INSTALLATION INSTRUCTIONS © Panduit Corp. 2002 Printed in U.S.A. FOR TECHNICAL SUPPORT CALL: 866-405-6654 Page 1 of 3 CM10B Slotted Duct Vertical Cable Management and Standard Rack 2. RACK INSTALLATION 2.1 ASSEMBLE RACK 2.1.1 Install top angle to upright channels. Finger tighten only. 2.1.2 Install the base angles to the vertical upright channels. Finger tighten only. 2.1.3 Stand rack upright. Square the upright channels with the base using a carpenter square. Completely tighten all bolts. 1. PART NUMBERS VERTICAL CABLE MANAGEMENT Brackets Racks Front/Back Front Only WMPV20 WMPVF20 CMVDRC CMR19X47 WMPV45 WMPVHCF45 CMVDR1 CMR19X84 WMPV50 WMPVFMHC45* CMVDR2 CMR23X84 WMPVHC45 WMPVFM45* CMVDR2S CMR19X26 WMPV3X5 WMPVF45 WMSRC2 WMPV6x8 WMPVF3X5 WMSRC1 WMPVF6X8 WMPVCB WMPVFM6X8* See the diagram below for dimensions needed to locate the rack and the vertical cable management. 2.2 MOUNT RACK TO FLOOR 2.2.1 Securely mount the rack to the floor using the appropriate hardware based on the floor construction (concrete, raised floor, or wood). LOCATION GUIDE Dimensions in () parenthesis are for 6” Vertical Cable Management Dimensions in [] brackets are for 3” Vertical Cable Management * Mounts to front of rack Sold by: http://www.TWAcomm.com Toll Free: (877) 892-2666

Upload: others

Post on 18-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Slotted Duct Vertical Cable Management and Standard Rackassets.twacomm.com/assets/pdf/17188.pdfSlotted Duct Vertical Cable Management and Standard Rack 2. RACK INSTALLATION 2.1 ASSEMBLE

INSTALLATION INSTRUCTIONS© Panduit Corp. 2002 Printed in U.S.A.

FOR TECHNICAL SUPPORT CALL: 866-405-6654

����

����

����

������������ �������������� �

������������ �������������� �

����

����

������������ �������������� �

������������ �������������� �

����������

����

����������

���

���

Page 1 of 3

CM10B

Slotted Duct Vertical Cable Managementand Standard Rack

2. RACK INSTALLATION2.1 ASSEMBLE RACK2.1.1 Install top angle to upright channels. Finger tighten only.

2.1.2 Install the base angles to the vertical upright channels. Fingertighten only.

2.1.3 Stand rack upright. Square the upright channels with the baseusing a carpenter square. Completely tighten all bolts.

1. PART NUMBERS

VERTICAL CABLE MANAGEMENT Brackets Racks

Front/Back Front OnlyWMPV20 WMPVF20 CMVDRC CMR19X47WMPV45 WMPVHCF45 CMVDR1 CMR19X84WMPV50 WMPVFMHC45* CMVDR2 CMR23X84

WMPVHC45 WMPVFM45* CMVDR2S CMR19X26WMPV3X5 WMPVF45 WMSRC2WMPV6x8 WMPVF3X5 WMSRC1

WMPVF6X8 WMPVCBWMPVFM6X8*

See the diagram below for dimensions needed to locate the rackand the vertical cable management.

2.2 MOUNT RACK TO FLOOR2.2.1 Securely mount the rack to the floor using the appropriate

hardware based on the floor construction (concrete, raisedfloor, or wood).

LOCATION GUIDEDimensions in () parenthesis are for 6” Vertical Cable Management

Dimensions in [] brackets are for 3” Vertical Cable Management

* Mounts to front of rack

Sold by:

http://www.TWAcomm.comToll Free: (877) 892-2666

Page 2: Slotted Duct Vertical Cable Management and Standard Rackassets.twacomm.com/assets/pdf/17188.pdfSlotted Duct Vertical Cable Management and Standard Rack 2. RACK INSTALLATION 2.1 ASSEMBLE

INSTALLATION INSTRUCTIONS

FOR TECHNICAL SUPPORT CALL: 866-405-6654

��������� ����

�������������

�����

������

����

���� ������ ��� ���

���������������

Page 2 of 3

CM10B

CMVDRC

CM VDR2S

CMVDR2

CMVDR1

3.1 ATTACH CENTER MOUNTED VERTICAL CABLE MANAGEMENT PANEL

3.1.1 Mount the racks to the floor (with theappropriate space indicated in the chart below)using #12 - 24 x 1/2” screws (supplied with the

vertical panels) tofasten the verticalmanagement betweenthe racks. Panelsfasten to the back ofthe vertical channeluprights.

3. VERTICAL CABLE MANAGEMENT INSTALLATION

3.2 ATTACH SIDE MOUNTED VERTICAL CABLE MANAGEMENT PANEL

3.2.1 Use #12 - 24 x 1/2” screws (supplied withthe vertical panels) to fasten the verticalmanagement between the racks. Panelsfasten to the back of the vertical channeluprights. (Except part numbersWMPVFMHC45 and WMPVFM45)

3.3 OPTION 2: USING THE CABLE MANAGEMENT BRACKETS

3.3.1 Mount the racks to the floor with 8.25”between the mounting holes.

3.3.2 Use two (4) #12 - 24 x 1/2” screws to fastenthe CMVDRC brackets between the racks.

3.3.3 Use two (2) 12-24 x 1/2” screws to fasten theCMVDR1,CMVDR2, or CMVDR2S bracketsto the sides of the racks on either the front orthe back.

FRONTBACK

FRONT

BACK

FRONT

BACK

Distance BetweenRack Mounting Holes

#12 - 24 X 1/2” Screws

#12 - 24 X 1/2” Screws

8.25” Between RackMounting Holes

#12 - 24 X 1/2” Screws

Center Bracket Assembly

WMPVCB

For use with 4” x 5”, 6” x 6”and 6” x 8” vertical panels

Page 3: Slotted Duct Vertical Cable Management and Standard Rackassets.twacomm.com/assets/pdf/17188.pdfSlotted Duct Vertical Cable Management and Standard Rack 2. RACK INSTALLATION 2.1 ASSEMBLE

INSTALLATION INSTRUCTIONS

NETWORK CONNECTIVITY GROUP

412 Rockwell CourtBurr Ridge, Illinois 60521

Technical Support: 866-405-6654Fax: 708-444-6993

E-mail: [email protected] site: www.panduit.com/ncg

WORLDWIDE SUBSIDIARIES AND SALES OFFICES

��� �� !�"# ���!�$%&'����"#! (� � ��"#! (� � ��"#! (� �

�����)�������*��#+ ,���-� .� * �� * ��� *

�����)�������*��#+ ,���-� ��� * �� * ��� *

��.���������*��#+ ,���-, �� * ��� * .�� *

�����)�������*��#+ ,���-�/ .� * �� * ��� *

��)����% ! ����0,���� ��� * ��� * ���� *

��)����% ! �������� ��� * ��� * ��� *

��)����% ! ��������� ��� * ��� * ���� *

��)����% ! ����0,�� ��� ��� ��� ��� ���� ����

��)����% ! ����0,��� ��� * ��� * ���� *

��)����% ! ������� ��� ��� ��� ��� ���� ����

��)����% ! �������� ��� * ��� * ���� *

��)����% ! ������ ��� ��� ��� ��� ��� ���

��)����% ! ������1��� ��� ��� ��� ��� ��� ���

��)����% ! ������� ��� * ��� * ��� *

��)����% ! ������� ��� * ��� * ��� *

$2345��36����#7"�&�!�"#����"#89�!"�'��%��:������+%�:���#���8� !�#+�!6�� �" �����;��:% !��36��&�)�&%&�&"%#!��&�9�<��9�� "�:�#+�!"�!9 ��"7�=���1��!���+6!#����"7�=����1�'����"%!�1��! �

>3��,�'8� / 3��"��,?3�� ��'��*" !� �,�'8����.@�:��� �,�'8�����@�:��� ��&&

��)����% !

��)����% !

�������

��������

���

���

���

* �

� ���

���

���

*

*

Page 3 of 3

CM10B4. VERTICAL CABLE MANAGEMENT INSTALLATION

BREAK OFF FINGERSOF VERTICALMANAGEMENTWHERE IT MEETSTHE HORIZONTALMANAGEMENT

THREAD CABLESTHROUGH THE BENDRADIUS CLIP

SNAP IN WIRERETAINER (WR5) ISINCLUDED IN THEVERTICAL PANELKITS.

CABLE CAPACITY CHART

Sold by:

http://www.TWAcomm.comToll Free: (877) 892-2666

Page 4: Slotted Duct Vertical Cable Management and Standard Rackassets.twacomm.com/assets/pdf/17188.pdfSlotted Duct Vertical Cable Management and Standard Rack 2. RACK INSTALLATION 2.1 ASSEMBLE

NETWORK CONNECTIVITY GROUP

412 Rockwell Court Burr Ridge, Illinois 60521Technical Support: 866-405-6654 Fax: 708-444-6993E-mail: [email protected] Web site: www.panduit.com/ncg

WORLDWIDE SUBSIDARIES AND SALES OFFICES

Sold by:

http://www.TWAcomm.comToll Free: (877) 892-2666