Case Study - Blow Fill Seal (BFS) Facility

TRANSCRIPT

Page 1: Eeco2 case study  blow fill seal (bfs) facility

Energy Efficiency Case StudyBlow Fill Seal (BFS) FacilityBFS Filling room air change rate reduction

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

Page 2: Eeco2 case study  blow fill seal (bfs) facility

Client: Sterile Pharmaceutical Manufacturer

Location: Australia

Sector: Pharmaceutical

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

Page 3: Eeco2 case study  blow fill seal (bfs) facility

Project Challenge:

HVAC designed to provide Grade A room conditions athigh energy cost is now only required to provide Grade Croom conditions for a BFS filling line.

Project Brief:

Phase 1 brief was a trial for 4 out of 8 rooms to reduce air change rate and therefore energy demand while maintaining the required airflow patterns for product protection. Phase 2 brief was to deliver air change rate reductions on all 8 rooms based on Phase 1 lessons learnt.

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

Page 4: Eeco2 case study  blow fill seal (bfs) facility

Solution:

• Carry out as found testing for airflow measurements, room balance, ‘as found’ airflow visualisation to ISO 14644 methodology.

• Reduce existing air change rates and Re-commission & balance each filling room.

• Validate new air change rates and airflow distribution using airflow visualisation to ISO 14644 methodology.

• Validate new cleanroom classification to ISO 14644 methodology.

• Remediation work identified and carried out on an additional AHU which resulted in energy savings and potential future breakdown avoidance.

• Completed to Planned Change Control, FRS, IOQ documentation.

• Reduced annual maintenance costs on fans, motors and filters.

• Reduced noise levels with positive impact on operator working conditions.

Conclusion:

EECO2 delivered the HVAC design review, re-commissioned the HVAC system & carried out thevalidation testing to protocol. EECO2 then delivered then additional savings on the remaining rooms based on findings and lessons learned during phase 1.

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

Page 5: Eeco2 case study  blow fill seal (bfs) facility

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

Page 6: Eeco2 case study  blow fill seal (bfs) facility

EECO2 Energy Efficiency Services• Pharmaceutical & Life Sciences 3• Energy & Compliance• Project Management• Energy Monitoring

To speak with one of our energy efficiency expertscall: +44 (0) 1625 660 717 or email:

[email protected]

www.eeco2.co.uk

EEC02 - Energy Efficiency Consultancy LimitedSuite 9, The Green, Fountain Street, Macclesfield,Cheshire, SK10 1JN

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]