 L-2 PP-1 PP-2 PP-3 PP-16

16A, SP,B-TYPE MCB

2X4

SQ

MM

PVC

CU

WIR

E

AC-5AC-16 AC-4 AC-3 AC-2 AC-1AC-6

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/34

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 32 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 37: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SDB-7 DETAILS

4C, 16 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

ALU

MIN

UM

CABLE

.

FROM MAIN DISTRIBUTIONBOARD

16A, SP,B-TYPE MCB

2X4

SQ

MM

PVC C

UW

IRE

40A, 415V,TPN RCCB.

SDB-8 DETAILS

FROM MAIN DISTRIBUTIONBOARD

63A, 415V,TPN RCCB.

L-1

6A, SP,B-TYPE MCB

2X2

.5 S

Q M

M P

VC

CU W

IRE

L-12 L-2 PP-1 PP-2 PP-3 PP-13

4C, 25 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

ALU

MIN

UM

CABLE

.

SMDB-7 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

12+36, IC+OGRESPECTIVELY

B TYPE, 6A MCB= 12 NosB TYPE, 16A MCB= 13 Nos

SMDB-8 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

12+36, IC+OGRESPECTIVELY

B TYPE, 6A MCB= 10 NosB TYPE, 16A MCB= 26 Nos

8 S

WG

CU E

ARTH

WIR

E

8 S

WG

CU E

ARTH

WIR

E

EARTH LINK EARTH LINK

16A, SP,B-TYPE MCB

2X4

SQ

MM

PVC C

UW

IRE

L-1

6A, SP,B-TYPE MCB

2X2

.5 S

Q M

M P

VC

CU W

IRE

L-10 L-2 PP-1 PP-2 PP-3 PP-26

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/35

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 33 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 38: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

SDB-9 DETAILS

4C, 25 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

ALU

MIN

UM

CABLE

.

FROM MAIN DISTRIBUTIONBOARD

16A, SP,B-TYPE MCB

2X4

SQ

MM

PVC

CU

WIR

E

63A, 415V,TPN RCCB.

L-1

6A, SP,B-TYPE MCB

2X2

.5 S

Q M

M P

VC

CU W

IRE

L-10 L-2 PP-1 PP-2 PP-3 PP-23

SMDB-9 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

12+36, IC+OGRESPECTIVELY

B TYPE, 6A MCB= 10 NosB TYPE, 16A MCB= 23 Nos8 S

WG

CU E

ARTH

WIR

E

EARTH LINK

SDB-10 DETAILS

FROM MAIN DISTRIBUTIONBOARD

32A, 415V,TPN RCCB.

4C, 10 S

Q.M

M P

VC IN

SULA

TED

ARM

ORED

ALU

MIN

UM

CABLE

.

SMDB-10 ACRYLIC DOOR (DOUBLEDOOR),6 WAYS, TPN-DB

6+18, IC+OGRESPECTIVELY

B TYPE, 6A MCB= 04 NosB TYPE, 16A MCB= 13 Nos

8 S

WG

CU E

ARTH

WIR

E

EARTH LINK

16A, SP,B-TYPE MCB

2X4

SQ

MM

PVC

CU

WIR

E

L-1

6A, SP,B-TYPE MCB

2X2

.5 S

Q M

M P

VC

CU W

IRE

L-4 L-2 PP-1 PP-2 PP-3 PP-13

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/36

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 34 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

Page 39: ELECTRICAL DRAWING - Royal University of Bhutan · The telephone cable duct must be separated by 0.5 meters away from the electrical cable duct and must be in recessed. 2 Sl.NO. The

1200.01200.0

120.0

40.0

300.0

2800.0

Ø20.0 G.I PIPEFOR WATERING

WIRE MESH

Ø6.0 M.S ROD

C.I FRAME

CEMENT CONCRETE (1:4:8)

600

Ø15.0 G.I PIPE1500 MIN3000 MAX

3600.0

600.0

A

600x600x3.0CU PLATE

(OR)600x600x6.0G.I PLATE

ALTERNATE LAYER OF SALTAND CHARCOAL OR COKE

EARTH LEAD FOREARTH CONNECTIONIN G.I PIPE

2400.0

2400.0

3600.0

Ø15.0 G.I PIPE

EARTH LEAD

EARTH ELECRODE

ENLARGED DETAILS OF A

NOTE:1. BOLT, NUTS, CHECK NUT AND WASHER TO BE OF G.I FOR G.I PLATE AND TI24ED BRASS FOR

COPPER PLATE ELECTRODE.

2. EARTH RESISTANCE SHALL NOT BE GREATER THAN 5Ω AND IN ROCKY SOILS MAY BE UP TO 8Ω.

3. EARTHING LEAD SHALL BE OF G.I. WIRE (6 SWG)/G.I. STRIP (25 MM X 4 MM), IN CASE OF G.I. PLATEEARTH ELECTRODE AND COPPER WIRE (8 SWG)/COPPER STRIP ( 20MM X 3MM) IN THE CASE OFCOPPER EARTH ELECTRODE.

4. PROTECTION PIPE SHALL BE BURIED WITHIN THE GROUND AT LEAST 50CM DEEP. IN CASE OFROAD CROSSING AND PAVEMENTS SHALL BE BURIED 0.6 TO 0.7M.

5. AN EARTH ELECTRODE SHALL NOT BE SITUATED LESS THAN 1.8 M FROM ANY BUILDING.

6. MINIMUM DISTANCE BETWEEN TWO EARTH PIT SHALL NOT BE LESS THAN 5M.

7. THE SIZE OF EARTH CONTINUITY WIRE SHALL BE NOT LESS THAN 1.5 SQ.MM (16SWG) AND 2.5SQ.MM (14SWG) BARE COPPER WIRE FOR LIGHT AND POWER CIRCUIT RESPECTIVELY.

C.I COVER HINGED TO C.IFRAME

GROUNDLEVEL

600.0

RIV0

LOCATION: DEWATHANG, SAMDRUP JONGKHAR

PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/37

DRAWING TITLE.: As mention above.

SCALE: NTS SHEET NO.: 35 OF 35DATE:

ALL DIMENSIONS ARE IN MILLIMETER

CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

ASH BAHADUR SUBBAELECTRICAL ENGINEER

APPROVED BYCHECKED BYDESIGNED/DRAWN

MODIFICATIONDATE

REVISION5

4 CONSTRUCTION

3

2

1 APPROVAL

RECORD

INFORMATION

ISSUED FOR:

AutoCAD SHX Text
PLATE EARTHING DETAILS