THE EAST CERMAK DATA CENTER
THE DOWNTOWN DATA CENTER OF CHOICE
THE EAST CERMAK DATA CENTER
5 Critical Considerations for a new data center 1.Connectivity 2.Power/Water 3.Size and Growth Requirements 4.CONTROL 5.Tax Relief 6.Location
100’ from Dense Fiber Concentration Two Diverse Fiber Entrances
Connectivity = Fiber Rich Cermak THE EAST CERMAK DATA CENTER
Power = 40 Mega Watts + 2 ER Feeders Water = 2 Diverse Supplies off Grid
40 MW from Multiple Feeders from Multiple Substations Bus A – Three Feeders (State) + ER Feeder from Quary Bus B – Three Feeders (Quary) + ER Feeder from State Store 60,000 Gallons of Fuel On-Site Store 150,000 Gallons of backup water supply On-Site Space for 24 Generators
THE EAST CERMAK DATA CENTER
Can you add additional power? Yes! 40 MW is committed. More can be requested! Can you modify the on-site storage amounts? Yes! You can change the types and quantities. Can you add more generators? Yes based on your design and following floor loading.
Complete First Floor with On-Site Parking
THE EAST CERMAK DATA CENTER
32’ Column Spacing 150-250 lbs./SF Floor Loading 50,000 lbs. Material Lift Estimated Space for 4875 Racks
Size & Growth = 356,000 SF
Typical Upper Floor with Generator Locations
THE EAST CERMAK DATA CENTER
Size = 7-52,000 SF Floors
THE EAST CERMAK DATA CENTER
Hi-Density Upper Level Floor Layout
Growth = Expansion Available
THE EAST CERMAK DATA CENTER
Complete Turnkey Lease or Ownership
Control = Complete
Tax Relief = Class 6b Tax Incentive
THE EAST CERMAK DATA CENTER
Building Class 6b • 60% Reduction of Real Estate
Taxes for the first 10 years! • 40% Reduction of Real Estate
Taxes for the 11th Year! • 20% Reduction of Real Estate
Taxes for the 12th Year! • Renewable based on City approval • Estimated Savings of $18.7 MM • Illinois House Bill 3336 – Tax
Exemption for data centers soon to be voted on!!
100’ from Cermak Road 1500’ from 350 E. Cermak
Location = Prime South Loop THE EAST CERMAK DATA CENTER
Quick Specs
THE EAST CERMAK DATA CENTER
• Internal Loading Docks w 2 Full Bays • Indoor Parking Available • 17’ Clearance Slab to Ceiling • Indoor Full Size Dumpster • Diverse Fiber MDF/Entrances • Diverse Water Supply Entrances • Diverse Power w/ER Feeder • Roof Rights • Private Secure Storage Rooms
Why is The East Cermak Data Center the right of Choice?
356,000 SF
24 Gen Pads
Tier III Purpose
Built Shell and Core
Flexibility
Dense Fiber
150,000 Gallons
of Water Storage
Prime Location
60,000 Gallons of Fuel
40 MW Critical
THE EAST CERMAK DATA CENTER
THE EAST CERMAK DATA CENTER
THE DOWNTOWN DATA CENTER OF CHOICE
THE EAST CERMAK DATA CENTER
For more information, please contact
Larry Graiber Data Center Development James McHugh Construction 773-569-1744 [email protected]