efficient implementation of road projects to raise eco-friendly green territory
DESCRIPTION
Efficient Implementation of Road Projects To Raise Eco-friendly Green Territory. 2010. 6. 23. - PowerPoint PPT PresentationTRANSCRIPT
Efficient Implementation Efficient Implementation of Road Projectsof Road Projects
To Raise Eco-friendly Green TerritoryTo Raise Eco-friendly Green Territory
Efficient Implementation Efficient Implementation of Road Projectsof Road Projects
To Raise Eco-friendly Green TerritoryTo Raise Eco-friendly Green Territory
2010. 6. 23.2010. 6. 23.
This report is written by the Taskforce consisting of
public officials and relevant experts from the
Presidential Council on National Competitiveness,
Ministry of Land, transport and Maritime Affairs (MLTM),
Ministry of Strategy and Finance (MOSF), Korean
Research Institute for Human Settlements, and Korea
Transport Institute. The TF has written the report from
last Oct. to this May based on site tours around the U.S.,
Japan, the U.K., France and Germany and discussion
with experts there.
The report is designed to come up with measures to
improve inefficient investment, damage on natural
landscape, and invasion of public lives.
CONTENTSCONTENTS
Current Status & ProblemsCurrent Status & ProblemsⅠⅠ
Causes of ProblemsCauses of ProblemsⅡⅡ
Improvement MeasuresImprovement MeasuresⅢⅢ
Expected EffectsExpected EffectsⅣⅣ
Future PlansFuture PlansⅤⅤ
Current Status & ProblemsCurrent Status & ProblemsⅠⅠ
Continuously expanding road network since the opening of Gyeongbu Expressway in 1970Continuously expanding road network since the opening of Gyeongbu Expressway in 1970
Road has driven enhanced territorial competitiveness, economic growth and regional developmentRoad has driven enhanced territorial competitiveness, economic growth and regional development
Rapid expansion of road network resulted in problems Rapid expansion of road network resulted in problems such as redundant and excessive investmentsuch as redundant and excessive investmentRapid expansion of road network resulted in problems Rapid expansion of road network resulted in problems such as redundant and excessive investmentsuch as redundant and excessive investment
1
Ⅰ. Current Status & Problems
Redundant & Excessive InvestmentRedundant & Excessive Investment11
Causing side effects such as lack of passage, double-up construction of national highways and expressways, and excessive construction of higher speed freeways
- Some of expanded national highways in regional areas found that the actual traffic fell short of traffic forecast
- Double-up of expressway & Nat’l highway ring roads, excessive linear or multi-dimensional roads
Causing side effects such as lack of passage, double-up construction of national highways and expressways, and excessive construction of higher speed freeways
- Some of expanded national highways in regional areas found that the actual traffic fell short of traffic forecast
- Double-up of expressway & Nat’l highway ring roads, excessive linear or multi-dimensional roads
2
Ⅰ. Current Status & Problems
Facing demands from political circle & complaints in the region for unnecessary projectsFacing demands from political circle & complaints in the region for unnecessary projects
Environmental Degradation from quantitative facility expansionEnvironmental Degradation from quantitative facility expansion22
Damaging landscape & environment, cutting off settlementsDamaging landscape & environment, cutting off settlements
Growing maintenance costs due to expanded roadsGrowing maintenance costs due to expanded roads33
Increased financial burden according to growing fixed costsIncreased financial burden according to growing fixed costs
“Efficient implementation of road projects and comprehensive system improvement are required “Efficient implementation of road projects and comprehensive system improvement are required 3
’00 ’01 ’02 ’03 ’04 ’05 ’06 ’07 ’08 ’09
24,842
164,7853Length of roadCost of maintenance
151,250
17,607
< Ref.: side effects of expanded public investment in Japan >
Japan has implemented excessive public investment since 1992 to stimulate demands
41% up from ’00 in maintenanceKRW 176.07 bil.(’00) 2484.2 bil.(’09)41% up from ’00 in maintenanceKRW 176.07 bil.(’00) 2484.2 bil.(’09)
* Investing JPY 59 tril. in SOC among total 136 tril. Investment for the past 10 yrs
Resulting in serious financial deficits and reduced to a debtor nation
Ⅰ. Current Status & Problems
4
6
4
4
3
2
1
0
6
4
4
3
2
1
0
11 44 77 1010 1313 1616 1919 2222 2424 2828 3131 3434 3737 4040 4343 4646 4949 5858
1.041.04
< Reference: current road facilities >
Road density (Total road lengths per land sizeRoad density (Total road lengths per land size
24th among 58 countries with 1.04(km/km2) road density (2010, IMD)
* Belgium-1st, Japan-4th, Germany-7th, U.K.-11th, France-16th, US-30th
24th among 58 countries with 1.04(km/km2) road density (2010, IMD)
* Belgium-1st, Japan-4th, Germany-7th, U.K.-11th, France-16th, US-30th
Total road lengths have increased by 8.9% for the past 10 yrs Total road lengths have increased by 8.9% for the past 10 yrs
Current road facilitiesCurrent road facilities
’00’00
4.994.99
’09’09
Total road lengths
Total road lengths
151,250151,250
164,785164,785
8.9% up8.9% up
ExpresswayExpressway
2,1312,131
3,7763,776
77% up77% up
National highwayNational highway
11% up11% up
13,81913,819
12,41312,413
Causes of ProblemsCauses of ProblemsⅡⅡ
Less conformity to Nat’l Comprehensive PlanLess conformity to Nat’l Comprehensive Plan
Less consistency in road plansLess consistency in road plans
Poor strategy for connected investment among transport modesPoor strategy for connected investment among transport modes
Separate planning of land use, road and transport result in less connectivitySeparate planning of land use, road and transport result in less connectivity
Lack of connectivity among road plansLack of connectivity among road plans11
Separate planning by local govt.s caused less consultation & coordinationSeparate planning by local govt.s caused less consultation & coordination
Unclear distinction for function and importance of each road resulted in scattered investmentUnclear distinction for function and importance of each road resulted in scattered investment
Priority standard for demand-based investment considering a section where roads and railroads competePriority standard for demand-based investment considering a section where roads and railroads compete
6
Ⅱ. Causes of Problems
Road expansion focusing on higher standard roadsRoad expansion focusing on higher standard roads
Inflexible methods and design standardInflexible methods and design standard22
Inflexible design standardInflexible design standard
Difficulty in flexible application considering regional characteristicsDifficulty in flexible application considering regional characteristics
Creating conflicts and longer time for consultation due to separated living area when designating routes(Max. 19months delayed)
Creating conflicts and longer time for consultation due to separated living area when designating routes(Max. 19months delayed)
Lack of considering environment & landscapeLack of considering environment & landscape
7
Direct and multi-leveled expansion through detour roadsDirect and multi-leveled expansion through detour roads
Ⅱ. Causes of Problems
Excessive demand from Nat’l Assembly and local govt.sExcessive demand from Nat’l Assembly and local govt.s
Causing waste of budget by investing in even less lucrative projectsCausing waste of budget by investing in even less lucrative projects
Insufficient feasibility & evaluation systemInsufficient feasibility & evaluation system33
Inaccurate demand forecastInaccurate demand forecast
Overestimates of future demand resulted in the shortfall of actual traffic in certain sectionsOverestimates of future demand resulted in the shortfall of actual traffic in certain sections
Poor evaluation systemPoor evaluation system
Delayed road projects could prolong project period without reevaluationDelayed road projects could prolong project period without reevaluation
Measuring project performance by provider cannot ensure reliabilityMeasuring project performance by provider cannot ensure reliability
8
Ⅱ. Causes of Problems
Scattered road management systemScattered road management system
Scattered road management system with less connectivityScattered road management system with less connectivity44
Conduct maintenance and management by road management agencyKorea Highway Corporation(expressway), regional administration(nat’l highway),local govt.s (provincial road)
Conduct maintenance and management by road management agencyKorea Highway Corporation(expressway), regional administration(nat’l highway),local govt.s (provincial road)
Capital area: local govt.s dialogue (Capital transport headquarter) is operated with weak coordination functionCapital area: local govt.s dialogue (Capital transport headquarter) is operated with weak coordination function
Non-capital area: wide-area transport demand management is required, but policy connection & coordination is absentNon-capital area: wide-area transport demand management is required, but policy connection & coordination is absent
Integrated management system required by metropolitan zoneIntegrated management system required by metropolitan zone
9
•Capital Transport Headquarter: operated in the form of cooperative among local govt.s including Seoul and Incheon•Capital Transport Headquarter: operated in the form of cooperative among local govt.s including Seoul and Incheon
Ⅱ. Causes of Problems
Improvement MeasuresImprovement MeasuresⅢⅢ
11
GoalGoal
DirectionDirection
TasksTasks
Raising eco-friendly green territory through efficient implementation of road projectsRaising eco-friendly green territory through efficient implementation of road projects
Integrated planning and management of road facilitiesIntegrated planning and management of road facilities
Maximizing the use of existing road facilities,Preventing redundant & excessive investmentMaximizing the use of existing road facilities,Preventing redundant & excessive investmentPursuing user-oriented & eco-friendly road projectsPursuing user-oriented & eco-friendly road projects
1. Establishing comprehensive planning of road projects1. Establishing comprehensive planning of road projects
2. Promoting efficient methods and standard for road projects2. Promoting efficient methods and standard for road projects
3. Strengthening road project investment evaluation system3. Strengthening road project investment evaluation system
4. Advancing road facility management system4. Advancing road facility management system
11
22
12
Enhancing conformity of road plan to comprehensive planEnhancing conformity of road plan to comprehensive plan
Strengthening connection of road plan to national comprehensive plan and basic national logistics planStrengthening connection of road plan to national comprehensive plan and basic national logistics plan
Connecting road projects and various development projectConnecting road projects and various development project
Nat’l Comprehensive
plan
Transportation, logistics
planRoad plan
Establishing comprehensive inter-modal management systemEstablishing comprehensive inter-modal management system
Linking and adjusting investment plans by transport modeLinking and adjusting investment plans by transport mode
- Strengthening link and adjustment of implementation period and priority by transport mode such as road and railroad
* Supplementing nat’l transport network plan(‘00~’19)
- Strengthening link and adjustment of implementation period and priority by transport mode such as road and railroad
* Supplementing nat’l transport network plan(‘00~’19)
1. Establishing Comprehensive Planning of Road Projects
33
13
Building up comprehensive planning system for major road networkBuilding up comprehensive planning system for major road network
1. Establishing Comprehensive Planning of Road Projects
Review of road ranksReview of road ranks Strengthening connection by roadStrengthening connection by road
Readjusting road ranks roads based on functions and road service levelReadjusting road ranks roads based on functions and road service level
ProvincialroadProvincialroad
Nat’l highwayNat’l highway
Establishing comprehensive plan (nat’l road network plan)Establishing comprehensive plan (nat’l road network plan)
Nat’l road network
plan(new, 20-year)
Nat’l road network
plan(new, 20-year)
Basic road maintenance
plan(10-year)
Basic road maintenance
plan(10-year)
Mid-term Investment
plan(5-year)
Mid-term Investment
plan(5-year)
Adjusting roads on boundariesAdjusting roads on boundaries
conflicts of interest among local govt.sfor linking roads on boundaries route adjustment by MLTM
conflicts of interest among local govt.sfor linking roads on boundaries route adjustment by MLTM
Improving functions of road policy review committeeImproving functions of road policy review committee
Reviewing route designation, redundant
& excessive investment, eco-friendly
guideline, reevaluating delayed projects
Reviewing route designation, redundant
& excessive investment, eco-friendly
guideline, reevaluating delayed projects
2. Promoting efficient methods & standard for road projects
11 Moving toward efficient and various methodsMoving toward efficient and various methods
Improving existing roads firstImproving existing roads first
Diversifying expansion of road capacityDiversifying expansion of road capacity
Eschewing simple expansion and improving interchanges andEschewing simple expansion and improving interchanges and
Supporting budget first for expansion project using existing road facilities at certain extentSupporting budget first for expansion project using existing road facilities at certain extent
When forecast traffic is less than 4-lane demand phase-in constructionWhen forecast traffic is less than 4-lane demand phase-in construction
Not much traffic increase expand capacity by using existing roads such as 2+1lane systemNot much traffic increase expand capacity by using existing roads such as 2+1lane system
16
Reducing scale of facility Reducing scale of facility
Over 4-lane alternative detour roads under construction
Construct 2-lane roads considering road condition and traffic
Over 4-lane alternative detour roads under construction
Construct 2-lane roads considering road condition and traffic
22
15
2. Promoting efficient methods & standard for road projects
Flexible standard for design speedFlexible standard for design speed
Breaking down design speed for landscape, environment, topography and flexibly apply such standard Breaking down design speed for landscape, environment, topography and flexibly apply such standard
* topographic condition (regional area): plain/mountain plain/ hill/ mountain* topographic condition (regional area): plain/mountain plain/ hill/ mountain
*Installing interchange: trumpet type rotary or diamond types*Installing interchange: trumpet type rotary or diamond types
Separating local communities or damaging environment due to road constructionSeparating local communities or damaging environment due to road construction
Coordinating design speed of each section and apply minimum design standard without compromising safetyCoordinating design speed of each section and apply minimum design standard without compromising safety
2. Promoting efficient methods & standard for road projects
44 Systemizing road project procedureSystemizing road project procedure
18
Expanding collection of residents’opinions
- Preventing separation of settlements and economic impacts during designation and implementation
Expanding collection of residents’opinions
- Preventing separation of settlements and economic impacts during designation and implementation
Creating green·scenic roadsCreating green·scenic roads
Phased expansion of Scenic Road and Revising ‘Scenic Road Guideline’ to consider and assess surrounding ecosystem, conditions Phased expansion of Scenic Road and Revising ‘Scenic Road Guideline’ to consider and assess surrounding ecosystem, conditions
33
* Ensuring participation of environment experts in route review, field study, and initial design * Ensuring participation of environment experts in route review, field study, and initial design
3. Strengthening road project investment evaluation system
Strengthening feasibility study for road projectStrengthening feasibility study for road project
Enhancing reliability and accuracy of demand forecastEnhancing reliability and accuracy of demand forecast
Strengthening performance-based evaluation for road projectStrengthening performance-based evaluation for road project
19
11
22
33
Verifying feasibility clearly for individual project when conducting blanket pre-feasibility study for mid-and long-term planVerifying feasibility clearly for individual project when conducting blanket pre-feasibility study for mid-and long-term plan
Verifying traffic demand forecast through national research institute
Expand target and period, verifying by outside expert * period (5yrs 1~2yrs), target area(248 3,500)
Verifying traffic demand forecast through national research institute
Expand target and period, verifying by outside expert * period (5yrs 1~2yrs), target area(248 3,500)
post evaluation by 3rd party, preventing inefficient investment
when investment necessity decreases according to conditional change, such project will be re-evaluated* projects which have not initiated for the past 10yrs or stopped for 2yrs
post evaluation by 3rd party, preventing inefficient investment
when investment necessity decreases according to conditional change, such project will be re-evaluated* projects which have not initiated for the past 10yrs or stopped for 2yrs
4. Advancing road facility management system
11
22
A single channeled and specialized road maintenanceA single channeled and specialized road maintenance
Comprehensively managing transport policies Comprehensively managing transport policies
Considering sourcing of road construction and maintenance to expert agencyConsidering sourcing of road construction and maintenance to expert agency
Capital areaCapital area Non-capital areaNon-capital area
Regional development
Regional developmentLogistics
policyLogistics
policyTransport policyTransport policy
Establishing cooperative mechanismAmong MLTM, local govt.sEstablishing cooperative mechanismAmong MLTM, local govt.s
Seoul regional Construction & management administration
Seoul regional Construction & management administration
Transport authorityIn Capital area
Transport authorityIn Capital area
20
* Consideration: commissioning to LH Corporation, private agency
* Developing system improvement plan through research and experts’opinions
(by Jun. 2011)
* Consideration: commissioning to LH Corporation, private agency
* Developing system improvement plan through research and experts’opinions
(by Jun. 2011)
Forming wide-area transport policy dialogue(Local agency, local govt.s)
Forming wide-area transport policy dialogue(Local agency, local govt.s)
Expected EffectsExpected EffectsⅣⅣ
Enhancing Financial EfficiencyEnhancing Financial Efficiency Saving Social CostsSaving Social Costs
Pursuing Green EfficiencyPursuing Green Efficiency Improving Road ConvenienceImproving Road Convenience
Preventing unnecessary projects
such as pork barrel projects
through verification
Preventing unnecessary projects
such as pork barrel projects
through verification
Ensuring participation of residents,experts in various sectorsEnsuring participation of residents,experts in various sectors
Minimizing environmental impactsby including environmental elements in each project stage
Minimizing environmental impactsby including environmental elements in each project stage
Enhancing efficiency of road network Reducing CO2 emissions saving traffic congestion cost
Enhancing efficiency of road network Reducing CO2 emissions saving traffic congestion cost
Concentrating investment and promoting efficient road operation saving congestion cost, logistics cost
Concentrating investment and promoting efficient road operation saving congestion cost, logistics cost
Enhancing efficiency in road facility operationEnhancing efficiency in road facility operation
21
Ⅳ. Expected Effects
Improving convenience of road users by ensuring stability, convenience, and eco-friendliness of roads
Improving convenience of road users by ensuring stability, convenience, and eco-friendliness of roads
Minimizing social conflicts Minimizing social conflicts
Future PlansFuture PlansⅤⅤ
22
Establishment of implementation plans for efficient road projects
- Specific implementation plans will be prepare by December 2010 by gathering Opinions of experts from the public, private sectors and academia.
Establishment of implementation plans for efficient road projects
- Specific implementation plans will be prepare by December 2010 by gathering Opinions of experts from the public, private sectors and academia.
Review of the second 5-year investment plan projects(2006-2010)That have not been completed to suspend them or reduce their scaleReview of the second 5-year investment plan projects(2006-2010)That have not been completed to suspend them or reduce their scale
Carry forward revision of the law required for amendment by Dec. 2010 along with subordinate laws and guidelinesCarry forward revision of the law required for amendment by Dec. 2010 along with subordinate laws and guidelines
Ⅴ. Future Plans