Page 1: Economical batch size 1 production - HOMAG Group | …€¢ Lower labor costs as manual recuts are eliminated • Low energy consumption and low tooling costs Decoupling buffer These

Economical batch size 1 production

Secure your future and your competitive standing with our solutions

MARTINI-w

erbeagentur.de04/2015

WEINMANN Holzbausystemtechnikwww.weinmann-partner.com

Page 2: Economical batch size 1 production - HOMAG Group | …€¢ Lower labor costs as manual recuts are eliminated • Low energy consumption and low tooling costs Decoupling buffer These

Your ability to stay ahead of your competitors and secure your company’s future

can hinge on finding the optimum underlying concept for your new production line.

Particularly in these times of high variant diversity, keeping production costs competitive

through the optimum use of resources, short throughfeed times and minimal inventories

can make that decisive difference. Finding the most suitable production philosophy to

meet your needs is key. HOMAG Group Engineering will guide you through the crucial

planning phase with the benefit of outstanding trade-specific knowledge, many years of

experience and comprehensive expertise across the widest product spectrum – all from

a single source.

Batch size 1 production – individually tailored and highly flexible solutions from the HOMAG Group

Warehousingtechnologyandtransportlogistics

Optimization,cutting/nestingandpartidentification

Bufferstoragesystem Sizingandedgeprocessing

Page 3: Economical batch size 1 production - HOMAG Group | …€¢ Lower labor costs as manual recuts are eliminated • Low energy consumption and low tooling costs Decoupling buffer These

•Longerpost-productiontimes

•Exchangeofcomponentsisverydifficult

•Lownumberofmultiplestorageprocesses,consequentlylowercapacityanddynamicutilizationinthebuffer,storageorsortingsystem

Component-specific production order

Thecomponentcanbeproducedforseveralcustomer

orders.Eachcomponenthasitsownuniquenumberandisassignedtothecustomerorderatalatestageintheproductionprocess(labelwithoutcustomerreference).Thehighdegreeofflexibilityfundamentaltothisproductionmethodcallsfortheuseofamanufacturingexecutionsystem.

•Highersortingqualitiesrequired

•Sortingandorderpickingatthelatestpossiblestage,asthispromotesthelongest

flexibilityinthepartflow(multipledepthstorage,changeofsequence)

•Post-productionpartscanbetakenfromstockifrequired

•Highprobabilityofmultiplestorageandhighcapacityanddynamicutilizationinthebuffer,storageorsortingsystem

•Sequenceofcomponentshasnorelevance

Customer-specific production order

Here,thecomponentisproducedforaspecificcustomerorder.Eachcomponenthasitsownuniquenumberandisassignedtothecustomerorderearlyonintheproductionprocess(labelwithcustomerreference).Thisproductionmethodrequiresahighleveloftransparency,permittingtheuseofamanufacturingexecutionsystem.

Drillingandhardwaremountingsystems

Sortingandorderpicking Assemblytechnology Packagingtechnology

PRODUCTION PHILOSOPHIES

Page 4: Economical batch size 1 production - HOMAG Group | …€¢ Lower labor costs as manual recuts are eliminated • Low energy consumption and low tooling costs Decoupling buffer These

Yourbenefit

•Savingsduetooptimummaterialflow

•Reduceddowntimes

Flexible edge application

Youdonotneedtoabidebyanyrulesintermsofcomponentdimensions.Flexiblemachinesandunitsensuretheshortestpossiblechangeovergapforedges.

Yourbenefit

•Optimumproductivity

Sorting and order picking

Apre-drillingsortingprocessmakessensewheretherearedifferentnon-redundantdrillinglinesandseveralproductionroutes.Apost-drillingsortingprocessisrecommendedwhereautomatichardwaremountingrestrictionsexist,orwherepartsrequiringdrillingandpartsnot

When implementing new production lines, we aspire to combine variant diversity and batch

size 1 production with outstanding economy. HOMAG Group Engineering will devise the

optimum machine configuration for your individual requirement, making optimum use of key

factors for your success.

Recuts

Fullyautomaticrecutsduringrunningproductionincreasetheeconomyachievablewithbatchsize1production

Yourbenefit

•Reducedmaterialcoststhroughoptimumutilizationofpanelsandminimizedcuttingwaste

•Lowerlaborcostsasmanualrecutsareeliminated

•Lowenergyconsumptionandlowtoolingcosts

Decoupling buffer

Thesedecouplecomponentsfromprocessesorblockcomponentstoensureoptimumpreparationofthedownstreammachine.Entryintoandremovalfromstoragetakeplaceinmultiplelayersorlanes.Decouplingbuffersareusedbetweendividingandedgeapplication,betweenedgeapplicationanddrilling,orwithinaprocessstep.

requiringdrillingaresimplycontrolled.

Yourbenefit

•Moreefficient,morecosteffectiveproductionsequencesduetohigheraccesstoidenticalparts(parentparts)

Networked drilling

Here,allcomponentsremaininasingleproductionflow.Theprocessingdimensionsareadjustedbymeansofsuitablemachineconfigurationtothecompletecomponentspectrum,e.g.carcases,frontsortabletops.

Yourbenefit

•Laborcostsavingsthroughreducedorganizationalinterventionbyoperators

•Lessscrapduetoreducedcomponentdamageasaresultofmanualhandling

•Higherlevelofusage

Key factors for batch size 1 production

Page 5: Economical batch size 1 production - HOMAG Group | …€¢ Lower labor costs as manual recuts are eliminated • Low energy consumption and low tooling costs Decoupling buffer These

The right information at the right time

Aswellasrequiringefficientandflexiblemachines,batch size 1productionreallycomesintoitsownthroughtheuseofanintelligenthigher-levelmanufacturingexecutionsystem.TheHOMAGGroupprovidesthisessentialingredientintheformofitsSoftwareManufacturingOrganizationSystem(MOS).

MOSprovidesoptimumcommunicationbetweenyourERPsystemandyourbatchsize1production.

Yourbenefit

•Centraldatabaseforproduction

•Supplyofdataandinformationtoyourmachines

•Orderandparttracking,completenesscheck

•Controlandevaluationofproductionbatchesandunits

•Managementofproductionroutesanddeadlines Performance category I

400–500parts/shift*

TLF 211 HPP/HPL/HKL BHP 200 TPK 400 Basic concept 1, 2, 3, 5, BMG 500 Robot Sorting Unit BHX 500 ABH 100 MPH 410 VKV 020

Performance category II800–1 100parts/shift*

TLF 411 BHP 200 TPK 400 Basic concept 4 or 6 BAZ 700 Robot Sorting Unit ABH 100 ABF 600

Performance category III

1 800–2 200parts/shift*

TLF 411 TPL 220 Basic concept 7 TLB 320 ABH 100 ABL 100/210 – ABH 100

Performance category IV

4 500–5 000(6 500)parts/shift*

TLF 411 – 2 bridgesIndividual solutions / Customized scaling

TPL 220 Basic concept 8 TLB 320 BST 800 ABF 800 – ABL 220 MDE 160 VKV 710

Storage system

*=8hours

Key factors for batch size 1 production

Page 6: Economical batch size 1 production - HOMAG Group | …€¢ Lower labor costs as manual recuts are eliminated • Low energy consumption and low tooling costs Decoupling buffer These

Performance category I

400–500parts/shift*

TLF 211 HPP/HPL/HKL BHP 200 TPK 400 Basic concept 1, 2, 3, 5, BMG 500 Robot Sorting Unit BHX 500 ABH 100 MPH 410 VKV 020

Performance category II800–1 100parts/shift*

TLF 411 BHP 200 TPK 400 Basic concept 4 or 6 BAZ 700 Robot Sorting Unit ABH 100 ABF 600

Performance category III

1 800–2 200parts/shift*

TLF 411 TPL 220 Basic concept 7 TLB 320 ABH 100 ABL 100/210 – ABH 100

Performance category IV

4 500–5 000(6 500)parts/shift*

TLF 411 – 2 bridgesIndividual solutions / Customized scaling

TPL 220 Basic concept 8 TLB 320 BST 800 ABF 800 – ABL 220 MDE 160 VKV 710

Dividing/cutting Dividing/nesting Buffer storage system Sizing and edgingSizing and edging

Page 7: Economical batch size 1 production - HOMAG Group | …€¢ Lower labor costs as manual recuts are eliminated • Low energy consumption and low tooling costs Decoupling buffer These

Performance category I

400–500parts/shift*

TLF 211 HPP/HPL/HKL BHP 200 TPK 400 Basic concept 1, 2, 3, 5, BMG 500 Robot Sorting Unit BHX 500 ABH 100 MPH 410 VKV 020

Performance category II800–1 100parts/shift*

TLF 411 BHP 200 TPK 400 Basic concept 4 or 6 BAZ 700 Robot Sorting Unit ABH 100 ABF 600

Performance category III

1 800–2 200parts/shift*

TLF 411 TPL 220 Basic concept 7 TLB 320 ABH 100 ABL 100/210 – ABH 100

Performance category IV

4 500–5 000(6 500)parts/shift*

TLF 411 – 2 bridgesIndividual solutions / Customized scaling

TPL 220 Basic concept 8 TLB 320 BST 800 ABF 800 – ABL 220 MDE 160 VKV 710

DrillingDrilling with hardware

mountingAssembly

Sorting and

order pickingPackaging

Page 8: Economical batch size 1 production - HOMAG Group | …€¢ Lower labor costs as manual recuts are eliminated • Low energy consumption and low tooling costs Decoupling buffer These

MARTINI-w

erbeagentur.de04/2015

For the Success of Original TechnologyA VDMA campaign

HOMAG Group AG72296SCHOPFLOCHGERMANYwww.homag-group.com

BÜTFERING Schleiftechnikwww.buetfering.de

HOMAG Holzbearbeitungssystemewww.homag.com

HOMAG Automation Handling und Verpackungwww.homag-automation.com

FRIZ Kaschiertechnikwww.friz.de

HOLZMA Plattenaufteiltechnikwww.holzma.com

SCHULER Consultingwww.schuler-consulting.com

WEEKE Bohrsystemewww.weeke.com

WEINMANN Holzbausystemtechnikwww.weinmann-partner.com

HOMAG eSOLUTIONSoftwarewww.homag-esolution.com

BRANDT Kantentechnikwww.brandt.de

A worldwide presencewww.homag-group.com