e/; izns’k e/; {ks= fo|qr forj.k daiuh fyfevsm vkwuykbu uohu lfozl dusd’ku

25
e/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

Upload: miles-horton

Post on 01-Jan-2016

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

e/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM

vkWuykbu uohu lfoZl dusD’ku

Page 2: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

Rejected

 

Accepted

 Required

 

Not Required

 

Office1

 

Office2

 

Office3

 

The application is rejected without assigning any reason and the user is unaware of the status.

 

Applicant needs to visit the office multiple times (roughly around 3 days is wasted).

 

Applicant

MPMKVVCL Office 

(New Service Connection) 

Document Issuing Office (Applicant Visits various offices to get documents which are required 

for new Connection) 

Bank(Applicant Visits bank for making 

DD ) Application Acceptance Status?

Infrastructure Required?

Who will prepare the estimate?

MPMKVVCL Metering Office

Applicant needs to submit documents and DD to Nodal Officer.

 

The applicant has to visit office multiple times to collect the information and know about application status.

 

The applicant has to visit multiple officers to know from where the estimate will be created?

 

Applicant has to visit this office multiple times to get the meter issued and then take the same to Nodal Officer at NSC Office.

 

Applicant gets to know about the documents which are required.

 

Existing NSC Process

Contd..

Page 3: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

Estimate Creator

MPMKVVCL Office

The applicant has to visit the office and the estimate creator multiple times to collect the estimate.

After collecting the estimate, the applicant decides whether he will do the work himself or get it done by MPMKVVCL.

MPMKVVCL Office (Supervisor)

Payment

Applicant decides to do the work himself and for this he needs to pay supervision charges and again visit MPMKVVCL office to find the supervisor.

MPMKVVCL Office

Electrical Inspectorate Office

Applicant Submits Work Completion Report to MPMKVVCL Office and Visits Electrical Inspectorate to get the Inspection Done.

Applicant now visits the metering office of MPMKVVCL to get the meter issued. For this also he has to visit the office multiple times and at each step the applicant has to get his work done all by himself after repetitive follow-up.

Existing NSC Process

Page 4: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

Application Submitted by Consumer

Nodal Officer Receives the Application

Verification Done by Nodal Officer

MPMKVVCL will create the estimate

New Invoice will be generated.

Work Completion Report.

Issue Work Order to STM

Notification to Meter Issuer

Will Enter Meter Details and Forwards the same to Nodal Officer for Meter Installation & Completing the connection.

Infrastructure Required?

Nodal Officer verifies  the details submitted by the applicant

Yes

Consumer will do by paying 5% supervision charges

Payment 

MPMKVVCL will do the work, after customer pays 100% of the amount

Consumer Uploads Work Completion Report

No

New NSC Process

Page 5: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

To Apply NSC Applicant will

open the www.mpcz.in

Page 6: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

JBT Transforms Akash Gupta

9907771622 [email protected]

34rwd

Page 7: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

Applicant will receive the Password

Page 8: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

To Login NSC Applicant will open the 

www.mpcz.inAnd go to the login page

[email protected] 

********

iv8z2

Page 9: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

To Apply NSC Applicant will Click

on the New Connection

Page 10: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku
Page 11: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

Fill the Basic Details

(Connection Details, Contact Details, Banking

Details)

Page 12: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

Plot No B-12

5000 sqft

Govind Pura

462023

e/;izns’k

Hkksiky

Page 13: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

Plot No B-12

Govind Pura

462023

e/;izns’k

Hkksiky

Hkksiky

Hkksiky

Page 14: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

JBT Transform

Akash Gupta

AG54682SP68

IND1358JH56

05/12/2014

04/12/2024

Page 15: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

HDFC Bank

Bhopal

M.P. Nagar

HDFC12358

35366898246

***********

Page 16: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

Land Details.pdf

Registration Detail.pdf

Test Report.pdf

Page 17: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

5000

10000

45015000

3750000

48775000

Page 18: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku
Page 19: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku
Page 20: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

JBT Transform

3061 8562 4567 3254

06 2022

348

Page 21: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku
Page 22: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

Options for Applicant

Circle Office, MPMKVVCL

100 % Deposit

5 % Supervisi

on Charges

MPMKVVCL Private Contractor

Division Office, MPMKVVCL

Approval of Work

Execution

Division issues work order will be issued to

applicant/EE(STC) against approved estimate.

OR

Applicant can view the Estimate

Applicant Online Pay the Amount using Payment

Gateway

Page 23: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

SMS ALERTS

Page 24: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

EMAIL ALERT

Page 25: E/; izns’k e/; {ks= fo|qr forj.k daiuh fyfeVsM vkWuykbu uohu lfoZl dusD’ku

Thank Youe/; izns’k e/; {ks= fo|qr forj.k

daiuh fyfeVsM