www.themegallery.com

Contents

Overview -Olympic Dam Expansion Project

Australian Carbon Tax Regime

Environmental & Social impacts of the Expansion Project

Actual status of Expansion Project & EIS approval4

1

2

3

31.01.2014 2EIS Olympic Dam Expansion Project in Australia

Page 3: Eis   olympic dam expansion project

www.themegallery.com

Overview – Olympic Dam Expansion Project

31.01.2014 3EIS Olympic Dam Expansion Project in Australia

• Multi-mineral ore body in northern South Australia some 550 km NNW of Adelaide

• Underground mine with integrated metallurgical plant

• Significant quantities of copper, uranium, gold and silver.

• Regulated by 3 – tier government– Australian– South Australian– Northern Territory

• Closest town – Roxby Downs

• Expansion is hinge on– Open-pit mine in parallel with – Underground mine

• Support facilities for expansion include:– Hiltabe Village for workers– Landing faciliity and new Port– A 105 km rail line – A 280 megalitre per day (ML/d) esalination plant– New electric transmiissiojline OR gas pipeline

OR hybrid solution of both– New airport

Page 4: Eis   olympic dam expansion project

www.themegallery.com

Production Capacity

1 Nameplate design capacity – max. continuous capacity of Olympic Dam within specific ore grade and parameters.

2 includes on-site and overseas production

31.01.2014 EIS Olympic Dam Expansion Project in Australia 4

Page 5: Eis   olympic dam expansion project

www.themegallery.com

Australian Carbon Tax Regime

31.01.2014 EIS Olympic Dam Expansion Project in Australia 5

• It set a fixed carbon tax of A$23 ($23.78) per tonne since July 2012

• Then move to an Emissions Trading Scheme from July 2015.– Companies involved will need a permit for every tonne of carbon they emit.

• The carbon price = cost on every tonne of carbon emitted

• Companies have financial incentive to reduce pollution, Australia can reach its goal to cut emissions by 5% of 2000 levels by 2020.

Page 6: Eis   olympic dam expansion project

www.themegallery.com

EIS Matrix for Olympic Dam Expansion Project

31.01.2014 EIS Olympic Dam Expansion Project in Australia 6

Page 7: Eis   olympic dam expansion project

www.themegallery.com

Status of Actual Expansion and Approval

2009Proposed Expansion & Approval 2011 2012

1988 2009 2011 2012

• Production began • BHB Biliton released extensive EIS to public for comment

• Federal and state government approvals for mine expansion granted

• Public protests in early 2012

• BHB Biliton anounced indefinite postponement for the expansion

• Pending investigation of ‘new & cheaper design