edi holdings welcomes all stakeholders within the … · edi holdings welcomes all stakeholders...
TRANSCRIPT
EDI HoldingsEDI HoldingsWelcomes All Welcomes All Stakeholders Stakeholders
Within the Within the RED ONE AREARED ONE AREA
20 July 2007 Slide 3
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 4
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 5
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 6
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 7
To enhance a common and shared vision among stakeholders on RED
establishment
To inform and educate internal and external stakeholders about the
establishment of six wall-to-wall REDs
To proactively engage and mobilise stakeholders for the acceleration of RED
establishment processes
To provide technical support and advice in preparation for the establishment of
six wall-to-wall REDs through working in liaison with the existing RED
establishment structures as well as other relevant provincial and local
government structures
To monitor and evaluate stakeholder readiness for RED ONE
Purpose of the Regional EngagementForum
20 July 2007 Slide 8
The Regional Engagement Forum shall comprise of the following members:
EDI Holdings
Eskom Regional representatives
SALGA Provincial Representatives
Municipalities within RED ONE Region
Municipal Manager
Councilor / MMC responsible for Infrastructure and Services
Director responsible for Infrastructure and Services
Head of Electricity Department
Membership of the Regional EngagementForum
20 July 2007 Slide 9
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 10
Presentation Outline
Electricity Distribution Industry (EDI) Historical Context
25 October 2006 Cabinet Decision
Key Implementation Enablers and Their Status
What are REDs?
How will we get there?
Stakeholder Engagement
Conclusion
20 July 2007 Slide 12
Industry
Business
Residential
Scheduling
Physical Energy Flow
Financial Flow
Municipalities
Metering & Billing
Currently, South Africa operates in the traditional mode of vertical integration with financial and physical flowsfollowing the same path
ESKO
M
Current Electricity Supply Industry Structure
180
20 July 2007 Slide 13
Current industry structure is highly inefficient owing to fragmentationAbsence of economies of scale in respect of investing in assets, sharing offacilities, services, people development.
Inadequate maintenance of networksEstimated maintenance backlog: R5 bn accumulated over the past 10 years
Supply interruptions cost to the Economy: R2.9 bn to R 8.6 bn p.a.**
Inequitable treatment of consumers across the countrySignificant variance in average tariffs by Distributors:
Inconsistent Electrification Performance
Access to electricity: ~73 % (National)
Slow and Inconsistent Roll-Out of FBE
Current rollout is less than 40% of targeted community
Key Challenges Facing the EDI
** Source: 2003/4 National Integrated Resource Plan (NIRP) ; # Source: NUS Consulting Study - 2005
20 July 2007 Slide 14
EDI Restructuring Objectives
Energy White Paper Objectives (1998) EDI Restructuring Blueprint Objectives (2001)
• Ensure electrification targets are met • Achievement of government’s electrification programme• Universal access to electricity for all South Africans
• Provide low-cost electricity • Sustainable electricity supply to low-income consumers,regardless of location, at affordable prices
• Facilitate better price equality
• Improve the financial health of the industry • Future REDs to operate on a sustained, financially viablebasis as independent businesses
• Improve quality of service and supply • Acceptable and sustainable levels of supply security andquality
• Foster proper co-ordination of operations andinvestment capital
• Attract and retain competent employees • Future REDs to provide secure employment to theiremployees, provide skills development and trainingconsistent with a high technology, modern distributionbusiness
• Transition to be done within the context of a comprehensivehuman resources strategy and an agreed social plan
• Planned and managed transition
20 July 2007 Slide 15
Early 1990s
Considerable Debate over EDI
1997
RED s Approach EndorsedERIC Report
1999
Cabinet ApprovedStart of Restructuring Process
End 1999
EDIRC Established
April 2000
Appointment of PWC
Aug 2000
Blueprint Approved by EDIRC
May 2001
Blueprint approved by Cabinet
July 2003
EDI Holdings established
July 2005
RED 1 established
Sept 2005
Cabinet decision
History of Restructuring
Oct 2006
Cabinet decision
20 July 2007 Slide 17
Having considered technical submissions on:The financial viability of the different RED models;
The institutional and governance arrangements for the REDs; and
How the various models respond to the restructuring policy objectives.
The Cabinet approved the following:That 6 wall to wall REDs be implemented;
That the REDs be established as public entities and be regulated according to the PFMA and theElectricity Regulation Act;
That Eskom becomes a shareholder in the respective REDs for a transitional period and that theyreduce their shareholding over time;
That DME, through EDI Holdings, will oversee and control the establishment of REDs;
That a roadmap will be put in place to move from the current scenario into the future industrystructure
That a strategy needs to be developed to deal with capital investment requirements for the REDs
That EDI Restructuring legislation will be introduced; and
That a National electricity pricing system will be developed.
Cabinet Decision: 25 October 2006
20 July 2007 Slide 19
Key Considerations and ImplementationEnablers
Key Implementation Enabler Responsible StatusGovernance of the REDs DME This issue will be addressed in the EDI
Restructuring Bill
Electricity Restructuring Legislation DME The process is driven by DME and indication from them is that the Electricity Restructuring Act is targeted for mid 2007
Promulgation of Asset Transfer Framework to enable effective and orderly transfer of assets from local government and Eskom to the REDs
National Treasury NT exempted municipalities and municipal entities from sections 14 & 90 of the LG: MFMA with regard to electricity transfers.
National Electricity Pricing System NERSA The process is driven by NERSA
National Tariff Harmonisation Framework to ensure rationalisation of tariffs nationally
NERSA EDI Holdings will submit a position paper by 31 March 2007 for input into the NERSA process
Salary Harmonisation Framework EDI Holdings A proposal served at the TLRS during January 2007 as part of the process of addressing the COS and salary harmonisation
Capital Investment Strategy for Infrastructure DME /EDI Holdings
Will be attended to through the REDEstablishment Business Case
Surcharge Principles Framework National Treasury The principles are being covered in the MunicipalFiscal Powers and Functions Bill to bepromulgated during 2007
Local Government Amendment Bill dplg Considering relaxing of MSA S78 process
20 July 2007 Slide 21
6 Wall-to-Wall RED Boundary Map
RED 1
RED 4
RED 2
RED 3
RED 6
RED 5
Provincial Boundaries
Cape Town
Nelson Mandela Bay Metro
(Port Elizabeth)
eThekwini Metro(Durban)
Ekhuruleni Metro
Tshwane Metro(Pretoria)Johannesburg
Metro
20 July 2007 Slide 22
REDs Statistical Information
DESCRIPTIONRED ONE
RED TWO
RED THREE
RED FOUR
RED FIVE
RED SIX
2004 FIGURES
No of customers: Eskom No 279122 363832 496490 636527 506564 1234667
No of customers: Municipality No 977742 936180 536661 651320 889157 819781
Energy Sales: Eskom TWh 3.860 4.112 1.312 6.597 3.186 7.644
Energy Sales: Municipality TWh 11.269 11.671 4.818 12.945 14,745 13.737
Assets: Eskom Rbn 2.196 2.694 2.297 3.414 3.652 6.375
Assets: Municipalities Rbn 3.581 4.154 2.693 5.537 5.731 2.634
Personnel No 5069 5059 2649 5707 5302 7899
Revenue Rbn 5.169 4.775 1.959 5.268 5.119 5.957
Current Surplus Transfer (Unaudited) Rm 345 454 207 388 377 101
5 YEAR PROJECTED
Refurbishment Capital Requirement Rbn 1.437 1.923 1.307 2.197 2.833 2.444
Maintenance Backlog Rbn 0.581 0.704 0.245 0.837 0.405 1.017
New Work Rbn 0.753 1.422 1.759 1.336 2.948 2.370
20 July 2007 Slide 23
New companies into which both municipalities and Eskom will transfer their electricity
distribution businesses
Shareholding to be split between Eskom, National and Local Government
Service providers of choice to the service authorities:
Municipality remains service authority and RED becomes Service provider
REDs will collect surcharges in accordance with the Municipal Fiscal Powers &
Functions Bill on behalf of the municipalities and pay it over to them
REDs will pay dividends to shareholders subject to financial performance
Relationship between RED and municipalities to be governed through the Service
Delivery Agreement as contemplated in Section 81 of Municipal Systems Act
Streamlined relationship reducing duplication and creating clear accountability
Better regulation with role clarity between service authorities, service providers and
the National Energy Regulator of South Africa
Future REDs (…1)
20 July 2007 Slide 24
Decentralised geographical service delivery
Enable Government’s social policy, e.g. electrification and free basic electricity
Single institution
Focus on service
Consistency in operating policies and application across RED geographical area
Development and application of best practices
Support Government’s objective of universal access to electricity by 2012
Become more efficient and able to service customers equally well, at realistic tariff levels
through:
Lower Interest charges due to improved access to capital markets
Efficiencies in “non-payroll” related areas, i.e., general costs
Accounts Receivable. Using best practices in a reasonable, good faith effort
approach to reduce bad debt accounts
Future REDs (…2)
20 July 2007 Slide 25
Municipal Revenue Stream
Municipalities will continue to derive income from electricity sales within their area of
jurisdiction
The income will be based on the current audited revenue generated from electricity
sales and transferred to the municipality to support other services
The method through which municipalities will receive a continued revenue stream from
electricity sales would be through:
A surcharge to customers on electricity sales
Dividends from the relevant RED, subject to financial performance and within the
approved policy of the relevant RED
Surcharges collected by the RED will be paid over to the relevant municipality on a
basis agreed to between the relevant municipality and the RED
20 July 2007 Slide 26Slide 26
RED Future Business Model
Bundled but clearly demarcated wires and retail businesses
Wires business key characteristics:Asset intensive
Capital intensive
Geared for serving an one to many relationship
Monopoly business with strong regulation
Retail business key characteristics:Customer driven
Trading in energy
Products and services aligned according to market segmentation
Business geared towards competition and less regulation
Shared corporate and support services to wires and retail
Focus on buy in of services to avoid stranded costs and duplication
Business model to be customised to complement the geographical composition of theRED area of jurisdiction
20 July 2007 Slide 27
Indicative RED Topography
AREA OFFICEAREA OFFICE
AREA OFFICE
DEPOT
DEPOT
DEPOT
DEPOT
DEPOT
DEPOT
DEPOT
DEPOT
DEPOTHEAD
OFFICE
20 July 2007 Slide 28
Roles and Responsibilities
ROLE RESPONSIBILTY
Shareholder Establish and contract shareholders compact with RED BoardMonitors the performance of the REDDefine socio and economic requirementsDefine business performance expectations Appoint the Board and CEO
RED Board Ensure compliance with the shareholders compactEstablish RED Policy, Direction and Compliance requirementsDevelop and implement strategies to create shareholder value and to ensure effective service deliveryEnsure governance, legal, regulatory and policy complianceAppoint Executive Management
RED Management Develop and implement strategies to create shareholder valueEnsure effective business operations and complianceEnsure effective service deliveryAppoint resources and ensure effective resource management
20 July 2007 Slide 29
Relationship Governance
Relationship Owner Relationship Partner Governance Instrument
National Government RED Board Shareholders AgreementShareholder CompactBusiness Plan
Local Government (Service Authority)
RED Board (Service Provider) Shareholders AgreementService Delivery Agreement (SDA)
Eskom Holdings RED Board Shareholders AgreementAsset Transfer Agreement
RED Board RED Management Business PlanPerformance Contract
National Energy Regulator of South Africa (NERSA)
RED Board NERSA Licence
20 July 2007 Slide 33
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 35
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 36
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 39
6 wall-to-wall REDs as approved by Cabinet in May 2001 & October 2006Mainly 2 Provinces: Western Cape & Northern Cape and a small part of EasternCapeMetro: City of Cape TownEskom Region: Western36 Local Municipalities8 District Municipalities
Key StatisticsNo of customers - 1,256,864Sales (GWh) - 15,129Revenue (R’m) - 5,169Assets (R’m) - 5,777Employees - 5,170
Strategic ApproachEskom Western Region as “footprint”“Critical mass”Leverage on the work done in establishing the RED1 (2005)Phased Approach
About RED ONE
20 July 2007 Slide 40
Municipal Preparations for RED Readiness
Council Resolution that the Municipality participate in RED ONE establishment
Accession to Co-operative Agreement
Legal Compliance
MSA Section 78 process
Ringfencing of Electricity Distribution Business
Participation in the RED ONE Regional Project Governance Structures
20 July 2007 Slide 41
State of Readiness: Municipalities within RED ONE (…1)
Municipality MSA S78 RingfencingAccession Agreement
Matzikama Local Municipality (WC011) No No No
Cederberg Local Municipality (WC012) No No No
Bergrivier Local Municipality (WC013) No No No
Saldanha Local Municipality (WC014) No No No
Swartland Local Municipality (WC015) No No No
West Coast District Municipality (WC01) No No No
Witzenberg Local Municipality (WC022) No No No
Drakenstein Local Municipality (WC023) Yes Yes Yes
Stellenbosch Local Municipality (WC024) Busy Busy No
Breede Valley Local Municipality (WC025) Yes Yes No
Breede River/Winelands Local Municipality (WC026) Busy Busy No
Cape Winelands District Municipality (DC02) No No No
Theewaterskloof Local Municipality (WC031) No No No
Overstrand Local Municipality (WC032) No No No
Cape Agulhas Local Municipality (WC033) No No No
Swellendam Local Municipality (WC034) No No No
Overberg District Municipality (DC03) No No No
20 July 2007 Slide 42
State of Readiness: Municipalities within RED ONE (…2)
Municipality MSA S78 RingfencingAccession Agreement
Kannaland Local Municipality (WC041) Yes Yes No
Hessequa Local Municipality (WC042) Yes Yes No
Mossel Bay Local Municipality (WC043) Yes Yes No
George Local Municipality (WC044) Yes Yes No
Oudtshoorn Local Municipality (WC045) Yes Yes No
Bitou Local Municipality (WC047) Yes Yes No
Knysna Local Municipality (WC048) Yes Yes No
Eden District Municipality (WC04) No No No
Laingsburg Local Municipality (WC051) Yes Yes No
Prince Albert Local Municipality (WC052) Yes Yes No
Beaufort West Local Municipality (WC053) Yes Yes No
Central Karoo District Municipality (DC05) No No No
Richtersveld Local Municipality (NC061) No No No
Nama Khoi Local Municipality (NC062) No No No
Kamiesberg Local Municipality (NC064) No No No
Hantam Local Municipality (NC065) No No No
Karoo Hoogland Local Municipality (NC066) No No No
20 July 2007 Slide 43
State of Readiness: Municipalities within RED ONE (…3)
Municipality MSA S78 RingfencingAccession Agreement
Khai-Ma Local Municipality (NC067) No No No
Namakwa District Municipality (DC06) No No No
Kareeberg Local Municipality (NC074) No No No
SiyathembaLocal Municipality (NC077) No No No
Pixley Ka Seme District Municipality (DC07) No No No
Mier Local Municipality (NC081) No No No
!Kai! Garib Local Municipality (NC082) No No Yes
Khara Hais Local Municipality (NC083) No No No
!Kheis Local Municipality (NC084) No No No
Siyanda District Municipality (DC08) No No No
Eskom n/a Yes Yes
City of Cape Town Metropolitan Municipality Yes Yes Yes
20 July 2007 Slide 44
Accession Agreement
EDI Co-operative Agreement entered into between National Government (DME),SALGA, Eskom Holdings Limited, EDI Holdings and NERSA during 2002
All Municipalities and Municipal Entities become party to this agreement by way of theAccession Agreement
On signing the Accession Agreement, Municipalities undertake to:
Provide the necessary assistance to EDI Holdings to enable it to meet itsobjective of restructuring the EDI in accordance with the overall intent of thereform process
Ringfence its Electricity Business (where applicable) in a manner agreed withEDI Holdings in preparations for the establishment of the REDs
Use their best endeavour to initiate the required process in terms of theMunicipal Systems Act
Keep EDI Holdings promptly and fully informed of any activities that wouldmaterially affect the business and/or the objectives of EDI Restructuring
20 July 2007 Slide 45
MSA Section 78
What is a Section 78 Assessment:
A Section 78 Assessment is a process required by the MSA to assess potential
service delivery mechanisms for the provision of a municipal service
Purpose of a Section 78 Assessment:
To select the most appropriate and optimal service delivery mechanism that will
ensure access to services for all.
Methodology for a Section 78 Assessment:
Assessment of Internal Mechanism [S78(1)]
Decision by Council [S78(2)]
Exploration and Assessment of External Mechanism [S78(3)]
Decision by Council [S78(4)]
20 July 2007 Slide 46
MSA Section 78 Process
STEP 1STATUS QUO ASSESSMENT
STEP 2ASSESS INTERNAL SERVICE DELIVERY MECHANISMS
STEP 3DECIDE
STEP 4IMPLEMENT APPROPRIATE INTERNAL
SERVICE DELIVERY MECHANISMS• Allocate sufficient human, financial and other
resources necessary for proper provisioning of the service
STEP 4GIVE NOTICE TO THE LOCAL COMMUNITY
STEP 5• Assess external service delivery mechanisms• Conduct a feasibility study
STEP 6DECIDE
On Internal Mechanism
EXTERNALINTERNAL
On External Mechanism
20 July 2007 Slide 47
Ringfencing in Context
Ringfencing is the initial step to the process of RED creation, during which the Electricity
Distribution Business is separated from the parent municipality for incorporation into the
RED
Electricity Distribution Business
Wires Activities
Retail Activities
Functional Support Activities
Ringfencing Phases
Financial Ringfencing
Operational Ringfencing
Human Resources Ringfencing
Consider establishing an internal EDI Restructuring Steering Committee
20 July 2007 Slide 48
EDI Holdings Support
Toolkits available for:
Ringfencing
MSA S78
Modeling Information
Financial
Statistical
Funding
NERSA approved, through Eskom Multi Year Price Determination, the allocation
of R1,2bn over a 3 year period
Projects initiated after 1 April 2006 will be considered for pro-rata funding
Establishment of a Central Panel of Service Providers for Ringfencing and MSA
S78
20 July 2007 Slide 49
MFMA Act, 2003 (Act No.56 of 2003): Exemption
To facilitate the EDI restructuring National Treasury provided exemption fromcertain specific provisions of the MFMA (Government Gazette No. 29781, 05 April2007)Municipalities and Municipal Entities are exempted from or in respect of theprovisions of sections 14 and 90 of the MFMA subject to the following conditions:
Exemption relates to the transfer of ownership or otherwise disposal of capitalassets (moveable and immoveable), owned by municipalities and used for theprovision of electricity reticulation and other electricity services, to REDs or publicentities
The exemption requires that:Municipalities must enter into a Service Delivery Agreement (SDA) and any otheragreement with the relevant REDMunicipalities must undertake a due diligence and ringfence their electricity businessAll capital assets, current assets, loans and liabilities associated with the assets tobe transferred to the relevant RED must be identifiedAll the assets to be transferred to the relevant RED must be recorded in an assetregisterAssets to be transferred must be valued through a transparent and auditablemethodology
20 July 2007 Slide 50
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 52
Eskom Preparations towards RED ONE Establishment
PROGRAMME 726
The Financial, People & Communication streams are all complete.
Retail Stream
± 2000 customers to be transferred between regions, This will occur during
June 2007
Wires Stream
Some metering points still outstanding. To be completed by end of October
Regional Internal Boundary Optimisation (RIBO) project completed to be
signed of between regions.
One Technical service area (TSA) to be established as normal business
The BP&S stream is reliant on the changes to the others streams and will
complete all changes during June with system shut down
20 July 2007 Slide 53
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 55
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 57
Conclusion
EDI Holdings welcomes the certainty created by the Cabinet Decision to create 6 wall towall REDs as Public Entities, regulated under the PFMA
EDI Holdings would like to urge RED ONE Municipalities to support the implementationof the Cabinet Decision by:
Signing Accession Agreement; and
Commencing the preparatory work:
MSA Section 78
Ringfencing
Due Diligence
Join the Engagement Forum
EDI Holdings will continue to work with all industry players to ensure fast-tracking of therestructuring process in order to ensure the realization of the restructuring objectives
20 July 2007 Slide 58
EDI Holdings RGM Contact Information
Name Telephone Number
Cell phone Email Address
Deon Louw (RED ONE)
021 446 2070 083 631 2240 [email protected]
Thandi Mazibuko(RED TWO)
012 316 7733 082 653 2191 [email protected]
Nigel Waters(RED THREE)
043 705 9634 082 449 0142 [email protected]
Nhlanhla Zondo(RED FOUR)
012 316 8001 082 449 0142 [email protected]
Nigel Waters(RED FIVE)
043 705 9634 082 449 0142 [email protected]
Diamond Mushwana(RED SIX)
082 829 5078 [email protected]
20 July 2007 Slide 59
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min
20 July 2007 Slide 60
Agenda
# POINTS FOR DISCUSSION TIME RESPONSIBLE
REGISTRATION 9h00-10h30
1. Opening 5 min Deon Louw: RED ONE RGM
2. Welcoming Address 15 min Executive Mayor Johnson: SALGA
3. Purpose of the Regional Engagement Forum 10 min Deon Louw: RED ONE RGM
4. EDI Restructuring 30 min Dr. W de Beer: COO EDI Holdings
5. Discussions 30 min ALLTEA BREAK@12H00 15 min
6. Municipal Preparations towards RED ONE Establishment 15 min Deon Louw: RED ONE RGM
7. Eskom Preparations towards RED ONE Establishment 10 min ESKOM
8.
Discussions8.1 RED ONE Restructuring Matters8.2 Debate and Acceptance of REF Terms of Reference8.3 Setting Date for First RED ONE Sponsors Committee
30 min ALL
9. Way Forward 10 min Deon Louw: RED ONE RGM
10. Closing Remarks 10 min SALGA Northern Cape
LUNCH @ 13h30 60 min