Page 1: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Eandis IEC61850

Next steps

27 September 2017

Page 2: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Distribution Grid Operator

Producers Electricity

Import Natural Gas

Elia

Fluxys

Suppliers

Customers

Regulator

CREG / VREG

Eandis in the Energy market

27 September 2017 IEC 61850 Europe - Amsterdam2

Page 3: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Eandis Network: TS -> SS -> DS

Elia

225 Transformator

stations

HS

300.000 LV

feeders2.500.000

Customers

LS

IEC 61850 Europe - Amsterdam

770 Switching

substations

28500

Distribution

Substations

14000

Customer

Substations

27 September 20173

Page 4: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Introduction Eandis and substation concept

IEC 61850 Europe - Amsterdam

HV/MV primary substation - TS MV secondary substation - SS

Double busbar cubicle Single busbar cubicle

2 or 3 busbar linear sections 2 to 4 busbar sections in O-shape

Always involving ELIA

Possibly involving other DNO(’s)

Rarely involving other DNO(‘s)

All position indications, measurements, alarms

and control signals implemented using classical wiring

(no experience with substation protocols, eg 103)

27 September 20174

Page 5: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Decentralised production systems

> 1 MVA or when N-1 situation is not guaranteed

IEC 61850 Europe - Amsterdam27 September 20175

Page 6: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Protection IED in Distribution substations

IEC 61850 Europe - Amsterdam27 September 2017

SP

A150

Cu35

Circuit Breaker

6

Page 7: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Implementation of UFLS using IEC61850

7 IEC 61850 Europe - Amsterdam27 September 2017

▪ Legacy Transformer Substations: no IEC61850

➢ Trip transformer CBR in case of frequency drop

➢ Partial clearing of feeders before reclosing transformer CBR

PRIO PRIO PRIO PRIO

▪ Under Frequency Load Shedding with IEC61850

➢ Partial clearing of feeders

➢ Prioritairy feeders → no zero pass through

PRIO PRIO

Page 8: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Implementation of UFLS using IEC61850

8 IEC 61850 Europe - Amsterdam27 September 2017

▪ Automated script determining the group setting for

every feeder in the transformer substation

➢ GROUP 1: non-priority feeders (passif feeders)

➢ GROUP 0: priority feeders (e.g. hospital)

▪ Script runs periodically (every month)

▪ UFLS setting group is send using the IEC60870-5-104

IEC60870-5-104

Group0

PRIO

Group1

No PRIO

IEC61850Group1

No PRIO

Group1

No PRIO

Page 9: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Implementation of UFLS using IEC61850

9 IEC 61850 Europe - Amsterdam27 September 2017

f<

&In / UitIn = 1

&

Feeder1 IED

grp 1 = 1

Interfacekast DNB- ELIA (DNB)

Interface IED

Block UFLS

HS

ELIA

DNB

ELIA

DNB

Ontlasting f< (Elia)

MS

&

U<

f1<

&

U<

f1<

≥1

TP K IED

7SJ62

TP L IED

7SJ62UFLS grp0/1

&

Feeder2 IED

grp 1 = 1

UFLS grp0/1

&

Feeder n IED

grp 1 = 1

UFLS grp0/1

&

Copper

IEC61850

Alarm= Acknowledgement

receiving Elia command for shedding

Puls ≥ 100ms

TSO

DSO

DSO

TSO

Page 10: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Implementation of UFLS using IEC61850

10 IEC 61850 Europe - Amsterdam27 September 2017

▪ Commissioning & maintenance aspects

➢ Reducing the risk of unwanted Trips

▪ Arming principle of DSO function

▪ VT – IED’ s have under frequency criteria

▪ Send pick up through GOOSE

▪ Interface IED is armed on pick up

➢ Possibility to test UFLS in live substation

▪ Implementation of generic BLOCK UFLS GOOSE signal

▪ Function key on interface IED sets BLOCK signal high

▪ “Live” feeder IED’ s will ignore the Trip signal

▪ Using key on Feeder IED you are able to test UFLS TRIP

Page 11: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Implementation of UFLS using IEC61850

11 IEC 61850 Europe - Amsterdam27 September 2017

▪ DSO pick up @ 49,8 Hz

▪ TSO pick up @ 49 Hz

➢ TSO → DSO: 10 ms (high speed relay)

▪ Processing time IED: 6 ms

▪ DSO- SAS reaction time: 44 ms (incl. CBR’ s)

Page 12: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Added value UFLS using IEC61850

12 IEC 61850 Europe - Amsterdam27 September 2017

▪ Flexibile and selective solution

➢ Priority of feeders can change in time

➢ no zero pass through Prio Feeders

▪ Reaction time E2E: 44 ms (incl. CBR trip)

➢ Total time Trip TSO → Trip DSO: 54 ms

▪ Need to implement GGIO GOOSE message(s)

➢ For commissioning and maintenance purposes

➢ Should be integrated in test mode

Page 13: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Transition to IEC61850: take the plunge

IEC 61850 Europe - Amsterdam

➢ 2011: POC (multi vendor)

➢Multivendor works

➢Many different toolings: too complex on DSO scale

➢ 2012: European Tender

➢Single sourcing (IED, RTU, Switch)

➢ 2013 – 2017: IEC61850

• 75 x MV secondary substations

• 12 x HV/MV primary substations

• 145 x Dec. production units

• 35 x Distr. Substations with OC

➢ What’ s next?

27 September 201713

Page 14: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Existing substations Eandis

IEC 61850 Europe - Amsterdam

Single vendor (IED and RTU)

IEC61850 Ed. 1

Client server implemented for reporting

Dynamic datasets possible

Engineering process

•Only 2 configuration tools required (RTU / IED)

•No .scd transfer between tools necessary

GOOSE implemented for interlocking and

protection schemes

Conventional VT and CT

27 September 201714

Page 15: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

IEC61850: research topics for Eandis

IEC 61850 Europe - Amsterdam

Interoperability with installed base

IEC61850 Ed. 1 vs Ed. 2

Engineering process

Dynamic vs Static datasets

Single vs Multi vendor

Inter-substation

Sampled values

Non- conventional sensors

27 September 201715

Page 16: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

IEC61850: research topics for Eandis

IEC 61850 Europe - Amsterdam27 September 201716

Page 17: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

17 IEC 61850 Europe - Amsterdam27 September 2017

Expanding existing substation

Case 1: Integrating new IED’ s in existing substation

Tr(A)

K(X) TP(L)

Tr(B)

TP(K)

F1 F2 F3

Rail K (front)

Rail L (rear)

INTERFACE CABINET

10.130.254.baynr / 24

10.130.254.90

Interoperability with installed base

▪ 3 different IED vendors

▪ Interlocking using GOOSE

▪ Engineering process (GOOSE)

▪ Ed1 vs Ed 2

▪ Dynamic / static datasets

FX FX FX

IED

X

IED

Y

IED

Z

Page 18: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

18 IEC 61850 Europe - Amsterdam27 September 2017

Greenfield conditions

Case 2: New IED on new RTU

10.130.254.baynr / 24

IED

X

IED

Z

IED

Y

Tr(A)

K(X) TP(L)

Tr(B)

TP(K)

F1 F2 F3

Rail K (front)

Rail L (rear)

IED <-> RTU (DMS)

RTU A RTU B RTU C

Greenfield (RTU – IED)

▪ 3 IED vendors

▪ 4 RTU vendors

▪ MMS communication

▪ Engineering process (MMS)

▪ Dynamic / static datasets

RTU D

Page 19: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Challenges for Eandis & industry

•Dynamic datasets

➢Nice feature for future data needs

➢However not widespread on market

➢ Issues with association process

▪ need for flexible RTU (/IED) vendor

▪ Conformance testing

•Datamodel specification

➢How to impose Top down datamodel on vendors

▪ Every vendor has own LD/LN hierarchy

▪ Readability: user-specific “Prefix” to LN name

•Engineering process

➢Trying to avoid need for SCT tool for every project

IEC 61850 Europe - Amsterdam27 September 201719

Page 20: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Challenges for Eandis & industry

• Combination of generations of equipment

➢ Single sourcing multi source environment

• Implementing ed. 2 not possible installed substation

➢ IED’ s have to be multi – edition

• Put specific functions of IED in ‘test mode’:

➢ Not possible now: so specific GGIO GOOSE messages!

➢ Industry has to implement more advanced test modes

• “Semi Automated” Asset management:

➢ E.g. firm versions

➢ Protection thresholds

• future use cases @ DSO?

➢ Inter substation GOOSE

➢ Sampled values

➢ Control room to substation IEC61850

IEC 61850 Europe - Amsterdam27 September 201720

Page 21: Eandis IEC61850 Next steps - Цифровая подстанцияdigitalsubstation.com/wp-content/uploads/2017/10/12.-IEC... · 2017. 10. 9. · Eandis in the Energy market 2 27

Conclusion: Integrating IEC61850 @ Eandis

Key success factors @ Eandis:

➢Standardisation (Prim. & Sec. equipment)

➢Time & resources to gain expertise

➢In house engineering

➢Involvement from decision makers to adopters

➢Good, easy to use software tools

➢Firmware freeze