EE/CS 480 Spring 2008

March, 2008 1University of Portland School of Engineering

Yellow Rumped WarblersInstant Message Control System

TeamKenneth Lee

Rob Vandermeulen

Mike Rumely

Vladimir Shvets

AdvisorDr. Nuxoll

Industry RepresentativeJason Favors

Harland Financial Solutions

EE/CS 480 Spring 2008

March, 2008 2University of Portland School of Engineering

Overview

• Introduction

• Scorecard

• Additional Accomplishments

• Plans

• Issues/Concerns

• Conclusions

EE/CS 480 Spring 2008

March, 2008 3University of Portland School of Engineering

Introduction

• Instant message control system for electrical devices.

User Host Machinew/ Yellowtooth Software

Electrical Device

YellowtoothHardwareInternet BlueTooth Wire

Command From User

(e.g “on” or “off”)

Binary Representation of Command

Close/Open Circuit

EE/CS 480 Spring 2008

March, 2008 4University of Portland School of Engineering

Introduction (cont.)

EE/CS 480 Spring 2008

March, 2008 5University of Portland School of Engineering

Scorecard

March Plans-• Translate textual message• YellowTooth software review• Test and Debug Bluetooth communication• Interface Hardware Components• Power electrical device using instant message

Completed Plans-• Almost all plans for March were completed

as scheduled

EE/CS 480 Spring 2008

March, 2008 6University of Portland School of Engineering

Scorecard (cont.)

Shortcomings-• Testing Bluetooth/PIC system together

with switch box• Software Review

EE/CS 480 Spring 2008

March, 2008 7University of Portland School of Engineering

Additional Accomplishments

• Finished switch box.

• Filmed software with PIC portion of the system.

EE/CS 480 Spring 2008

March, 2008 8University of Portland School of Engineering

Plans

• Successfully interface switchbox with PIC

• Get started on the Final Report

EE/CS 480 Spring 2008

March, 2008 9University of Portland School of Engineering

MilestonesNumber Description Original Previous Present

1 Translate textual message 03/06/08 03/06/08 03/06/08

2 YellowTooth Software Review

03/07/08 03/07/08 03/07/08

3 Test and Debug Bluetooth communication

03/12/08 03/12/08 03/12/08

4 Interface Switchbox and Bluetooth

03/18/08 03/18/08 03/18/08

5 Power electrical device using instant message

04/03/08 04/03/08 04/03/08

6 Test and Debug the complete system

04/07/08 04/07/08 04/07/08

7 Present Yellowtooth 04/08/08 04/08/08 04/08/08

8 Final Report is Due 04/23/08 04/23/08 04/23/08

EE/CS 480 Spring 2008

March, 2008 10University of Portland School of Engineering

Concerns/Issues

• Founder's Day Demo

-Getting Bluetooth signal from the third floor.

EE/CS 480 Spring 2008

March, 2008 11University of Portland School of Engineering

Conclusions

• Will be ready to demonstrate the working project by Founder's day

EE/CS 480 Spring 2008

March, 2008 12University of Portland School of Engineering