THE EAST CERMAK DATA CENTER

THE DOWNTOWN DATA CENTER OF CHOICE

Page 2: East Cermak Data Center

THE EAST CERMAK DATA CENTER

5 Critical Considerations for a new data center 1.Connectivity 2.Power/Water 3.Size and Growth Requirements 4.CONTROL 5.Tax Relief 6.Location

Page 3: East Cermak Data Center

100’ from Dense Fiber Concentration Two Diverse Fiber Entrances

Connectivity = Fiber Rich Cermak THE EAST CERMAK DATA CENTER

Page 4: East Cermak Data Center

Power = 40 Mega Watts + 2 ER Feeders Water = 2 Diverse Supplies off Grid

40 MW from Multiple Feeders from Multiple Substations Bus A – Three Feeders (State) + ER Feeder from Quary Bus B – Three Feeders (Quary) + ER Feeder from State Store 60,000 Gallons of Fuel On-Site Store 150,000 Gallons of backup water supply On-Site Space for 24 Generators

THE EAST CERMAK DATA CENTER

Can you add additional power? Yes! 40 MW is committed. More can be requested! Can you modify the on-site storage amounts? Yes! You can change the types and quantities. Can you add more generators? Yes based on your design and following floor loading.

Page 5: East Cermak Data Center

Complete First Floor with On-Site Parking

THE EAST CERMAK DATA CENTER

32’ Column Spacing 150-250 lbs./SF Floor Loading 50,000 lbs. Material Lift Estimated Space for 4875 Racks

Size & Growth = 356,000 SF

Page 6: East Cermak Data Center

Typical Upper Floor with Generator Locations

THE EAST CERMAK DATA CENTER

Size = 7-52,000 SF Floors

Page 7: East Cermak Data Center

THE EAST CERMAK DATA CENTER

Hi-Density Upper Level Floor Layout

Growth = Expansion Available

Page 8: East Cermak Data Center

THE EAST CERMAK DATA CENTER

Complete Turnkey Lease or Ownership

Control = Complete

Page 9: East Cermak Data Center

Tax Relief = Class 6b Tax Incentive

THE EAST CERMAK DATA CENTER

Building Class 6b • 60% Reduction of Real Estate

Taxes for the first 10 years! • 40% Reduction of Real Estate

Taxes for the 11th Year! • 20% Reduction of Real Estate

Taxes for the 12th Year! • Renewable based on City approval • Estimated Savings of $18.7 MM • Illinois House Bill 3336 – Tax

Exemption for data centers soon to be voted on!!

Page 10: East Cermak Data Center

100’ from Cermak Road 1500’ from 350 E. Cermak

Location = Prime South Loop THE EAST CERMAK DATA CENTER

Page 11: East Cermak Data Center

Quick Specs

THE EAST CERMAK DATA CENTER

• Internal Loading Docks w 2 Full Bays • Indoor Parking Available • 17’ Clearance Slab to Ceiling • Indoor Full Size Dumpster • Diverse Fiber MDF/Entrances • Diverse Water Supply Entrances • Diverse Power w/ER Feeder • Roof Rights • Private Secure Storage Rooms

Page 12: East Cermak Data Center

Why is The East Cermak Data Center the right of Choice?

356,000 SF

24 Gen Pads

Tier III Purpose

Built Shell and Core

Flexibility

Dense Fiber

150,000 Gallons

of Water Storage

Prime Location

60,000 Gallons of Fuel

40 MW Critical

THE EAST CERMAK DATA CENTER

Page 13: East Cermak Data Center

THE EAST CERMAK DATA CENTER

THE DOWNTOWN DATA CENTER OF CHOICE

Page 14: East Cermak Data Center

THE EAST CERMAK DATA CENTER

For more information, please contact

Larry Graiber Data Center Development James McHugh Construction 773-569-1744 [email protected]