Page 1: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

DUBAI MUNICIPALITY SOLAR BEST PARCTICES

Page 2: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

His Highness Sheikh Mohammed bin Rashid Al Maktoum Vice President, Prime Minister of UAE and Ruler of Dubai

“We recognize that preserving our energy resources will be one of the greatest challenges in our drive towards sustainable development. This, however, will not materialize unless the different facets of our society adopt energy conservation principles in their core values. The future generations will be the chief beneficiary of our achievements and the best judge of what we accomplish in this field. ”

Page 3: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

• Dubai Integrated Energy Strategy

2030 (DIES) was deployed in 2011 to set the strategic direction of Dubai towards securing sustainable supply of energy and enhancing demand efficiency of water, power and fuel.

• Dubai Integrated Energy Strategy

2030 plan, aims to reduce energy demand by 30% by 2030 and diversify the energy mix with 61% from natural gas, 24% from nuclear and clean coal, and 15% from solar energy.

Page 4: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

• DUBAI MUNICIPALITY VISION

“ Creating an excellent city that provides the essence of success and comfort of sustainable living ”

• DUBAI MUNICIPALITY MISSION

“ Working to plan, design, build and manage the municipal infrastructure, facilities and services through the appropriate investment in our human and other resources maintaining the sustainable development ”

Page 5: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving energy consumption as part of Dubai’s plan for applying Green Building Regulation. As a first step Dubai Municipality applied solar lighting system in Dubai Neighbourhood Parks and Community Facilities in 2009. The decision to apply Green Building Regulation on entire government buildings and facilities in Dubai became compulsory in 2010. The first solar thermal application (solar water heating system) has been implemented in H.H. Sheikh Hamdan Bin Mohammed Bin Rashid Al-Matoum Sport Complex in 2010. Dubai Municipality applied off-grid PV systems in various projects (Al-Fahaidi Market, Al-Manara Center & Quran Park Green Building) as a part of Green Building Regulation in 2011.

Page 6: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

In 2013, DM issued a decree for the use of solar water heaters In 2014, DM enforced Green Building regulation on all projects in Dubai In 2015, DM implemented the first zero energy park in UAE and middle east. In 2015, DM announced that BIPV will be implemented in Dubai Frame and it will be the first integrated building in gulf area with solar technology.

Page 7: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

PV Technologies :

• There are two primary types of PV – Crystalline Silicon and Thin Film.

• Crystalline Silicon divided into two main technologies - Mono and Poly Crystalline

• Within Thin Film, there are currently five technologies that have either reached or are soon to reach commercialization :

1- Cadmium Telluride (CdTe), 2- Amorphous silicon (a-Si), 3- Copper Indium Gallium Selenide (CIGS), 4- Organic Photovoltaics (OPV), 5- Dye-Sensitized Solar Cells (DSSC).

• Gallium arsenide (GaAs) cells are also in production.

• Concentrated solar power systems (CSP highly efficient, but very expensive)

PV Connection Categories :

• On-grid PV systems

• Off-grid PV systems

Page 8: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

On-Grid Solar

Definition: These systems are solar pv systems that generate electrical power during the daytime to operate the connected loads and to export excess power to the grid if the plant is overproducing so it can utilized later.

Benefits: These are simplest systems and the most cost effective to install. The expected payback (ROI) of these systems offsetting utility bills is avg. 10 yrs.

Off-Grid Solar

Definition: These systems are solar pv systems that generate electrical power during the daytime to operate the connected loads and to export excess power to the batteries in order to be used during nighttime.

Benefits: Provides power for critical loads at remote areas in the absence of grid connection when they power grid is down. Payback can be 15-20 yrs.

Page 9: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

Advantages of Solar Power : • Cut your electricity bills. Sunlight is free, so once you've paid for the initial installation,

your electricity costs will be reduced. • Export electricity back to the grid. If your system is producing more electricity than you

need, you can export the surplus back to the grid through the Feed-in Tariff scheme. • PV panels provide clean – green energy. Eliminating the carbon foot print. During

electricity generation with PV panels there is no harmful greenhouse gas emissions thus solar PV is environmentally friendly.

• Solar energy can be made available almost anywhere there is sunlight • Solar energy is especially appropriate for smart energy networks with distributed

power generation – DPG is indeed the next generation power network structure!

Page 10: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

• Solar Panels cost is currently on a fast reducing track and is expected to continue reducing for the next years – consequently solar PV panels has indeed a highly promising future both for economical viability and environmental sustainability.

• Operating and maintenance costs for PV panels are considered to be low, almost

negligible, compared to costs of other renewable energy systems • PV panels have no mechanically moving parts, except in cases of –sun-tracking

mechanical bases; consequently they have far less breakages or require less maintenance than other renewable energy systems (e.g. wind turbines)

• PV panels are totally silent, producing no noise at all; consequently, they are a perfect

solution for urban areas and for residential applications (see solar panels for home)

Page 11: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

دبي بلديةمشاريع DUBAI MUNICIPALITY PROJECTS

Page 12: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

Completed PV Projects

TECHNOLOGY BIPV / Crystallyne Technologies

Solar Thermal (Water Heating)

DESCRIPTION Solar Lighting System

Mono / Poly Crystalline Modules

Flat Collectors Solar Heaters

PV CONNECTION Off-grid/On-grid PV Systems

PV CAPACITY 1314 KWp

ANNUAL PRODUCTION 2,637,855 KWH/Year

SWH E.SAVING 2,193,480 KWH/Year

TOTAL ANNUAL SAVINGS 1,835,900 AED

CO2 FT.PRT. 2,151,870 KG

EQUIVALENT TREES 53,790 TREE

Under Construction Projects

TECHNOLOGY BIPV / Crystallyne Technologies

Solar Thermal (Water Heating)

DESCRIPTION Solar Lighting System

Mono / Poly Crystalline Modules

Flat Collectors Solar Heaters

PV CONNECTION On-grid PV Systems

PV CAPACITY 1930 KWp

ANNUAL PRODUCTION 3,874,475 KWH/Year

SWH E.SAVING 2,502,360 KWH/Year

TOTAL ANNUAL SAVINGS 2,423,190 AED

CO2 FT.PRT. 2,840,240 KG

EQUIVALENT TREES 71,000 TREE

Page 13: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

مشاريع تخصصيةSPECIALIZED PROJECTS

Page 14: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

مجمع حمدان بن محمد بن راشد الرياضيSHEIKH HAMDAN BIN RASHID SPORT

COMPLEX TECHNOLOGY Crystallyne Technology

Solar Thermal (Water Heating)

DESCRIPTION Solar Lighting System

Poly Crystalline Modules

Flat Collectors Solar Heaters (18000 Ltrs)

PV CONNECTION Standalone System (Off-grid)

PV CAPACITY 40 KWp

PRODUCTION 80,300 KWH/Year

SWH E.SAVING 898,560 KWH/Year

TOTAL SAVINGS 370,000 AED

CO2 FT.PRT. 435,980 KG

EQUIVALENT TREES 10,900 TREE

Page 15: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

بروزا دبيDUBAI FRAME

TECHNOLOGY Thin-Film Technology

DESCRIPTION Building Integrated Photovoltaic System (BIPV)

CONNECTION On-grid System

CAPACITY 50 KWp

PRODUCTION 80,000 KWH/Year

SAVINGS 30,000 AED

CO2 FT.PRT. 35,350 KG

EQUIVALENT TREES 880 TREE

Page 16: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

سفاري دبيDUBAI SAFARI

TECHNOLOGY Crystalline Technology

DESCRIPTION CAR PARK MOUNTING STRUCTURE

Poly Crystalline Modules

PV CONNECTION On-grid System

Off-grid System

CAPACITY 850 KWp

PRODUCTION 1,698,000 KWH/Year

SAVINGS 645,000 AED

CO2 FT.PRT. 756,400 KG

EQUIVALENT TREES 18,900 TREE

Page 17: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

الفهيديسوق AL-FAHAIDI MARKET

TECHNOLOGY Crystalline Technology

DESCRIPTION Roof Top PV System

Poly Crystalline Modules

Flat Collectors Solar Heaters (8850 LTRS)

PV CONNECTION Off-grid System

PV CAPACITY 50 KWp

PRODUCTION 100,375 KWH/Year

SWH E.SAVING 734,400 KWH/Year

TOTAL SAVINGS 317,215 AED

CO2 FT.PRT. 371,800 KG

EQUIVALENT TREES 9,290 TREE

Page 18: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

حتا التراثي سوق ونزل HATTA HERITAGE SOUQ& MOTEL

TECHNOLOGY Crystallyne Technology

Solar Water Heating

DESCRIPTION Solar Lighting System

Poly Crystalline Modules

Flat Collectors Solar Heaters

(2000 LTRS)

PV CONNECTION Standalone System (Off-grid)

PV CAPACITY 30 KWp

PRODUCTION 60,200 KWH/Year

SWH E.SAVING 120,950 KWH/Year

TOTAL ANNUALSAVINGS 68,850 AED

CO2 FT.PRT. 80,700 KG

EQUIVALENT TREES 2,000 TREE

Page 19: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

راشد آل مكتوممحمد بن مكتبة الشيخ SHEIKH MOHAMMED BIN RASHID AL-

MAKLIBRARY

TECHNOLOGY Crystalline Technology

DESCRIPTION CAR PARK MOUNTING STRUCTURE

Poly Crystalline Modules

PV CONNECTION On-grid System

CAPACITY 500 KWp

PRODUCTION 1,003,750 KWH/Year

SAVINGS 381,425 AED

CO2 FT.PRT. 447,070 KG

EQUIVALENT TREES 11,175 TREE

Page 20: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

مركز دبي للأراضي الرطبةDUBAI WETAND CENTER

TECHNOLOGY Crystalline Technology

DESCRIPTION CAR PARK MOUNTING STRUCTURE

Poly Crystalline Modules

PV CONNECTION On-grid System

CAPACITY 1,000 KWp

PRODUCTION 2,007,500 KWH/Year

SAVINGS 762,850 AED

CO2 FT.PRT. 894,140 KG

EQUIVALENT TREES 22,350 TREE

الثريا مرصد ASTRONOMY CENTER

TECHNOLOGY Crystalline Technology

DESCRIPTION CAR PARK MOUNTING STRUCTURE

Poly Crystalline Modules

PV CONNECTION On-grid System

CAPACITY 50 KWp

PRODUCTION 100,375 KWH/Year

SAVINGS 38,140 AED

CO2 FT.PRT. 44,700 KG

EQUIVALENT TREES 1,115 TREE

Page 21: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

بحتا فلل 33 33 VILLAS AT HATTA

TECHNOLOGY Crystallyne Technology

Solar Thermal (Water Heating)

DESCRIPTION Solar Lighting System

Poly Crystalline Modules

Flat Collectors Solar Heaters (300 LTRS)

PV CONNECTION Standalone System (Off-grid)

PV CAPACITY 6 KWp

PRODUCTION 12,045 KWH/Year

SWH E.SAVING 320,760 KWH/Year

TOTAL SAVINGS 126,465 AED

CO2 FT.PRT. 148,230 KG

EQUIVALENT TREES 3,705 TREE

وبردبيسكن بديره 234مشروع بناء

234 VILLAS AT DEIRA & BURDUBAI

TECHNOLOGY Solar Thermal (Water Heating)

DESCRIPTION Flat Collectors Solar Heaters (300 LTRS)

SWH E.SAVING 2,274,480 KWH/Year

TOTAL SAVINGS 864,300 AED

CO2 FT.PRT. 1,013,050 KG

EQUIVALENT TREES 25,325 TREE

Page 22: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

فيلا بحتا 11 11 VILLAS AT HATTA

TECHNOLOGY Solar Thermal (Water Heating)

DESCRIPTION Flat Collectors Solar Heaters (300 LTRS)

SWH E.SAVING 106,920 KWH/Year

TOTAL SAVINGS 40,630 AED

CO2 FT.PRT. 47,620 KG

EQUIVALENT TREES 1,190 TREE

القوزبمنطقة فلل 10 10 VILLAS AT AL QUOZ

TECHNOLOGY Solar Thermal (Water Heating)

DESCRIPTION Flat Collectors Solar Heaters (300 LTRS)

PV CONNECTION Standalone System (Off-grid)

SWH E.SAVING 97,200 KWH/Year

TOTAL SAVINGS 36,935 AED

CO2 FT.PRT. 43,290 KG

EQUIVALENT TREES 1,080 TREE

Page 23: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

ومراكز البلدية مكاتب DM CENTERS & OFFICES

Page 24: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

بالليسيلي مكتب البلدية DM OFFICE AT AL LISAILY

TECHNOLOGY Crystallyne Technology

DESCRIPTION Roof Top PV System

Poly Crystalline Modules

CONNECTION On-grid System

CAPACITY 10 KWp

PRODUCTION 20,075 KWH/Year

SAVINGS 7,625 AED

CO2 FT.PRT. 8,940 KG

EQUIVALENT TREES 220 TREE

Page 25: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

بالقوز مكتب البلدية DM OFFICE AT AL QUOZ

TECHNOLOGY Crystallyne Technology

DESCRIPTION Roof Top PV System

Poly Crystalline Modules

CONNECTION On-grid System

CAPACITY 15 KWp

PRODUCTION 30,110 KWH/Year

SAVINGS 11,440 AED

CO2 FT.PRT. 13,410 KG

EQUIVALENT TREES 335 TREE

Page 26: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

مركز البلدية بالكفافDM CENTER AT AL-KIFAF

TECHNOLOGY Crystallyne Technology

DESCRIPTION Roof Top PV System

Poly Crystalline Modules

CONNECTION On-grid System

CAPACITY 15 KWp

PRODUCTION 30,110 KWH/Year

SAVINGS 11,440 AED

CO2 FT.PRT. 13,410 KG

EQUIVALENT TREES 335 TREE

Page 27: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

مركز البلدية بالمنارةAL-MANARA DM CENTER

TECHNOLOGY Crystallyne Technology

Solar Water Heating

DESCRIPTION Roof Top PV System

Poly Crystalline Modules

Flat Collectors Solar Heaters (300 LTRS)

PV CONNECTION Off-grid System

PV CAPACITY 30 KWp

PRODUCTION 60,225 KWH/Year

SWH E.SAVING 21,600 KWH/Year

CO2 FT.PRT. 36,445 KG

EQUIVALENT TREES 910 TREE

Page 28: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

مركز الطوار توسعة EXTENSION OF DM CENTER AT AL TAWAR

TECHNOLOGY Crystalline Technology

DESCRIPTION

Roof Top PV System

Poly Crystalline Modules

PV CONNECTION On-grid System

PV CAPACITY 20 KWp

PRODUCTION 40,150 KWH/Year

SWH E.SAVING 15,255 AED

CO2 FT.PRT. 17,880 KG

EQUIVALENT TREES 445 TREE

الشباالبلدية بند مكتب DM OFFICE AT NAD AL SHIBA SECOND

TECHNOLOGY Crystalline Technology

DESCRIPTION Roof Top PV System

Poly Crystalline Modules

PV CONNECTION On-grid System

PV CAPACITY 15 KWp

PRODUCTION 30,110 KWH/Year

SWH E.SAVING 11,440 AED

CO2 FT.PRT. 13,410 KG

EQUIVALENT TREES 335 TREE

Page 29: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

بالمحيصنةالبلدية مكتب DM OFFICE AT MUHAISNAH

TECHNOLOGY Crystalline Technology

DESCRIPTION

Roof Top PV System

Poly Crystalline Modules

PV CONNECTION On-grid System

PV CAPACITY 20 KWp

PRODUCTION 40,150 KWH/Year

SWH E.SAVING 15,255 AED

CO2 FT.PRT. 17,880 KG

EQUIVALENT TREES 445 TREE

Page 30: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

مشاريع حدائقPARKS PROJECTS

Page 31: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

الخزان إعادة تطوير حديقة AL KHAZZAN PARK

TECHNOLOGY Crystalline Technology

DESCRIPTION Ground Mounted PV System

Poly Crystalline Modules

PV CONNECTION Off-grid System

CAPACITY 52 KWp

PRODUCTION 104,390 KWH/Year

SAVINGS 39,665 AED

CO2 FT.PRT. 46,495 KG

EQUIVALENT TREES 1,160 TREE

Page 32: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

حديقة النخيلAL NAKHEEL PARK

TECHNOLOGY Crystalline Technology

DESCRIPTION Ground Mounted PV System

Poly Crystalline Modules

PV CONNECTION Off-grid System

CAPACITY 32 KWp

PRODUCTION 64,240 KWH/Year

SAVINGS 24,410 AED

CO2 FT.PRT. 28,610 KG

EQUIVALENT TREES 715 TREE

Page 33: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

القرآن المبنى البيئي حديقة QURAN PARK GREEN BUILDING

TECHNOLOGY Crystalline Technology

DESCRIPTION Ground Mounted PV System

Mono Crystalline Modules

PV CONNECTION Off-grid System

CAPACITY 18 KWp

PRODUCTION 36,135 KWH/Year

SAVINGS 13,730 AED

CO2 FT.PRT. 16,095 KG

EQUIVALENT TREES 400 TREE

القرآن حديقة QURAN PARK

TECHNOLOGY Crystalline Technology

DESCRIPTION Solar Lighting System

Poly Crystalline Modules

PV CONNECTION Standalone System (Off-grid)

CAPACITY 50 KWp

PRODUCTION 100,375 KWH/Year

SAVINGS 38,140 AED

CO2 FT.PRT. 44,705 KG

EQUIVALENT TREES 1,115 TREE

Page 34: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

ساحة شعبية في الورقاء الثالثةAL-WARQAA 3RD COMMUNITY

FACILITY TECHNOLOGY Crystalline Technology

DESCRIPTION Shade Mounting Structure PV System (Play Area)

Poly Crystalline Modules

PV CONNECTION On-grid System

CAPACITY 100 KWp

PRODUCTION 200,750 KWH/Year

SAVINGS 76,285 AED

CO2 FT.PRT. 89,410 KG

EQUIVALENT TREES 2,235 TREE

الثانية بالمحيصنةحديقة حي AL- MUHAISNAH SECOND PARK

TECHNOLOGY Crystalline Technology

DESCRIPTION Ground Mounted PV System

Poly Crystalline Modules

PV CONNECTION On-grid System

CAPACITY 25 KWp

PRODUCTION 50,180 KWH/Year

SAVINGS 19,070 AED

CO2 FT.PRT. 22,350 KG

EQUIVALENT TREES 555 TREE

Page 35: DUBAI MUNICIPALITY SOLAR BEST PARCTICES · 2015. 11. 5. · Dubai municipality has started the implementation of solar energy systems in its activities and projects aiming at saving

الأولى الخوانيجحديقة بحيرة في AL KHAWANEEJ POND PARK

TECHNOLOGY Crystalline Technology

DESCRIPTION Ground Mounted PV System

Poly Crystalline Modules

PV CONNECTION On-grid System

CAPACITY 260 KWp

PRODUCTION 521,950 KWH/Year

SAVINGS 198,340 AED

CO2 FT.PRT. 232,475 KG

EQUIVALENT TREES 5,810 TREE

حديقة حي المزهر الثانية AL MEZHAR SECON

TECHNOLOGY Crystalline Technology

DESCRIPTION Ground Mounted PV System

Poly Crystalline Modules

PV CONNECTION On-grid System

CAPACITY 40 KWp

PRODUCTION 80,300 KWH/Year

SAVINGS 30,510 AED

CO2 FT.PRT. 35,765 KG

EQUIVALENT TREES 890 TREE