Name of Work DETAILED ESTIMATE Description No. L B D 1 South to North street 1 x 1 385.00 4.00 0.15 West to East 1 x 1 255.00 4.00 0.15 (or) 2 South to North street 1 x 1 385.00 4.00 0.15 West to East 1 x 1 255.00 4.00 0.15 (or) 3 Providing and laying of Block Topping using Paver machine @ Ee thaika street to singithurai main road and Keelanainar street road in Kayalpatnam Municipality Sl. No Collection and supply of well gravel (white gravel) from the approved quarry including cost and conveyance of all materials to the site and stacking from on road side the departmental gauge for pre measurement and all other incidental charges etc., complete Collection and supply of Red gravel from the approved quarry including cost and conveyance of all materials to the site and stacking from on road side the departmental gauge for pre measurement and all other incidental charges etc., complete Filling the collected Gravel to the required thickness, including labor charges for filling the gravel in layers, tamping under optimum moisture content to get to maximum dry density including watering with all leads for good water etc., complete as per std specification.

Upload: kayalontheweb

Post on 31-Oct-2014

27 views

Category:

Documents


4 download

DESCRIPTION

Project details for Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality - General Fund - 2012-13

TRANSCRIPT

Page 1: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

Name of Work :

DETAILED ESTIMATE

Description No. L B D Quantity

1

South to North street 1 x 1 385.00 4.00 0.15 231.00

West to East 1 x 1 255.00 4.00 0.15 153.00

384.00

(or) 384.00 m3

2

South to North street 1 x 1 385.00 4.00 0.15 231.00West to East 1 x 1 255.00 4.00 0.15 153.00

384.00(or) 384.00 m3

3

768.00

Providing and laying of Block Topping using Paver machine @ Eekkiappa thaika street to singithurai main road and Keelanainar street east street road in Kayalpatnam Municipality

Sl. No

Collection and supply of well gravel (white gravel) from the approved quarry including cost and conveyance of all materials to the site and stacking from on road side the departmental gauge for pre measurement and all other incidental charges etc., complete

Collection and supply of Red gravel from the approved quarry including cost and conveyance of all materials to the site and stacking from on road side the departmental gauge for pre measurement and all other incidental charges etc., complete

Filling the collected Gravel to the required thickness, including labor charges for filling the gravel in layers, tamping under optimum moisture content to get to maximum dry density including watering with all leads for good water etc., complete as per std specification.

m3

Page 2: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

4

South to North street 1 x 1 385.00 3.75 0.075 108.28

West to East 1 x 1 255.00 3.75 0.075 71.72

180.00

(or) 180.00 m3

5

South to North street 1 x 1 385.00 3.75 0.075 108.28West to East 1 x 1 255.00 3.75 0.075 71.72

180.00(or) 180.00 m3

6

South to North street 1 x 1 385.00 3.75 1443.75

West to East 1 x 1 255.00 3.75 956.25

2400.00

(or) 2400.00 m3

Providing and laying WBM 75 mm compacted thickness with grade II metal using Cu.m. of 63 – 45mm IRC Size HBG metal with 0.24 Cu.m. of gravel / for blind age per 10 Sq.m. including cost and conveyance of all materials and stacking them at the site to departmental gauge for per pre measurement / labor charges for spreading metal and gravel / hand packing in camber watering with all leads for water and compaction by 80 – 100 KN power roller including hire charges and fuel charges for power roller, water sprinkler and all other tools and plants employed, barricading etc., complete class 404 of MOST specification

Providing and laying WBM 75 mm compacted thickness with grade III metal using 1 Cu.M of 53 – 22.4 mm IRC size HBG metal with 0.24 Cu.M of gravel / for blind age per 10 Sq. M including cost and conveyance of all materials and stacking them at the site to departmental gauge for per pre measurement / labor charges for spreading metal and gravel / hand packing in camber watering with all leads for water and compaction by 80 – 100 KN power roller including hire charges and fuel charges for power roller, water sprinkler and all other tools, and plants employed, barricading etc., complete class 404 of MOST specification

Applying tack coat of 4kgs/10sqm over the WBM surface treated with premix using 4kgs of bituminous binder for 10sqm area including cost of binder labour for applying the required quantity to bitumen as tack coat manually as per specification.503

Page 3: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

7

South to North street 1 x 1 385.00 3.75 1443.75West to East 1 x 1 255.00 3.75 956.25

2400.00

(or) 2400.00

8 Labour Welfare Fund (0.3%) LS

9 LS

Overseer, Kayalpatnam Municipality Kayalpatnam Municipality,

Providing and laying Semi Dense Bituminous Concrete of 25mm thickness which work shall consist of construction in a single course binder / wearing source on a previously prepared bituminous base to the requirements of the specification (As per job mix formula)

m2

Contingencies and other unforeseen charges and P.S Charges etc complete.

Municipal Engineer ,

Page 4: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

5110

5

Page 5: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

Name of Work :

Abstract Estimate Estimate Amount : 13,00,000/-

Qty Description Rate Per Amount

1 384.00 258.05 99091

2 384.00 271.80 104371

3 768.00 12.80 9830

4 180.00 1340.20 241236

Providing and laying of Block Topping using Paver machine @ Eekkiappa thaika street to singithurai main road and Keelanainar street east street road in Kayalpatnam Municipality

Sl. No

m3

Collection and supply of Well gravel (white gravel) from the approved quarry including cost and conveyance of all materials to the site and stacking from on road side the departmental gauge for pre measurement and all other incidental charges etc., complete

1 m2

m3

Collection and supply of Red gravel from the approved quarry including cost and conveyance of all materials to the site and stacking from on road side the departmental gauge for pre measurement and all other incidental charges etc., complete

1 m3

m3

Filling the collected Gravel to the required thickness, including labor charges for filling the gravel in layers, tamping under optimum moisture content to get to maximum dry density including watering with all leads for good water etc., complete as per std specification.

1 m3

m3

Providing and laying WBM 75 mm compacted thickness with grade II metal using Cu.m. of 63 – 45mm IRC Size HBG metal with 0.24 Cu.m. of gravel / for blind age per 10 Sq.m. including cost and conveyance of all materials and stacking them at the site to departmental gauge for per pre measurement / labor charges for spreading metal and gravel / hand packing in camber watering with all leads for water and compaction by 80 – 100 KN power roller including hire charges and fuel charges for power roller, water sprinkler and all other tools and plants employed, barricading etc., complete class 404 of MOST specification

1 m3

Page 6: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

5 180.00 1599.30 287874

6 2400.00 29.89 71736

2400.00 196.95 472680

7 LS Labour Welfare Fund (0.3%) LS 3900

8 LS LS 9281

1300000

(Rupees Thirteen Lakhs Only)

Overseer, Municipal Engineer Kayalpatnam Municipality Kayalpatnam Municipality,

m3

Providing and laying WBM 75 mm compacted thickness with grade III metal using 1 Cu.M of 53 – 22.4 mm IRC size HBG metal with 0.24 Cu.M of gravel / for blind age per 10 Sq. M including cost and conveyance of all materials and stacking them at the site to departmental gauge for per pre measurement / labor charges for spreading metal and gravel / hand packing in camber watering with all leads for water and compaction by 80 – 100 KN power roller including hire charges and fuel charges for power roller, water sprinkler and all other tools, and plants employed, barricading etc., complete class 404 of MOST specification

1 m3

m2

Applying tack coat of 4kgs/10sqm over the WBM surface treated with premix using 4kgs of bituminous binder for 10sqm area including cost of binder labour for applying the required quantity to bitumen as tack coat manually as per specification.503

1 m2

m2

Providing and laying Semi Dense Bituminous Concrete of 25mm thickness which work shall consist of construction in a single course binder / wearing source on a previously prepared bituminous base to the requirements of the specification (As per job mix formula)

Contingencies and other unforeseen charges including P.S. Charges

Page 7: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

1286819

1286819

Page 8: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

TENDER SCHEDULE

Name of work : Providing BT Surface @ Eekkiappa thaika street to singithurai main road and Keelanainar street east street road in Kayalpatnam Municipality

Estimate Amount : 9,00,000/- EMD Rs.9000/-

Qty. Description of work UnitRates in

Figures Words

1 384.00 6

2 384.00 6

3 768.00 25

No. of Corrections Signature of the Contractor

Sl. No

TNBPSSNO

m3

Collection and supply of Well gravel (white gravel) from the approved quarry including cost and conveyance of all materials to the site and stacking from on road side the departmental gauge for pre measurement and all other incidental charges etc., complete

1 m3

(One cubic

metre)

m3

Collection and supply of Red gravel from the approved quarry including cost and conveyance of all materials to the site and stacking from on road side the departmental gauge for pre measurement and all other incidental charges etc., complete

1 m3

(One cubic

metre)

m3

Filling the collected Gravel to the required thickness, including labor charges for filling the gravel in layers, tamping under optimum moisture content to get to maximum dry density including watering with all leads for good water etc., complete as per std specification.

1 m3

(One cubic

metre)

No. of over writings

Page 9: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

4 180.00

5 180.00 404

m3

Providing and laying WBM 75 mm compacted thickness with grade II metal using Cu.m. of 63 – 45mm IRC Size HBG metal with 0.24 Cu.m. of gravel / for blind age per 10 Sq.m. including cost and conveyance of all materials and stacking them at the site to departmental gauge for per pre measurement / labor charges for spreading metal and gravel / hand packing in camber watering with all leads for water and compaction by 80 – 100 KN power roller including hire charges and fuel charges for power roller, water sprinkler and all other tools and plants employed, barricading etc., complete class 404 of MOST specification

m3

Providing and laying WBM 75 mm compacted thickness with grade III metal using 1 Cu.M of 53 – 22.4 mm IRC size HBG metal with 0.24 Cu.M of gravel / for blind age per 10 Sq. M including cost and conveyance of all materials and stacking them at the site to departmental gauge for per pre measurement / labor charges for spreading metal and gravel / hand packing in camber watering with all leads for water and compaction by 80 – 100 KN power roller including hire charges and fuel charges for power roller, water sprinkler and all other tools, and plants employed, barricading etc., complete class 404 of MOST specification

1 m3

(One cubic

metre)

No. of over writings

Page 10: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

No. of Corrections Signature of the Contractor

6 2400.00 503

7 2400.00

Signature of the Contractor

No. of Corrections

m2

Applying tack coat of 4kgs/10sqm over the WBM surface treated with premix using 4kgs of bituminous binder for 10sqm area including cost of binder labour for applying the required quantity to bitumen as tack coat manually as per specification.503

1 m2

(One square metre)

m2

Providing and laying Semi Dense Bituminous Concrete of 25mm thickness which work shall consist of construction in a single course binder / wearing source on a previously prepared bituminous base to the requirements of the specification (As per job mix formula)

1 m2

(One square metre)

No. of over writings

Page 11: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

Providing BT Surface @ Eekkiappa thaika street to singithurai main road and Keelanainar street east street road in Kayalpatnam Municipality

Page 12: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

COMPARATIVE STATEMENT

Qty. Description of workAs per Estimate Thiru.R.Nagoor meerasha Thiru. Thalavanimuthu

Rate Amount Rate Amount Rate Amount

1 384.00 258.05 99091.20 280.00 107520.00 270.80 103987.20

2 384.00 271.80 104371.20 300.00 115200.00 285.10 109478.40

3 768.00 Filling the gravel as per standard specification 12.80 9830.40 17.00 13056.00 13.40 10291.20

4 180.00 1340.20 241236.00 1450.00 261000.00 1405.80 253044.00

5 180.00 1599.30 287874.00 1700.00 306000.00 1676.00 301680.00

2400.00 m2 29.89 71736.00 40.00 96000.00 31.30 75120.00

6 2400.00 196.95 472680.00 215.00 516000.00 206.50 495600.00

1286818.80 1414776.00 1349200.80

-127957.20 -62382.00

9.94% above the ER 4.85% above the ER

The Lowest Rate Quoted by Thiru. Thalavanimuthu at 4.85% above the

Estimate Rate may be approved for Tender Concurrence.

Name fo the work: Providing and laying of Block Topping using Paver machine @ Eekkiappa thaika street to singithurai main road and Keelanainar street east street road in Kayalpatnam Municipality

Sl.

No

m3 Collectio and supply of well gravel from approved qry including all cost and conveyance etc.complete.

m3 Collectio and supply of Red gravel from approved qry including all cost and conveyance etc.complete.

m3

m3

Providing and laying the WBM 75mm compacted thickness with grade II metal 1cum of 63mm-45mm IRC metal with 0.24 cum of red gravel including all cost and conveyance etc.complete.

m3

Providing and laying the WBM 75mm compacted thickness with grade III metal 1cum of 53mm-22.4mm IRC metal with 0.24 cum of red gravel including all cost and conveyance etc.complete.

Applying tack coat of 4kgs/10sqm over the WBM surface treated with premix using 4kgs of bituminous binder for 10sqm area including cost of binder labour for applying the required quantity to bitumen as tack coat manually as per specification.503

m2

Providing and laying premix carpet with seal coat type a 20mm thick with using 13.2mm -6.7mm IRCmetal including 14.6kg of bitumen using premix coat and 9.8kg of seal coat including tack coat over WBM surface 10kg/10m2 all cost and conveyance etc.complete.

Page 13: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

Overseer M.E

Page 14: Eekkiappa Thaika Street to Singithurai, Kayalpattinam Municipality

-4.847769

-9.943684