efficiently rising to the occasion - mixed use and multi-family construction

1
M cKenney’s replaced chilled water risers in high-rise towers without compromising cooling system performance. THE CHALLENGE New chilled water risers were required for large high-rise condominium towers. McKenney’s needed to install new piping without interrupt- ing existing building cooling system opera- tions. In addition, the team had to spread the cost of the project over three years to match the budget of the building’s owner. THE SOLUTION The McKenney’s team chose an alternate location to install the new chilled water risers in order to simplify the transition to the new cooling system in a cost-efficient, convenient manner for the homeowners. Two or three units were connected to the new risers at a time to accommodate the project’s unique scheduling needs. Riser sections were pre- fabricated at McKenney’s campus facility to streamline installation. Once all units were connected, the old risers were capped, drained and abandoned. THE RESULTS Using a phased approach, the building owner’s unique budgetary and schedule requirements were met with minimal impact to homeowners during installation. Efficiently Rising to the Occasion PROJECT NAME Plaza Towers Risers PROJECT LOCATION Atlanta, Georgia PROJECT TEAM Owner: Plaza Towers Condominium Association General Contractor: McKenney’s, Inc. Engineer: McKenney’s, Inc. SPECIALIZATIONS Design/Build Plumbing Shop Prefab MARKETS Mixed-use & Multifamily The content of this document is not intended as an endorsement. www.mckenneys.com © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

Upload: mckenneys-inc

Post on 25-Jan-2017

140 views

Category:

Business


0 download

TRANSCRIPT

McKenney’s replaced chilled water risers in high-rise towers without compromising cooling

system performance.

THE CHALLENGENew chilled water risers were required for large high-rise condominium towers. McKenney’s needed to install new piping without interrupt-ing existing building cooling system opera-tions. In addition, the team had to spread the

cost of the project over three years to match the budget of the building’s owner.

THE SOLUTIONThe McKenney’s team chose an alternate location to install the new chilled water risers in order to simplify the transition to the new cooling system in a cost-efficient, convenient manner for the homeowners. Two or three units were connected to the new risers at a time to accommodate the project’s unique

scheduling needs. Riser sections were pre-fabricated at McKenney’s campus facility to streamline installation. Once all units were connected, the old risers were capped, drained and abandoned.

THE RESULTSUsing a phased approach, the building owner’s unique budgetary and schedule requirements were met with minimal impact to homeowners during installation.

Efficiently Rising to the OccasionPROJECT NAME

� Plaza Towers Risers

PROJECT LOCATION

� Atlanta, Georgia

PROJECT TEAM

� Owner: Plaza Towers Condominium Association

� General Contractor: McKenney’s, Inc.

� Engineer: McKenney’s, Inc.

SPECIALIZATIONS

Design/Build

Plumbing Shop Prefab

MARKETS

� Mixed-use & Multifamily

The content of this document is not intended as an endorsement.

www.mckenneys.com© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]

3601 Performance Road Charlotte, North Carolina 28214