“e-kranti transforming e-governance for transforming...
TRANSCRIPT
National e-Governance Plan 2.0
“e-Kranti”
Transforming e-Governance for
Transforming Governance
Department of Electronics and Information Technology (DeitY)
16-04-2014
National e-Governance Plan (NeGP): Vision
“Make all Government services accessible to
the COMMON MAN IN HIS LOCALITY,
through Common Service Delivery Outlets and
ensure EFFICIENCY, TRANSPARENCY & RELIABILITY
of such services at AFFORDABLE COSTS to realise
the BASIC NEEDS of the common man”
May 2006
222 Services provided (out 0f 252 planned)
Average of over 11.7 Cr e-Transactions
/month
(from Jan’14-March’14)
State Wide Area Network State Data Center
Common Service Centers SSDG and State Portal
* Target
7
15
25
30 31 33 35
0
5
10
15
20
25
30
35
40
2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15*
12 16
21 23 28
0
10
20
30
2010-11 2011-12 2012-13 2013-14 2014-15*
10,350
43,464
80,669
95,710 99247
129,690
4,000
27,200
57,482
69,574
85,928
113,831
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
2007-08 2008-09 2009-10 2010-11 2011-12 Feb-2014
No. of CSCs Rolled Out Connectivity
1 4
11
18
23
0
5
10
15
20
25
2010-11 2011-12 2012-13 2013-14 2014-15*
Core Infrastructure under NeGP
Strengths
General Awareness on eGovernance
24 out of 31 MMPs gone live
Basic IT Infrastructure available
Significant increase in political support
Catalyzed movement towards citizen right on time
bound delivery of services
Supplemented various eGov projects
Weaknesses
Lack of attainment in desired impact
Significant time overruns
Weak Standards and interoperability
Low degree of process-reengineering
Lack of mission approach on implementation
Weak monitoring & evaluation system
Problem of last mile connectivity
Sub optimal use of Core IT Infra
Opportunities
Huge advancements in the Technology
Advent of the Cloud
New business models
Capacity Building
Radical process re-engineering
Strong international presence
Threats
Losing appeal for Transformation
Obsolete or inefficient eGov Projects
A large number of islands of IT activity
Competition from other countries
India could lose the opportunity to leapfrog in the
quality and nature of citizen services offered through eGov
NeGP
Why NeGP 2.0? (1/2) oFor enhancing portfolio of citizen centric services
oCurrent Portfolio of MMPs does not cover all citizen centric services
oLong gestation period of MMPs (Health, Education, e-Posts)
oDesirability of optimum usage of core infrastructure
o SDC – 22/33, SWAN – 33/35, SSDG – 17/35, CSCs – 129,690
o Fully established MSDG, NSDG and Payment Gateway
oCurrent average utilization of assets is about 50 %
o For rapid replication and integration of eGov applications o Lack of integrated services o Lack of end to end automation o Lack of interoperability among exiting eGov applications o Lack of replication of successful eGov applications across States and UTs
Why NeGP 2.0? (2/2)
oNeed to exploit Emerging Technologies
o Cloud
oMobile Platform- Smart phones, Tablets
o In-Memory Database
o Software Defined Network (SDN)
o Big Data Analytics
o Avoid risk of obsolescence
oNeed for introducing more agile implementation models
Need for redefining NeGP
o Incremental approach Vs. Transformational approach
o Consequence of SWOT Analysis
o New Image
o New Priorities
o Global Leadership
NeGP 2.0 (e-Kranti)
o Transformation and not Translation
o Integrated Services and not Individual Services
o GPR to be mandatory in every MMP
o Infrastructure on Demand
o Cloud by Default
o Mobile First
o Fast Tracking Approvals
o Mandating Standards and Protocols
Principles
o Transforming the Delivery Channels
o Awareness and Communication
o Introduce New Business Models
o Exporting eGov
o National e-Governance Academy
o e-Governance Knowledge Portal
o Create e-Governance Impact Index
o Effective use of Social Media
NeGP 2.0 (e-Kranti)
Institutions and Instruments
Implementation & Delivery
o Discussed in PM’s Committee on NeGP on 1st July, 2013
o Discussed in Apex Committee on NeGP on 5th November, 2013
o Concept Paper shared with Cabinet Secretary, PMO and MCIT on 1st
January, 2014
o Concept paper circulated to all Central Ministries/Departments and all
States/UTs for comments
o Discussed in Council of Mission Leaders on 14th March’ 2014
o Discussed in Apex Committee on NeGP on 18th March’ 2014
o 10 New MMPs approved in principle by the Apex Committee
Status update on NeGP 2.0
Responses on NeGP 2.0 (e-Kranti)
Sl. No. Department/ Ministry Comments / Suggestions
1 DRDO Productisation of applications for reusability, G2G
Helpdesk coordination by Govt. officials
2 D/o Health Research Capacity building, Integrated services &
interoperable systems
3 Inter-State Council
Secretariat
Data Privacy
4 D/o Space Local Language, Data preservation and Data privacy
5 D/o ARPG Mandatory TPA before software launch
6 D/o H&FW Fast Track Mechanism for GPR approval, Adoption
of Standards (EHR Standards)
7 D/o Atomic Energy ERP for govt. dept., Integration with Aadhaar
Responses on NeGP 2.0 (e-Kranti) Sl. No. Department/ Ministry Comments / Suggestions
8 D/o Justice Private Cloud
9 UIDAI DBT, PPP Business Model
10 M/o Home Affairs – D/o
Official Languages
Implementation of Official Language Policy
11 M/o DNER Consultations with academics, private stakeholders
and public
12 M/o Law & Justice Capacity Building
13 M/o Railways Common Ticketing Service for all modes of
Transport, Integrated Consignment Tracking
System, Integration of Taxes with freight charge
14 D/o Finance To remove Banking and Insurance MMP and to
include “Financial Inclusion” as a new MMP
Responses on NeGP 2.0 (e-Kranti)
Sl. No. Department/ Ministry Comments / Suggestions
15 M/o Overseas Indian
Affairs
Supported
16 M/o RD and D/o LR Supported
17 M/o Home Affairs - Policy
Planning Division
No Comments
18 D/o Heavy Industries Supported
19 D/o AYUSH Supported
21 Lok Sabha Secretariat Supported and proposed new MMPs
22 M/o External Affairs Supported and proposed eGov initiatives
23 M/o Road Transport &
Highways
Supported and proposed eGov initiatives
24 M/o Labour &
Employment
Supported and proposed eGov initiatives
Responses on NeGP 2.0 (e-Kranti)
Sl. No. Department/ Ministry Comments / Suggestions
25 D/o Posts To defer inclusion of e-Posts MMP under “e-
Kranti”
26 D/o Food & Public
Distribution
No Comments
27 Planning Commission Service prioritization and Gap Analysis
28 M/o New and Renewable
Energy
Capacity Building on Cloud
29 D/o Economic Affairs Supported
30 D/o Pensions &
Pensioner’s welfare
Replication of NIC applications and System
Integrations
31 M/o Corporate Affairs To continue in MMP list, API interface through
NSDG
32 M/o Mines Proposed Mining Tenement System
33 M/o Power Supported
Responses on NeGP 2.0 (e-Kranti) Sl. No. State / UT Comments / Suggestions
1 Andhra Pradesh GIS, Risk Management, eGovernance Standards Institute
under NeGA
2 Uttar Pradesh NeGA to help build capacities
3 Meghalaya GIS
4 GNCTD Supported
5 J&K NISG mode of hiring to be promoted.
6 Puducherry Introduction of e-Governance course in textbooks
7 Bihar High Bandwidth, Solar Charging Option, Dedicated
Project Team (DPT)
8 Arunachal Pradesh Prioritized projects and DPT
9 Punjab Mandatory use of Core ICT Infra, DPT
10 Uttarakhand Prioritization of eGov Projects
11 Lakshadweep Cloud, Data Analytics
New MMPs
Sl. No. New MMPs Owner Department Key Components
1 e-Sansad Parliament of India,
Lok-Sabha Secretariat
Bills, Gazette notifications, Budget,
Parliamentary Questions database,
Parliamentary proceedings, Publications
2 e-Vidhaan Parliament of India,
Lok-Sabha Secretariat
as above for State Legislatures -
3 Financial Inclusion Financial Services Strengthening Banking & Insurance
services in the rural areas through
strategic use of ICT
4 Roads and
Highways
Information
System (RAHI)
M/o Road Transport &
Highways
Integrated citizen centric services
related to roads and highways
5 Agriculture 2.0 D/o Agriculture Sector specific services for Horticulture
and Fisheries, Governance & citizen-
centric services for Co-operatives and
Fertilizer testing labs
New MMPs
Sl. No. New MMPs Owner
Department
Key Components
6 NGIS M/o Earth Sciences Integrated GIS Platform
7 Rural Development D/o Rural
Development
A portfolio of rural development
services including NREGA
8 Social Benefits M/o Social Justice
and Empowerment
as the leader and
other welfare
departments as co-
owners
Online Benefit Schemes,
Integrated eServices for NGOs
9 Women and Child
Development
M/o Women and
Child Development
Integrated Child Development Scheme,
Integration with Health MMP
10 Common IT
Roadmap for Para
Military Forces
MHA
Way Forward
o DPR to be prepared incorporating major components like
New Portfolio of Projects
Mandating Transformation, BPR, Standards, Cloud by Default, Mobile First
and Standards
National e-Governance Academy
National Institute for e-Governance Standards
e-Governance Impact Index
NII 2.0
Fast-track approval procedures
o Preparation of Cabinet Note for approval of e-Kranti
Nagaland
Maharashtra
Kerala
Tamil
Nadu
J&K
HP
Rajasthan
Gujarat
CHH
Sikkim
Arunachal
Pradesh
PondicherryTN
WB
Bihar
JHD
Uttarakhand
UP
MP
Maharashtra
AP
Orissa
Assam
Manipur
Mizoram
Meghalaya
Tripura
SDC Implementation Status Across India
1 Dec’14
Goa
Daman & DiuDadra
Lakshadweep
SDC - Go Live
Delhi
2 Opted Out
Punjab
Haryana
Chandigarh
Andaman
1 Apr - May’14
23 SDC Operational
4 Feb-Mar‘15
4 Jul-Aug’15
BACK
SWAN: Implementation Status (March 2014)
BACK
BACK
CSCs: Implementation Status (as on 28-02-2014)
70%-100% (15)
50% - 70% (3)
Jammu Kashmir
Himachal Pradesh
Punjab
Haryana
Uttar Pradesh
Uttaranchal
Bihar
Gujarat
Maharashtra
Karnataka
KeralaTamilNadu
AndhraPradesh
Orissa
Chattisgarh
West Bengal
J&K
HP
Punjab
Haryana
Rajasthan
Gujarat
Karnataka
Kerala
CHH
Sikkim
Arunachal Pradesh
Puducherry
TN
WB
BiHJHD
Uttarakhand
UP
MP
Maharashtra
AP
Orissa
ASM NGLMNP
MGH
TRIPURA
10% - 50% (3)
≤ 10% (5)
Chandigarh
Goa
MZR
CSCs operational - 1,29,690
Daman and Diu
Dadra & Nagar Haveli
Lakshadweep
Andaman & Nicobar
Islands
Under Discussion (0)
Delhi
100% (9)
BACK