EIS for the Olympic Dam Expansion Project
Obumneme NzekweChai Gongzhe
IMRE 2011
![Page 2: Eis olympic dam expansion project](https://reader038.vdocuments.site/reader038/viewer/2022103010/554d7a66b4c9053e0c8b4c68/html5/thumbnails/2.jpg)
www.themegallery.com
Contents
Overview -Olympic Dam Expansion Project
Australian Carbon Tax Regime
Environmental & Social impacts of the Expansion Project
Actual status of Expansion Project & EIS approval4
1
2
3
31.01.2014 2EIS Olympic Dam Expansion Project in Australia
![Page 3: Eis olympic dam expansion project](https://reader038.vdocuments.site/reader038/viewer/2022103010/554d7a66b4c9053e0c8b4c68/html5/thumbnails/3.jpg)
www.themegallery.com
Overview – Olympic Dam Expansion Project
31.01.2014 3EIS Olympic Dam Expansion Project in Australia
• Multi-mineral ore body in northern South Australia some 550 km NNW of Adelaide
• Underground mine with integrated metallurgical plant
• Significant quantities of copper, uranium, gold and silver.
• Regulated by 3 – tier government– Australian– South Australian– Northern Territory
• Closest town – Roxby Downs
• Expansion is hinge on– Open-pit mine in parallel with – Underground mine
• Support facilities for expansion include:– Hiltabe Village for workers– Landing faciliity and new Port– A 105 km rail line – A 280 megalitre per day (ML/d) esalination plant– New electric transmiissiojline OR gas pipeline
OR hybrid solution of both– New airport
![Page 4: Eis olympic dam expansion project](https://reader038.vdocuments.site/reader038/viewer/2022103010/554d7a66b4c9053e0c8b4c68/html5/thumbnails/4.jpg)
www.themegallery.com
Production Capacity
1 Nameplate design capacity – max. continuous capacity of Olympic Dam within specific ore grade and parameters.
2 includes on-site and overseas production
31.01.2014 EIS Olympic Dam Expansion Project in Australia 4
![Page 5: Eis olympic dam expansion project](https://reader038.vdocuments.site/reader038/viewer/2022103010/554d7a66b4c9053e0c8b4c68/html5/thumbnails/5.jpg)
www.themegallery.com
Australian Carbon Tax Regime
31.01.2014 EIS Olympic Dam Expansion Project in Australia 5
• It set a fixed carbon tax of A$23 ($23.78) per tonne since July 2012
• Then move to an Emissions Trading Scheme from July 2015.– Companies involved will need a permit for every tonne of carbon they emit.
• The carbon price = cost on every tonne of carbon emitted
• Companies have financial incentive to reduce pollution, Australia can reach its goal to cut emissions by 5% of 2000 levels by 2020.
![Page 6: Eis olympic dam expansion project](https://reader038.vdocuments.site/reader038/viewer/2022103010/554d7a66b4c9053e0c8b4c68/html5/thumbnails/6.jpg)
www.themegallery.com
EIS Matrix for Olympic Dam Expansion Project
31.01.2014 EIS Olympic Dam Expansion Project in Australia 6
![Page 7: Eis olympic dam expansion project](https://reader038.vdocuments.site/reader038/viewer/2022103010/554d7a66b4c9053e0c8b4c68/html5/thumbnails/7.jpg)
www.themegallery.com
Status of Actual Expansion and Approval
2009Proposed Expansion & Approval 2011 2012
1988 2009 2011 2012
• Production began • BHB Biliton released extensive EIS to public for comment
• Federal and state government approvals for mine expansion granted
• Public protests in early 2012
• BHB Biliton anounced indefinite postponement for the expansion
• Pending investigation of ‘new & cheaper design
31.01.20147
EIS Olympic Dam Expansion Project in Australia
![Page 8: Eis olympic dam expansion project](https://reader038.vdocuments.site/reader038/viewer/2022103010/554d7a66b4c9053e0c8b4c68/html5/thumbnails/8.jpg)
Thank You!
EIS Olympic Dam Expansion Project in Australia