eglinton crosstown crosstown ... piling the southwest side at the station box ... forest hill...

11
EGLINTON CROSSTOWN Cedarvale-Forest Hill Construction Liaison Committee June 28, 2017

Upload: buikhanh

Post on 28-Apr-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover

EGLINTON CROSSTOWN Cedarvale-Forest Hill Construction Liaison Committee June 28, 2017

Page 2: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover

2

Agenda

• Cedarvale Station Update

• Forest Hill Station Update

Page 3: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover

3

Cedarvale Station Updates

June 2017

• Utilities relocation works (Sanitary sewer & water main) are ongoing at Park Hill Rd and Eglinton Ave W

• Crews will soon be on Everden Rd and Winnett Ave to continue the relocation of utilities

• Invert tunnel concrete pour is ongoing at both the east and west side of Allen Rd

• Shoring and construction for the east entrance (at Allen Rd North and Eglinton Ave) is underway

– Waterproofing and Formwork underway

• Ongoing noise and vibration monitoring

• Traffic flip for Eglinton Rd scheduled mid-July

• Shoring on the south side of Eglinton Ave to start as early as July

Page 4: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover

4

Outdoor Bicycle Parking

Cedarvale Station Aerial Rendering

Accessible Entrance

Outdoor Bicycle Parking

Accessible Entrance

Outdoor Bicycle Parking

Eglinton West TTC Station

Page 5: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover

5

Construction Progress Picture

Page 6: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover

Forest Hill Station Construction Update

Complete

Demolition of 842, 874, 875 and 876 Eglinton Ave W

Installation of geotechnical monitoring equipment

Bell utilities relocation

Hydro utilities relocation

Installation of temporary traffic signals

Watermain servicing

Sanitary and storm sewer relocation

Piling the southwest side at the station box

Summer 2017

• Continue piling at the southeast side of the station box

• Continue shallow excavation at the southwest side of the station box

• Continue piling at the Secondary Entrance

• Piling at the Main Entrance

Page 7: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover

Forest Hill Station Concept Aerial View

Main Entrance

Secondary Entrance

*60% rendering

Page 8: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover

Forest Hill Station Construction Progress

8

PILING SOUTHEAST WORK ZONE

SOUTHWEST SHALLOW

EXCAVATION

Page 9: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover

Forest Hill Station Construction Progress

9

PILING AT SECONDARY ENTRANCE

OVERNIGHT SEWER WORK

Page 10: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover

Forest Hill Station Construction Progress

10 May 2017 Flyover

Page 11: EGLINTON CROSSTOWN CROSSTOWN ... Piling the southwest side at the station box ... Forest Hill Station Construction Progress 10May 2017 Flyover

Gallery City Update

ART BY JACQUIE COMRIE AT

PRESTIGE NAIL SALON (FOREST HILL STATION)