ELECTRIC NETWORK DESIGN APPROVAL APPLICATION Doc Ref: UKDA Revision: A Page 1 of 5 Please complete all sections of the application form and return to [email protected] Section 1 – Site Details UKPD Reference Number: Energisation Date: Site Name/Address/Postcode: Project Description: Section 2 – Independent Connection Provider (ICP) Details Your Site Reference Number: Company Name: Address: Designer: Contact Telephone Number: Email Address: Section 3 – Land Owner Details Company Name: Address: Contact Name: Contact Telephone Number: Email Address:

Upload: others

Post on 11-Feb-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

 

 ELECTRIC NETWORK DESIGN APPROVAL APPLICATION 

Doc Ref: UKDA  Revision: A

  Page 1 of 5   

Please complete all sections of the application form and return to [email protected] 

Section 1 – Site Details 

UKPD Reference Number:   

Energisation Date:   

Site Name/Address/Postcode:   

Project Description:   

   

Section 2 – Independent Connection Provider (ICP) Details 

Your Site Reference Number:   

Company Name:   

Address:    

Designer:   

Contact Telephone Number:    

Email Address:    

   

Section 3 – Land Owner Details 

Company Name:   

Address:    

Contact Name:   

Contact Telephone Number:    

Email Address:   

 

 ELECTRIC NETWORK DESIGN APPROVAL APPLICATION 

Doc Ref: UKDA  Revision: A

  Page 2 of 5   

Section 4 – Land Owner Solicitor Details 

Company Name:   

Address:    

Contact Name:   

Contact Telephone Number:    

Email Address:    

Section 5 – Proposed Connection Load Details 

Plot Number or Name 

Quantity Supply Capacity (kVA)  LV 

HV  Build Phase Per Plot*  Total  1Ph  3Ph 

               

               

               

               

         

         

         

         

         

Total Load:             

*ADMD (After Diversity Maximum Demand) 

As a guide for gas heated semi‐detached domestic housing use 1.0 kVA per plot (up to 3 bedrooms) and for detached domestic housing use 1.4 kVA per plot (up to 5 bedrooms). 

As a guide for electric heated domestic apartments/housing use 3.4 kVA per plot (up to 2 bedrooms and within  a  high  density  of  units).  For  electric  heated  housing with  ‘restricted  hours  tariffs  and  all  other scenarios please refer to UKPD for guidance. 

For  electric  heated  domestic  apartments  use  UKPD  ADMD  Ready  Reckoner  to  calculate  the  rating  of distribution transformers.              

Section 6 – Proposed Generation and Export Details 

Maximum power output (phased if appropriate):   

Generation set specification type e.g. PV, CHP:   

Confirmation of plans to export back to network:   

Plans to run in parallel e.g. test back‐up generator: 

 

Completed ENA document e.g. G59, G83:   

 

 ELECTRIC NETWORK DESIGN APPROVAL APPLICATION 

Doc Ref: UKDA  Revision: A

  Page 3 of 5   

Section 7 – Proposed Materials and Equipment for Adoption 

Category  Description  Specification  Supplier 

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

Note: If you need to provide any further materials and equipment details please provide on a separate sheet in the above format 

 

 ELECTRIC NETWORK DESIGN APPROVAL APPLICATION 

Doc Ref: UKDA  Revision: A

  Page 4 of 5   

Section 8 – Other drawings and documents to be provided as indicated    

Please include the information below depending on the type of projects listed on the right. 

LV Networks 

LV supplies from a 

new

 standard sub‐

station 

LV supplies from a 

new

 non‐standard 

sub‐station 

HV M

etered

 

Supply 

1  Site plan to include the following minimum information: ‐

Clearly defined site boundary 

North point 

Site location detail (can be provided on separate drawing if desired) 

Minimum scale 1:500 @ A3 

Yes  Yes  Yes  Yes 

2  LV design drawing to include the following minimum information: ‐

Size/type and network asset owner of existing cable at the point of connection 

Link box and fuse sizes where required 

Substation location where required 

Proposed LV cable size/type and ducting size/type where required 

All joints, pot ends, terminations and earthing 

Detailed cross sections along the cable route 

Service load, termination, service fuse size, CT ratio and metering arrangements for each supply 

Kiosk/cabinet details, where required, including manufacturers specification 

For apartments include details of internal mains and service routes, cable ways, containment, multi metering layouts, distribution boards, fusing and service positions 

Street lighting connections where required  

Single line diagram (can be provided on separate drawing if desired) 

North point 

Minimum scale 1:500 @ A3 

Yes  Yes  Yes  N/A 

3  HV design drawing to include the following minimum information: ‐

Size/type and network asset owner of existing cable at the point of connection 

Substation location, load and plant specification including manufacturers details 

Small power and lighting specification and details 

Proposed HV cable size/type and ducting size/type where required 

All joints and terminations 

Detailed cross sections along the cable route 

Customers transformer or HV network details for any HV metered supplies 

Emergency trip button and HV meter panel details where required 

Kiosk/cabinet details, where required, including manufacturers specification  

Single line diagram (can be provided on separate drawing if desired) 

HV Protection details and settings 

Ancillaries: Tripping battery, automation details, where required 

North point 

Minimum scale 1:500 @ A3 

N/A  Yes  Yes  Yes 

4  Substation earthing drawing to include the following minimum information: ‐

Substation layout 

Earthing design 

N/A  Yes  Yes  Yes 

 

 ELECTRIC NETWORK DESIGN APPROVAL APPLICATION 

Doc Ref: UKDA  Revision: A

  Page 5 of 5   

Section 9 – Additional information/comments 

 

   

Section 10 – ICP Declaration 

I confirm that by submitting this application we have been appointed as an ICP to design and install electrical networks to the above  named development.  I  understand  that  failure  to  supply  any  of  the  required  information may  result  in  a  delay  in my application being processed. 

ICP Company Name:   

Print Name:   

Signature:   

Date:   

UKPD exist to provide customers with a forward thinking, flexible and least hassle approach in the area of adoption of electricity distribution networks, which we will look to deliver through pioneering commercial solutions and the introduction of a more pragmatic and streamlined approach to the whole adoption process.  Contact Us:  Address: Head Office, 6500 Daresbury Park, Warrington, Cheshire, WA4 4GE Phone number: 0844 74 000 74 E‐mail: [email protected] We are open: Main office is open from 8.30am to 5pm Monday to Friday 

5  Substation with standard housing drawing to include the following minimum information: ‐ 

GRP specification and manufacturer or brick built housing specification 

Plinth construction details 

N/A  Yes  N/A  Yes 

6  Substation with non‐standard housing drawing to include the following minimum information: ‐ 

Architect proposals for substation room 

Substation layout including dimensions, doors, joint locking arrangement and ventilation details 

N/A  N/A  Yes  Yes 

7  IDNO legal drawing to include the following minimum information: ‐

Substation access 

Cable easements 

Street names 

North point 

Scale 1:1250 with insert at 1:500 to highlight any substation detail 

Yes  Yes  Yes  Yes 

8  Volt drop and earth loop impedance calculations for LV network   Yes  Yes  Yes  N/A 

9  Drawing register confirming the following:‐ 

Drawing numbers and revision details 

Drawing title 

Scheme title 

Yes  Yes  Yes  Yes