EDIEL MODEL VOOR DE
GELIBERALISEERDE ENERGIESECTOR IN
BELGIE
LE MODELE EDIEL
DANS LE SECTEUR LIBERALISE
DE L'ENERGIE EN BELGIQUE
UMIG PART II A Structuring Fase:
Stappenplannen & Berichten Overzicht
UMIG PARTIE II A: Phase de structuration:
Plans par étapes & aperçu des messages
00. Introductie Structuring 00. Introduction Structuring
Versie: 4.1
Datum: 20/12/2011
Status: Voor implementatie
Version: 4.1
Date: 20/12/2011
Status: Pour implémentation
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 2 / 37
Inhoudsopgave – Table des matières 1 STAPPENPLANNEN “STRUCTURING FASE” – PLANS PAR ETAPES - PHASE DE
“STRUCTURATION” .......................................................................................................................................... 3
1.1 SENARIO’S LIJST – LISTE DES SCENARII ..................................................................................................... 4
2 SCENARIO INTERACTIE - INTÉRACTION ENTRE SCÉNARIOS ......................................................... 6
2.1 INLEIDING – INTRODUCTION ...................................................................................................................... 6 2.2 GEDURENDE ANNULERINGSPERIODE - DURANT LA PÉRIODE D'ANNULATION ............................................. 7 2.3 GEDURENDE BEVROREN PERIODE - DURANT LA “FROZEN PERIOD” ......................................................... 24
3 OP VOORHAND VEREISTE AANKONDIGINGEN - ANNONCES REQUISES D'AVANCE ............. 26
4 PERIODES TUSSEN TRANSACTIES - PÉRIODES ENTRE LES TRANSACTIONS ........................... 28
5 AFSPRAKEN ROND GEBRUIK E44 “SECURED “ BERICHTEN – ACCORDS SUR
L’UTILISATION DES MESSAGES E44 “SECURED” ................................................................................. 30
5.1 INLEIDING - INTRODUCTION .................................................................................................................... 30 5.2 SCOPE ...................................................................................................................................................... 31 5.3 E44S-PROCEDURE - PROCEDURE E44S ..................................................................................................... 31 5.4 BEVEILIGDE E-MAILSTRUCTUUR - STRUCTURE DE L’E-MAIL SECURISE .................................................... 33 5.5 PERIODES - TIMINGS ................................................................................................................................ 33
5.5.1 Annulering/bevroren periode - Annulation/période « frozen » ..................................................... 33 5.5.2 Beveiligde mail in “post-processing” periode - Mail sécurisé dans la période de « post-
processing » ................................................................................................................................................. 34 5.6 LIJST MET E-MAILADRESSEN EN TELEFOONNUMMERS VOOR DE BEVEILIGDE ANNULERINGSPROCEDURE –
LISTE DES ADRESSES E-MAIL ET DES NUMEROS DE TELEPHONE NECESSAIRES A LA PROCEDURE D’ANNULATION
SECURISEE ......................................................................................................................................................... 35 5.7 SAMENVATTING – RÉSUMÉ ..................................................................................................................... 36
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 3 / 37
1 Stappenplannen “Structuring Fase” – Plans par étapes - phase de “structuration”
Een stappenplan geeft een overzicht van de berichten
gestuurd tussen twee verschillende marktpartijen en
geeft de volgorde aan waarin de berichten dienen
verstuurd te worden.
De stappenplannen zijn enkel representatief m.b.t.
EDIEL-berichten. In de reeks van berichten zul je ook
niet-EDIEL-berichten aantreffen, gewoonlijk tussen de
verschillende functionaliteiten van de DNB (Market
Registration, Works en Meter Data Handling). EDIEL-
berichten zullen in de “sequence diagrams” en
“activity diagrams” als boodschap genoemd worden
met het voorvoegsel “Process ...”. Welke dient te
worden geïnterpreteerd als het gebod “verwerk ....”.
Het onderscheid met de niet-EDIEL-berichten wordt
gemaakt door dit gebod niet te vermelden. Deze
interne wisselwerkingen zijn enkel getekend ter
verduidelijking van het algehele proces (scenario). Ze
zijn verondersteld en kunnen daarom dan ook
afwijken van het werkelijke verloop.
Voor het modelleren van de berichtenuitwisseling
(“sequence diagrams”), de berichten zelf (“class
diagrams”) en de activiteiten (“activity diagrams”) uit
te voeren door desbetreffende marktpartijen werd
gebruik gemaakt van de “Unified Modelling
Language” (UML).
Als we over een leverancierswissel spreken in het
stappenplan nemen we aan dat er een nieuwe
Evenwichtsverantwoordelijke/Vervoernetgebruiker is,
alhoewel deze dezelfde partij kan zijn. Ook in andere
stappenplannen nemen we aan dat de aanvraag
eveneens van toepassing is op zowel de Leverancier
als de Evenwichtsverantwoordelijke.
Het aanvraagbericht bij een klantenwissel en een
gecombineerde wissel kunnen een meterindex bevatten
maar enkel voor jaarlijks gelezen netgebruikers met
een gewone meterconfiguratie (enkel één meter met
dag, nacht en/of exclusieve nachtregister)
De contractuele uitvoerdatum, vermeld in het
teruggekeerde 414-bericht, zal ook de datum zijn in het
UTILTS E11-bericht dat terugkeert met de
gevalideerde wisselindexen.
De UTILTS E11-berichten zoals aangegeven in de
stappenplannen, uitgezonderd historische waarden,
worden enkel gestuurd voor jaarlijks en maandelijks
gelezen netgebruikers, en niet voor continu gelezen
netgebruikers. Deze laatsten ontvangen, op periodieke
basis, de UTILTS E13-berichten.
Un plan par étapes donne une vue d'ensemble des
messages envoyés entre deux partis du marché
différents et indique l'ordre dans lequel les messages
doivent être envoyés.
Les plans par étapes sont uniquement représentatifs en
ce qui concerne les messages EDIEL. Dans la série de
messages, vous trouverez aussi des messages non-
EDIEL, généralement entre les différentes
fonctionnalités du GRD (Market Registration, Works
et Meter Data Handling). Les messages EDIEL seront
désignés par préfixe “Process ...” dans le “sequence
diagram” et l'“activity diagram”. Ce qu'il convient
d'interpréter comme l'ordre “traiter ....”. La distinction
avec les messages non-EDIEL s'établit par le fait que
cet ordre n'est pas mentionné. Ces interactions internes
visent uniquement à clarifier l'ensemble du processus
(scénario). Elles sont supposées et peuvent donc aussi
s'écarter du déroulement réel.
Pour modéliser les échanges de messages (“sequence
diagrams”), les messages proprement dit (“class
diagrams”) ainsi que pour l'exécution des activités
(“activity diagrams”) par les parties du marché
concernées, le langage UML (Unified Modelling
Language) a été utilisé.
Lorsqu'il est question d'un switch fournisseur dans le
plan par étapes, nous supposons qu'il existe un
nouveau Responsable d'équilibre/Utilisateur du réseau
de transport, bien qu'il puisse s'agir de la même partie.
Dans d'autres plans par étapes, nous supposons aussi
que la demande s'applique tant au Fournisseur qu'au
Responsable d'équilibre.
Le message de demande lors d'un switch client et d'un
switch combiné peut contenir un index de compteur
mais uniquement pour les utilisateurs du réseau à
lecture annuelle avec une configuration de compteur
ordinaire (un seul compteur avec registre jour, nuit
et/ou exclusif nuit)
La date d'exécution contractuelle, mentionnée dans le
message 414 qui revient, sera aussi la date du message
UTILTS E11 qui revient avec les index de switch
validés.
Les messages UTILTS E11 mentionnés dans les plans
par étapes, à l'exception des valeurs historiques, sont
uniquement envoyés pour les utilisateurs du réseau à
lecture annuelle et mensuelle, et pas pour les
utilisateurs du réseau à lecture continue. Ces derniers
reçoivent, de manière périodique, les messages
UTILTS E13.
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 4 / 37
De historische waarden (BGM E11 STS E30) worden
altijd na de contractuele uitvoerdatum, maar ten laatse
op “de contractuele uitvoerdatum + 15” gestuurd.
Onderstaande stappenplannen zijn in dit document
opgenomen.
Les valeurs historiques (BGM E11 STS E30) sont
toujours envoyés après la date d'exécution
contractuelle, mais au plus tard à la “date d'exécution
contractuelle + 15”.
Les plans par étapes ci-dessous figurent dans ce
document.
1.1 Senario’s lijst – Liste des scénarii
Structuring
fase
Phase de
structuration
00 Stappenplannen & Berichten Overzicht – Plans par étapes & aperçu des messages
01 Leverancierswissel – Changement de fournisseur – (CoS)
02 Annulatie van een leverancierswissel – Annulation d’un changement de fournisseur
03a Mystery switch voor effectieve datum – Mystery switch avant date effective – (MS before ED)
03b Mystery switch na effectieve wisseldatum – Mystery switch après date effective – (MS after ED)
04
Verhuis (Move-in) naar een nieuwe/verzegelde aansluiting – Déménagement vers un nouveau
raccordement / raccordement scellé – (Move-in)
05
Annulatie van een verhuis naar nieuwe/ verzegelde aansluiting – Annulation d’un déménagement vers un
nouveau raccordement / raccordement scellé
06 Klantenwissel – Changement de clients – (CuS)
07 Annulatie van een klantenwissel – Annulation d’un changement de clients
08
Gecombineerde klanten- en leverancierswissel (jaarlijks gelezen) – Changement combiné clients et
fournisseurs (lecture annuelle) – (Comb yearly)
09
Gecombineerde klanten- en leverancierswissel (maandelijks of continu gelezen) – Changement combiné
clients et fournisseurs (lecture mensuelle ou en continu) – (Comb month/cont.)
10
Annulatie van een gecombineerde klanten- en leverancierswissel – Annulation d’un changement combiné
clients et fournisseurs
11 Drop residentieel – Drop résidentiel – (Drop res)
12 Drop niet-residentieel – Drop non résidentiel – (Drop n-res)
13 Annulatie van een drop – Annulation d’un drop
14 Leverancierswissel na drop – Changement de fournisseur après drop – (CoS after drop)
15
Verhuis (Move-out) met verzegelde/afgesloten meter – Déménagement (Move-out) avec scellée/fermeture
du raccordement – (Move-out)
16
Wijzigen van relationele data door de leverancier – Changement de données relationnelles par le
fournisseur – (MDPC)
17
Wijzigen van stamgegevens op het toegangspunt door de Distributienetbeheerder – Modification des
master data d’un point d’accès par le Gestionnaire du réseau de distribution – (Update MD) 18 Einde Contract niet-residentieel – Fin de contrat non résidentiel – (EOC n-res)
19 Annulatie van een einde contract – Annulation d’une fin de contrat
20 Leverancierswissel na einde contract – Changement de fournisseur après fin de contrat – (CoS after EOC)
21
Wissel van Vervoernetgebruiker / Evenwichtsverantwoordelijke – Changement de Responsable
d’équilibre / Utilisateur du réseau de transport – (Switch BRP/Shipper)
22
Hangende verhuis naar een nieuwe/verzegelde aansluiting – Déménagement vers un nouveau
raccordement / raccordement scellé en suspens – (Sleeping Move-in)
23 --- niet gebruikt – pas utilisé ---
24
Annulatie van een leverancierswissel door de Sociale Leverancier – Annulation d’un changement de
fournisseur par le Fournisseur social
25 --- niet gebruikt – pas utilisé ---
26 --- niet gebruikt – pas utilisé ---
27 Einde Contract residentieel – Fin de contrat résidentiel – (EOC res)
28 Move-out zonder afspraak – Move-out sans rendez-vous – (MOZA)
29 --- niet gebruikt – pas utilisé ---
30a Rectificatie stamgegevens – Rectification de mater data
30b
Rectificatie Structuring van Distributienetbeheerder naar Leverancier – Rectification Structuring
Gestionnaire du réseau de distribution vers Fournisseur
31 Annulatie van een drop door Sociale leverancier – Annulation d’un drop par le Fournisseur social
32
Leverancierswissel naar Noodleverancier (enkel Brussel) – Changement de fournisseur vers le
Fournisseur de dernier recours (uniquement Bruxelles) – (CoS to SoLR)
33
Leverancierswissel terug naar Commerciële leverancier (enkel Brussel) – Changement de fournisseur à
nouveau vers le Fournisseur commercial (uniquement Bruxelles) – (CoS back to Supplier)
34
Aanvraag tot plaatsing stroombegrenzer (enkel Brussel) – Demande de placement d’un limiteur de
puissance (uniquement Bruxelles) – (Req. PL Instal.)
35
Aanvraag tot het wegnemen van een stroombegrenzer – residentiële klant niet beleverd door SoLR (enkel
Brussel) – Demande d’enlèvement d’un limiteur de puissance – client résidentiel non fourni par SoLR
(uniquement Bruxelles) – (Req. PL Removal – non SoLR Cust.)
36
Annulatie van een leverancierswissel naar Noodleverancier (enkel Brussel) – Annulation d’un
changement de fournisseur vers le Fournisseur de dernier recours (uniquement Bruxelles)
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 5 / 37
37
Annulatie van een leverancierswissel terug naar Commerciële leverancier (enkel Brussel) – Annulation
d’un changement de fournisseur à nouveau vers le Fournisseur commercial (uniquement Bruxelles)
38
Move-out zonder afspraak (enkel Brussel) – Move-out sans rendez-vous (uniquement Bruxelles) (MOZA
Brussels)
39 Plaatsen Budgetmeter (enkel Wallonië)– Pose Compteur à Budget (uniquement le Wallon) (PcàB)
40
Annulatie plaatsen budgetmeter (enkel Wallonië) – Annulation pose compteur à budget (uniquement le
Wallon) (Cancellation PCàB)
41 Snapshot Masterdata
Tabel 1 – Tableau 1
Introductie Structuring / Introduction
Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 6 / 37
2 Scenario Interactie - Intéraction entre scénarios
2.1 Inleiding – Introduction Onderstaande tabellen zijn voorstellingen van de
werking van de marktregistratie. Een "inkomende
transactie" betekent dat het marktregistratie
werkinstrument, zijnde het Toegangsregister, een
inkomend EDIEL-bericht ontvangt (392 of 432).
Eén uitzondering is de "move-out" (verhuis) die geen
aanleiding geeft tot het aanmaken van een EDIEL-
bericht. De move-out (verhuis) wordt op gang gebracht
door de Distributienetgebruiker (of door de
Leverancier die fungeert als tussenpersoon) die een
aanvraag doet bij de Beheerder van Meters om een
werk uit te voeren. Eens het werk uitgevoerd is, zal dit
departement het Toegangsregister laten aanpassen.
Deze inkomende aanvraag tot aanpassing van het
Toegangsregister door de Beheerder van Meters,
wordt beschouwd als een "inkomende transactie".
Deze transactie kan uiteraard nooit worden verworpen
aangezien de werken reeds zijn uitgevoerd.
De belangrijkste regel in bovenstaande tabel is, dat er
tegelijk maar één transactie lopende kan zijn in het
Toegangsregister.
Een lopende transactie is een transactie die op gang
gebracht is (door een 392 of 432 bericht), maar nog
niet uitgevoerd (cf. de contractuele uitvoerdatum die
door de Leverancier in veel scenario's nauwkeurig kan
worden opgegeven).
In geval dat er een transactie lopende is, en er komt
een nieuwe transactie binnen, dan geldt de algemene
regel dat ofwel de eerste transactie verwijderd wordt
(typisch voorbeeld: inkomend annuleringsbericht of
bericht met een hogere prioriteit), ofwel dat de nieuwe
transactie verworpen wordt (bericht met een lagere
prioriteit dan de transactie in uitvoering). Er zijn
enkele uitzonderingen waar twee parallel lopende
berichten toegelaten wordt.
R = inkomende transactie is verworpen
(Rejected)
CP = Annuleren van lopende transactie +
inlichten van betrokken partijen: de
Leverancier krijgt een EDIEL-bericht als
bevestiging van de annulering (Cancel
Pending Transaction)
PP = moet mogelijk zijn zonder de lopende
transacties te onderbreken (Parallel
Process)
NP = Inlichten van betrokken partijen via
een EDIEL-bericht (Notify Party)
X = zal in principe niet voorkomen (N.A.)
Les tableaux ci-dessous représentent le fonctionnement
d'enregistrement de requêtes par le marché. Une
"transaction entrante" signifie que le registre d'accès
("Access register") reçoit un message EDIEL entrant
(392 ou 432).
Exception : le "move-out" (déménagement) n'entraîne
pas la création d'un message EDIEL. Le move-out
(déménagement) est lancé par l'Utilisateur du réseau
de distribution (ou le fournisseur qui sert
d'intermédiaire) qui en fait la demande auprès du
Gestionnaire des compteurs en vue d'exécuter des
travaux. Lorsque les travaux sont effectués, ce dernier
demande d’adapter le Registre d'accès. Cette demande
d'adaptation du registre d'accès par le Gestionnaire des
compteurs est considérée comme une "transaction
entrante". Cette transaction ne peut évidemment jamais
être refusée vu que les travaux ont déjà été effectués.
La règle principale dans le tableau ci-dessus est que
seul une transaction peut être en cours d’exécution
dans le registre d'accès.
Une transaction en cours est une transaction lancée
(par un message 392 ou 432), mais pas encore
exécutée (cf. la date d'exécution contractuelle qui peut
difficilement être indiquée avec exactitude par le
fournisseur dans de nombreux scénarios).
Lorsqu'une nouvelle transaction arrive alors qu'une
transaction est déjà en cours, on applique la règle
générale qui veut que, soit la première transaction est
rejetée (exemple typique : un message entrant est un
message d'annulation ou bénéficie d’une priorité
supérieure), soit la nouvelle transaction est rejetée
(message entrant avec une priorité inférieure à celle de
la transaction en cours). Dans certains cas
exceptionnels, deux messages en cours peuvent quand
même être admis simultanément.
R = la transaction entrante est rejetée
(Rejected)
CP = Annuler la transaction en cours +
informer les parties concernées : la
fournisseur reçoit un message EDIEL
confirmant l'annulation (Cancel Pending
Transaction)
PP = doit être possible sans interrompre les
transactions en cours (Parallel Process)
NP Notify Party = Informer les parties
concernées via un message EDIEL (Notify
Party)
X = en principe impossible (N.A.)
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 7 / 37
2.2 Gedurende annuleringsperiode - Durant la période d'annulation
Inkomende transactie – Transaction entrante
Transactie in uitvoering – Transaction en cours
Voor betekenis afkorting / Pour correspondance abréviations
(zie tabel / voir tableau 1.1 Senario’s lijst – Liste des scénarii)
Inkomende transactie ED – ED Transaction entrante
< ED trans. in
uitvoering / en cours
= ED trans. in
uitvoering / en cours
> ED trans. in
uitvoering / en cours
01. Leverancierswissel – Changement de
fournisseur
01. CoS R
03b. MS after ED R
04. Move-in R
06. CuS X (CuS max 30cd future) R
08. Comb yearly X (Comb yearly max 30cd future) R
09. Comb month/cont. R R R
11. Drop res
CP (Flanders, Wallonia) / X (Brussels – Drop
res not applicable) R
12. Drop n-res R R R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels – scenario 28 MOZA not
applicable)
32. CoS to SoLR R
33. CoS back to Supplier R
38. MOZA Brussels R (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable in Flanders & Brussels)
03a. Mystery switch voor effectieve wisseldatum –
Mystery switch avant date effective & 03b.
Mystery switch na effectieve wisseldatum –
Mystery switch après date effective:
MS detectiebericht – Message de detection de
MS
01. CoS PP PP
03b. MS after ED R
04. Move-in R
06. CuS R R
08. Comb yearly PP PP
09. Comb month/cont. PP PP
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 8 / 37
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR PP PP
33. CoS back to Supplier PP PP
38. MOZA Brussels R (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable in Flanders & Brussels)
03b. Mystery switch na effectieve wisseldatum –
Mystery switch après date effective:
MS correctiebericht – Message de correction
de MS
01. CoS R
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly R
09. Comb month/cont. R
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR R
33. CoS back to Supplier R
38. MOZA Brussels R (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable in Flanders & Brussels)
03b. Mystery switch na effectieve wisseldatum –
Mystery switch après date effective:
Leverancierswissel na Mystery – Changement
de fournisseur après Mystery Switch
01. CoS R
03b. MS after ED CP
04. Move-in R
06. CuS R
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 9 / 37
08. Comb yearly R
09. Comb month/cont. R
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR R
33. CoS back to Supplier R
38. MOZA Brussels R (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable in Flanders & Brussels)
04. Verhuis naar een nieuwe/verzegelde aansluiting
– Déménagement vers un nouveau raccordement /
raccordement scellé
01. CoS R
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly R
09. Comb month/cont. R
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR R
33. CoS back to Supplier R
38. MOZA Brussels CP (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable in Flanders & Brussels)
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 10 / 37
06. Klantenwissel – Changement de clients
01. CoS CP R
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly CP R R
09. Comb month/cont. CP R R
11. Drop res CP (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res CP
14. CoS after drop R
18. EOC n-Res CP
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res CP
28. MOZA
CP (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR CP R
33. CoS back to Supplier CP R
38. MOZA Brussels CP (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB
CP (only for CuS-YMR/ Walloon) / X (scenario 39 not applicable in
Flanders & Brussels)
08. Gecombineerde klanten- en leverancierswissel
(jaarlijks gelezen) – Changement combiné de
clients et de fournisseurs (lecture annuelle)
01. CoS CP R
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly R
09. Comb month/cont. R
11. Drop res
CP (Flanders, Wallonia) / X (Brussels – Drop
res not applicable)
CP (<= ED + 10 cd)
(Flanders, Wallonia) /
X (Brussels – Drop
res not applicable)
R (> ED + 10 cd)
(Flanders, Wallonia) /
X (Brussels – Drop
res not applicable)
12. Drop n-res CP
CP (<= ED + 10 cd)
R (> ED + 10 cd)
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 11 / 37
14. CoS after drop R
18. EOC n-Res CP
CP (<= ED + 10 cd)
R (> ED + 10 cd)
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res CP
CP (<= ED + 10 cd)
R (> ED + 10 cd)
28. MOZA
CP (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR CP R
33. CoS back to Supplier CP R
38. MOZA Brussels CP (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB
CP (Walloon) / X (scenario 39 not applicable in
Flanders & Brussels)
R (Walloon) / X
(scenario 39 not
applicable in Flanders
& Brussels)
09. Gecombineerde klanten- en leverancierswissel
(maandelijks/continu gelezen) – Changement
combiné de clients et de fournisseurs (lecture
manuelle/en continu)
01. CoS CP R
03b. MS after ED R
04. Move-in R
06. CuS X (CuS max 30cd future) R
08. Comb yearly R
09. Comb month/cont. R
11. Drop res
CP
CP (<= ED + 10 cd)
(Flanders, Wallonia) /
X (Brussels – Drop
res not applicable)
R (> ED + 10 cd)
(Flanders, Wallonia) /
X (Brussels – Drop
res not applicable)
12. Drop n-res CP
CP (<= ED + 10 cd)
R (> ED + 10 cd)
14. CoS after drop R
18. EOC n-Res CP
CP (<= ED + 10 cd)
R (> ED + 10 cd)
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res CP CP (<= ED + 10 cd)
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 12 / 37
R (> ED + 10 cd)
28. MOZA X (MOZA not applicable for monthly/continuous read AP)
32. CoS to SoLR X (CoS to SoLR 7cd future) R
33. CoS back to Supplier X (CoS back to Supplier 7cd future) R
38. MOZA Brussels X (MOZA not applicable for monthly/continuous read AP)
39. PCàB R (Walloon) / X (scenario 39 not applicable in Flanders & Brussels)
11. Drop residentieel – Drop résidentiel
01. CoS CP R
03b. MS after ED R
04. Move-in R
06. CuS X (CuS max 30cd future) R
08. Comb yearly X (Comb yearly max 30cd future) R
09. Comb month/cont. R (Comb month/cont. max 45cd future)
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA R
32. CoS to SoLR X (CoS to SoLR 7cd future) R
33. CoS back to Supplier X (CoS back to Supplier 7cd future) R
38. MOZA Brussels R (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable in Flanders & Brussels)
12. Drop niet-residentieel – Drop non résidentiel
01. CoS CP R
03b. MS after ED R
04. Move-in R
06. CuS X (CuS max 30cd future) R
08. Comb yearly X (Comb yearly max 30cd future) R
09. Comb month/cont. R (Comb month/cont. max 45cd future)
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 13 / 37
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR X (CoS to SoLR 7cd future) R
33. CoS back to Supplier X (CoS back to Supplier 7cd future) R
38. MOZA Brussels R (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable in Flanders & Brussels)
14. Leverancierswissel na drop – Changement de
fournisseur après drop
01. CoS R
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly R
09. Comb month/cont. R
11. Drop res
CP (Flanders) / R (Wallonia) / X (Brussels –
Drop res not applicable)
R (Flanders,
Wallonia) / X
(Brussels – Drop res
not applicable)
12. Drop n-res CP R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR X (CoS to SoLR 7cd future) R
33. CoS back to Supplier X (CoS back to Supplier 7cd future) R
38. MOZA Brussels R (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable in Flanders & Brussels)
15. Verhuis (Move-out) met verzegelde/afgesloten
meter – Déménagement (Move-out) avec
scellée/fermeture du raccordement
01. CoS CP
X (Move-out always in past)
X
03b. MS after ED CP
04. Move-in X (not open yet)
06. CuS CP
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 14 / 37
08. Comb yearly CP
09. Comb month/cont. CP
11. Drop res
CP (Flanders,
Wallonia) / X
(Brussels – Drop res
not applicable)
12. Drop n-res CP
14. CoS after drop CP
18. EOC n-Res CP
20. CoS after EOC CP
22. Sleeping Move-in X (not open yet)
27. EOC res CP
28. MOZA
CP (Flanders,
Wallonia) / X
(Brussels -
scenario 28
MOZA not
applicable)
32. CoS to SoLR CP
33. CoS back to Supplier CP
38. MOZA Brussels
CP (Brussels)/ X
(scenario 38 not
applicable in Flanders
& Walloon)
39. PCàB
CP (Walloon) / X
(scenario 39 not
applicable in Flanders
& Brussels)
16. Wijzigen van relationele data door de
leverancier – Changement de données
relationnelles par le fournisseur
01. CoS PP
X (MDPC always immediately effective)
03b. MS after ED PP
04. Move-in R
06. CuS PP
08. Comb yearly PP
09. Comb month/cont. PP
11. Drop res
PP (Flanders,
Wallonia) / X
(Brussels – Drop res
not applicable)
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 15 / 37
12. Drop n-res PP
14. CoS after drop PP
18. EOC n-Res PP
20. CoS after EOC PP
22. Sleeping Move-in R
27. EOC res PP
28. MOZA
PP (Flanders,
Wallonia) / X
(Brussels -
scenario 28
MOZA not
applicable)
32. CoS to SoLR PP
33. CoS back to Supplier PP
38. MOZA Brussels
PP / X (Scenario 38
not applicable in
Flanders & Walloon)
39. PCàB
PP / X (Scenario 39
not applicable in
Flanders & Brussels)
17. Wijzigen van stamgegevens op het
toegangspunt door de Distributienetbeheerder
– Modification des master data d’un point
d’accès par le Gestionnaire du réseau de
distribution
01. CoS PP
X (Update MD always in past)
03b. MS after ED PP
04. Move-in X (not open yet)
06. CuS PP
08. Comb yearly PP
09. Comb month/cont. PP
11. Drop res
PP (Flanders,
Wallonia) / X
(Brussels – Drop res
not applicable)
12. Drop n-res PP
14. CoS after drop PP
18. EOC n-Res PP
20. CoS after EOC PP
22. Sleeping Move-in X (not open yet)
27. EOC res PP
28. MOZA PP (Flanders,
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 16 / 37
Wallonia) / X
(Brussels -
scenario 28
MOZA not
applicable)
32. CoS to SoLR PP
33. CoS back to Supplier PP
38. MOZA Brussels
PP / X (Scenario 38
not applicable in
Flanders & Walloon)
39. PCàB
PP / X (Scenario 39
not applicable in
Flanders & Brussels)
18. Einde Contract niet-residentieel – Fin de
contrat non résidentiel
01. CoS CP R
03b. MS after ED R
04. Move-in R
06. CuS X (CuS max 30cd future) R
08. Comb yearly X (Comb yearly max 30cd future) R
09. Comb month/cont. R (Comb month/cont. max 45cd future)
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR X (CoS to SoLR 7cd future) R
33. CoS back to Supplier X (CoS back to Supplier 7cd future) R
38. MOZA Brussels R (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB R (Walloon) / X (Scenario 39 not applicable in Flanders & Brussels)
20. Leverancierswissel na einde contract –
Changement de fournisseur après fin de contrat
01. CoS R
03b. MS after ED R
04. Move-in R
06. CuS R
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 17 / 37
08. Comb yearly R
09. Comb month/cont. R
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res CP R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res CP R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR X (CoS to SoLR 7cd future) R
33. CoS back to Supplier X (CoS back to Supplier 7cd future) R
38. MOZA Brussels R (Brussels) / X (Scenario 38 not applicable in Flanders & Walloon)
39. PCàB R (Walloon) / X (Scenario 39 not applicable in Flanders & Brussels)
21. Wissel van Vervoernetgebruiker /
Evenwichtsverantwoordelijke – Changement de
Responsable d’équilibre / Utilisateur du réseau de
transport
01. CoS PP R
03b. MS after ED PP R
04. Move-in R (No supplier registered yet for the AP)
06. CuS PP
08. Comb yearly PP R
09. Comb month/cont. PP R
11. Drop res
PP (Flanders,
Wallonia) / X
(Brussels – Drop res
not applicable)
R (Flanders, Wallonia) / X (Brussels – Drop res
not applicable)
12. Drop n-res PP R
14. CoS after drop PP R
18. EOC n-Res PP R
20. CoS after EOC PP R
22. Sleeping Move-in PP
27. EOC res PP R
28. MOZA
PP (Flanders,
Wallonia) / X
(Brussels - scenario
28 MOZA not
applicable)
R (Flanders, Wallonia) / X (Brussels - scenario
28 MOZA not applicable)
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 18 / 37
32. CoS to SoLR X (CoS to SoLR 7cd future) R
33. CoS back to Supplier X (CoS back to Supplier 7cd future) R
38. MOZA Brussels
PP (Brussels) / X
(scenario 38 not
applicable in Flanders
& Walloon)
R (Brussels) / X (scenario 38 not applicable in
Flanders & Walloon)
39. PCàB
PP (Walloon)/ X
(scenario 39 not
applicable in Flanders
& Brussels)
R (Walloon) / X (scenario 39 not applicable in
Flanders & Brussels)
22. Hangende verhuis naar een nieuwe/verzegelde
aansluiting – Déménagement vers un nouveau
raccordement / raccordement scellé en suspens:
Move-in herbevestigingsbericht – Message de
reconfirmation de Move-in
01. CoS R
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly R
09. Comb month/cont. R
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in CP
27. EOC res R
28. MOZA
2.2.1 R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR R
33. CoS back to Supplier R
38. MOZA Brussels R (Brussels) / X (scenario 38 not applicable for Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable for Flanders & Brussels)
24. Annulatie van een leverancierswissel door de
Sociale Leverancier – Annulation d’un changement
de fournisseur par le Fournisseur social
01. CoS CP
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly R
09. Comb month/cont. R
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 19 / 37
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR R
33. CoS back to Supplier R
38. MOZA Brussels R (Brussels) / X (scenario 38 not applicable for Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable for Flanders & Brussels)
27. Einde Contract residentieel – Fin de contrat
résidentiel
01. CoS CP R
03b. MS after ED R
04. Move-in R
06. CuS X (CuS max 30cd future) R
08. Comb yearly X (Comb yearly max 30cd future) R
09. Comb month/cont. R (Comb month/cont. max 45cd future)
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR X (CoS to SoLR 7cd future) R
33. CoS back to Supplier X (CoS back to Supplier 7cd future) R
38. MOZA Brussels R (Brussels) / X (scenario 38 not applicable for Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable for Flanders & Brussels)
28. Move-out zonder afspraak – Move-out sans
rendez-vous
01. CoS CP
03b. MS after ED R
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 20 / 37
04. Move-in R
06. CuS R (CuS max 30cd future)
08. Comb yearly R (Comb yearly max 30cd future)
09. Comb month/cont. R (Comb month/cont. max 45cd future)
11. Drop res R (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR R
33. CoS back to Supplier R
38. MOZA Brussels R (Brussels) / X (scenario 38 not applicable for Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable for Flanders & Brussels)
31. Annulatie van een drop door Sociale
leverancier – Annulation d’un drop par le
Fournisseur social
01. CoS R
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly R
09. Comb month/cont. R
11. Drop res CP (Flanders, Wallonia) / X (Brussels – Drop res not applicable)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA
R (Flanders, Wallonia) / X (Brussels - scenario 28 MOZA not
applicable)
32. CoS to SoLR R
33. CoS back to Supplier R
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 21 / 37
38. MOZA Brussels R (Brussels) / X (scenario 38 not applicable for Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable for Flanders & Brussels)
32. Leverancierswissel naar Noodleverancier
(enkel Brussel) – Changement de fournisseur vers
le Fournisseur de dernier recours (uniquement
Bruxelles)
01. CoS R
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly R
09. Comb month/cont. R
11. Drop res X (Drop res not applicable for Brussels)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA X (scenario 28 MOZA not applicable for Brussels)
32. CoS to SoLR R
33. CoS back to Supplier R
38. MOZA Brussels R (Brussels) / X (scenario 38 not applicable for Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable for Flanders & Brussels)
33. Leverancierswissel terug naar Commerciële
leverancier (enkel Brussel) – Changement de
fournisseur à nouveau vers le Fournisseur
commercial (uniquement Bruxelles)
01. CoS R
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly R
09. Comb month/cont. R
11. Drop res X (Drop res not applicable for Brussels)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA X (scenario 28 MOZA not applicable for Brussels)
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 22 / 37
32. CoS to SoLR R
33. CoS back to Supplier R
38. MOZA Brussels R (Brussels) / X (scenario 38 not applicable for Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable for Flanders & Brussels)
38. Move-out zonder afspraak (enkel Brussel) –
Move-out sans rendez-vous (uniquement
Bruxelles)
01. CoS CP
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly R
09. Comb month/cont. R
11. Drop res X (Drop res not applicable for Brussels)
12. Drop n-res R
14. CoS after drop R
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA X (scenario 28 MOZA not applicable for Brussels)
32. CoS to SoLR CP
33. CoS back to Supplier CP
38. MOZA Brussels R (Brussels) / X (scenario 38 not applicable for Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable for Flanders & Brussels)
39. Plaatsen Budgetmeter (enkel Wallonië) – Pose
Compteur à Budget (uniquement le Wallon)
01. CoS
CP (Walloon)/ X
(scenario 39 not
applicable in Flanders
& Brussels)
R R
03b. MS after ED R
04. Move-in R
06. CuS R
08. Comb yearly R
09. Comb month/cont. R
11. Drop res R
12. Drop n-res R
14. CoS after drop R
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 23 / 37
18. EOC n-Res R
20. CoS after EOC R
22. Sleeping Move-in R
27. EOC res R
28. MOZA R
32. CoS to SoLR R
33. CoS back to Supplier R
38. MOZA Brussels R (Brussels) / X (scenario 38 not applicable for Flanders & Walloon)
39. PCàB R (Walloon) / X (scenario 39 not applicable for Flanders & Brussels)
Alle scenario’s van annulatie van de aanvraag door
aanvrager / Tous les scenarii d’annulation de la
demande par son demandeur
01. CoS CP
03b. MS after ED R (not cancelable)
04. Move-in CP
06. CuS CP
08. Comb yearly CP
09. Comb month/cont. CP
11. Drop res CP (Flanders, Wallonia) / X (Drop res not applicable for Brussels)
12. Drop n-res CP
14. CoS after drop R (not cancelable)
18. EOC n-Res CP
20. CoS after EOC R (not cancelable)
21. BRP switch R (not cancelable)
22. Sleeping Move-in R (not cancelable)
27. EOC res CP
28. MOZA
R (not cancelable) (Flanders, Wallonia) / X (Brussels - scenario 28
MOZA not applicable)
32. CoS to SoLR CP
33. CoS back to Supplier CP
38. MOZA Brussels
R (not cancelable) / X (scenario 38 not applicable for Flanders &
Walloon)
39. PCàB CP / X (scenario 39 not applicable for Flanders & Brussels)
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 24 / 37
2.3 Gedurende bevroren periode - Durant la “frozen period”
Alle aanvragen worden verworpen behalve in de volgende situaties: Toutes les demandes sont rejetées excepté dans les situations suivantes :
Inkomende transactie – Transaction entrante
Transactie in bevroren periode – Transaction en période “Frozen”
Voor betekenis afkorting / Pour correspondance abréviations (zie tabel / voir tableau 1.1 Senario’s lijst – Liste des scénarii)
Resultaat /
Résultat
15. Verhuis (Move-out) met
verzegelde/afgesloten meter – Déménagement
(Move-out) avec scellée/fermeture du
raccordement
01. CoS CP
03b. MS after ED CP
06. CuS CP
08. Comb yearly CP
09. Comb month/cont. CP
11. Drop res CP
12. Drop n-res CP
14. CoS after drop CP
18. EOC n-Res CP
20. CoS after EOC CP
27. EOC res CP
32. CoS to SoLR CP
33. CoS back to Supplier CP
17. Wijzigen van stamgegevens op het
toegangspunt door de Distributienetbeheerder
– Modification des master data d’un point
d’accès par le Gestionnaire du réseau de
distribution
01. CoS PP
03b. MS after ED PP
06. CuS PP
08. Comb yearly PP
09. Comb month/cont. PP
11. Drop res PP
12. Drop n-res PP
14. CoS after drop PP
18. EOC n-Res PP
20. CoS after EOC PP
27. EOC res PP
32. CoS to SoLR PP
33. CoS back to Supplier PP
Notificatie van gebruik van Regularistaie 11. Drop res (yearly read) CP
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 25 / 37
formulier – Notification de l’usage du
formulaire de régularistaion 12. Drop n-res (yearly read) CP
18. EOC n-Res (yearly read) CP
27. EOC res (yearly read) CP
Notificatie van « secured » annulatie –
Notification d’annulation « secured »
11. Drop res CP
12. Drop n-res CP
18. EOC n-Res CP
27. EOC res CP
39 . PCàB CP
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 26 / 37
3 Op voorhand vereiste aankondigingen - Annonces requises d'avance
Transactie / Transaction
Op voorhand vereiste aankondiging tussen Aanvraag datum en
uitvoerdatum (ED) van een scenario - Annonce requise d'avance entre Date
de la demande et Date d'exécution d'un scénario
01 Leverancierswissel – Changement de fournisseur Min 21 / Max 365
02 Annulatie van een leverancierswissel – Annulation d’un changement de fournisseur 0
03a Mystery switch voor effectieve datum – Mystery switch avant date effective NR
03b Mystery switch na effectieve wisseldatum – Mystery switch après date effective 0
04
Verhuis (Move-in) naar een nieuwe/verzegelde aansluiting – Déménagement vers un nouveau
raccordement / raccordement scellé Min 0 / Max 180
05
Annulatie van een verhuis naar nieuwe/ verzegelde aansluiting – Annulation d’un déménagement vers un
nouveau raccordement / raccordement scellé 0
06 Klantenwissel – Changement de clients Min – 60 / Max 30
07 Annulatie van een klantenwissel – Annulation d’un changement de clients 0
08
Gecombineerde klanten- en leverancierswissel (jaarlijks gelezen) – Changement combiné clients et
fournisseurs (lecture annuelle) Min- 30 / -10 (*) / Max 30
09
Gecombineerde klanten- en leverancierswissel (maandelijks of continu gelezen) – Changement combiné
clients et fournisseurs (lecture mensuelle ou en continu) Min 30 / Max 45
10
Annulatie van een gecombineerde klanten- en leverancierswissel – Annulation d’un changement combiné
clients et fournisseurs 0
11 Drop residentieel – Drop résidentiel Min 30 / 60 (**) / Max 180
12 Drop niet-residentieel – Drop non résidentiel Min 30 / Max 180
13 Annulatie van een drop – Annulation d’un drop 0
14 Leverancierswissel na drop – Changement de fournisseur après drop Min 7 / Max 180
15
Verhuis (Move-out) met verzegelde/afgesloten meter – Déménagement (Move-out) avec
scellée/fermeture du raccordement NR
16
Wijzigen van relationele data door de leverancier – Changement de données relationnelles par le
fournisseur 0
17
Wijzigen van stamgegevens op het toegangspunt door de Distributienetbeheerder – Modification des
master data d’un point d’accès par le Gestionnaire du réseau de distribution NR
18 Einde Contract niet-residentieel – Fin de contrat non résidentiel Min 28 / Max 180
19 Annulatie van een einde contract – Annulation d’une fin de contrat 0
20 Leverancierswissel na einde contract – Changement de fournisseur après fin de contrat Min 7 / Max 180
21
Wissel van Vervoernetgebruiker / Evenwichtsverantwoordelijke – Changement de Responsable
d’équilibre / Utilisateur du réseau de transport Min 10 / Max 60
22
Hangende verhuis naar een nieuwe/verzegelde aansluiting – Déménagement vers un nouveau
raccordement / raccordement scellé en suspens NR
24
Annulatie van een leverancierswissel door de Sociale Leverancier – Annulation d’un changement de
fournisseur par le Fournisseur social 0
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 27 / 37
27 Einde Contract residentieel – Fin de contrat résidentiel Min 60 / Max 180
28 Move-out zonder afspraak – Move-out sans rendez-vous NR
31 Annulatie van een drop door Sociale leverancier – Annulation d’un drop par le Fournisseur social 0
32
Leverancierswissel naar Noodleverancier (enkel Brussel) – Changement de fournisseur vers le
Fournisseur de dernier recours (uniquement Bruxelles) Min 7 / Max 7
33
Leverancierswissel terug naar Commerciële leverancier (enkel Brussel) – Changement de fournisseur à
nouveau vers le Fournisseur commercial (uniquement Bruxelles) Min 7 / Max 7
34
Aanvraag tot plaatsing stroombegrenzer (enkel Brussel) – Demande de placement d’un limiteur de
puissance (uniquement Bruxelles) 0
35
Aanvraag tot het wegnemen van een stroombegrenzer – residentiële klant niet beleverd door SoLR (enkel
Brussel) – Demande d’enlèvement d’un limiteur de puissance – client résidentiel non fourni par SoLR
(uniquement Bruxelles)
0
36
Annulatie van een leverancierswissel naar Noodleverancier (enkel Brussel) – Annulation d’un
changement de fournisseur vers le Fournisseur de dernier recours (uniquement Bruxelles) 0
37
Annulatie van een leverancierswissel terug naar Commerciële leverancier (enkel Brussel) – Annulation
d’un changement de fournisseur à nouveau vers le Fournisseur commercial (uniquement Bruxelles) 0
38 Move-out zonder afspraak (enkel Brussel) – Move-out sans rendez-vous (uniquement Bruxelles) (MOZA Brussels) 0
39 Plaatsen Budgetmeter (enkel Wallonië)– Pose Compteur à Budget (uniquement le Wallon) (PcàB) 0
40 Annulatie plaatsen budgetmeter (enkel Wallonië) – Annulation pose compteur à budget (uniquement le Wallon)
(Cancellation PCàB) 0
Noot:
- Een negatief aantal dagen geeft aan dat een uitvoerdatum in het verleden zal
worden aanvaard.
- Alle aankondigingsdagen zijn kalenderdagen
- NR: niet relevant
(*) De termijn vastgelegd op -30 dagen voor Vlaanderen en Wallonië en -10 dagen
voor Brussel
(**) De termijn vastgelegd op 60 dagen voor Vlaanderen en 30 dagen voor
Wallonië
Remarque :
- Un nombre de jours négatif indique qu'une date d'exécution dans le passé sera
acceptée.
- Tous les jours d'annonces sont des jours calendrier
- NR: ne s'applique pas
(*) Le délai est fixé à -30 jours pour la Flandre et la Wallonie et -10 jours pour
Bruxelles
(**) Le délai est fixé à 60 jours pour la Flandre et 30 jours pour la Wallonie
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 28 / 37
4 Periodes tussen transacties - Périodes entre les transactions
Inkomende transactie – Transaction entrante Vorige transactie / Transaction précédente
Vereiste periode tussen Contractuele uitvoerdatum
(CED) van twee opeenvolgende scenario's - Période
requise entre la date d'exécution contractuelle de
deux scénarios successifs
01. Leverancierswissel – Changement de
fournisseur
01. Leverancierswissel – Changement de fournisseur 0 / 90 (*)
02. Annulatie van een leverancierswissel – Annulation d’un changement de fournisseur NR
03a. Mystery switch voor effectieve datum – Mystery switch avant date effective NR
03b. Mystery switch na effectieve wisseldatum – Mystery switch après date effective 0
04. Verhuis (Move-in) naar een nieuwe/verzegelde aansluiting – Déménagement vers un
nouveau raccordement / raccordement scellé 0 / 90 (*)
05. Annulatie van een verhuis naar nieuwe/ verzegelde aansluiting – Annulation d’un
déménagement vers un nouveau raccordement / raccordement scellé /
06. Klantenwissel – Changement de clients 30
07. Annulatie van een klantenwissel – Annulation d’un changement de clients NR
08. Gecombineerde klanten- en leverancierswissel (jaarlijks gelezen) – Changement
combiné clients et fournisseurs (lecture annuelle) 30
09. Gecombineerde klanten- en leverancierswissel (maandelijks of continu gelezen) –
Changement combiné clients et fournisseurs (lecture mensuelle ou en continu) 30
10. Annulatie van een gecombineerde klanten- en leverancierswissel – Annulation d’un
changement combiné clients et fournisseurs NR
11. Drop residentieel – Drop résidentiel 30
12. Drop niet-residentieel – Drop non résidentiel /
13. Annulatie van een drop – Annulation d’un drop NR
14. Leverancierswissel na drop – Changement de fournisseur après drop 0 / 90 (*)
15. Verhuis (Move-out) met verzegelde/afgesloten meter – Déménagement (Move-out)
avec scellée/fermeture du raccordement /
16. Wijzigen van relationele data door de leverancier – Changement de données
relationnelles par le fournisseur NR
17. Wijzigen van stamgegevens op het toegangspunt door de Distributienetbeheerder –
Modification des master data d’un point d’accès par le Gestionnaire du réseau de
distribution
NR
18. Einde Contract niet-residentieel – Fin de contrat non résidentiel /
19. Annulatie van een einde contract – Annulation d’une fin de contrat NR
20. Leverancierswissel na einde contract – Changement de fournisseur après fin de
contrat 0 / 90 (*)
21. Wissel van Vervoernetgebruiker / Evenwichtsverantwoordelijke – Changement de
Responsable d’équilibre / Utilisateur du réseau de transport NR
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 29 / 37
22. Hangende verhuis naar een nieuwe/verzegelde aansluiting – Déménagement vers un
nouveau raccordement / raccordement scellé en suspens NR
24. Annulatie van een leverancierswissel door de Sociale Leverancier – Annulation d’un
changement de fournisseur par le Fournisseur social NR
27. Einde Contract residentieel – Fin de contrat résidentiel 30
28. Move-out zonder afspraak – Move-out sans rendez-vous NR
31. Annulatie van een drop door Sociale leverancier – Annulation d’un drop par le
Fournisseur social NR
32. Leverancierswissel naar Noodleverancier (enkel Brussel) – Changement de
fournisseur vers le Fournisseur de dernier recours (uniquement Bruxelles) 30
33. Leverancierswissel terug naar Commerciële leverancier (enkel Brussel) –
Changement de fournisseur à nouveau vers le Fournisseur commercial (uniquement
Bruxelles)
30
34. Aanvraag tot plaatsing stroombegrenzer (enkel Brussel) – Demande de placement
d’un limiteur de puissance (uniquement Bruxelles) NR
35. Aanvraag tot het wegnemen van een stroombegrenzer – residentiële klant niet
beleverd door SoLR (enkel Brussel) – Demande d’enlèvement d’un limiteur de puissance
– client résidentiel non fourni par SoLR (uniquement Bruxelles)
NR
36. Annulatie van een leverancierswissel naar Noodleverancier (enkel Brussel) –
Annulation d’un changement de fournisseur vers le Fournisseur de dernier recours
(uniquement Bruxelles)
NR
37. Annulatie van een leverancierswissel terug naar Commerciële leverancier (enkel
Brussel) – Annulation d’un changement de fournisseur à nouveau vers le Fournisseur
commercial (uniquement Bruxelles)
NR
38. Move-out zonder afspraak (enkel Brussel) – Move-out sans rendez-vous (uniquement Bruxelles)
(MOZA Brussels) NR
39. Plaatsen Budgetmeter (enkel Wallonië)– Pose Compteur à Budget (uniquement le Wallon)
(PcàB) NR
40. Annulatie plaatsen budgetmeter (enkel Wallonië) – Annulation pose compteur à budget
(uniquement le Wallon) (Cancellation PCàB) NR
Alle andere scenario’s / Tous les autres scénarii : Geen tussentijdse vereiste periode - Aucune période intermédiaire requise
(*) Geen termijn vastgelegd voor Vlaanderen. Een termijn van 90 dagen is van
toepassing voor Brussel en Wallonië
(*) Pas de délai défini pour la Flandre. Un délai minimum de 90 jours est
applicable pour Bruxelles et la Wallonie.
Veronderstellingen: - Vroegere transactie werd geaccepteerd
- In geval van annulering, rekening houden met transactie vóór annulering
Noot:
- Alhoewel er, strikt genomen, geen periode dient te zijn tussen bepaalde scenario’s,
zal het niet mogelijk zijn deze scenario’s uit te voeren zonder bvb één dag tussenin te
Hypothèses :
- La transaction précédente a été acceptée
- En cas d'annulation, tenir compte de la transaction avant annulation
Remarque :
- Même si, stricto sensu, aucune période n'est nécessaire entre des scénarios
donnés, il ne sera pas possible d'exécuter ces scénarios sans prévoir par ex. un jour
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 30 / 37
voorzien, omdat:
1. Er een regel bestaat die bepaalt dat er enkel 1 transactie tegelijk mag lopen.
Daarom kan de volgende transactie pas aangevraagd worden NADAT de
vorige uitgevoerd werd.
2. Bepaalde transacties enige tijd op voorhand moeten aangevraagd worden.
Bvb.: er moeten minstens 30 dagen zijn tussen aanvraag van
Leverancierswissel (392) en de uitvoering van de Leverancierswissel. Zie
overzicht “Op voorhand vereiste aankondigingen”.
- Alle besproken dagen zijn kalenderdagen.
Afkortingen:
NR = niet relevant; hangt af van vorige transactie
/ = De wissel zal verworpen worden als het toegangspunt niet actief is. In deze
gevallen is de verwerping het gevolg van de status van het toegangspunt en niet
omwille van de vorige transactie. De 30/90*-dagen regel geldt dan niet voor de vorige
transactie.
Opmerkingen:
- (*) Alhoewel de hoofdregel is dat, voor annuleringscenario’s en scenario’s van reeds
geannuleerde transacties, er rekening moet gehouden worden met de vorige transactie,
zullen er nooit problemen zijn met de 30/90*-dagen regel na een annulering van een
Leverancierswissel, omdat, indien de annulering van de Leverancierswissel verstuurd
werd en aanvaard, dit betekent dat er een lopende Leverancierswissel was die ook
door het systeem werd aanvaard en dat de 30/90*-dagen test reeds voorbij was.
Daarom zal de nieuwe Leverancierswissel (inkomende transactie) ook aanvaard
worden.
entre eux, car :
1. Il existe une règle qui détermine qu'une seule transaction peut avoir
lieu à la fois. La transaction suivante ne peut donc seulement être
demandée qu'après l'exécution de la transaction précédente.
2. Certaines transactions doivent être demandées au préalable. A titre
d'exemple, il faut au moins 30 jours entre une demande de switch
fournisseur (392) et l'exécution du switch fournisseur. Voir aperçu
“Annonces requises d'avance”
- Tous les jours évoqués sont des jours calendrier
Abréviations :
NR = Ne s'applique pas; dépend de la transaction précédente
/ = Le switch sera rejeté si le point d'accès n'est pas actif. Dans ces cas, le rejet
résulte du statut du point d'accès et pas de la transaction précédente. La règle des
30/90*-jours ne s'applique alors pas à la transaction précédente.
Remarques:
- (*) Même si la règle principale consiste, pour les scénarios d'annulation et les
scénarios de transactions déjà annulées, à tenir compte de la transaction
précédente, il n'y aura jamais de problème avec la règle des 30/90*-jours après
l'annulation d'un switch fournisseur, car l'envoi et l'acceptation de l'annulation du
switch fournisseur signifient qu'un switch fournisseur était en cours, après avoir
été accepté par le système et avoir passé le test des 30/90*-jours. Dès lors, le
nouveau switch fournisseur (transaction entrante) pourra aussi être accepté.
5 Afspraken rond gebruik E44 “secured “ berichten – Accords sur l’utilisation des messages E44 “secured”
5.1 Inleiding - Introduction
De afspraken vermeld in dit document zijn geldig vanaf 19 oktober 2009. Les accords repris dans le présent document font foi à compter du 19 octobre
2009.
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 31 / 37
5.2 Scope
Scenario’s in scope (waarvoor het gebruik van de E44 “secured”-procedure van
toepassing is):
Drop residentieel / niet-residentieel
EOC residentieel / niet-residentieel
Pose Compteur à Budget (PCàB)
Move-in
De procedure kan door een andere dan de huidige leverancier op het toegangspunt
gebruikt worden, enkel in geval van een weigering bij een verhuis voor een
toegangspunt dat jaarlijks opgenomen wordt.
Voor toegangspunten die maandelijks of continu opgenomen (AMR) worden, is deze
procedure enkel toe te passen door de huidige leverancier.
Scénarios considérés (pour lesquels l’utilisation de la procédure E44 « secured »
est applicable) :
Drop résidentiel / non résidentiel
EOC résidentiel / non résidentiel
Pose Compteur à Budget (PCàB)
Move-in
La procédure peut être utilisée par un fournisseur tiers, uniquement en cas de
rejet d’un scénario de déménagement pour un point d’accès en relevé annuel.
Pour des points d’accès en relevé mensuel ou continu (AMR), cette procédure
est applicable uniquement par le fournisseur responsable du point d’accès.
5.3 E44s-procedure - Procédure E44s
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 32 / 37
In normale gevallen zal de volgende procedure worden gevolgd:
1. Vraag gesteld door de huidige leverancier verantwoordelijk voor het toegangspunt:
a) De leverancier zendt een “beveiligde” mail naar de DNB (geen voorafgaand
contact vereist). Bijvoorbeeld, de distributienetgebruiker heeft zijn schulden
betaald, de leverancier wil de DROP die hij geïnitieerd heeft, annuleren. .
b) In geval van aanvaarding zendt de DNB een EDIEL E44-BA4-boodschap (geen
antwoord via e-mail!). De DNB annuleert de transactie in het toegangsregister
en annuleert ook de daaruit voortvloeiende acties waaronder deze op het
terrein. In geval van een Move-in wordt het toegangspunt opnieuw vrijgemaakt.
c) In geval van weigering, antwoordt de DNB zo snel mogelijk op de “beveiligde”
mail (naar het verzendadres van de mail) en dit, binnen maximaal twee
werkdagen.
2. Vraag gesteld door een derde (andere) leverancier:
a) Een derde leverancier kan een lopend scenario annuleren, enkel in geval van
een weigering op een aanvraag van een gecombineerde wissel (CCSS). Hij
stuurt een “beveiligde” mail naar de DNB (geen voorafgaand contact vereist).
Door deze vraag verbindt deze leverancier zich ertoe het toegangspunt zo snel
mogelijk over te nemen. Na ontvangst van een aanvaardingsbericht van de
DNB, stuurt hij een CCSS (392-E35) en dit binnen de twee werkdagen. Hij kan
het toegangspunt maar overnemen door middel van een CCSS waarvan de
effectieve datum nooit later mag zijn dan de effectieve datum van het lopende
scenario. Anders gezegd, een derde leverancier mag nooit de
verantwoordelijkheid van de huidige leverancier op het toegangspunt
verlengen. Leverancierwissels zijn verboden. In geval van een Move-In, kan de
procedure E44S slechts gelanceerd worden door de leverancier die het initiële
scenario veroorzaakt heeft.
b) In geval van aanvaarding stuurt de DNB naar de leverancier die de annulatie
aangevraagd heeft, een EDIEL E44-BA5-bericht en naar de leverancier die
verantwoordelijk is voor het lopende scenario een EDIEL E44-BA6-bericht
(geen antwoord per email). De DNB annuleert de lopende transactie in het
toegangsregister en annuleert ook de daaruit voortvloeiende acties waaronder
deze op het terrein.
c) In geval van weigering antwoordt de DNB zo snel mogelijk op de “beveiligde”
e-mail (naar het verzendadres van de e-mail) et dit binnen de twee werkdagen.
3. Aandachtspunten
Pour les cas normaux, la procédure suivante sera suivie :
1. Demande faite par le fournisseur responsable du point d’accès :
a) Le fournisseur envoie un mail « sécurisé » à l’attention du GRD (pas
de contact préalable nécessaire). Par exemple, l’utilisateur de réseau a
payé ses dettes, le fournisseur veut annuler le DROP qu’il a initié.
b) En cas d’acceptation, le GRD envoie un message EDIEL E44-BA4
(pas de réponse par e-mail!). Le GRD annule la transaction dans le
registre d’accès et annule aussi les actions résultantes, en ce compris
celles sur le terrain. En cas de Move-In, le point d’accès est de nouveau
libéré.
c) En cas de rejet, le GRD répond le plus rapidement possible au mail
sécurisé (à l’adresse émettrice) et ce, au maximum dans les deux jours
ouvrables.
2. Demande faite par un fournisseur tiers :
d) Un fournisseur tiers est autorisé à annuler un scénario en cours,
uniquement en cas de rejet d’une demande de déménagement (switch
combiné - CCSS). Il envoie un mail sécurisé au GRD (pas de contact
préalable). De par cette demande, le fournisseur tiers s’engage à
reprendre le point d’accès au plus vite. Dès réception de l’acceptation
du GRD, il envoie donc un CCSS (392-E35) et ce, au plus tard dans les
deux jours ouvrables. Il ne peut procéder à la régularisation qu’à l’aide
d’un switch combiné dont la date effective ne peut, en aucun cas, se
situer au delà de la date effective du scénario en cours. Autrement dit,
un fournisseur tiers n’est pas autorisé à prolonger la responsabilité du
fournisseur actuel du point d’accès. Les switch fournisseur sont
interdits. En cas de Move-In, la procédure E44s ne peut être lancée que
par le fournisseur demandeur du scénario initial.
e) En cas d’acceptation, le GRD envoie un message EDIEL E44-BA5 au
fournisseur demandeur de l’annulation et un message EDIEL E44-BA6
au fournisseur responsable du scénario en cours (pas de réponse par e-
mail !). Le GRD annule la transaction en cours dans le registre
d’Accès et annule aussi les actions résultantes, en ce compris celles
sur le terrain.
f) En cas de rejet, le GRD répond le plus rapidement possible au mail
sécurisé (à l’adresse émettrice) et ce, au maximum dans les deux jours
ouvrables.
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 33 / 37
In kritieke/dringende/complexe gevallen blijft een voorafgaand contact via de telefoon
vooraleer de “beveiligde mail” te zenden mogelijk. Het .xls-bestand in punt 3 bevat e-
mailadressen en telefoonnummers nodig voor de beveiligde annuleringsprocedure.
Bij twijfel is het gebruik van een voorafgaand contact aan te raden (bijv. geen EDIEL en
geen verwerpingboodschap via mail ontvangen binnen twee werkdagen).
3. Situations critiques :
Dans des cas critiques/urgents/complex, un contact par téléphone avant l’envoi
de l’ « e-mail sécurisé » reste possible. Le fichier .xls dans le point 3 reprend les
adresses e-mail et les numéros de téléphone nécessaires à la procédure
d’annulation sécurisée.
En cas de doute, il convient d’utiliser un contact précédent (par ex. aucun
message EDIEL ou aucun message de rejet par e-mail reçu dans les deux jours
ouvrables).
5.4 Beveiligde e-mailstructuur - Structure de l’e-mail sécurisé Mailonderwerp:
De code in de beveiligde mail kan maximum 15 alfanumerieke tekens lang zijn. Dit
houdt in dat codes met een lengte van minder dan 15 tekens ook toegelaten zijn.
De gedetailleerde structuur van de mail wordt beschreven in de betrokken scenario's.
Objet de l’e-mail :
Le code du mail sécurisé peut comprendre 15 caractères alphanumériques au
maximum, ce qui implique que des codes de longueur inférieure à 15 caractères
sont également autorisés.
La structure détaillée des mails est décrite dans les scénarios concernés.
5.5 Periodes - Timings 5.5.1 Annulering/bevroren periode - Annulation/période « frozen »
Procedure voor Drop /EOC:
Door Drop/EoC-aanvrager :
o Als aantal kd vóór ED Drop/EOC > 7 kd annulering Drop/EOC
Procédure pour le Drop /EOC :
Par le demandeur de Drop/EoC
o Si le nombre de jc avant l'ED Drop/EOC > 7 jc annulation
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 34 / 37
o Als aantal kd vóór ED Drop/EOC ≤ 5 kd E44s-procedure starten
o Als aantal kd vóór ED Drop/EOC = 6 of 7 kd contact via telefoon
met DNB ofwel Drop/EOC-annulering zenden, ofwel E44s-
procedure starten volgens DNB-beslissing.
o Pragmatisch: Indien verwerping op annulering Drop/EOC ontvangen
en het aantal kd vóór ED Drop/EOC ≤ 7 kd E44s-procedure starten
Door een andere leverancier:
o Indien verwerping op een gecombineerde wissel tijdens de bevroren
periode van een hangend proces, E44s-procedure starten. In dat geval
moet de leverancier de gecombineerde wissel zo spoedig mogelijk
opnieuw zenden (na ontvangst van de E44-boodschap).
Procedure voor Pose Compteur à Budget (PCàB):
Door CàB aanvrager:
o Als aantal kd vóór de ED van de PCàB (Bevestigingsdatum van de
aanvraag PCàB + 40kd) > 30 kd annulering PCàB
o Als aantal kd vóór de ED van de PCàB < 30 kd of na de ED van de
PCàB E44s-procedure starten
Door een andere leverancier:
o Indien verwerping op een gecombineerde wissel tijdens de bevroren
periode van een hangend proces, E44s-procedure starten. In dat geval
moet de leverancier de gecombineerde wissel zo spoedig mogelijk
opnieuw zenden (na ontvangst van de E44-boodschap).
Drop/EOC
o Si le nombre de jc avant l'ED Drop/EOC ≤ 5 jc lancement
de la procédure E44s
o Si le nombre de jc avant ED Drop/EOC = 6 ou 7 jc contact
par téléphone avec le GRD envoi d’annulations Drop/EOC
ou lancement de la procédure E44s conformément à la
décision du GRD.
o D’un point de vue pragmatique : si rejet de l’annulation
Drop/EOC reçu et si nombre de jc avant l’ED Drop/EOC ≤ 7
jc lancement de la procédure E44s
Par un autre fournisseur :
o En cas de rejet d’un switch combiné pendant la période
« frozen » d' une procédure en cours, lancement de la
procédure E44s. En l’occurrence, le fournisseur doit renvoyer
le switch combiné dans les plus brefs délais (après réception
du message E44).
Procédure pour la Pose Compteur à Budget (CàB):
Par le demandeur de CàB :
o Si le nombre de jc avant l'ED CàB (Date de confirmation du
CàB + 40jc) > 30 jc annulation Pose Compteur à Budget
o Si le nombre de jc avant l'ED CàB < 30 jc ou postérieur à la
PCàB lancement de la procédure E44s
Par un autre fournisseur :
o En cas de rejet d’un switch combiné pendant la période
« frozen » d' une procédure en cours, lancement de la
procédure E44s. En l’occurrence, le fournisseur doit renvoyer
le switch combiné dans les plus brefs délais (après réception
du message E44).
5.5.2 Beveiligde mail in “post-processing” periode - Mail sécurisé dans la période de « post-processing »
Een Drop/EOC in “post-processing” periode kan worden geannuleerd door de aanvrager Un Drop/EOC dans la période de « post-processing » peut être annulé par le
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 35 / 37
van de Drop of door een derde leverancier met behulp van de E44s-procedure als de
drop nog niet is uitgevoerd. Deze procedure geldt vanaf 23/11/2009.
demandeur du Drop ou par un autre fournisseur, par le biais de la procédure
E44s, si le drop n’est pas encore exécuté. Cette procédure est valable à compter
du 23/11/2009. Les règles sont similaires à celles appliquées pendant la période
« frozen »
5.6 Lijst met e-mailadressen en telefoonnummers voor de beveiligde annuleringsprocedure – Liste des adresses e-mail et des numéros de téléphone nécessaires à la procédure d’annulation sécurisée
Emailadressen_secured_cancels V4.xls
Een eerste lijst met e-mailadressen en telefoonnummers voor contactneming tijdens de
beveiligde annulatieprocedure.
De meest actuele versie is gepubliceerd op de UMIX-website.
Une première liste reprenant les adresses e-mail et les numéros de téléphone
nécessaires à la procédure d’annulation sécurisée.
La version la plus actuelle est publiée sur le site web UMIX.
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 36 / 37
5.7 Samenvatting – Résumé
Gedurende de “frozen” periode:
Lopende scenario Huidige leverancier Andere leverancier
Drop / Eoc E44S
Alleen in geval van afwijzing van
een gecombineerde switch (verhuis)
+
Régularisatie binnen de 2 werkdagen
Pose Compteur à Budget E44S
Alleen in geval van afwijzing van
een gecombineerde switch (verhuis)
+
Régularisatie binnen de 2 werkdagen
Move In E44S Niet van toepassing
Pendant la periode “frozen”:
Scénario en cours Fournisseur Actuel Fournisseur Tiers
Drop / Eoc E44S
Uniquement en cas de rejet d’un
switch combiné (déménagement)
+
Régularisation dans les 2 jours
ouvrables
Introductie Structuring
Introduction Structuring
Voor implementatie
Pour implémentation
UMIG 4.1 - 20/12/2011
p. 37 / 37
Pose Compteur à Budget E44S
Uniquement en cas de rejet d’un
switch combiné (déménagement)
+
Régularisation dans les 2 jours
ouvrables
Move In E44S Pas d’application