slotted duct vertical cable management and standard...
TRANSCRIPT
INSTALLATION INSTRUCTIONS© Panduit Corp. 2002 Printed in U.S.A.
FOR TECHNICAL SUPPORT CALL: 866-405-6654
����
����
����
������������ �������������� �
������������ �������������� �
����
����
������������ �������������� �
������������ �������������� �
����������
����
����������
���
���
Page 1 of 3
CM10B
Slotted Duct Vertical Cable Managementand Standard Rack
2. RACK INSTALLATION2.1 ASSEMBLE RACK2.1.1 Install top angle to upright channels. Finger tighten only.
2.1.2 Install the base angles to the vertical upright channels. Fingertighten only.
2.1.3 Stand rack upright. Square the upright channels with the baseusing a carpenter square. Completely tighten all bolts.
1. PART NUMBERS
VERTICAL CABLE MANAGEMENT Brackets Racks
Front/Back Front OnlyWMPV20 WMPVF20 CMVDRC CMR19X47WMPV45 WMPVHCF45 CMVDR1 CMR19X84WMPV50 WMPVFMHC45* CMVDR2 CMR23X84
WMPVHC45 WMPVFM45* CMVDR2S CMR19X26WMPV3X5 WMPVF45 WMSRC2WMPV6x8 WMPVF3X5 WMSRC1
WMPVF6X8 WMPVCBWMPVFM6X8*
See the diagram below for dimensions needed to locate the rackand the vertical cable management.
2.2 MOUNT RACK TO FLOOR2.2.1 Securely mount the rack to the floor using the appropriate
hardware based on the floor construction (concrete, raisedfloor, or wood).
LOCATION GUIDEDimensions in () parenthesis are for 6” Vertical Cable Management
Dimensions in [] brackets are for 3” Vertical Cable Management
* Mounts to front of rack
Sold by:
http://www.TWAcomm.comToll Free: (877) 892-2666
INSTALLATION INSTRUCTIONS
FOR TECHNICAL SUPPORT CALL: 866-405-6654
��������� ����
�������������
�����
������
����
���� ������ ��� ���
���������������
Page 2 of 3
CM10B
CMVDRC
CM VDR2S
CMVDR2
CMVDR1
3.1 ATTACH CENTER MOUNTED VERTICAL CABLE MANAGEMENT PANEL
3.1.1 Mount the racks to the floor (with theappropriate space indicated in the chart below)using #12 - 24 x 1/2” screws (supplied with the
vertical panels) tofasten the verticalmanagement betweenthe racks. Panelsfasten to the back ofthe vertical channeluprights.
3. VERTICAL CABLE MANAGEMENT INSTALLATION
3.2 ATTACH SIDE MOUNTED VERTICAL CABLE MANAGEMENT PANEL
3.2.1 Use #12 - 24 x 1/2” screws (supplied withthe vertical panels) to fasten the verticalmanagement between the racks. Panelsfasten to the back of the vertical channeluprights. (Except part numbersWMPVFMHC45 and WMPVFM45)
3.3 OPTION 2: USING THE CABLE MANAGEMENT BRACKETS
3.3.1 Mount the racks to the floor with 8.25”between the mounting holes.
3.3.2 Use two (4) #12 - 24 x 1/2” screws to fastenthe CMVDRC brackets between the racks.
3.3.3 Use two (2) 12-24 x 1/2” screws to fasten theCMVDR1,CMVDR2, or CMVDR2S bracketsto the sides of the racks on either the front orthe back.
FRONTBACK
FRONT
BACK
FRONT
BACK
Distance BetweenRack Mounting Holes
#12 - 24 X 1/2” Screws
#12 - 24 X 1/2” Screws
8.25” Between RackMounting Holes
#12 - 24 X 1/2” Screws
Center Bracket Assembly
WMPVCB
For use with 4” x 5”, 6” x 6”and 6” x 8” vertical panels
INSTALLATION INSTRUCTIONS
NETWORK CONNECTIVITY GROUP
412 Rockwell CourtBurr Ridge, Illinois 60521
Technical Support: 866-405-6654Fax: 708-444-6993
E-mail: [email protected] site: www.panduit.com/ncg
WORLDWIDE SUBSIDIARIES AND SALES OFFICES
��� �� !�"# ���!�$%&'����"#! (� � ��"#! (� � ��"#! (� �
�����)�������*��#+ ,���-� .� * �� * ��� *
�����)�������*��#+ ,���-� ��� * �� * ��� *
��.���������*��#+ ,���-, �� * ��� * .�� *
�����)�������*��#+ ,���-�/ .� * �� * ��� *
��)����% ! ����0,���� ��� * ��� * ���� *
��)����% ! �������� ��� * ��� * ��� *
��)����% ! ��������� ��� * ��� * ���� *
��)����% ! ����0,�� ��� ��� ��� ��� ���� ����
��)����% ! ����0,��� ��� * ��� * ���� *
��)����% ! ������� ��� ��� ��� ��� ���� ����
��)����% ! �������� ��� * ��� * ���� *
��)����% ! ������ ��� ��� ��� ��� ��� ���
��)����% ! ������1��� ��� ��� ��� ��� ��� ���
��)����% ! ������� ��� * ��� * ��� *
��)����% ! ������� ��� * ��� * ��� *
$2345��36����#7"�&�!�"#����"#89�!"�'��%��:������+%�:���#���8� !�#+�!6�� �" �����;��:% !��36��&�)�&%&�&"%#!��&�9�<��9�� "�:�#+�!"�!9 ��"7�=���1��!���+6!#����"7�=����1�'����"%!�1��! �
>3��,�'8� / 3��"��,?3�� ��'��*" !� �,�'8����.@�:��� �,�'8�����@�:��� ��&&
��)����% !
��)����% !
�������
��������
���
���
���
* �
� ���
���
���
*
�
*
Page 3 of 3
CM10B4. VERTICAL CABLE MANAGEMENT INSTALLATION
BREAK OFF FINGERSOF VERTICALMANAGEMENTWHERE IT MEETSTHE HORIZONTALMANAGEMENT
THREAD CABLESTHROUGH THE BENDRADIUS CLIP
SNAP IN WIRERETAINER (WR5) ISINCLUDED IN THEVERTICAL PANELKITS.
CABLE CAPACITY CHART
Sold by:
http://www.TWAcomm.comToll Free: (877) 892-2666
NETWORK CONNECTIVITY GROUP
412 Rockwell Court Burr Ridge, Illinois 60521Technical Support: 866-405-6654 Fax: 708-444-6993E-mail: [email protected] Web site: www.panduit.com/ncg
WORLDWIDE SUBSIDARIES AND SALES OFFICES
Sold by:
http://www.TWAcomm.comToll Free: (877) 892-2666