Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands 6/25/2013 JUNE 19, 2013 DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS

Upload: others

Post on 15-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

6/25/2013

JUNE 19, 2013

DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS

Page 2: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

STATUS OF PERMIT APPEALS

• Permit Appeals by DuPont & Passaic River Coalition - - February 2013 • Stay of the Permit Appeal Requires:

– August 26, 2013: Progress Status Report – October 25, 2013: EPA Response if Issues Unresolved

• Meetings with DuPont – Progress to Determine Scope of Sediment/Ecological Risk – Fieldwork to Resolve Appeal – Fieldwork Expected in July/August

• Meetings with Passaic River Coalition: Status Update

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

2

Page 3: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

STATUS OF BIOREMEDIATION PILOT

Activities Conducted – May 2013 • Soil Gas Probe/Water Level Loggers Installed in

Injection/Extraction Wells

• Start-up/Leak Testing to Ensure Functionality

• Electrical Work Required Repair

• Baseline Sampling Conducted

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

3

Page 4: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

STATUS OF BIOREMEDIATION PILOT

Activities – Week of June 10th

• EPA Site Visit to Observe System – June 6th • Pre-Pilot Initiation Test with Water to Injection Pumps

“Dosing” Correctly

• Bromide Injection to Verify Recirculation is Occurring

• Sodium Lactate Injection

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

4

Page 5: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

STATUS OF BIOREMEDIATION PILOT Pilot Study Performance Monitoring • Daily (First 2 Weeks)

– Monitoring Circulation of Lactate and Water Levels

• Bi-weekly (As of July 1st) – Sampling Extraction Well and Monitoring Well at Two

Depths

• Monthly (As of July 1st) – Additional Well Sampling at Multiple Depths/Soil Gas

Sampling

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

5

Page 6: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

EISB Pilot Study Extraction Well and Instrumentation (Chamber Interior)

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

6

Page 7: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

STATUS OF HORIZONTAL WELL FLUSHING

Design Plan for the Hydraulic Surcharging

• Establish Location of Piping

• Water Table Monitoring

• NJDEP Permit-By-Rule - Will be for Greater than 180 days - Outreach and Public Notice to be Determined

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

7

Page 8: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

RESULTS of MAY 16 TECHNICAL GROUNDWATER MEETING

• Technical Reps from EPA/CAGs/DuPont Attended and

the Consensus was that It Went Very Well

• General Agreement that Hydraulic Flushing of the Shallow Groundwater Zone Had Potential to be Very Effective

• Remedial Technologies to Address Contamination Causing Vapor Intrusion are Limited

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

8

Page 9: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

FOLLOW-UP TO MAY 16 TECHNICAL MEETING

• EPA to Review 2010 Report on Alternative GW

Remedial Technologies

• EPA to Perform Analysis to Determine Correlations Between VOC Concentrations in the Soil Gas and in GW

• EPA to Evaluate Potential to Employ Additional Technologies to Address Vapor Intrusion

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

9

Page 10: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

STATUS UPDATE – VAPOR INTRUSION PROGRAM

• Vapor Mitigation Systems Installed

– 247 (DuPont/O’Brien & Gere) – 56 (Third Party Contractor)

• Vapor Mitigation Systems “In Pipeline” For Installation – 3 (DuPont/O’Brien & Gere) – 26 (Third Party Contractor)

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

10

Page 11: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

FISH ADVISORY SIGNAGE

• Concerns Raised About Need for Additional Fish

Advisory Signage for Pompton Lake

• Local Officials Purchasing Additional Signage (7 in English/Spanish for Placement)

• Locations Include: Within Rotary Park/Ramp Area with Signs Facing Water/Lakeside Avenue Bridge

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

11

Page 12: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

RESULTS OF CLADDING TUNNEL INSPECTION

• Concerns Raised About Presence of Depleted Uranium

in Tunnel

• Department of Energy File Review Indicated No Depleted Uranium Was Ever Present on the DuPont Pompton Lakes Works Site

• EPA Radiological Specialist Inspection June 6th Revealed No Presence of Depleted Uranium

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

12

Page 13: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

13

• DOE Radiological Record Search: No Records Related to Depleted Uranium or Other Radiological Contaminants

• EPA Physical Inspection: All radiation

readings at entrance of the tunnel and inside tunnel were within the natural background level ranging from 6-16 uR/h

Review of Cladding Tunnel Inspection

Page 14: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

REVIEW OF AIR MONITORING/MODELING PROPOSAL

• Received Proposal for Air Monitoring/Modeling in

Pompton Lakes Vapor Mitigation Area

• Rationale for Proposal Indicated that NJDEP Modeling had Underestimated VOC Emissions

• EPA and NJDEP Reviewed the Proposal

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

14

Page 15: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

REVIEW OF AIR MONITORING/MODELING PROPOSAL FINDINGS:

• Modeling Previously Performed by NJDEP Followed EPA

Guidelines

• Contractor Model Run in “Rural” Mode, Limiting Nighttime Dispersion vs. Using Data from Newark Only Causes Minor Increase in VOC Concentrations

• VOC Emissions From the Air Stripper Is the Dominant Source

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

15

Page 16: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

REVIEW OF AIR MONITORING/MODELING PROPOSAL (continued) • Increasing the Contribution of VOC Emissions From Soil in the Modeling

Would Not Likely Cause Exceedance of a Health-Based Benchmark

• 600+ Ambient Air Samples From the Community Over 5-Years Support Conclusion that VOC Contributions from Soil are Low

• Sampling Transects in Neighborhood May Not Produce Results Indicative of Exposure to VOCs from the Subsurface Due to Other Potential VOC Sources in the Community

• If Valid Samples Could be Taken, Sampling Protocol Requires Extensive QA/QC Documentation to Meet Goals of the Community & Meet EPA Standards for Sampling and Analysis

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

16

Page 17: DuPont/Pompton Lakes Works Public Availability Sessions · DuPONT POMPTON LAKES WORKS PUBLIC AVAILABILITY SESSIONS . STATUS OF PERMIT APPEALS • Permit Appeals by DuPont & Passaic

QUESTIONS??????

6/25/2013

Region 2 serving the people of New Jersey, New York, Puerto Rico and the U.S. Virgin Islands

17