eco park revised scheme: fgrfc stadium · 2018. 1. 18. · eco park revised scheme: fgrfc stadium...

20
ECO PARK REVISED SCHEME: FGRFC STADIUM APPLICATION S.16/0043/OUT TRANSPORT ASSESSMENT VOLUME 5: APPENDICES L - P ECOTRICITY (NEXT GENERATION) LTD DECEMBER 2017

Upload: others

Post on 07-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • ECO PARK REVISED SCHEME: FGRFC STADIUM APPLICATION S.16/0043/OUT

    TRANSPORT ASSESSMENT VOLUME 5: APPENDICES L - P

    ECOTRICITY (NEXT GENERATION) LTD

    DECEMBER 2017

  • PAGE LEFT INTENTIONALLY BLANK

  • ECO PARK REVISED SCHEME: FGRFC STADIUM TRANSPORT ASSESSMENT

    i E191-DOC02 TA Vol 5 Issue 2 Apps L - P December 2017

    DOCUMENT CONTROL

    Job No E191

    File Reference G:\workfiles\E191\REPORTS\E191-DOC02 TA Vol 5 Issue 2 Apps L - P.docx

    Name Date Initials

    Prepared By C J Mumford 06 December 2017

    Checked By T Slater 08 December 2017

    Issue Date Comments Approved

    2 13 December 2017 Submission

    C J Mumford

    This document has been prepared for the exclusive use of the client in connection with the project and its copyright remains vested in PFA Consulting. Unless otherwise agreed in writing by PFA Consulting, no person or party may copy, reproduce, make use of or rely upon its contents other than for the purposes for which it was originally prepared and provided. Opinions and information provided in this document have been provided using due care and diligence. It should be noted and is expressly stated that no independent verification of any information supplied to PFA Consulting has been made. Warning: This document may contain coloured images which may not print satisfactorily in black and white. It may also contain images originally created at a size greater than A4 which may not print satisfactorily on small printers. If copying is authorised but difficulty is incurred in reproducing a paper copy of this document, or a scaled copy is required, please contact PFA Consulting. Authorisation for reproducing plans based upon Ordnance Survey information cannot be given. © PFA Consulting Ltd 2017

  • ECO PARK REVISED SCHEME: FGRFC STADIUM TRANSPORT ASSESSMENT

    ii E191-DOC02 TA Vol 5 Issue 2 Apps L - P December 2017

    PAGE LEFT INTENTIONALLY BLANK

  • ECO PARK REVISED SCHEME: FGRFC STADIUM TRANSPORT ASSESSMENT

    v E191-DOC02 TA Vol 5 Issue 2 Apps L - P December 2017

    APPENDICES VOLUME 2: APPENDICES A - C Appendix A Concept Plan Appendix B Proposed Access: Drawing E191/01 Rev C Appendix C Proposed A419 Corridor Improvements VOLUME 3: APPENDICES D - I Appendix D Traffic Turning Movements Saturday Arrivals (14:00 – 15:00) Appendix E Traffic Turning Movements Saturday Departures (17:00 – 18:00) Appendix F Traffic Turning Movements Weekday Arrivals (18:00 – 19:00) Appendix G Collision Plan Appendix H Public Rights of Way Appendix I Proposed Grove Lane Bus Entrance: Drawing E191/05 Rev A VOLUME 4: APPENDICES J & K Appendix J Proposed Improvements to NCN Route 45 Appendix K Replacement Laybys: Drawing E161/23 Rev B & File Note E161/42 VOLUME 5: APPENDICES L - P Appendix L FGRFC Trip Generation Calculations – Full 5,000 Capacity Stadium Appendix M Hourly Arrival / Departure Profiles Appendix N FGRFC Supporter Trip Distribution Appendix O TEMPRO Calculations Appendix P Email from CH2M for Highways England, 19 September 2017

  • ECO PARK REVISED SCHEME: FGRFC STADIUM TRANSPORT ASSESSMENT

    1 of 1 E191-DOC02 TA Vol 5 Issue 2 Apps L - P December 2017

  •    

    Appe

    ndix L   

  • E161 ECO PARK WEST OF STONEHOUSE

    ESTIMATE TRIP GENERATION - 5,000 CAPACITY

    FGRFC EXISTING

    Total

    Crowd

    Away

    Crowd% Away

    Home

    CrowdCar Parking % Parking Coaches

    Average League Game - 15/16 1722 220 13% 2

    Average League Game - 14/15 1506 221 15% 1285 210 14% 2

    Major Game - Tuesday Game v Cheltenham 22.09.15 3127 459 2668 588 19% 4

    TRAFFIC ESTIMATES FOLLOWING MOVE TO STADIUM AT

    STONEHOUSE

    Total

    Crowd

    Away

    Crowd

    (15%)

    Home

    Crowd

    Away

    CoachesOccupancy

    Total by

    Away Coach

    Home

    Bus /

    Coach

    Occupancy

    Total by

    Home Bus

    / Coach

    Total by

    Coach or

    Bus

    % of home

    supporters

    walk or cycle

    Total walk or

    cycleTotal by car

    Car

    occupancy

    Total

    supporter

    cars

    Hospitality,

    Directors, staff

    cars

    Total cars one

    way

    10% Lifts &

    taxis

    Reverse

    direction

    Parking

    Demand (Total

    Cars minus

    Lifts)

    Assume Full Capacity Stadium 5000 750 4250 6 50 300 10 50 500 800 4% 170 4030 2.2 1832 50 1882 188 1694

    Notes:

    Assume 6 coaches for away supporters for 5,000 capacity game, occupancy 50 (NB Worst Case - aim at 8 coaches for 'normal' match in 2030-31)

    Assume 10 local shuttle buses for capacity game, occupancy 50

    Assume average car occupancy of 2.2

    Existing site has 50 spaces for Directors, Staff & Hospitality (included in parking total). Assume the same, all full.

    2015/16 average staff per game = 35 plus players

    F:\Workfile\E191\Trip Generation & Distribution\FGRFC N Stadium based on FGR forecasts 10.01.17

    19 September 2017

  •     

    Appe

    ndix M

       

  • E161 - Ecotricity Eco Park

    MATCHDAY TRAFFIC - SATURDAY (14:00 - 15:00 & 17:00 - 18:00)

    Saturday - Cars / TaxisCalculated Trip Generation

    Car Occupancy 2.2

    Football Match Traffic

    Match Day Trip Generation taken from:

    F:\Workfile\E161\Trip Generation\FGRFC\FGRFC Trip Gen Calcs April 2016

    Pre-Match Post-Match

    Departures 188 Departures 1882

    Arrivals 1882 Arrivals 188

    Match Arrival and Departure Profile - (ATC at The New Lawn, Nympsfield Sep- Oct 2015)

    F:\Workfile\E161\Paramics\E161 Nailsworth ATC Match Profile Jan 16

    Taken from: Westbound Arrivals Taken from: Eastbound Departures

    13:00 - 14:00 32.9% 16:00 - 17:00 23.8%

    14:00 - 15:00 67.1% 17:00 - 18:00 76.2%

    Saturday Match Day Traffic

    Junction Models S-Paramics Models

    14:00 - 15:00 13:00 - 18:00

    Departures 126 Departures 2070

    Arrivals 1263 Arrivals 2070

    17:00 - 18:00

    Departures 1434

    Arrivals 143

    PARKING DEMAND 1694

    F:\Workfile\E191\Trip Generation & Distribution\Saturday Turning Flows - 1400-1500 FINAL

    April 2016

  • E161 - Ecotricity Eco Park

    MATCHDAY TRAFFIC - WEEKDAY (18:00 - 19:00)

    Weekday - Cars / TaxisCalculated Trip Generation

    Car Occupancy 2.2

    Football Match Traffic

    Match Day Trip Generation taken from:F:\Workfile\E161\Trip Generation\FGRFC\FGRFC Trip Gen Calcs April 2016

    Pre-MatchDepartures 188Arrivals 1882

    Match Arrival and Departure Profile - (ATC at The New Lawn, Nympsfield Sep- Oct 2015)F:\Workfile\E161\Paramics\E161 Nailsworth ATC Match Profile Jan 16

    Match Traffic Profile18:00 - 19:00 55.3%19:00 - 20:00 44.7%

    Weekday Match Traffic18:00 - 19:00Departures 104Arrivals 1041

    Vehicle Trips (Parking)18:00 - 19:00Departures 0Arrivals 937

    Vehicle Trips (Lifts)18:00 - 19:00Departures 104Arrivals 104

    F:\Workfile\E191\Trip Generation & Distribution\Weekday Turning Flows - 1800-1900 FINALNovember 2017

  •     

    Appe

    ndix N   

  •    

    Appe

    ndix O   

  • TRAFFIC GROWTH CALCULATIONS

    2015 to 2021

    Stroud

    Origin 1.0187

    1.0475 Average: 1.0331

    Stroud

    Origin 1.0386

    1.0206 Average: 1.0296

    Stroud

    Origin 1.0298

    1.0299 Average: 1.0299

    2015 to 2021

    1.0789

    2015 to 2021

    1.0752

    2015 to 2021

    1.0755

    Destination

    Adjusted Local Peak Period AM Growth Factors to be applied to Base Traffic

    Adjusted Local Peak Period PM Growth Factors to be applied to Base Traffic

    Adjusted Local Peak Period SAT Growth Factors to be applied to Base Traffic

    Destination

    TEMPRO Local PM Peak Hour Factors

    Weekday PM Peak Car Driver Trip End Growth for

    Destination

    TEMPRO Local SAT Peak Factors

    Saturday Car Driver Trip End Growth for

    Weekday AM Peak Car Driver Trip End Growth for

    TRAFFIC GROWTH:

    Traffic Growth factors to be applied to base traffic using factors derived from TEMPRO (NTEM Dataset 7.0) and NTM.

    Traffic Analysis Guidance (TAG) Unit M4 identifies that NTM forecast growth factors should be adjusted using the ratio

    of the local TEMPRO growth factors to the national average day car driver trip end growth derived using TEMPRO v7.0.

    The calculation can be undertaken within the TEMPRO software as identified in TAG Unit M4.

    NTM - 2015 Forecast

    Area Type: Urban

    Road Type: Principal

    Local Tempro Zone: Stroud

    TEMPRO Local AM Peak Hour Factors

    January 2017

    F:\Workfile\E191\TEMPRO\TEMPRO Calculations Jan 2017

  • TRAFFIC GROWTH CALCULATIONS

    2015 to 2031

    Stroud

    Origin 1.0509

    1.1069 Average: 1.0789

    Stroud

    Origin 1.0931

    1.0579 Average: 1.0755

    Stroud

    Origin 1.0849

    1.0852 Average: 1.0851

    2015 to 2031

    1.1583

    2015 to 2031

    1.1546

    2015 to 2031

    1.1649

    Destination

    Adjusted Local Peak Period AM Growth Factors to be applied to Base Traffic

    Adjusted Local Peak Period PM Growth Factors to be applied to Base Traffic

    Adjusted Local Peak Period SAT Growth Factors to be applied to Base Traffic

    Destination

    TEMPRO Local PM Peak Hour Factors

    Weekday PM Peak Car Driver Trip End Growth for

    Destination

    TEMPRO Local SAT Peak Factors

    Saturday Car Driver Trip End Growth for

    Weekday AM Peak Car Driver Trip End Growth for

    TRAFFIC GROWTH:

    Traffic Growth factors to be applied to base traffic using factors derived from TEMPRO (NTEM Dataset 7.0) and NTM.

    Traffic Analysis Guidance (TAG) Unit M4 identifies that NTM forecast growth factors should be adjusted using the ratio

    of the local TEMPRO growth factors to the national average day car driver trip end growth derived using TEMPRO v7.0.

    The calculation can be undertaken within the TEMPRO software as identified in TAG Unit M4.

    NTM - 2015 Forecast

    Area Type: Urban

    Road Type: Principal

    Local Tempro Zone: Stroud

    TEMPRO Local AM Peak Hour Factors

    January 2017

    F:\Workfile\E191\TEMPRO\TEMPRO Calculations Jan 2017

  •    

    Appe

    ndix P   

  • 1

    Caroline Mumford

    From: Gorski, Nigel/BHX

    Sent: 19 September 2017 13:09

    To: Caroline Mumford; 'Paul Key'

    Cc: Sandy, Rachel; Templeman, Lee/BRS; Nila, Parmjit/BHX;

    [email protected]; TROUGHTON, Neil

    Subject: Eco Park - LinSIg Modelling

    Caroline,

    Thank you for the file note explaining the traffic flow differences in the various modelling tools. Highways England has now

    undertaken a review of the note and its appendices and our comments ae set out below.

    Highways England is content that accurate traffic flows have been calculated, based on agreed trip generation and distribution

    methodologies for weekday peak and Saturday peak profiles. The weekday leisure and employment proposals match those

    previously agreed, and we accept that weekday football matches will not generate traffic during the weekday peak

    hours. During a Saturday peak, football match traffic has taken account of a maximum capacity football match attendance, with

    67% of football arrivals assumed to travel during the 1400-1500 Saturday peak hour, and 76% of football departures occurring

    during the 1700-1800 Saturday peak hour. Again, these conclusions are agreed.

    Vehicles have been converted into PCUs using a value of 2.3 PCUs for HGV. We have undertaken spot checks on values and

    believe these have been calculated correctly.

    The traffic figures provided show development trips with each element of the proposals distributed over the highway network.

    Highways England welcomes the updated set of traffic figures, which have been used to check against traffic flows included in

    the various traffic models.

    Based on the comments above, Highways England is satisfied that further modelling can be undertaken based on these flows.

    Site Access Junction (Signal Controlled)

    Highways England has previously provided comments on the signal controlled access junction, as ‘sticky notes’ on a PDF drawing

    sent by email on 23 August 2017. If these comments result in further changes to the access layout, these changes will again

    need to be reflected in both the LinSig and S-Paramics traffic models.

    Noting that changes are already likely to be needed to the S-Paramics model, due to more recent Highways England comments

    on the site access design and LinSig model, comments have been provided on the S-Paramics models received on 02 August

    2017.

    S-Paramics Model

    These comments are interim pending finalisation of the site access layout and the final junctions form incorporation into S-

    Paramics.

    The most recently supplied modelling report (“E161-DOC13 LMVR & Forecasting Issue 4 - FULL REPORT.pdf” has been reviewed

    along with the associated modelling files comprising Scenarios 1 to 10. This has confirmed that all issues raised previously by

    CH2M/Highways England have been resolved, or that satisfactory reasoning has been provided in the modelling report, namely:

    • GA Look-Next parameter has been added to most circulatory sections at Oldends Lane Roundabout;

    • The A419 Bristol Road/Boakes Drive mini-roundabout has been added to the network;

    • GA Look-Next parameter has been added to the circulatory link opposing Ebley Road at Horse Trough Roundabout;

    • Horse Trough Roundabout coding has been amended to improve give-way behaviour from the Bath Road entry.

    Examination of the base model calibration and validation results for the time periods modelled shows that observed and

    modelled turning movements compare well, and that journey time validation along the A419 corridor meets DMRB acceptability

    criteria. Observed and modelled queue lengths also show a reasonable correlation. It is therefore considered that the base

    model can be accepted as a basis for forecast testing.

  • 2

    A review of the forecast models supplied confirms that they are consistent with the revised and updated calibrated/validated

    base model. Additionally, a number of previously raised concerns relating to the forecast models have also now been

    addressed, as follows:

    • Link modifiers on the Ebley Road entry to Horse Trough Roundabout are now consistent with the base model;

    • Inter-green timings have been amended at the proposed access junction (although see comments below);

    • Entry link lengths on Oldends Lane and Bath Road have been extended with all queuing now contained within the

    network.

    The acceptance of the base model and the above, should mean that the forecast models can now be relied upon to provide a

    reasonable prediction of future changes in operational conditions within the modelled network. There is however a need to

    update the traffic scenarios to match those now agreed Highways England. These include an Opening Year scenario of 2021.

    Once the A419 site access junction is agreed and correctly replicated in both LinSig and S-Paramics, Highways England will again

    review the results and provide the necessary comments and/or final recommendation. For local highway network junctions,

    comments should be sought from GCC.

    If you would like to discuss any of the points set out below, please do not hesitate to contact me.

    Regards

    Nigel Gorski

    Associate

    CH2M Tel +44 (0)121 456 0664 (direct dial)

    Tel +44 (0)121 456 2345 (reception)

    7th Floor Lyndon House

    58-62 Hagley Road Edgbaston Birmingham B16 8PE [email protected] www.ch2m.com | LinkedIn | Twitter | Facebook

    From: Caroline Mumford [mailto:[email protected]]

    Sent: 11 September 2017 10:20

    To: 'Gorski, Nigel/BHX' Cc: Sandy, Rachel; 'Nila, Parmjit/BHX'

    Subject: RE: Eco Park - LinSIg Modelling Clarification sought

    Nigel

    I attach File Note E161-FN47 which explains the difference between the spreadsheet and LinSig model flows, and

    also sets out the spreadsheet model flows by element.

    Please could you look through that and let me know if you have any comments or queries, before we go on to the

    further modelling.

    Thanks & Regards

    Caroline

    Caroline Mumford Associate Director

    PFA Consulting Ltd