east side lands (stage 1) master environmental servicing plan and community plan
DESCRIPTION
One of the Region's key roles is to manage future growth in Waterloo Region and ensure necessary municipal infrastructure and services are in place, such as water and wastewater. In June 2009, Regional Council approved the new Regional Official Plan with approximately 300 hectares of land designated for employment uses in what is known as the East Side Area. The East Side Area is located on the eastern edge of Waterloo Region, at the border of Woolwich Township and Cambridge, near the Region of Waterloo International Airport. In November 2010, the Region began a Master Environmental Servicing Plan (MESP) and Community Plan for the East Side Area in cooperation with the City of Cambridge, the Township of Woolwich, the City of Kitchener and the Grand River Conservation Authority. This integrated process will include: Municipal Water and Wastewater Service Assessment Transportation System Assessment Subwatershed Study and Master Drainage Plan for Freeport Creek and Tributary to the Grand Utilities Assessment Fiscal Impact Analysis Staging and Implementation Strategy East Side Stage 1 - Cambridge Community PlanTRANSCRIPT
East Side Lands (Stage 1) Master Environmental
Servicing Plan and Community Plan
Public Information Centre #1
WELCOME
Project Team
Representatives
Region of Waterloo
City of Cambridge
Grand River Conservation Authority
Consulting Team
Presentation Outline
1. Purpose of Project and This Public Information Centre
2. Outline of the PIC3. Background of Project 4. Study Area Description5. Study Objectives6. Study Process7. Planned Public Consultation
Purpose of the Project
The Region of Waterloo, City of Cambridgeand Grand River Conservation Authority, in cooperation with the City of Kitchener and Township of Woolwich, are working together to complete the background work needed to advance the development of the East Side Stage 1 lands.
Purpose of this PIC
This Public Information Centre will:• Provide background information about the East Side Stage 1 Lands
• Explain the Master Environmental Servicing Plan (MESP) and Community Plan process
• Provide an opportunity to discuss your questions and issues with staff and provide comments
• Identify next steps
Outline of Event
• 5:30 to 7:00 p.m.: Open house format• 7:00 to 7:30 p.m.: Presentation to provide an overview of the East Side Lands and process for this project
• 7:30 to 8:30 p.m.: Discussion and questions with technical specialists
Document Your Feedback Have Your Voice Heard!
Background of the Project
East Side Community Scoping Study
2003 20062004 2008
20092006 - 2009
Regional Official Policy Plan Amendment 28
2010-Present
Master Environmental Servicing Plan and Community Plan
Regional Growth Management Strategy
2003
East Side Community Scoping Study
The Scoping Study recommended a high‐level Structure Plan be prepared to coordinate the work of the Region of Waterloo, the City of Cambridge, the City of Kitchener and the Township of Woolwich.
East Side Community Scoping Study
2004
*********
222222222111111111
kilometreskilometreskilometreskilometreskilometreskilometreskilometreskilometreskilometres
000000000
Region of Waterloo
Region of Waterloo
Region of Waterloo
Region of Waterloo
Region of Waterloo
Region of Waterloo
Region of Waterloo
Region of Waterloo
Region of Waterloo
International Airport
International Airport
International Airport
International Airport
International Airport
International Airport
International Airport
International Airport
International Airport
Spee
d Ri
ver
Spee
d Ri
ver
Spee
d Ri
ver
Spee
d Ri
ver
Spee
d Ri
ver
Spee
d Ri
ver
Spee
d Ri
ver
Spee
d Ri
ver
Spee
d Ri
ver
Grand River
Grand River
Grand River
Grand River
Grand River
Grand River
Grand River
Grand River
Grand River
FOUNTAIN ST N
FOUNTAIN ST N
FOUNTAIN ST N
FOUNTAIN ST N
FOUNTAIN ST N
FOUNTAIN ST N
FOUNTAIN ST N
FOUNTAIN ST N
FOUNTAIN ST N
LAN
CAS
TER
ST WLA N
CA
STE
R S
T WLA
NC
AS TE R
ST W
LAN
CA S
T ER
S T WLA
NC
AST ER
ST W
LAN
CA S
TER
S T WLA N
CA
STE
R S
T WLA
NC
ASTE R
ST W
LANC
AS
T ER
ST W
COURTLAND AVE E
COURTLAND AVE E
COURTLAND AVE E
COURTLAND AVE E
COURTLAND AVE E
COURTLAND AVE E
COURTLAND AVE E
COURTLAND AVE E
COURTLAND AVE E
WEBER ST E
WEBER ST E
WEBER ST E
WEBER ST E
WEBER ST E
WEBER ST E
WEBER ST E
WEBER ST E
WEBER ST ECHARLES ST E
CHARLES ST E
CHARLES ST E
CHARLES ST E
CHARLES ST E
CHARLES ST E
CHARLES ST E
CHARLES ST E
CHARLES ST E
SHANTZ STATION RD
SHANTZ STATION RD
SHANTZ STATION RD
SHANTZ STATION RD
SHANTZ STATION RD
SHANTZ STATION RD
SHANTZ STATION RD
SHANTZ STATION RD
SHANTZ STATION RD
HESP
ELER
RD
HESP
ELER
RD
HESP
ELER
RD
HESP
ELER
RD
HESP
ELER
RD
HESP
ELER
RD
HESP
ELER
RD
HESP
ELER
RD
HESP
ELER
RD
KOSSUTH RD
KOSSUTH RD
KOSSUTH RD
KOSSUTH RD
KOSSUTH RD
KOSSUTH RD
KOSSUTH RD
KOSSUTH RD
KOSSUTH RD
LACKNER BLVD
LACKNER BLVD
LACKNER BLVD
LACKNER BLVD
LACKNER BLVD
LACKNER BLVD
LACKNER BLVD
LACKNER BLVD
LACKNER BLVD
FAIRWAY RD N
FAIRWAY RD N
FAIRWAY RD N
FAIRWAY RD N
FAIRWAY RD N
FAIRWAY RD N
FAIRWAY RD N
FAIRWAY RD N
FAIRWAY RD N
MAPLE GROVE RD
MAPLE GROVE RD
MAPLE GROVE RD
MAPLE GROVE RD
MAPLE GROVE RD
MAPLE GROVE RD
MAPLE GROVE RD
MAPLE GROVE RD
MAPLE GROVE RD
BRIDGE ST E
BRIDGE ST E
BRIDGE ST E
BRIDGE ST E
BRIDGE ST E
BRIDGE ST E
BRIDGE ST E
BRIDGE ST E
BRIDGE ST E
EBYCREST RDEBYCREST RDEBYCREST RDEBYCREST RDEBYCREST RDEBYCREST RDEBYCREST RDEBYCREST RDEBYCREST RD
BLOOMINGDALE RD N
BLOOMINGDALE RD N
BLOOMINGDALE RD N
BLOOMINGDALE RD N
BLOOMINGDALE RD N
BLOOMINGDALE RD N
BLOOMINGDALE RD N
BLOOMINGDALE RD N
BLOOMINGDALE RD N
OTTAWA ST N
OTTAWA ST N
OTTAWA ST N
OTTAWA ST N
OTTAWA ST N
OTTAWA ST N
OTTAWA ST N
OTTAWA ST N
OTTAWA ST N
GREENHO
USE RD
GREENHO
USE RD
GREENHO
USE RD
GREENHO
USE RD
GREENHO
USE RD
GREENHO
USE RD
GREENHO
USE RD
GREENHO
USE RD
GREENHO
USE RD
LONSDALE RD
LONSDALE RD
LONSDALE RD
LONSDALE RD
LONSDALE RD
LONSDALE RD
LONSDALE RD
LONSDALE RD
LONSDALE RD
WOOLW
ICH-GUELPH TOWNLINE
WOOLW
ICH-GUELPH TOWNLINE
WOOLW
ICH-GUELPH TOWNLINE
WOOLW
ICH-GUELPH TOWNLINE
WOOLW
ICH-GUELPH TOWNLINE
WOOLW
ICH-GUELPH TOWNLINE
WOOLW
ICH-GUELPH TOWNLINE
WOOLW
ICH-GUELPH TOWNLINE
WOOLW
ICH-GUELPH TOWNLINE
RIDER RD
RIDER RD
RIDER RD
RIDER RD
RIDER RD
RIDER RD
RIDER RD
RIDER RD
RIDER RD
LERCH RD
LERCH RD
LERCH RD
LERCH RD
LERCH RD
LERCH RD
LERCH RD
LERCH RD
LERCH RD
KENN
EDY R
D
KENN
EDY R
D
KENN
EDY R
D
KENN
EDY R
D
KENN
EDY R
D
KENN
EDY R
D
KENN
EDY R
D
KENN
EDY R
D
KENN
EDY R
D
WO
OLW
ICH
ST S
WO
OLW
ICH
ST S
WO
OLW
ICH
ST S
WO
OLW
ICH
ST S
WO
OLW
ICH
ST S
WO
OLW
ICH
ST S
WO
OLW
ICH
ST S
WO
OLW
ICH
ST S
WO
OLW
ICH
ST S
MENNO STMENNO STMENNO STMENNO STMENNO STMENNO STMENNO STMENNO STMENNO ST
WUR
STER PL
WU
RSTER PL
WU
RSTER PL
WUR
STER PL
WU
RSTER PL
WUR
STER PL
WU
RSTER PL
WU
RSTER PL
WU
RSTER PL
KRAMP RD
KRAMP RD
KRAMP RD
KRAMP RD
KRAMP RD
KRAMP RD
KRAMP RD
KRAMP RD
KRAMP RD
VANCE RD
VANCE RD
VANCE RD
VANCE RD
VANCE RD
VANCE RD
VANCE RD
VANCE RD
VANCE RD
COBER RD
COBER RD
COBER RD
COBER RD
COBER RD
COBER RD
COBER RD
COBER RD
COBER RD
MIDDLE BLOCK RD
MIDDLE BLOCK RD
MIDDLE BLOCK RD
MIDDLE BLOCK RD
MIDDLE BLOCK RD
MIDDLE BLOCK RD
MIDDLE BLOCK RD
MIDDLE BLOCK RD
MIDDLE BLOCK RD
RIV
ERBA
NK
DR
RIV
ERBA
NK
DR
RIV
ERBA
NK
DR
RIV
ERBA
NK
DR
RIV
ERBA
NK
DR
RIV
ERBA
NK
DR
RIV
ERBA
NK
DR
RIV
ERBA
NK
DR
RIV
ERBA
NK
DR
SPITZIG RD
SPITZIG RD
SPITZIG RD
SPITZIG RD
SPITZIG RD
SPITZIG RD
SPITZIG RD
SPITZIG RD
SPITZIG RD
CHILLIG
O RD
CHILLIG
O R
D
CHILLIG
O R
D
CHILLIG
O RD
CHILLIG
O R
D
CHILLIG
O RD
CHILLIG
O R
D
CHILLIG
O R
D
CHILLIG
O R
D
FIFE RDFIFE RDFIFE RDFIFE RDFIFE RDFIFE RDFIFE RDFIFE RDFIFE RD
ALLENDALE RD
ALLENDALE RD
ALLENDALE RDALLENDALE RD
ALLENDALE RDALLENDALE RD
ALLENDALE RD
ALLENDALE RDALLENDALE RD
HOPEWELL CREEK RD
HOPEWELL CREEK RD
HOPEWELL CREEK RD
HOPEWELL CREEK RD
HOPEWELL CREEK RD
HOPEWELL CREEK RD
HOPEWELL CREEK RD
HOPEWELL CREEK RD
HOPEWELL CREEK RD
BEAVER
DALE R
DBEAV
ERD
ALE R
DBEAV
ERD
ALE RD
BEAVER
DALE R
DBEAV
ERD
ALE RD
BEAVER
DALE R
DBEAV
ERD
ALE R
DBEAV
ERD
ALE RD
BEAVER
DALE
RD
SPEEDSVILLE R
D
SPEEDSVILLE R
D
SPEEDSVILLE R
D
SPEEDSVILLE R
D
SPEEDSVILLE R
D
SPEEDSVILLE R
D
SPEEDSVILLE R
D
SPEEDSVILLE R
D
SPEEDSVILLE R
D
BOXW
OO
D D
RBO
XWO
OD
DR
BOXW
OO
D D
RBO
XWO
OD
DR
BOXW
OO
D D
RBO
XWO
OD
DR
BOXW
OO
D D
RBO
XWO
OD
DR
BOXW
OO
D D
R
MOHAWK RDMOHAWK RDMOHAWK RDMOHAWK RDMOHAWK RDMOHAWK RDMOHAWK RDMOHAWK RDMOHAWK RD
GU
ELPH AVE
GU
ELPH AVE
GU
ELPH AVE
GU
ELPH AVE
GU
ELPH AVE
GU
ELPH AVE
GU
ELPH AVE
GU
ELPH AVE
GU
ELPH AVE
TOW
NLIN
E RD
TOW
NLIN
E RD
TOW
NLIN
E RD
TOW
NLIN
E RD
TOW
NLIN
E RD
TOW
NLIN
E RD
TOW
NLIN
E RD
TOW
NLIN
E RD
TOW
NLIN
E RD
KRAFT DR
KRAFT DR
KRAFT DR
KRAFT DR
KRAFT DR
KRAFT DR
KRAFT DR
KRAFT DR
KRAFT DR
VICTORIA ST N
VICTORIA ST N
VICTORIA ST N
VICTORIA ST N
VICTORIA ST N
VICTORIA ST N
VICTORIA ST N
VICTORIA ST N
VICTORIA ST N
HIGHWAY 8HIGHWAY 8HIGHWAY 8
HIGHWAY 8HIGHWAY 8
HIGHWAY 8HIGHWAY 8HIGHWAY 8
HIGHWAY 8
HIGHWAY 85
HIGHWAY 85
HIGHWAY 85
HIGHWAY 85
HIGHWAY 85
HIGHWAY 85
HIGHWAY 85
HIGHWAY 85
HIGHWAY 85
Proposed Highway 7
Proposed Highway 7
Proposed Highway 7
Proposed Highway 7
Proposed Highway 7
Proposed Highway 7
Proposed Highway 7
Proposed Highway 7
Proposed Highway 7
Produced by: Planning, Housing & Community Services, June 2006
© Region of Waterloo 2006© Region of Waterloo 2006© Region of Waterloo 2006© Region of Waterloo 2006© Region of Waterloo 2006© Region of Waterloo 2006© Region of Waterloo 2006© Region of Waterloo 2006© Region of Waterloo 2006
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
KITCKITCKITCKITCKITCKITCKITCKITCKITC
TTTTTTTTTO
FO
FO
FO
FOFO
FO
FO
FO
F
WOOWOOWOOWOOWOOWOOWOOWOOWOOHEHEHEHEHEHEHEHEHENER
NERNERNERNERNERNERNERNER
IPIPIPIPIPIPIPIPIPNNNNNNNNN
ICHICHICHICHICHICHICHICHICHLLLLLLLLLWWWWWWWWW
CITY OF CAMBRIDGE
CITY OF CAMBRIDGE
CITY OF CAMBRIDGE
CITY OF CAMBRIDGE
CITY OF CAMBRIDGE
CITY OF CAMBRIDGE
CITY OF CAMBRIDGE
CITY OF CAMBRIDGE
CITY OF CAMBRIDGECITY
CITY
CITY
CITY
CITY
CITY
CITY
CITY
CITY
OFOFOFOFOFOFOFOFOF
WNSHIP OF WOOLWI
WNSHIP OF WOOLWI
WNSHIP OF WOOLWI
WNSHIP OF WOOLWI
WNSHIP OF WOOLWI
WNSHIP OF WOOLWI
WNSHIP OF WOOLWI
WNSHIP OF WOOLWI
WNSHIP OF WOOLWI
TOTOTOTOTOTOTOTOTO
CHCHCHCHCHCHCHCHCH
WWW WW WWWWOOOOOOOOO
SHSHSHSHSHSHSHSHSH
EAST SIDE COMMUNITYPreferred Structure PlanStaging of Development
Scenario #4
Priority Lands ServicedFrom Cambridge
444444444
333333333222222222
111111111
Municipal Boundaries: Region of Waterloo, Planning Information & Research, 2005East Side Study Area: Region of Waterloo, Community Planning based on Regional Growth Management Strategy, 2003
Sources:
Staging of Development: Region of Waterloo, Planning Information & Research, 2006Proposed Highway 7: Ministry of Transportation Ontario, Oct. 2004Fairway Road Extension: Alignment D2 as approved by Regional Council, Jun. 2005Proposed Ottawa Street Corridor: Region of Waterloo, ROPP 1998 Consolidation
444444444
*********
Municipal Boundary
LEGEND
Study Area
Indicates Portion of CountrysideLine to be Further Refined*********Staging of Development
Approved Road Alignment
Proposed Road Corridor
1 - Stage 12 - Stage 23 - Stage 34 - Stage 4 - Staging to be Determined*********
Notes:1) Lands currently zoned for dry industrial use. Potential for municipal water and wastewater servicing would occur in Stage 3.
Available Industrial Lands(Unserviced)
2) Staging boundaries conceptual only. Refinement would occur through subsequent Planning Act process (e.g. Regional Official Policies Plan Amendment, Local Municipal Official Plan and Zoning By-law amendments).
Priority Employment Lands (Serviced)
East Side Community Structure Plan
2006
ROPPA 28
Regional Official Policy Plan Amendment 28
2006 2009
New Regional Official Plan
2009
Study Area Description
East Side Lands
East Side Stage 1 Lands
Prime Industrial Strategic Reserve
Study Objectives
The objective of the Project are: • To provide the necessary analysis required to facilitate the development of the Prime Industrial Strategic Reserve lands
• To work in partnership with City of Cambridge, GRCA, Township of Woolwich and City of Kitchener
• To develop solutions that are economically, environmentally and socially responsible
What is a Master Environmental Servicing Plan (MESP)?
What is a Community Plan?
Study Process
Phase 3January 2012 to May 2012
Phase 2June 2011 to January 2012
Phase 1December 2010 to June 2011
Background data collection
Key issues identification, confirmation of financial viability, identification of options
Consideration of development concepts
MESP and Community Plan
Water/Wastewater Master PlanTransportation Master PlanSubwatershed Plan and Master Drainage Plan
Background Report
Issues and Options Report
Technical Memorandums
MESP and Community Plan
PIC #1 PIC #4PIC #3PIC #2
Preferred development option
WE ARE HERE
Planned Public Consultation
• Phase 1: Consultation for Study Initiation and Background Report– PIC #1 to introduce project, background
review and identify issues• Phase 2: Consultation for Detailed Study– PIC #2 to confirm key issues, high level financial feasibility and
identify options– PIC #3 to present the preferred development option
• Phase 3: Consultation for Study Finalization and Implementation– PIC #4 to present the draft MESP and Community Plan
Ongoing Consultation:All reports and presentation material is available here:
www.regionofwaterloo.ca/eastside
Questions, Comments and Discussions
• Each key technical area is staffed with a technical specialist
• Comment forms are available at the reception table